ML091520459
| ML091520459 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/07/2008 |
| From: | NRC/RGN-III |
| To: | Entergy Nuclear Palisades |
| Shared Package | |
| ML082200319 | List: |
| References | |
| Download: ML091520459 (8) | |
Text
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO-ADMIN 3 TITLE:
PLACE IN OPERATION RIA-2322 CONTAINMENT GAMMA MONITOR CANDIDATE:
EXAMINER:
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
Remove/Restore to operation and test Analog and Digital Area Radiation Monitors Alternate Path: N/A Facility JPM #: NEW K/A: 2.3.5 Importance: RO: 2.9 K/A Statement: Ability to use radiation monitoring systems, such a fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Task Standard: Correctly place in service and test RIA-2322, Containment Gamma Monitor per SOP-39 Preferred Evaluation Location: Simulator
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate
References:
SOP-39, AREA RADIATION MONITORING SYSTEM Validation Time: 10 minutes Time Critical:
NO Candidate:
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-39, Section 7.2.3, Rev.12 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
RIA-2322, Containment Gamma Monitor, has been returned to service following maintenance by the I & C department.
INITIATING CUES:
The CRS directs you to perform an Electronic Check Source Test on RIA-2322 per Section 7.2.3 of SOP-39.
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a SOP-39, Area Radiation Monitoring System, Section 7.2.3, To Test located.
Section 7.2.3 of SOP-39 located S U Comment:
Evaluator provides candidate with a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.2.3.a.1 Place function switch in TEST position Function switch placed in TEST position S U Comment:
NOTE: EK-0226, Cont Gamma RIA-2322 Fail, alarm may annunciate when going to the TEST position, this is considered normal CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 7.2.3.a.2.a Momentarily DEPRESS ECS push button AND VERIFY the following:
(a) Green (Safe-Reset) light stays illuminated ECS push button momentarily DERESSED and Operator VERIFIES Green (Safe-Reset) light illuminates.
S U Comment:
CRITICAL STEP
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 7.2.3.a.2.b Momentarily DEPRESS ECS push button AND VERIFY the following:
(b) IF the meter fails to deflect OR the green light extinguishes after approx. four seconds,..
Determines that this step does not apply.
Meter deflects and green light stays illuminated.
S U Comment:
Proc. Step TASK ELEMENT 5 STANDARD Grade 7.2.3.a.3 PUSH AND HOLD Channel Test push button AND OBSERVE Alert, High, and Channel Test lamps light immediately and annunciator EK-0226 will alarm Channel Test push button Pushed AND HELD, Operator OBSERVES (the following):
Alert Channel Test lamp lights immediately High Channel Test lamp lights immediately Annunciator EK-0226, CONT GAMMA RIA-2322 FAIL (On front of Panel C-11A).
S U Comment:
Evaluator Note: Operator may respond to alarm EK-0226, this alarm is normal when Channel Test pushbutton is pushed.
CRITICAL STEP
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 6 STANDARD Grade 7.2.3.a.4 RELEASE Channel Test push button AND OBSERVE the Alert and High lamps shall go out. The Safe/Reset lamp may go out.
Channel Test push button RELEASED AND Operator OBSERVES:
Alert lamp goes out High lamp goes out S U Comment:
Evaluator Note: Operator may respond to alarm EK-0226, this alarm is normal when Channel Test pushbutton is pushed.
CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade 7.2.3.a.5 PLACE function switch to ALL position Function switch PLACED to ALL position S U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 7.2.3.a.6 Momentarily DEPRESS ECS push button AND VERIFY the following:
(a) Meter indicates approximately 103 R/hr (b) Green (Safe-Reset) light illuminates ECS push button DEPRESSED AND the following VERIFIED:
(a) Meter reads approximately 103 R/hr (b) Green (Safe-Reset) light illuminated S U Comment:
CRITICAL STEP
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify the CRS that RIA-2322 has been returned to service and tested per Section 8.2.2 of SOP-39.
Operator notifies CRS of completion of return to service of RIA-2322, per Section 8.2.2 of SOP-
- 39.
S U Comment:
END OF TASK
JPM RO-ADMIN 3 PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
RIA-2322, Containment Gamma Monitor, has been returned to service following maintenance by the I & C department.
INITIATING CUES:
The CRS directs you to perform an Electronic Check Source Test on RIA-2322 per Section 7.2.3 of SOP-39.