ML091520499

From kanterella
Revision as of 23:04, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System G, Title: Align Backup Cooling to Engineered Safeguards Pumps
ML091520499
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520499 (7)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE

JPM: RO SYSTEM g TITLE: ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS

CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Align backup cooling to Engineered Safeguards Pumps

Alternate Path: NO

Facility JPM #: NEW

K/A: 008A4.01 Importance: RO: 3.3 SRO: 3.1

K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls

Task Standard: Service Water aligned to ESS pumps per SOP-16.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-16, Component Cooling Water System

Validation Time: 10 minutes Time Critical: NO

Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes

Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________ Signature JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-16, Component Cooling Water System, Rev. 31

Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE

DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
  • CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
  • Chemistry has been notified of the operation.

INITIATING CUES:

  • The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.

JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate SOP-16, Section 7.6.1, To Align Service Water to ESS Pumps SOP-16, Section 7.6.1 located S U Comment: Evaluator provides candidate with a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade7.6.1a ENSURE in the CLOSED position, handswitches for the following valves: CV-0879, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return Handswitches for the following valves verified closed: CV-0879, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return S U Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade7.6.1b OPEN the Air Supply Valves to the following valves: CV-0879, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return Auxiliary Operator contacted to open air supplies to the following valves: CV-0879, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return S U Comment: NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete.

CRITICAL STEP

JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade7.6.1c CLOSE the following valves: CV-0913, ESS Pumps CCW Supply CV-0950, ESS Pump CCW Return CV-0913, ESS Pumps CCW Supply, AND CV-0950, ESS Pump CCW Return, closed.

S U Comment:

CRITICAL STEP

Proc. Step TASK ELEMENT 5 STANDARD Grade7.6.1d OPEN CV-0879 OR CV-0880, ESS Pumps SW Supply CV-0879 OR CV-0880 placed in the OPEN position.

S U Comment: NOTE: Only one of these valves needs to be placed to open to satisfy the critical step.

CRITICAL STEP

Proc. Step TASK ELEMENT 6 STANDARD Graden/a EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156, EAST ENG SAFEGUARDS PPS CLG WTR LO FLOW alarms annunciate (CV-0879 or CV-0880 opening)

ARP-7 checked for alarms EK-1155 and EK-1156 alarming. (Alarms due to opening of CV-0879 or CV-0880). No operator action needed.

S U Comment: NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps

JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade7.6.1e OPEN CV-0951, ESS Pumps SW Return CV-0951 placed to open.

S U Comment: NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling).

CRITICAL STEP

Proc. Step TASK ELEMENT 8 STANDARD Grade7.6.1f NOTIFY Chemistry Department to sample mixing basin for sodium nitrite.

Chemistry notified to sample.

S U Comment: NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them.

Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify the CRS that SOP-16, Section 7.6.1 is complete.

CRS notified Section 7.6.1 of SOP-16 complete.

S U Comment:

END OF TASK

JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
  • CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.

INITIATING CUES:

  • The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.