NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO, SRO-U SYSTEM j TITLE:
LOCALLY START AND LOAD 1/1 D/G CANDIDATE:
EXAMINER:
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
MANUALLY START AND LOAD DIESEL GENERATOR TO A DEENERGIZED BUS Alternate Path: YES Facility JPM #: PL-OPS-EDG-003J K/A: 064A2.05 Importance:
RO: 2.9 SRO: 3.3 K/A Statement: Methods for energizing a dead bus Task Standard: Bus 1C energized from 1-1 Diesel Generator Preferred Evaluation Location: Simulator In Plant
__X___
Preferred Evaluation Method:
Perform Simulate
__X___
References:
ONP-20, Diesel Generator Manual Control Validation Time: 15 minutes Time Critical:
NO Candidate:
Time Start: ________
Time Finish:
Performance Time:
________ minutes Time Critical:
NO Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
ONP-20, Diesel Generator Manual Control, Section 4.7.2, Rev.23 ONP-20, Attachment 1, Woodward Governor Type EGB, Rev.23 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Loss of off-site power has occurred.
- Reactor has been tripped and all rods have been inserted into the core.
- Bus 1C has not been energized from 1-1 Diesel Generator.
- Electricians have determined that the 1-1 Diesel Generator governor has malfunctioned causing 1-1 Diesel Generator to trip.
INITIATING CUES:
- During performance of ONP-20, the Control Room Supervisor directs you to locally start and load 1-1 Diesel Generator per Step 4.7.2, "Manual Unit Control (EGA Malfunctioning)".
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Operator obtains a copy of ONP-20, Section 4.7.2, Manual Unit Control (EGA Malfunctioning)
ONP-20, Section 4.7.2 obtained S U Comment:
NOTE: Evaluator provides the operator a working copy ONP-20, Section 4.7.2.
Proc. Step TASK ELEMENT 2 STANDARD Grade 4.7.2a TRIP all breakers on affected bus (D/G 1-1
= Bus 1C) electrically or mechanically.
All breakers on Bus 1C are verified tripped (red light out, green light on)
S U Comment:
NOTE: EVALUATOR CUE: The breaker status lights on Bus 1C have their red lights out and green lights on.
Proc. Step TASK ELEMENT 3 STANDARD Grade 4.7.2b Utilizing ladder from D/G room to PERFORM the following:
- 1. RECORD all existing governor control settings on affected D/G (1-
- 1) (refer to Att. 1)
D/G 1-1 governor control settings recorded:
SPEED Drop setting 2.1, LOAD LIMIT setting
_MAX, Speed setting _13, _3.4 (Recessed dial and Outer dial)
S U Comment:
NOTE: The Speed setting has a recessed dial and an outer dial.
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 4.7.2b Utilizing ladder from D/G room to PERFORM the following:
- 2. DISCONNECT the electrical connector (Item A inner connector on Att. 1) from affected D/G governor Electrical connector on side of Woodward Governor fro 1-1 D/G disconnected S U Comment:
NOTE: Operator is not to remove the electrical connector, simulate only.
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 4.7.2c.1 IF the affected D/G is NOT running, THEN START affected D/G as follows:
- 1. PLACE Engine Control Switch on Local Gauge Board to Start position Engine Control Switch on Local Gauge Board placed to START S U Comment:
NOTE: Operator is not to insert the handle into the Local Gauge Board, simulate only.
NOTE: Handle must be inserted into Engine Control Switch, not in procedure.
NOTE: The 1-1 diesel engine is not running.
NOTE: EVALUATOR CUE: After the Operator simulates placing the engine control switch to START, CUE that the 1-1 diesel engine is not running.
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008 Proc. Step TASK ELEMENT 6 STANDARD Grade 4.7.2c.2 IF the affected D/G is NOT running, THEN START affected D/G as follows:
- 2. REMOVE handle from Engine Control Switch Handle removed from Engine Control Switch S U Comment:
NOTE: EVALUATOR CUE: After the Operator simulates placing the engine control switch to START, CUE that the 1-1 diesel engine is not running.
Proc. Step TASK ELEMENT 7 STANDARD Grade 4.7.2c.3 IF D/G did NOT start after performing Step 1, THEN PRESS AND HOLD for at least five seconds the Air Start Motor Solenoid Override pushbutton.
Air Start Motor Solenoid Override pushbutton pressed and held for at least five seconds S U Comment:
NOTE: Operator is not to press and hold the pushbutton, simulate only.
NOTE: EVALUATOR CUE: After the Operator simulates pressing and holding the Air Start Motor solenoid Override pushbutton, CUE: the 1-1 diesel engine is running NOTE: EVALUATOR CUE: Operator may verify proper operation of D/G, CUE: D/G is operating as expected (frequency, voltage, temps, etc)
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 4.7.2c.4 IF D/G did NOT start, THEN GO TO Section 4.5 Operator determines this step does not apply S U Comment:
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade 4.7.2d.1 Utilize ladder from D/G Room to PERFORM the following actions as concurrently possible:
- 1. SLOWLY LOWER Speed Droop Control Knob to zero (Item B on Att.
- 1)
Speed Droop Control Knob slowly lowered to zero S U Comment:
NOTE: Operator is not to slowly lower the Speed Control Knob, simulate only.
NOTE: EVALUATOR CUE: Speed Droop Control Knob is at zero CRITICAL STEP Proc. Step TASK ELEMENT 10 STANDARD Grade 4.7.2d.2 ADJUST Speed Setting Knob (Item C on Att. 1) to maintain D/G Output frequency between 60 to 62 Hz (900 to 930 RPM)
Speed Setting Knob rotated (RAISED) to maintain D/G output frequency between 60 and 62 Hz.
S U Comment:
NOTE: Operator is not to adjust the Speed Setting Knob, simulate only.
NOTE: EVALUATOR CUE: When Operator requests/reads frequency, NOTIFY them that it is 59.5 Hz NOTE: EVALUATOR CUE: When it has been determined that the Operator has raised control speed with the speed setting knob, provide CUE that speed is at 900 rpm and frequency is between 60 to 62 Hz CRITICAL STEP
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 4.7.2e IF D/G Output Breaker did not automatically close, THEN locally CLOSE affected D/G Output Breaker D/G 1-1 = 152-107 D/G Output Breaker 152-107 verified closed OR Bus 1C verified energized S U Comment:
NOTE: EVALUATOR CUE: If Operator checks Breaker 152-107 indication, cue that the red breaker status light is lit.
NOTE: EVALUATOR CUE: If Operator calls the Control Room to verify if 1C Bus is energized, cue that 1C Bus is energized.
Proc. Step TASK ELEMENT 12 STANDARD Grade 4.7.2f CONTACT Control Room, if available, to verify Critical Service Water Header pressure to affected D/G is greater than 42 psig. IF Control Room is unavailable, THEN VERIFY Raw Water Pressure (Gauges on the Local D/G Control Panels) is greater than 25 psig.
D/G 1-1 = Critical Header B or PI-1472 Control Room contacted to verify B Critical Service Water Header Pressure is greater than 42 psig.
OR PI-1472 verified reading greater than 25 psig.
S U Comment:
NOTE: EVALUATOR CUE: If Control Room contacted to verify B Critical Service Water pressure, CUE that B Critical Service Water Header is at 70 psig.
NOTE: EVALUATOR CUE: If PI-1472 is read on Local Gauge Board, CUE that PI-1472 indicates 56 psig.
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008 Proc. Step TASK ELEMENT 13 STANDARD Grade 4.7.2g RESTORE loads on affected Bus one at a time as directed by Shift Manager Operator questions if more loads need to be restored S U Comment:
NOTE: EVALUATOR CUE: Another Operator will restore loads on Bus 1C as needed.
Proc. Step TASK ELEMENT 14 STANDARD Grade 4.7.2h ADJUST speed setting knob (Item C on Att. 1) to maintain 60 to 62 Hz (900 to 930 RPM) 60 to 62 Hz (900 to 930 RPM) maintained on D/G 1-1 S U Comment:
NOTE: EVALUATOR CUE: No other loads will be added onto the D/G.
Proc. Step TASK ELEMENT 15 STANDARD Grade n/a Notify CRS that 1-1 D/G has been manually started and loaded onto Bus 1C per ONP-20, Section 4.7.2.
CRS notified that 1-1 D/G has been manually started and loaded onto Bus 1C per ONP-20, Section 4.7.2.
S U Comment:
END OF TASK
JPM: RO, SRO-U SYSTEM j PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Loss of off-site power has occurred.
- Reactor has been tripped and all rods have been inserted into the core.
- Bus 1C has not been energized from 1-1 Diesel Generator.
- Electricians have determined that the 1-1 Diesel Generator governor has malfunctioned causing 1-1 Diesel Generator to trip.
INITIATING CUES:
- During performance of ONP-20, the Control Room Supervisor directs you to locally start and load 1-1 Diesel Generator per Step 4.7.2, "Manual Unit Control (EGA Malfunctioning)".