Ltr 11/4/13 Dresden, Unit 2 and 3, Notification to Perform an Inspection of Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestone 1-7 and Request for Information IR 05000237-14-405; 05000249-144-40
ML13308B232
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/04/2013
From: Robert Daley
Engineering Branch 3
To: Pacilio M
Exelon Generation Co
Stuart Sheldon
References
IR-14-405
Download: ML13308B232 (9)


See also: IR 05000237/2014405

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

November 4, 2013

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NOTIFICATION TO

PERFORM AN INSPECTION OF TEMPORARY INSTRUCTION 2201/004,

INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY

MILESTONES 1 - 7 AND REQUEST FOR INFORMATION INSPECTION

REPORT NUMBER 05000237/2014405; 05000249/2014405

Dear Mr. Pacilio:

On February 10, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection

of Temporary Instruction (TI) 2201/004 at your Dresden Nuclear Power Station, Units 2 and 3.

The TI inspection will be performed to evaluate and verify your ability to meet the interim

milestone requirements of the NRCs Cyber Security Rule, Title 10, Code of Federal

Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication

Systems and Networks.

In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit a

proposed cyber security plan (CSP) and implementation schedule for NRC approval. On

December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute (NEI), the NRC

provided their expectations for the proposed implementation schedule. On January 5, 2011, by

letter (ML110060093) to the NRC, NEI issued an initial Template for the Cyber Security Plan

Implementation Schedule (ML110060097). On February 28, 2011, by letter (ML110600206) to

the NRC, NEI provided a revised, Template for the Cyber Security Plan Implementation

Schedule. The purpose of the letters attachment was to provide the licensee with a generically

written template to develop their proposed CSP implementation schedule. Utilization of the

generic template required the licensee to make conforming changes to ensure the submitted

schedule accurately accounted for site-specific activities. Based on an NRC technical review

(ML110070348), the template was found acceptable to develop the licensees CSP

implementation schedule (i.e., Milestones 1 through 8). On March 31, 2011, by letter

(ML110940225) to the NRC, Exelon provided a revised CSP and implementation schedule that

accounted for the site-specific activities. On August 10, 2011, by letter (ML111861341), the

NRC issued an amendment that approved the Dresden Nuclear Power Station CSP and

associated implementation schedule. In addition, the amendment revised the existing facility

operating license condition regarding physical protection to require the station to fully implement

and maintain in effect all provisions of the NRC-approved CSP.

M. Pacilio -2-

The subject TI inspection provides a programmatic level review and verification of the licensees

site-specific implementation of Interim Milestones 1 through 7. The schedule for the onsite TI

Inspection for the Interim Milestones 1 through 7 is as follows:

  • Information Gathering Visit: January 27 - 31, 2014; and

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with your cyber security program and

plant layout; and (3) arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure that the inspectors are adequately prepared. These documents have been

divided into four groups. The first group lists information necessary to aid the inspectors in

planning for the TI inspection. It is requested that this information be provided to the lead

inspector via mail or electronically no later than January 13, 2014. The second group also lists

information and possible areas for discussion necessary to assist the inspectors during the TI

inspection. It is requested this information be available during the information gathering visit

(January 27, 2014). The third group of requested documents consists of those items that the

inspectors will review, or need access to, during the TI inspection. Please have this information

available by the first day of the onsite inspection week (February 10, 2014). The fourth group

lists the information necessary to aid the inspectors in tracking questions and answers identified

as a result of the TI inspection. It is requested that this information be provided to the lead

inspector as the information is generated during the TI inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the TI inspection.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our

regulatory contact for this inspection is Mr. Dean Walker of your organization. If there are any

questions about the TI inspection or the material requested, please contact the lead inspector at

(630) 829-9727 or via e-mail at stuart.sheldon@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

M. Pacilio -3-

In accordance with Title 10, Code of Federal Regulations (CFR), Part 50, Section 2.390 of the

NRC's "Rules of Practice," a copy of this letter, and its enclosure will be available electronically

for public inspection in the NRC Public Document Room or from the Publicly Available Records

System (PARS) component of NRC's Agencywide Documents Access and Management

System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure: Document Request for Cyber Security Temporary Instruction 2201/004 Interim

Milestones 1 - 7 Inspection

cc w/encl: Distribution via ListServ'

DOCUMENT REQUEST FOR

CYBER SECURITY TEMPORARY INSTRUCTION 2201/004

INTERIM MILESTONES 1 - 7 INSPECTION

Inspection Report: 05000237/2014405; 05000249/2014405

Onsite Dates: January 27 - 31, 2014 (Information Gathering Visit)

February 10 - 14, 2014 (Cyber Security TI Inspection)

Procedure: Temporary Instruction 2201/004, Inspection of Implementation of Interim

Cyber Security Milestones 1 - 7

Lead Inspector: Dr. Stuart Sheldon

(630) 829-9727

stuart.sheldon@nrc.gov

I. Information Requested Prior to the Information Gathering Visit

The following information is requested by January 13, 2014. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to Dr. Stuart Sheldon (e-mail address stuart.sheldon@nrc.gov). Electronic

media is preferred. Where information is provided that includes tables and/or lists of data

or other such information, please do not scan such tables and/or lists as images. The

preferred file format is a searchable pdf file or excel spreadsheet on a compact

disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use. Please

provide three copies of each CD submitted (one for each inspector and for a cyber

security contractor).

A. Cyber Security TI Documentation

1. Provide a list of all documents required to complete each of the Cyber Security

Milestones 1 through 7 identified by letter (ML110940225) dated March 31, 2011,

Enclosure 3 - Exelon Cyber Security Plan Revised Implementation Schedule.

Provide each milestone in a separate folder on the CD (e.g., Milestone 1,

Milestone 2, etc.). Each milestone document shall be listed in a table as follows:

MILESTONE X, where X equals 1 through 7

Document

Number Title Description Rev Status

No. 1

No. 2

No. 3

No. 4

etc.

1 Enclosure

DOCUMENT REQUEST FOR

CYBER SECURITY TEMPORARY INSTRUCTION 2201/004

INTERIM MILESTONES 1 - 7 INSPECTION

Based on the list of documents identified in I.A.1 above, for each milestone

document where the Status is identified as completed, place the completed

document in its associated folder and hyperlink the associated document

number to the completed document. For each document, the Status should

be identified as not started, in-progress or completed.

In addition to the documents requested in I.A.1 above, ensure the documents

identified below (I.A.2 - I.A.8) for MILESTONE 1 - 7 are included in the I.A.1 table

above.

2. MILESTONE 1 - Provide the following documentation for the Cyber Security

Assessment Team (CSAT):

a. Procedures establishing the CSAT team.

b. List of CSAT members noting primary areas of responsibility.

c. Procedures detailing qualification requirements for CSAT members.

d. Supporting documentation that demonstrates each CSAT member meets

the requirements to fulfill their respective position on the team. For

example, member resumes; evaluation of previous education and

experience; training required by your implementing procedures and

supporting documentation, which shows training was completed; or

industry certifications).

3. MILESTONE 2 - Provide the following documentation:

a. List of plant systems noting which system have been identified as critical

systems (CSs).

b. List of all digital assets noting which have been classified as Critical

Digital Assets (CDAs) and which have not.

c. Procedure documenting the process by which CSs and CDAs are

identified in accordance with (IAW) your CSP, Section 3.1.3.

4. MILESTONE 3 - Provide the following documentation:

a. Procedures establishing your cyber defensive architecture. Explain any

variances from your CSP, Section 4.3, and tracking documents for their

correction.

b. Provide an overview of your cyber defensive architecture, preferably with

overview level diagrams showing the various levels and location of the

subject deterministic one-way device.

c. Provide details of the implementation of the subject deterministic one-way

device.

2 Enclosure

DOCUMENT REQUEST FOR

CYBER SECURITY TEMPORARY INSTRUCTION 2201/004

INTERIM MILESTONES 1 - 7 INSPECTION

5. MILESTONE 4 - Provide the following documentation:

a. Procedures implementing the security control Access Control for

Portable and Mobile Devices. Include any training material or

promotional literature distributed to staff associated with the control.

6. MILESTONE 5 - Provide the following documentation:

a. Procedures implementing the requirements described in Milestone 5.

b. Training materials associated with the changes to plant programs

associated with Milestone 5.

7. MILESTONE 6 - Provide the following documentation:

Procedures documenting the process by which technical cyber security

controls have been identified for those CDAs which require the

implementation of technical security controls for Milestone 6.

8. MILESTONE 7 - Provide the following documentation:

Procedures implementing the ongoing monitoring and assessment

activities as described in your CSP, Section 4.4.

B. Cyber Security Supporting Documentation

1. Provide a copy of the current version of the Updated Safety Analysis

Report (USAR), Technical Specifications (TS), and technical requirements

manual (TRM) or equivalent.

2. Provide a copy of the current cyber security Health Report, if available.

3. Provide a copy of the current plant drawings use for operator training that

provide additional information on system operation, system operating

parameters, setpoints, etc. (e.g., some licensees refer to these drawings as

Horse Notes) for identified cyber security CSs, if available.

4. Provide operator training lesson plans and/or operator training aids for

identified cyber security CSs, if available.

II. Information Requested During the Information Gathering Visit (January. 27 - 31,

2014)

The following information is requested to be provided to the inspectors during the onsite

information gathering visit. It is requested that the following information be provided on

three sets of CDs (searchable, if possible).

A. General Information:

1. A listing of abbreviations and/or designators for plant systems;

3 Enclosure

DOCUMENT REQUEST FOR

CYBER SECURITY TEMPORARY INSTRUCTION 2201/004

INTERIM MILESTONES 1 - 7 INSPECTION

2. Organizational chart for corporate and site personnel involved in establishing,

overseeing, and maintaining the Cyber Security Program and;

3. A phone list for licensee personnel.

B. Facility Information:

1. Provide a presentation/discussion of your CSP, existing cyber security CSs,

and associated CDAs.

2. Provide a list and discussion of currently scheduled or planned cyber security

related modifications to be installed in the plant.

C. Specific Information Associated with the Milestones:

1. MILESTONE 3 - Be prepared to provide an overview walkdown of the cyber

architecture within the plant including safety, security and emergency

preparedness related CDAs.

2. MILESTONE 6 - Be prepared to present information for target set CDAs

including a list of target set CDAs, and documentation of the process for

identifying them.

3. MILESTONE 6 - For selected CDAs, be prepared to produce documentation

for each of the technical controls in Appendix D of NEI 08-09, Revision 6, the

results of reviews required under your CSP, Section 3.1.6.

a. For controls that are implemented, provide the procedures implementing

the control. Common controls for all CDAs may be provided in a separate

list with the procedures implementing each of them.

b. For alternate controls that have been implemented, provide the

documented basis for employing alternative countermeasures, and the

procedures implementing the alternative measures.

c. Where controls have been deemed unnecessary, provide the threat vector

analysis supporting the conclusion that the threat vector does not exist.

4. MILESTONE 7 - For the CDAs selected above, be prepared to produce

documentation for each of the technical controls in Appendix D of NEI 08-09,

Revision 6, and the results of immediate activities required under your CSP,

Section 4.4.

a. For all controls that are implemented, provide the objective evidence that

the control is effective IAW your CSP, Section 4.4.3.1. This may be

combined with the documentation provided for Milestone 6.

b. Documentation for common controls for all CDAs may be provided in a

separate list with the procedures implementing each of them.

c. Provide governing procedures and results of vulnerability scans performed

to comply with your CSP, Section 4.4.3.2

4 Enclosure

DOCUMENT REQUEST FOR

CYBER SECURITY TEMPORARY INSTRUCTION 2201/004

INTERIM MILESTONES 1 - 7 INSPECTION

III. Information Requested to be Available on First Day of the Onsite Inspection Week

(February 10, 2014)

The following information is requested to be provided on the first day of the TI inspection.

It is requested that this information be provided on three sets of CDs (searchable, if

possible).

Any updates to information previously provided.

IV. Information Requested to be Provided Throughout the Temporary Instruction

Inspection Assessment

Copies of the list of questions/documents requested identified by the inspector

and the status/resolution of the information requested (provided daily during the

TI inspection to each inspector).

If you have questions regarding the information requested, please contact the lead inspector.

5 Enclosure

M. Pacilio -3-

In accordance with Title 10, Code of Federal Regulations (CFR), Part 50, Section 2.390 of the

NRC's "Rules of Practice," a copy of this letter with its enclosure, and your response (if any), will

be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System (PARS) component of NRC's Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure: Document Request for Cyber Security Temporary Instruction 2201/004 Interim

Milestones 1 - 7 Inspection

cc w/encl: Distribution via ListServ'

DISTRIBUTION:

Daniel Rich

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Anne Boland

Steven Orth

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

DOCUMENT NAME: G: Cyber\Dresden 2014\Dresden Cyber RFI.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME SSheldon:ls RCDaley

DATE 10/31/13 11/04/13

OFFICIAL RECORD COPY