Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans - Inspection Report 05000483/2017008
ML17277A053
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/03/2017
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-A
To: Diya F
Ameren Missouri
Taylor N
References
EA-12-049, EA-12-051 IR 2017008
Download: ML17277A053 (15)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 October 3, 2017 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant P.O. Box 620 Fulton, MO 65251 SUBJECT: CALLAWAY PLANT

- INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND SPENT FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY PREPAREDNESS COMMUNICATION/ STAFFING/MULTI-UNIT DOSE ASSESSMENT PLANS

- INSPECTION REPORT 05000483/2017008

Dear Mr. Diya:

On September 1 , 201 7, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of an inspection at the Callaway Plant. On September 26, 2017 , the NRC inspectors discussed the results of this inspection with Ms. S. Banker, Senior Director, Engineering, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and emergency preparedness communication s , staffing, and multi-unit/source dose assessment plans; your compliance with the Commission's rules and regulations; and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

The NRC inspectors did not identify any findings or violations of more than minor significance associated with this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA David Proulx Acting for/

Nicholas H. Taylor

, Chief Project Branch B Division of Reactor Projects Docket No. 50-483 License No. NPF-30

Enclosure:

Inspection Report 05000 483/20170 08 w/ Attachment: Supplemental Information

REGION IV Docket: 050004 83 License: NPF-30 Report: 05000483/2017008 Licensee: Union Electric Company Facility: Callaway Plant Location: Junction Highway CC and Highway O Steedman, Missouri Dates: August 28

- September 26, 2017 Inspectors:

R. Alexander, Sr. Project Engineer (Team Leader)

S. Alferink, Reactor Inspector D. Bradley, Sr. Resident Inspector

- Callaway M. Stafford, Project Engineer Approved By: Nicholas H. Taylor Chief, Project Branch B Division of Reactor Projects

2

SUMMARY

IR 05000483/2017008

08/28/2017 - 09/26/2017; Callaway Plant
Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans

, issued December 23, 2015.

The inspection covered a one-week inspection by the resident inspector and three inspectors from the Region IV office. No findings were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG

-1649, "Reactor Oversight Process," Revision 5.

A. NRC-Identified and Self-Revealing Findings

None

B. Licensee-Identified Violations

None 3

REPORT DETAILS

4. Other Activities

4OA5 Other Activities

(TI 2515/191)

The objective of Temporary Instruction (TI) 2515/191 "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans

," is to verify that licensees have adequately implemented the mitigation strategies as described in the licensee's Final Integrated Plan (ADAMS Accession No

. ML16189A304

) and the NRC's plant safety evaluation (ADAMS Accession No. ML17010A332) and to verify that the licensees installed reliable water level measurement instrumentation in their spent fuel pools. The purpose of this TI is also to verify the licensees have implemented Emergency Preparedness (EP) enhancements as described in their site

-specific submittals and NRC safety assessments, including multi

-unit dose assessment capability and enhancements to ensure that staffing is sufficient and communications can be maintained during such an event.

The inspection verified that plans for complying with NRC Orders EA 049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

," (ADAMS Accession No. ML12229A174) and EA 051, "Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation

," (ADAMS Accession No. ML12056A044) are in place and are being implemented by the licensee. Additionally, the inspection verified implementation of staffing and communications information provided in response to the March 12, 2012

, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, "Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned," dated March 27, 2013 (ADAMS Accession No. ML12339A262).

The team discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify that the strategies could be implemented as stated in the licensee's submittals and the NRC staff

-prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged. Specific details of the team's inspection activities are described in the following sections.

1. Mitigation Strategies for Beyond

-Design-Basis External Events

a. Inspection Scope

The team examined the licensee's established guidelines and implementing procedures for the beyond

-design-basis mitigation strategies. The team assessed how the licensee coordinated and documented the interface/transitio n between existing off

-normal and emergency operating procedures with the newly developed mitigation strategies. The team selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures

, familiarity of operators with the procedure objectives 4 and specific guidance, staging and compatibility of equipment

, and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios.

The team verified that a preventive maintenance program had been established for the FLEX portable equipment and that periodic equipment inventories were in place and being conducted. Additionally, the team examined the introductory and planned periodic/refresher training provided to the Operations and Security staffs most likely to be tasked with implementation of the FLEX mitigation strategies. The team also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel.

b. Assessment Based on samples selected for review, the team verified that the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittals and the associated safety evaluation and determined that the licensee is generally in compliance with NRC Order EA 049. The team verified that the licensee satisfactorily:

Developed and issued FLEX Support Guidelines (FSGs) to implement the FLEX strategies for postulated external events

, Integrated their FSGs into their existing plant procedures such that entry into and departure from the FSGs are clear when using existing plant procedures

, Protected FLEX equipment from site

-specific hazards

, Developed and implemented adequate testing and maintenance of FLEX equipment to ensure their availability and capability

, Trained their staff to assure personnel proficiency in the mitigation of beyond-design-basis events

, and Developed means to ensure that the necessary off

-site FLEX equipment will be available from off

-site locations

. The team verified that any non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program.

c. Findings

No findings identified.

5 2. Spent Fuel Pool (SFP) Instrumentation

a. Inspection Scope

The team examined the licensee's newly installed spent fuel pool instrumentation. Specifically, the team verified the sensors were installed as described in the plant specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel are physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment.

b. Assessment Based on samples selected for review, the team determined that the licensee satisfactorily installed and established control of the SFP instrumentation as described in the plant specific submittals and the associated safety evaluation and determined that the licensee is generally in compliance with NRC Order EA 051. The team verified that the licensee satisfactorily:

Installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittal and safety evaluation

Installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittals; and Trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation.

The team verified that any non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program.

c. Findings

No findings identified.

3. Staffing and Communication Request for Information

a. Inspection Scope

Through discussions with plant staff, review of documentation and plant walk downs, the team verified that the licensee has implemented required changes to staffing, communications equipment

, and facilities to support an Extended Loss of All AC Power (ELAP) scenario as described in the licensee's staffing assessment and the NRC safety assessment. The team also verified that the licensee has implemented dose assessment (including releases from spent fuel pools) capability using the licensee's site-specific dose assessment software and approach as described in the licensee's dose assessment submittal. Documents reviewed are listed in the attachment.

6 b. Assessment The team reviewed information provided in the licensee's multi

-unit dose submittal and in response to the NRC's March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near

-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that results in an extended loss of all ac power to the site and impedes access to the site.

The team verified the following:

Licensee satisfactorily implemented required staffing change(s) to support an ELAP scenario , Emergency preparedness communications equipment and facilities are sufficient for dealing with an ELAP scenario

, and Implemented dose assessment capabilities (including releases from spent fuel pools) using the licensee's site

-specific dose assessment software and approach.

The team verified that any non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program.

c. Findings

No findings identified.

4OA6 Exit Exit Meeting Summary

On September 1, 2017, the team presented the on-site inspection results in a management debrief to T. Herrmann, Site Vice President

, and other members of the site staff. The inspectors confirmed that proprietary information examined during the inspection had been returned to the licensee. The team lead completed an exit meeting conducted with S. Banker, Senior Director, Engineering

, a nd other members of the site staff, via telephone on September 26, 2017 , to discuss the final results of the inspection.

ATTACHMENT: SUPPLEMENTA L INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

S. Abel, Director, Engineering Projects
A. Alley, Engineering Program Supervisor
S. Banker, Senior Director Engineering
F. Bianco, Director, Nuclear Operations
J. Cortez, Director, Training
M. Covey, Manager, Operations
B. Cox, Senior Director Nuclear Operations
D. Farnsworth, Director, Work Management
T. Herrmann, Site Vice President
T. Holland, Shift Manager
B. Huhmann, Regulatory Affairs Supervisor
B. Jungmann, Director, Maintenance
S. Kovaleski, Director, Engineering Design
G. Kremer, Director, Engineering Programs
M. McLachlan, Senior Director Plant Support
K. Mills, Director, Engineering Systems
T. Moser, Director, Nuclear Projects
J. Nurrenbern, FLEX Program Enginee

r

E. Olson, Director, Engineering Programs
J. Patterson, Director, Nuclear Projects
E. Ptasznik, Licensing Engineer
S. Sandbothe, Director , Plant Support
D. Stepanovic, Manager, Materials

NRC Personnel

S. Janicki, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Closed 2515/191 TI Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans

, issued December 23, 2015

LIST OF DOCUMENTS REVIEWED