ML091520476

From kanterella
Jump to navigation Jump to search
NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO-ADMIN E, Title: Obtain Meteorological Data for Emergency Notification Form
ML091520476
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520476 (7)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO-ADMIN e TITLE: OBTAIN METEOROLOGICAL DATA FOR EMERGENCY NOTIFICATION FORM CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM RO-ADMIN 4 JOB PERFORMANCE MEASURE DATA PAGE Task: Obtain Meteorological Data for Emergency Notification Form Alternate Path: N/A Facility JPM #: JPM RO-A.4 (ILT 2005 Cert)

K/A: 2.4.39 Importance: RO: 3.9 K/A Statement: Knowledge of RO responsibilities in emergency plan implementation Task Standard: EI-6.7, Attachment 1, completed with correct data obtained.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EI-3.0, Communications and Notifications EI-6.0, Offsite Dose Calculation and Recommendations for Protective Actions EI-6.7, Plant Site Meteorological System Validation Time:5 minutes Time Critical: NO Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008

JPM RO-ADMIN 4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EI-6.7, Attachment 1, Rev. 7 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.

INITIATING CUES:

The Shift Manager has directed you to obtain Meteorological Data by completing of EI-6.7, utilizing the Meteorological Data display in the Control Room.

PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008

JPM RO-ADMIN 4 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located EI-6.7, Attachment 1 located S U Comment:

Notes: Evaluator provides candidate with a Working Copy.

EVALUATOR NOTE: EI-6.7 Attachment 1 is completed by referencing steps 5.1.3 and 5.1.4. Due to wind speed and wind direction at 10 meters unavailable, 60 meter data is used.

Proc. Step TASK ELEMENT 2 STANDARD Grade On EI-6.7 Att. 1 data recorded as follows:

Obtain meteorological data from the PPC, page 351 WS, Wind Speed = 6.93 mph 5.1.3 S U WS, Wind Speed (WS60) _9_MPH 9 mph X .77 = 6.93 MPH

( X ) 60 meters, *corrected Comment:

Notes: WS60 must be used. WS60 multiplied by 0.77 to obtain corrected wind speed.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade Obtain meteorological data from the PPC, On EI-6.7 Att. 1 data recorded as follows:

page 351 5.1.3 WD, Wind Direction (WD60) ____° WD, Wind Direction = 73° from S U

( X ) 60 meters Comment:

Notes: WD60 must be used.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008

JPM RO-ADMIN 4 Proc. Step TASK ELEMENT 4 STANDARD Grade Obtain meteorological data from the PPC, page 351 On EI-6.7 Att. 1 data recorded as follows:

5.1.4 Stability Class (STAB) ____ S U Stability Class = C Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade On EI-6.7 Att. 1 data recorded as follows:

EI-6.7, Attachment 1 completed: Date: Todays date n/a S U Date:, Time:, Completed By: Time: Current time Completed By: Operators name Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade Notify the CRS that EI-6.7 Attachment 1 Operator notifies CRS of completion of EI-6.7, n/a completed. Attachment 1. S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008

JPM RO-ADMIN 4 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

The Shift Manager, acting as the Site Emergency Director, has declared an Alert condition. A thunderstorm is in progress.

INITIATING CUES:

The Shift Manager has directed you to obtain Meteorological Data by completing of EI-6.7, utilizing Meteorological Data display in the Control Room.

PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008

Proc No EI-6.7 Attachment 1 Revision 7 Page 1 of 1 PLANT SITE METEOROLOGICAL SYSTEM WORKSHEET

1. WS, Wind Speed = ___6.93____ mph ( ) 10 meters (X) 60 meters, *corrected (See Step 5.1.3 or 5.2.6)
  • Multiply by 0.77 ( 9 MPH X 0.77 = 6.93 MPH)
2. WD, Wind Direction = ___73___ ° from ( ) 10 meters (X) 60 meters (See Step 5.1.3 or 5.2.6)

(see Step 5.1.4 or 5.2.7)

3. Stability Class = ___C Date: __TODAY_____ Time: __NOW___ Completed By: __JOE OPERATOR_______

ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008