ML091520500

From kanterella
Jump to navigation Jump to search
NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System H, Title: Set RIA-1113 Waste Gas Discharge Monitor Hi Alarm Setpoint
ML091520500
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520500 (9)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM h TITLE: SET RIA-1113 WASTE GAS DISCHARGE MONITOR HI ALARM SETPOINT CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO SYSTEM h JOB PERFORMANCE MEASURE DATA PAGE Task: Adjust RIA-1113 Waste Gas Discharge Monitor Hi Alarm Setpoint Alternate Path: NO Facility JPM #: PL-OPS-RMS-001J K/A: 073A4.01 Importance: RO: 3.9 SRO: 3.9 K/A Statement: Ability to manually operate and/or monitor in the control room: effluent release Task Standard: Waste Gas Discharge Monitor,RIA-1113, high alarm setpoint adjusted to 8585 CPM Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-38, Gaseous Waste Monitoring System Validation Time:10 minutes Time Critical: NO Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 9 JULY 2008

JPM: RO SYSTEM h EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-38, Gaseous Waste Monitoring System Release Order, Form HP 6.6-3 (batch card)

Safety glasses (optional)

Fire Retardant Class 1 Electrical Safety Shirt (optional)

Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
  • Release Order, Form HP 6.6-3 (batch card) is available.
  • Breaker 34 on Y-01 is closed.
  • RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
  • A check source has been completed on RIA-1113 with a reading of 620000 CPM.

INITIATING CUES:

  • The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.

PALISADES NUCLEAR PLANT Page 3 of 9 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-38, Section 7.3.6 SOP-38, Section 7.3.6 located n/a S U Comment:

Evaluator provides candidate with a Working Copy of SOP-38 and Form HP 6.6-3 Proc. Step TASK ELEMENT 2 STANDARD Grade READ the As Found count rate on RIA- 9.5 x 101 As Found count rate read on RIA-7.3.6a 1113, Waste Gas Discharge Monitor 1113 (given in initial conditions) S U Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade PULL RIA-1113 out from the panel about RIA-1113 pulled out from panel about 6 inches.

7.3.6b (6) inches to access the control buttons S U Comment:

NOTE: Operator may don safety glasses and a Fire Retardant Class 1 electrical safety shirt, although this is not required.

Proc. Step TASK ELEMENT 4 STANDARD Grade VERIFY the Function switch is on 0. Verifies right side of Function Switch is set to 7.3.6c (seen on the right side of the switch) 0. S U Comment:

PALISADES NUCLEAR PLANT Page 4 of 9 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 5 STANDARD Grade PRESS Enter button to display the High Enter button pressed and one digit blinking.

7.3.6d Alarm setpoint. S U Comment:

NOTE: Control buttons and Function switch are located on the right, inside RIA-1113. The control buttons are labeled Digit, Value, and Enter.

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade SET the High Alarm Setpoint per Form HP 6.6-3, WGDT Release Authorization, by performing the following as necessary: "Digit" and "Value" push buttons used to change 3

the trip setpoint to 8.6 x 10 (8600) CPM value.

IF changing the digit value, THEN 7.3.6e S U PRESS the Value pushbutton until the desired value for that digit is displayed IF selecting another digit, THEN PRESS the Digit pushbutton Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade WHEN entire display indicates the desired Setpoint, THEN PRESS the Enter Enter pushbutton pressed 7.3.6f pushbutton S U Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 9 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 8 STANDARD Grade PUSH the monitor back into panel. Monitor pushed back into panel.

7.3.6g S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade PRESS High Alarm pushbutton on the 3 High Alarm push button pressed and 8.6 x 10 front of RIA-1113 to verify High Alarm 7.3.6h (8600) CPM trip setpoint verified. S U Setpoint is correct.

Comment:

Proc. Step TASK ELEMENT 10 STANDARD Grade PRESS Alarm Ack pushbutton to clear any Alarms clear.

7.3.6i alarms that may have annunciated. S U Comment:

Proc. Step TASK ELEMENT 11 STANDARD Grade VERIFY EK-1364, Gaseous Waste Monitoring Hi Radiation annunciator is Alarm clear.

7.3.6j CLEAR. S U Comment:

PALISADES NUCLEAR PLANT Page 6 of 9 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 12 STANDARD Grade NOTIFY RETS/REMP representative of Step not necessary, setpoint raised for batch 7.3.6k the new High Alarm Setpoint. release. S U Comment:

NOTE: Evaluator: If operator starts to contact RETS/REMP, STATE: they are aware that the High Alarm Setpoint has been raised for the batch release.

Proc. Step TASK ELEMENT 13 STANDARD Grade Notify the CRS that RIA-1113 High Alarm CRS notified of RIA-1113 setpoint raised to 8.6 3

n/a Setpoint is 8.6 x 10 (8600) CPM. x 103 (8600) CPM. S U Comment:

NOTE: Evaluator Cue: If Operator asks if Batch Card needs to be signed in Alarm Set By: space, RESOND: YES, sign the Batch Card END OF TASK PALISADES NUCLEAR PLANT Page 7 of 9 JULY 2008

JPM: RO SYSTEM h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
  • Release Order, Form HP 6.6-3 (batch card) is available.
  • Breaker 34 on Y-01 is closed.
  • RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
  • A check source has been completed on RIA-1113 with a reading of 620000CPM.

INITIATING CUES:

  • The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.

PALISADES NUCLEAR PLANT Page 8 of 9 JULY 2008

FORM HP 6.6-3 Proc No HP 6.6 Attachment 3 WGDT RELEASE AUTHORIZATION Revision 21 Page 1 of 2 WGDT # __T-101C______ Batch Number __08________013_____

Isolation Date 07/12/07 Time 1200 Release Volume 32.5 m3

-5 Isolation Pressure 93 psig Gamma Conc 7.24E Ci/cc 1

Release Pressure 93 psig Expected RIA-1113 RDG 9.5 x 10 cpm Qtr A i /C i 0.1 (must be < 0.5)

Year-to-Date A i /C i 0.24 (must be < 1.0)

APPROVAL TO RELEASE

+3 RIA-1113 Release Limit 8.5E cpm RETS Analyst Jane Retssup Today / 0815 Shift Manager Ralph Manager Today / 0840 C Main Exhaust Fan If RIA-1113 is not operational, effluent releases O In Service V-6A V-6B I/S fan may continue provided that prior to release:

N T Purge RIA-1113 1. At least two independent samples are 5

R Source Check RIA-1113 6.5 X 10 cpm analyzed; and O RIA-1113 Release Limit 3

8.5 x 10 cpm L 1 2. At least two technically qualified RIA-1113 Background + 9.5 x 10 cpm members of the Facility Staff R RIA-1113 Alarm Setpt =

3 8.6 x 10 cpm M independently verify the release rate Alarm Set By: calculations and discharge line valving.

O Alarm Verified By:

P Palisades ODCM Appendix A, Table A-1, Purge RIA-1113 After Release E Item 1.a Action 1.

R Reset Alarm to 2500 cpm Alarm Reset By:

Alarm Reset Verified By:

Remarks:

PALISADES NUCLEAR PLANT Page 9 of 9 JULY 2008