Request for Information for an NRC Pilot Design Bases Inspection on the Implementation of the Environmental Qualification Program Inspection Report 05000237/2016009; 05000249/2016009
ML16070A110
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/09/2016
From: Dunlop A
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co
References
IR 2016009
Download: ML16070A110 (7)


See also: IR 05000237/2016009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

March 9, 2016

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - REQUEST FOR

INFORMATION FOR AN NRC PILOT DESIGN BASES INSPECTION ON THE

IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM

INSPECTION REPORT 05000237/2016009; 05000249/2016009

Dear Mr. Hanson:

On June 27, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin the pilot program

portion of the triennial baseline Design Bases Inspection at Dresden Nuclear Power Station,

Units 2 and 3. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21N.

The inspection will focus on the implementation of the Environmental Qualification (EQ)

Program. The EQ components to be reviewed during this baseline inspection will be identified

during the in-office preparation week that occurs prior to the onsite inspection week.

The inspection will include a bagman trip to support selection of components and one week

of onsite inspection. The inspection team will consist of three NRC inspectors. The current

inspection schedule is as follows:

Bagman trip onsite week:

May 17 - 18, 2016

Inspection onsite week:

June 27, 2016, through July 1, 2016

The team will be preparing for the inspection, mainly during the week of June 20-24, 2016, as

discussed in the enclosure.

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

B. Hanson

-2-

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than April 5, 2016.

Prior to the bagman trip on April 15, 2016, the lead inspector will communicate the

initial selected set of approximately 12 - 15 EQ components.

The second group of documents requested is those items needed to support the

bagman trip. This set of documents should be available to the lead inspector onsite

on May 17, 2016.

The third group of documents requested is those items needed to support our

in-office preparation activities for the selected set of 6 - 9 EQ components. This

set of documents should be provided to the lead inspector at the Regional Office

no later than June 15, 2016. During the in-office preparation activities, the team

may identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

June 27, 2016. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the lead inspector as the documents

are generated.

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing

contact for this inspection is Mr. Dean Walker of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at (630) 829-9726 or via e-mail at Andrew.Dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

Information Request for Design Bases Inspection

cc: Distribution via LISTSERV

REQUEST FOR INFORMATION - DESIGN BASES INSPECTION

Enclosure

Inspection Report: 05000237/2016009; 05000249/2016009

Bagman Dates:

May 17 - 18, 2016

Inspection Dates:

June 27, 2016, through July 1, 2016

Inspection Procedure:

IP 71111.21N, Design Bases Inspection

Lead Inspector:

Andrew Dunlop, Senior Reactor Engineer, DRS

(630) 829-9726

Andrew.Dunlop@nrc.gov

I.

Information Requested Prior to the Onsite Information Gathering/Bagman Week

The following information is requested by April 5, 2016, or sooner, to facilitate inspection

preparation. If you have any questions regarding this information, please call the team

leader as soon as possible. (Please provide the information electronically in pdf files,

Excel, or other searchable formats, preferably on some portable electronic media

(e.g., CD-ROM, DVD, etc.). The portable electronic media should contain descriptive

names, and be indexed and hyperlinked to facilitate ease of use. Information in lists

should contain enough information to be easily understood by someone who has

knowledge of light water reactor technology).

1. Risk-ranking of top 250 components required to meet Environmental Qualifications

(EQs) from your site specific probabilistic safety analysis sorted by Fussell Vesely

Importance.

2. Probabilistic Safety Analysis listing of top ten risk significant systems.

3. NRC Safety Evaluation Report(s) associated with EQ.

4. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,

and Technical Specifications Bases. Specifically identify which Updated Final Safety

Analysis Report sections address EQ (including seismic).

5. Identify the various EQ standards (including year, edition, or revision) that the station

is committed to.

6. Copy of EQ Design Basis Document, if applicable.

7. Copy of any open licensing commitments related to EQ, if applicable.

8. Equipment Qualification Master List. Specific issues to be identified include:

safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97

instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after

implementation of 50.49, and plant location.

REQUEST FOR INFORMATION - DESIGN BASES INSPECTION

2

9. List of any installed equipment removed from the Equipment Qualification Master

List and basis for removal.

10. If EQ files were reviewed for Aging Management effects of license renewal, identify

which EQ files were modified/changed to incorporate appropriate actions for the

period of extended operation. Copies of any EQ Aging Management Programs.

11. List or drawings of plant areas that are subjected to EQ, identifying design (limiting)

temperature, both normal and accident, high energy line break, radiation levels,

etc. that the associated equipment will have to be qualified to meet EQ. If unit

has obtained a power uprate (greater than 5 percent) provide same information

pre-update (earliest available if multiple uprates).

12. Site (and corporate if applicable) procedures associated with the Title 10, Code of

Federal Regulations, Part 50.49 EQ Program for electrical components. Include

procedures for procurement of qualified equipment, maintenance of qualified

equipment, modification to qualified equipment (including Equivalency or Commercial

Grade Dedication (CGD) Programs), and material storage and shelf life controls.

13. List of CGD evaluations performed, for which the dedicated parts have been issued

for installation (parts issued for the last 10 years) on EQ applications in the plant.

Include CGD evaluation number, name of part, component ID or description of the

component the part was issued to repair, work order, and date issued or installed.

14. List of Corrective Action Documents related to the EQ Program or EQ of specific

components for the last 5 years.

15. Current management and engineering organizational chart.

II.

Information Requested (for the approximate 12 - 15 selected components) to be

Available by the Bagman Trip on May 17, 2016.

1. EQ Summary Report for each component/subcomponent.

2. Qualification Maintenance Requirement Sheet or equivalent.

3. List of corrective action documents associated with each of the selected

components for the last 5 years.

4. Photos of any component in containment or high-radiation areas, if available.

III.

Information Requested (for the approximate 6 - 9 selected components) to be

Available by June 15, 2016, (will be reviewed by the team in the Regional office

during the week of June 20, 2016).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes EQ files,

Qualification Test Reports, calculations, corrective action documents, maintenance

history, etc.).

1. EQ file, including associated Qualification Test Reports.

2. Vendor manual (electronic copy or availability of hard copy during inspection).

REQUEST FOR INFORMATION - DESIGN BASES INSPECTION

3

3. Preventive maintenance template.

4. Last performed work order (WO) for each associated EQ preventive maintenance.

5. List of corrective maintenance WOs for the last 10 years. Include WO number,

date performed, and brief one line description.

6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide

copy of the purchase order.

7. Thermal life calculation.

8. Any self-assessments of the EQ Program in the last 3 years.

IV.

Additional Information to be Provided on June 27, 2016, Onsite

1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide a

list of the additional information needed during the week of June 20 - 24, 2016.

V.

Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

If you have questions regarding the information requested, please contact the lead inspector.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

Information Request for Design Bases Inspection

cc: Distribution via LISTSERV

DISTRIBUTION:

Kimyata MorganButler

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML16070A110

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

ADunlop:cl

DATE

03/09/16

OFFICIAL RECORD COPY