ML082460243

From kanterella
Revision as of 08:34, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
09/02/08 - Dresden - Mid-Cycle Performance Review and Inspection Plan
ML082460243
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/02/2008
From: Ring M
NRC/RGN-III/DRP/B1
To: Pardee C
Exelon Generation Co
References
FOIA/PA-2010-0209
Download: ML082460243 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008

Mr. Charles G. Pardee

Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC

4300 Winfield Road Warrenville IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DRESDEN NUCLEAR POWER STATION

Dear Mr. Pardee:

On August 14, 2008, the NRC staff completed its performance review of the Dresden Nuclear Power Station for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only -Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for both Dresden Units 2 and 3 during the assessment period was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections of Units 2 and 3.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Additional inspections scheduled include: engineering modifications/50.59, license renewal, independent spent fuel storage installation, and initial license examination. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle

review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public C. Pardee

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/

Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects

Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan

DISTRIBUTION:

See next page Letter to C. Pardee from M. Ring dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DRESDEN NUCLEAR POWER STATION

cc w/encl: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood G. Mortensen, INPO C. Pardee

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects

Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\1-SECY\2008 MID-CYCLE FINAL LETTERS\DRESDEN MOC LETTER 2008.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME MRing:cms

DATE 8/27/08 OFFICIAL RECORD COPY Letter to C. Pardee from M. Ring dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DRESDEN NUCLEAR POWER STATION

DISTRIBUTION

Tamara Bloomer

RidsNrrDorlLpl3-2

RidsNrrPMDresden Resource RidsNrrDirslpab Resource James Caldwell

Mark Satorius

Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov

Dresden Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2008 Report 22 2 TI-TEMPORARY INSTRUCTION 2515/171 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 2 2515/171 IP 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 11/03/2008 11/21/2008 3 7111108G IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 11/10/2008 11/14/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 11/10/2008 11/14/2008 2 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 11/10/2008 11/14/2008 2 71151-OR01 IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 02/09/2009 02/13/2009 2 7112202 IP 3 FY 2009-DRESDEN INIT PREP FEB/2009 Not Applicable OL - INITIAL EXAM - MARCH 2009 - DRES 02/16/2009 02/20/2009 2 W90196 1 ISFSI-ISFSI - ROUTINE LOADING Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 03/01/2009 06/30/2009 2, 3 60855.1 IP 1 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspection Exercise Evaluation 03/23/2009 03/27/2009 2 7111401 IP Baseline Inspections Drill/Exercise Performance 03/23/2009 03/27/2009 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 03/23/2009 03/27/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 03/23/2009 03/27/2009 2 71151-EP03 IP 3 OL EXAM-DRESDEN INITIAL LICENSE EXAMINATION Not Applicable OL - INITIAL EXAM - MARCH 2009 - DRES 03/09/2009 03/20/2009 2 W90196 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 04/27/2009 05/01/2009 2 7112101 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/27/2009 05/01/2009 2 7112201 IP Baseline Inspections Reactor Coolant System Activity 04/27/2009 05/01/2009 2 71151-BI01 IP 3 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.

Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 05/18/2009 06/05/2009 2 7111117B IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Generic Safety Inspecti o Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 08/04/2009 08/14/2009 2 2515/173 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/04/2009 08/14/2009 2 7112201 IP Baseline Inspections RETS/ODCM Radiological Effluent 08/04/2009 08/14/2009 2 71151-PR01 IP 5 RENEWAL-POST-LICENSE RENEWAL INSPECTION License Renewal Inspe c Post-Approval Site Inspection for License Renewal 10/05/2009 10/23/2009 2 71003 IP 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 11/09/2009 11/13/2009 2 7111108G IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Dresden Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2008 Report 22 2 RENEWAL-POST LIC RENEWAL INSPECTION License Renewal Inspe c Post-Approval Site Inspection for License Renewal 11/09/2009 11/20/2009 2 71003 IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 11/16/2009 11/20/2009 2 7112101 IP Baseline Inspections A LARA Planning and Controls 11/16/2009 11/20/2009 2 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 11/16/2009 11/20/2009 2 71151-OR01 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.