UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
March 9, 2016
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - REQUEST FOR
INFORMATION FOR AN NRC PILOT DESIGN BASES INSPECTION ON THE
IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM
INSPECTION REPORT 05000237/2016009; 05000249/2016009
Dear Mr. Hanson:
On June 27, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin the pilot program
portion of the triennial baseline Design Bases Inspection at Dresden Nuclear Power Station,
Units 2 and 3. This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21N.
The inspection will focus on the implementation of the Environmental Qualification (EQ)
Program. The EQ components to be reviewed during this baseline inspection will be identified
during the in-office preparation week that occurs prior to the onsite inspection week.
The inspection will include a bagman trip to support selection of components and one week
of onsite inspection. The inspection team will consist of three NRC inspectors. The current
inspection schedule is as follows:
Bagman trip onsite week:
May 17 - 18, 2016
Inspection onsite week:
June 27, 2016, through July 1, 2016
The team will be preparing for the inspection, mainly during the week of June 20-24, 2016, as
discussed in the enclosure.
Experience with previous baseline design inspections of similar depth and length has shown
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
B. Hanson
-2-
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into four groups:
The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than April 5, 2016.
Prior to the bagman trip on April 15, 2016, the lead inspector will communicate the
initial selected set of approximately 12 - 15 EQ components.
The second group of documents requested is those items needed to support the
bagman trip. This set of documents should be available to the lead inspector onsite
on May 17, 2016.
The third group of documents requested is those items needed to support our
in-office preparation activities for the selected set of 6 - 9 EQ components. This
set of documents should be provided to the lead inspector at the Regional Office
no later than June 15, 2016. During the in-office preparation activities, the team
may identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant specific
reference material. This information should be available to the team onsite on
June 27, 2016. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the lead inspector as the documents
are generated.
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
contact for this inspection is Mr. Dean Walker of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630) 829-9726 or via e-mail at Andrew.Dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
B. Hanson
-3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Andrew Dunlop, Senior Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-237; 50-249
Enclosure:
Information Request for Design Bases Inspection
cc: Distribution via LISTSERV
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
Enclosure
Inspection Report: 05000237/2016009; 05000249/2016009
Bagman Dates:
May 17 - 18, 2016
Inspection Dates:
June 27, 2016, through July 1, 2016
Inspection Procedure:
IP 71111.21N, Design Bases Inspection
Lead Inspector:
Andrew Dunlop, Senior Reactor Engineer, DRS
(630) 829-9726
Andrew.Dunlop@nrc.gov
I.
Information Requested Prior to the Onsite Information Gathering/Bagman Week
The following information is requested by April 5, 2016, or sooner, to facilitate inspection
preparation. If you have any questions regarding this information, please call the team
leader as soon as possible. (Please provide the information electronically in pdf files,
Excel, or other searchable formats, preferably on some portable electronic media
(e.g., CD-ROM, DVD, etc.). The portable electronic media should contain descriptive
names, and be indexed and hyperlinked to facilitate ease of use. Information in lists
should contain enough information to be easily understood by someone who has
knowledge of light water reactor technology).
1. Risk-ranking of top 250 components required to meet Environmental Qualifications
(EQs) from your site specific probabilistic safety analysis sorted by Fussell Vesely
Importance.
2. Probabilistic Safety Analysis listing of top ten risk significant systems.
3. NRC Safety Evaluation Report(s) associated with EQ.
4. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
and Technical Specifications Bases. Specifically identify which Updated Final Safety
Analysis Report sections address EQ (including seismic).
5. Identify the various EQ standards (including year, edition, or revision) that the station
is committed to.
6. Copy of EQ Design Basis Document, if applicable.
7. Copy of any open licensing commitments related to EQ, if applicable.
8. Equipment Qualification Master List. Specific issues to be identified include:
safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97
instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after
implementation of 50.49, and plant location.
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
2
9. List of any installed equipment removed from the Equipment Qualification Master
List and basis for removal.
10. If EQ files were reviewed for Aging Management effects of license renewal, identify
which EQ files were modified/changed to incorporate appropriate actions for the
period of extended operation. Copies of any EQ Aging Management Programs.
11. List or drawings of plant areas that are subjected to EQ, identifying design (limiting)
temperature, both normal and accident, high energy line break, radiation levels,
etc. that the associated equipment will have to be qualified to meet EQ. If unit
has obtained a power uprate (greater than 5 percent) provide same information
pre-update (earliest available if multiple uprates).
12. Site (and corporate if applicable) procedures associated with the Title 10, Code of
Federal Regulations, Part 50.49 EQ Program for electrical components. Include
procedures for procurement of qualified equipment, maintenance of qualified
equipment, modification to qualified equipment (including Equivalency or Commercial
Grade Dedication (CGD) Programs), and material storage and shelf life controls.
13. List of CGD evaluations performed, for which the dedicated parts have been issued
for installation (parts issued for the last 10 years) on EQ applications in the plant.
Include CGD evaluation number, name of part, component ID or description of the
component the part was issued to repair, work order, and date issued or installed.
14. List of Corrective Action Documents related to the EQ Program or EQ of specific
components for the last 5 years.
15. Current management and engineering organizational chart.
II.
Information Requested (for the approximate 12 - 15 selected components) to be
Available by the Bagman Trip on May 17, 2016.
1. EQ Summary Report for each component/subcomponent.
2. Qualification Maintenance Requirement Sheet or equivalent.
3. List of corrective action documents associated with each of the selected
components for the last 5 years.
4. Photos of any component in containment or high-radiation areas, if available.
III.
Information Requested (for the approximate 6 - 9 selected components) to be
Available by June 15, 2016, (will be reviewed by the team in the Regional office
during the week of June 20, 2016).
This information should be separated for each selected component, especially if
provided electronically (e.g., folder with component name that includes EQ files,
Qualification Test Reports, calculations, corrective action documents, maintenance
history, etc.).
1. EQ file, including associated Qualification Test Reports.
2. Vendor manual (electronic copy or availability of hard copy during inspection).
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
3
3. Preventive maintenance template.
4. Last performed work order (WO) for each associated EQ preventive maintenance.
5. List of corrective maintenance WOs for the last 10 years. Include WO number,
date performed, and brief one line description.
6. If repair work (e.g., a motor rewind) was performed under a purchase order, provide
copy of the purchase order.
7. Thermal life calculation.
8. Any self-assessments of the EQ Program in the last 3 years.
IV.
Additional Information to be Provided on June 27, 2016, Onsite
1. During the in-office preparation activities, the team may identify additional
information needed to support the inspection. The lead inspector will provide a
list of the additional information needed during the week of June 20 - 24, 2016.
V.
Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
If you have questions regarding the information requested, please contact the lead inspector.
B. Hanson
-3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Andrew Dunlop, Senior Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-237; 50-249
Enclosure:
Information Request for Design Bases Inspection
cc: Distribution via LISTSERV
DISTRIBUTION:
Kimyata MorganButler
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML16070A110
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive