ML091520496
| ML091520496 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/07/2008 |
| From: | NRC/RGN-III |
| To: | Entergy Nuclear Palisades |
| Shared Package | |
| ML082200319 | List: |
| References | |
| Download: ML091520496 (12) | |
Text
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO, SRO-U SYSTEM f TITLE:
PLACE THE ZERO POWER MODE BYPASS IN OPERATION CANDIDATE:
EXAMINER:
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 2 of 12 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
Insert, remove, or test the Reactor Protection System Zero Power Mode Bypass.
Alternate Path: NO Facility JPM #: PL-OPS-RPS-003J K/A: 012A4.03 Importance:
RO: 3.6 SRO: 3.6 K/A Statement: Ability to manually operate and/or monitor in the control room: Channel blocks and bypasses Task Standard: Zero Power Mode Bypass placed in operation.
Preferred Evaluation Location: Simulator
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate
References:
SOP-36, Reactor Protective System And Anticipated Transient Without Scram (ATWS) System Validation Time: 10 minutes Time Critical:
NO Candidate:
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 3 of 12 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-36, Reactor Protective System And Anticipated Transient Without Scram (ATWS) System, Section 7.2.1, Rev. 10 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Plant is in Mode 5.
- Wide Range NIs (NI-3 and NI-4) are operable.
- All Control Rod Drive clutch power toggle switches are in the OFF position.
- Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.
INITIATING CUES:
- Per SOP-36 Section 7.2.1, you are directed to place the Zero Power Mode Bypass in operation.
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 4 of 12 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate SOP-36, Section 7.2.1, To Place Zero Power Mode Bypass In operation SOP-36, section 7.2.1, located S U Comment:
Note:
Evaluator provides candidate with a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade 7.2.1a ENSURE BOTH Wide Range Nis (NI-1/3 and NI-2/4) are operable, REFER TO Technical Specifications LCO 3.3.1 Both Wide Range NIs (NI-1/3 and NI-2/4) are determined operable (given in initial conditions)
S U Comment:
Proc. Step TASK ELEMENT 3 STANDARD Grade 7.2.1b ENSURE power level less than 10-4% RTP Power level verified less than 10E-4% RTP S U Comment:
Proc. Step TASK ELEMENT 4 STANDARD Grade 7.2.1c WHEN in Modes 3, 4 or 5 THEN VERIFY
. OR no more than one full-length control rod capable of being withdrawn All control rod drive clutch power toggle switches are verified in the OFF position (given in initial conditions)
S U Comment:
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 5 of 12 JULY 2008 Proc. Step TASK ELEMENT 5 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:
- 1. INSERT key in ENABLE switch AND TURN clockwise to enable the desired Channel (A):
Channel A (Key 287)
Key 287 inserted in Channel A switch and turned clockwise until key stops S U Comment:
NOTE: EK-06 Rack D #1 (Zero Power Mode Bypass) will alarm.
NOTE: Evaluator: It is permissible to insert key and enable Channels in any order, as well as inserting keys into all the Channels, enabling, and then testing the lights.
JPM written as enabling one channel at a time.
CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain off (Channel A).
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Four test switches pushed on ZPM Channel A and associated lights above each verified off:
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Lights remain OFF S U Comment:
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 6 of 12 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales (Channel A)
RPS Trip telltales pressed on A Channel RPS for:
Low Flow, the (red) Trip light goes out.
Low Level S/G 1, the (red) Trip light goes out.
Low Level S/G 2, the (red) Trip light goes out.
Thermal Margin/Low Pressure, the (red)
Trip light goes out.
S U Comment:
Note:
The (white) pre-trip light stays on.
Proc. Step TASK ELEMENT 8 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:
- 1. INSERT key in ENABLE switch AND TURN clockwise to enable the desired Channel (B):
Channel B (Key 286)
Key 286 inserted in Channel B switch and turned clockwise until key stops S U Comment:
CRITICAL STEP
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 7 of 12 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain off (Channel B).
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Four test switches pushed on ZPM Channel B and associated lights above each verified off:
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Lights remain OFF S U Comment:
Proc. Step TASK ELEMENT 10 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales (Channel B)
RPS Trip telltales pressed on B Channel RPS for:
Low Flow, the (red) Trip light goes out.
Low Level S/G 1, the (red) Trip light goes out.
Low Level S/G 2, the (red) Trip light goes out.
Thermal Margin/Low Pressure, the (red)
Trip light goes out.
S U Comment:
Note:
The (white) pre-trip light stays on.
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 8 of 12 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:
- 1. INSERT key in ENABLE switch AND TURN clockwise to enable the desired Channel (C):
Channel C (Key 285)
Key 285 inserted in Channel C switch and turned clockwise until key stops S U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain off (Channel C).
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Four test switches pushed on ZPM Channel C and associated lights above each verified off:
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Lights remain OFF S U Comment:
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 9 of 12 JULY 2008 Proc. Step TASK ELEMENT 13 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales (Channel C)
RPS Trip telltales pressed on C Channel RPS for:
Low Flow, the (red) Trip light goes out.
Low Level S/G 1, the (red) Trip light goes out.
Low Level S/G 2, the (red) Trip light goes out.
Thermal Margin/Low Pressure, the (red)
Trip light goes out.
S U Comment:
Note:
The (white) pre-trip light stays on.
Proc. Step TASK ELEMENT 14 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:
- 1. INSERT key in ENABLE switch AND TURN clockwise to enable the desired Channel (D):
Channel D (Key 288)
Key 288 inserted in Channel D switch and turned clockwise until key stops S U Comment:
CRITICAL STEP
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 10 of 12 JULY 2008 Proc. Step TASK ELEMENT 15 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain off (Channel D).
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Four test switches pushed on ZPM Channel D and associated lights above each verified off:
LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE Lights remain OFF S U Comment:
Proc. Step TASK ELEMENT 16 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales (Channel D)
RPS Trip telltales pressed on D Channel RPS for:
Low Flow, the (red) Trip light goes out.
Low Level S/G 1, the (red) Trip light goes out.
Low Level S/G 2, the (red) Trip light goes out.
Thermal Margin/Low Pressure, the (red)
Trip light goes out.
S U Comment:
Note:
The (white) pre-trip light stays on.
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 11 of 12 JULY 2008 Proc. Step TASK ELEMENT 17 STANDARD Grade n/a Notify the CRS that Zero Power Mode Bypass is in operation CRS notified Zero Power Mode Bypass in operation S U Comment:
END OF TASK
JPM RO, SRO-U SYSTEM f PALISADES NUCLEAR PLANT Page 12 of 12 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Plant is in Mode 5.
- Wide Range NIs (NI-3 and NI-4) are operable.
- All Control Rod Drive clutch power toggle switches are in the OFF position.
- Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.
INITIATING CUES:
- Per SOP-36 Section 7.2.1, you are directed to place the Zero Mode Bypass in operation.