ML091520496
ML091520496 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/07/2008 |
From: | NRC/RGN-III |
To: | Entergy Nuclear Palisades |
Shared Package | |
ML082200319 | List: |
References | |
Download: ML091520496 (12) | |
Text
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO, SRO-U SYSTEM f TITLE: PLACE THE ZERO POWER MODE BYPASS IN OPERATION CANDIDATE: _____________________________________________
EXAMINER: _____________________________________________
JPM RO, SRO-U SYSTEM f JOB PERFORMANCE MEASURE DATA PAGE Task: Insert, remove, or test the Reactor Protection System Zero Power Mode Bypass.
Alternate Path: NO Facility JPM #: PL-OPS-RPS-003J K/A: 012A4.03 Importance: RO: 3.6 SRO: 3.6 K/A Statement: Ability to manually operate and/or monitor in the control room: Channel blocks and bypasses Task Standard: Zero Power Mode Bypass placed in operation.
Preferred Evaluation Location: Simulator __X__ In Plant _____
Preferred Evaluation Method: Perform __X__ Simulate _____
References:
SOP-36, Reactor Protective System And Anticipated Transient Without Scram (ATWS) System Validation Time:10 minutes Time Critical: NO Candidate:
Time Start: ________ Time Finish: ________
Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______
Comments:
Examiner: _______________________________ Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-36, Reactor Protective System And Anticipated Transient Without Scram (ATWS) System, Section 7.2.1, Rev. 10 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- Plant is in Mode 5.
- Wide Range NIs (NI-3 and NI-4) are operable.
- All Control Rod Drive clutch power toggle switches are in the OFF position.
- Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.
INITIATING CUES:
- Per SOP-36 Section 7.2.1, you are directed to place the Zero Power Mode Bypass in operation.
PALISADES NUCLEAR PLANT Page 3 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-36, Section 7.2.1, To Place SOP-36, section 7.2.1, located n/a Zero Power Mode Bypass In operation S U Comment:
Note: Evaluator provides candidate with a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade ENSURE BOTH Wide Range Nis (NI-1/3 Both Wide Range NIs (NI-1/3 and NI-2/4) are and NI-2/4) are operable, REFER TO 7.2.1a determined operable (given in initial conditions) S U Technical Specifications LCO 3.3.1 Comment:
Proc. Step TASK ELEMENT 3 STANDARD Grade
-4 ENSURE power level less than 10 % RTP Power level verified less than 10E-4% RTP 7.2.1b S U Comment:
Proc. Step TASK ELEMENT 4 STANDARD Grade WHEN in Modes 3, 4 or 5 THEN VERIFY All control rod drive clutch power toggle switches
. OR no more than one full-length are verified in the OFF position (given in initial 7.2.1c control rod capable of being withdrawn conditions) S U Comment:
PALISADES NUCLEAR PLANT Page 4 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 5 STANDARD Grade PERFORM the following on the desired Channel to place the ZPM Bypass in service: Key 287 inserted in Channel A switch and
- 1. INSERT key in ENABLE switch turned clockwise until key stops 7.2.1d.1 AND TURN clockwise to enable S U the desired Channel (A):
Channel A (Key 287)
Comment:
NOTE: EK-06 Rack D #1 (Zero Power Mode Bypass) will alarm.
NOTE: Evaluator: It is permissible to insert key and enable Channels in any order, as well as inserting keys into all the Channels, enabling, and then testing the lights.
JPM written as enabling one channel at a time.
CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade PRESS EACH of the four test switches Four test switches pushed on ZPM Channel A one at a time AND VERIFY the associated and associated lights above each verified off:
lights above each switch remain off (Channel A).
- TM/LP ZPM SW OFF and ZPM AUTO
- TM/LP ZPM SW OFF and ZPM Lights remain OFF AUTO DABLE Comment:
PALISADES NUCLEAR PLANT Page 5 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 7 STANDARD Grade RPS Trip telltales pressed on A Channel RPS for:
RESET the RPS Trip telltales (Channel A)
- Low Flow, the (red) Trip light goes out.
- Low Level S/G 1, the (red) Trip light goes out.
7.2.1d.3 S U
- Low Level S/G 2, the (red) Trip light goes out.
- Thermal Margin/Low Pressure, the (red)
Trip light goes out.
Comment:
Note: The (white) pre-trip light stays on.
Proc. Step TASK ELEMENT 8 STANDARD Grade PERFORM the following on the desired Channel to place the ZPM Bypass in service: Key 286 inserted in Channel B switch and turned clockwise until key stops
- 1. INSERT key in ENABLE switch 7.2.1d.1 S U AND TURN clockwise to enable the desired Channel (B):
Channel B (Key 286)
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT Page 6 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 9 STANDARD Grade PRESS EACH of the four test switches Four test switches pushed on ZPM Channel B one at a time AND VERIFY the associated and associated lights above each verified off:
lights above each switch remain off (Channel B).
- TM/LP ZPM SW OFF and ZPM AUTO
- TM/LP ZPM SW OFF and ZPM Lights remain OFF AUTO DABLE Comment:
Proc. Step TASK ELEMENT 10 STANDARD Grade RPS Trip telltales pressed on B Channel RPS for:
RESET the RPS Trip telltales (Channel B)
- Low Flow, the (red) Trip light goes out.
- Low Level S/G 1, the (red) Trip light 7.2.1d.3 goes out. S U
- Low Level S/G 2, the (red) Trip light goes out.
- Thermal Margin/Low Pressure, the (red)
Trip light goes out.
Comment:
Note: The (white) pre-trip light stays on.
PALISADES NUCLEAR PLANT Page 7 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 11 STANDARD Grade PERFORM the following on the desired Channel to place the ZPM Bypass in Key 285 inserted in Channel C switch and service:
turned clockwise until key stops
- 1. INSERT key in ENABLE switch 7.2.1d.1 AND TURN clockwise to enable S U the desired Channel (C):
Channel C (Key 285)
Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 12 STANDARD Grade PRESS EACH of the four test switches Four test switches pushed on ZPM Channel C one at a time AND VERIFY the associated and associated lights above each verified off:
lights above each switch remain off (Channel C).
- TM/LP ZPM SW OFF and ZPM AUTO
- TM/LP ZPM SW OFF and ZPM Lights remain OFF AUTO DABLE Comment:
PALISADES NUCLEAR PLANT Page 8 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 13 STANDARD Grade RPS Trip telltales pressed on C Channel RPS for:
RESET the RPS Trip telltales (Channel C)
- Low Flow, the (red) Trip light goes out.
- Low Level S/G 1, the (red) Trip light 7.2.1d.3 goes out. S U
- Low Level S/G 2, the (red) Trip light goes out.
- Thermal Margin/Low Pressure, the (red)
Trip light goes out.
Comment:
Note: The (white) pre-trip light stays on.
Proc. Step TASK ELEMENT 14 STANDARD Grade PERFORM the following on the desired Channel to place the ZPM Bypass in service: Key 288 inserted in Channel D switch and
- 1. INSERT key in ENABLE switch turned clockwise until key stops 7.2.1d.1 AND TURN clockwise to enable S U the desired Channel (D):
Channel D (Key 288)
Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT Page 9 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 15 STANDARD Grade PRESS EACH of the four test switches Four test switches pushed on ZPM Channel D one at a time AND VERIFY the associated and associated lights above each verified off:
lights above each switch remain off (Channel D).
- TM/LP ZPM SW OFF and ZPM AUTO
- TM/LP ZPM SW OFF and ZPM Lights remain OFF AUTO DABLE Comment:
Proc. Step TASK ELEMENT 16 STANDARD Grade RPS Trip telltales pressed on D Channel RPS for:
RESET the RPS Trip telltales (Channel D)
- Low Flow, the (red) Trip light goes out.
- Low Level S/G 1, the (red) Trip light 7.2.1d.3 goes out. S U
- Low Level S/G 2, the (red) Trip light goes out.
- Thermal Margin/Low Pressure, the (red)
Trip light goes out.
Comment:
Note: The (white) pre-trip light stays on.
PALISADES NUCLEAR PLANT Page 10 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f Proc. Step TASK ELEMENT 17 STANDARD Grade Notify the CRS that Zero Power Mode CRS notified Zero Power Mode Bypass in n/a Bypass is in operation operation S U Comment:
END OF TASK PALISADES NUCLEAR PLANT Page 11 of 12 JULY 2008
JPM RO, SRO-U SYSTEM f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- Plant is in Mode 5.
- Wide Range NIs (NI-3 and NI-4) are operable.
- All Control Rod Drive clutch power toggle switches are in the OFF position.
- Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.
INITIATING CUES:
- Per SOP-36 Section 7.2.1, you are directed to place the Zero Mode Bypass in operation.
PALISADES NUCLEAR PLANT Page 12 of 12 JULY 2008