ML22146A024
| ML22146A024 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/08/2017 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Entergy Nuclear Operations |
| Baker R | |
| Shared Package | |
| ML17142A234 | List: |
| References | |
| Download: ML22146A024 (27) | |
Text
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Palisades Task No: PL-115 209 01 04 Task
Title:
Comply with an RWP Job Performance Measure No: 2017 Remediation Admin 3 K/A
Reference:
2.3.7, Ability to comply with radiation work permit requirements during normal or emergency conditions Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance _______________
Actual Performance _______X________
Classroom ______X________
Simulator ______________
Plant __________
Appendix C Job Performance Measure Worksheet Form ES-C-1 Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. The reactor is at full power.
- 2. QO-19, Inservice Test Procedure-HPSI Pumps and ESS Check Valve Operability Test is being performed under WO 543210, after HPSI Pump, P-66B maintenance.
- 3. Two Pipe fitters are working near P-8C, Auxiliary Feedwater Pump Task Standard:
Review and Approve A Primary System Leakage Calculation (DWO-1,
, PCS Inventory Form)
Required Materials:
Blank Radiation Worker trip Ticket East Engineered Safeguards Survey map West Engineered Safeguards Survey map Operations General RWP General
References:
EN-RP-100, Radworker Expectations EN-RP-105, Radiological Work Permits Initiating Cue:
You have been directed to take vibrational data during the performance of Technical Specification Surveillance for the HPSI Pump, P-66B (QO-19, Inservice Test Procedure-HPSI Pumps and ESS Check Valve Operability Test It is expected to take you 15 minutes in the pump room.
You are to complete a Radiation Worker Trip Ticket for this job Time Critical Task:
No Validation Time:
15 minutes
Appendix C 3
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 1, Obtain copy of the Operations General RWP, Survey Maps and Trip Ticket Standard:
Candidate is provided the Operations General RWP, Survey Maps and Trip Ticket Comment:
Evaluator provides candidate with the Operations General RWP, Survey Maps and Trip Ticket.
Performance step: 2, Candidate completes Name section of Trip Ticket Standard:
Fills in name in blank on trip ticket Comment:
Performance step: 3, Candidate completes Badge Number section of Trip Ticket Standard:
Fills in name in blank on trip ticket Comment:
Appendix C 4
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 4 Candidate completes Date section of Trip Ticket Standard:
Fills in date in blank on trip ticket Comment:
Performance step: 5 Candidate completes WO # section of Trip Ticket Standard:
Fills in WO# 543210 in blank on trip ticket Comment:
WO Number given in turnover Performance step: 6 Candidate completes RWP section of Trip Ticket Standard:
Fills in 20170002 in RWP blank on trip ticket Comment:
Candidate uses number on RWP provided
Appendix C 5
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 7 Candidate completes Task Number section of Trip Ticket Standard:
Fills in 4 on Task blank on trip ticket Comment:
Candidate reviews all tasks and determines that Task 4 is correct due to job related to TS testing Performance step: 8 Candidate completes Department section of Trip Ticket Standard:
Fills in OPS on Dept. section Comment:
Performance step: 9 Candidate completes Supervisor section of Trip Ticket Standard:
Fills in supervisors name on Dept. section Comment:
Candidate can use any name.
Appendix C 6
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 10 Candidate completes SRD Dose Alarm Set Point section of Trip Ticket Standard:
Fills in 20 mrem on Self-Reading Dosimeter Set Point Dept. section Comment:
Determined from RWP Performance step: 11 Candidate completes SRD Dose Rate Alarm Set Point section of Trip Ticket Standard:
Fills in 125 mrem on Self-Reading Dosimeter Set Point Dept. section Comment:
Determined from RWP Performance step: 12 Candidate completes 80% SRD Dose Alarm Set Point section of Trip Ticket Standard:
Fills in 16 mrem on Self-Reading Dosimeter Set Point Dept. section Comment:
Candidate calculates 80% of step 10 value (20)
Appendix C 7
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 13 Candidate completes Expected Dose section of Trip Ticket Standard:
Fills in approximately 4-10 mrem on expected dose (since 30mrem/hr)(0.25 hrs)=
7.5 mrem Comment:
Candidate reviews survey map and work paths and calculates an approximate dose expected for the 15 minute job. 30 mrem/hr should be the highest dose area needed to travel through. Roughly (16 mrem/hr)(.25 hrs)= 4 Performance step: 14 Candidate completes the work location section of Trip Ticket Standard:
Candidate identifies travel through 570 East Engineered Safeguards room and into West Engineered Safeguards Room on work location section of trip ticket Comment:
Performance step: 15 Candidate completes the Work Area Dose Rate section of Trip Ticket Standard:
Candidate identifies 8-22 mrem/hr near P-66B, HPSI Pump section of trip ticket Comment:
Candidate uses survey map to determine estimate
Appendix C 8
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 16 Candidate completes the Contamination Level section of Trip Ticket Standard:
Candidate identifies 100 dpm/100cm2 at P-66B, HPSI Pump section of trip ticket Comment:
Candidate uses survey map and determines that the pump has high contamination however work area expected not to exceed 100dpm/cm2 Performance step: 17 Candidate completes the Low Dose Area Location Area section of Trip Ticket Standard:
Candidate identifies LDWA in 570 West Engineered Safeguards SW Corner of room on trip ticket Comment:
Candidate uses survey map to identify LDWA Performance step: 18 Candidate completes the RCA Hazards section of Trip Ticket Standard:
Candidate identifies job as RA, HRA, CA section of trip ticket Comment:
Using survey map candidate determines a Radiation Area, High Radiation Area and Contamination Area are all applicable
Appendix C 9
Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step:19 Candidate completes the HR or LHR area section of Trip Ticket Standard:
Candidate identifies job as HR and checks the Yes box section of trip ticket Comment:
A briefing is required due to HRA being entered. If asked what name to place in the HR briefing respond that Roger P. Technician provided the HR briefing Performance step:20 Candidate completes the RP Coverage section of Trip Ticket Standard:
Candidate identifies determination must be made and requests RP support for coverage. Once told the intermittent portion will be circled on the Trip Ticket.
Comment:
If asked what RP coverage will be provided respond that intermittent coverage will be provided Terminating cue:
EVALUATOR QUE: When candidate completes the fromt page of the trip ticket, end the JPM.
Appendix C 10 Form ES-C-1 Verification of Completion Job Performance Measure No.
ADMIN JPM 3 Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question: __________________________________________________________________
Response: _________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________
Appendix C 11 Form ES-C-1 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Initial Conditions:
- 1. The reactor is at full power.
- 2. QO-19, Inservice Test Procedure-HPSI Pumps and ESS Check Valve Operability Test is being performed under WO 543210, after HPSI Pump, P-66B maintenance.
- 3. Two Pipe fitters are working near P-8C, Auxiliary Feedwater Pump Initiating Cue: You have been directed to take vibrational data during the performance of Technical Specification Surveillance for the HPSI Pump, P-66B (QO-19, Inservice Test Procedure-HPSI Pumps and ESS Check Valve Operability Test)
It is expected to take you 15 minutes in the pump room.
You are to complete a Radiation Worker Trip Ticket for this job
Appendix C 12 Form ES-C-1 Student Handouts
Appendix C 13 Form ES-C-1 Student Handouts
Appendix C 14 Form ES-C-1 Student Handouts
Appendix C 15 Form ES-C-1 Student Handout
Appendix C 16 Form ES-C-1 Student Handout
Appendix C 17 Form ES-C-1 Student Handout
Appendix C 18 Form ES-C-1 Student Handout
Appendix C 19 Form ES-C-1 Student Handout
Appendix C 20 Form ES-C-1 Student Handout
Appendix C 21 Form ES-C-1 Student Handout
Appendix C 22 Form ES-C-1 Student Handout
Appendix C 23 Form ES-C-1 Student Handout
Appendix C 24 Form ES-C-1 Student Handout
Appendix C 25 Form ES-C-1 Student Handout
Appendix C 26 Form ES-C-1 Student Handout
Appendix C 27 Form ES-C-1 Answer Key