Text
NRC EXAM MATERIAL Page 1 of 16 Palisades April 2020 PALISADES 2020 INITIAL NRC EXAM JOB PERFORMANCE MEASURE JPM: CONDUCT OF OPERATIONS: A1.a.
TITLE: REVIEW OF DETERMINATION OF EMERGENCY BORATION REQUIREMENTS CANDIDATE:
EXAMINER:
NRC EXAM MATERIAL Page 2 of 16 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-341 224 03 03 / Implement the Requirements of the Operating Requirements Manual, Technical Specifications, and Plant License.
Alternate Path: No.
Facility JPM #: PLJPM-LOR-SRO Admin 2, Review of Determination of Emergency Boration Requirements, revision 00.
K/A: 2.1.37 Importance:
SRO 4.6 K/A Statement: Knowledge of procedures, guidelines, or limitations associated with reactivityl management. (CFR: 41.1 / 43.6 / 45.6)
Task Standard: Identify errors in the performance of the Supplement and provide corrected readings for those errors per the Answer Key.
Preferred Evaluation Location: Classroom __X __
In Plant Preferred Evaluation Method:
Perform
_ X___
Simulate ______
References:
EOP Supplement 35, Determination of Emergency Boration Requirements, revision 009 Cycle 27 Technical Data Book Validation Time: 10 minutes Time Critical: No Candidate:
Time Start: ________
Time Finish: ________
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
NRC EXAM MATERIAL Page 3 of 16 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
Answer Key Calculator Ruler Red pen READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The plant is at 8900 MWD/MTU (MOL).
PCS boron concentration is 1000 ppm.
The reactor has been manually tripped due to a PCS leak.
Three (3) full length control rods did not fully insert on the reactor trip.
Emergency Manual Boration has been initiated from both boric acid flow paths per SOP-2A, Attachment 14.
EOP-1.0, Standard Post Trip Actions, is complete.
The Control Room Supervisor (CRS) has entered EOP-4.0, Loss of Coolant Accident Recovery.
A PCS cooldown is in progress with PCS temperature currently at 514oF.
CBAT Boron Concentration is 12400 ppm.
INITIATING CUE:
The CRS directs you to review, in its entirety, the completed EOP Supplement 35, Determination of Emergency Boration Requirements, which used the Technical Data Book data for this event. You are to identify errors, if any, by circling in red pen and provide the correct value.
Provide copy of completed EOP Supplement 35 (JPM Attachment 1) and Cycle 27 Technical Data Book.
NRC EXAM MATERIAL Page 4 of 16 Palisades April 2020 Time Start: ________
Proc.Step TASK ELEMENT 1 STANDARD Grade 1.01 MULTIPLY the number of full length Control Rods beyond one, NOT fully inserted, by 225 ppm.
__________ x 225 ppm = _____ ppm (Number of stuck rods > 1)
Candidate identifies that the incorrect value of full length control rods beyond one was recorded for this calculation.
AND Circles 3 in red pen. (ERROR)
AND Identifies that the calculated value for this step is not correct.
AND Circles 675 in red pen. (ERROR)
AND Documents 2 for full length control rods beyond one and 450 for calculated value in red pen.
S U Comment:
Evaluator Cue: Provide cue to Candidate to determine and document the correct values in red pen adjacent to the errors identified.
Evaluator Note: Per Initial Conditions three control rods were not fully inserted, therefore, 2 should have been recorded for number of stuck rods > 1 and 450 should have been recorded for final ppm value.
CRITICAL STEP
NRC EXAM MATERIAL Page 5 of 16 Palisades April 2020 Proc.Step TASK ELEMENT 2 STANDARD Grade 1.02 DETERMINE the required Shutdown Boron concentration using the current Core Burnup for the desired Plant Condition from either of the following:
- Duty Station Manager's Book
- Technical Data Book, Figure 1.2 Candidate reviews the Required Shutdown Boron concentration value is recorded as 1395.
S U Comment:
Evaluator Note: Per Initial Conditions - core burnup is 8900 MWD/MTU and PCS temperature is 514oF; the Technical Data Book was used; and Candidate uses the <525, 2% delta rho curve to determine required boron concentration.
CRITICAL STEP Proc.Step TASK ELEMENT 3 STANDARD Grade 1.03 DETERMINE Refueling Boron concentration Technical Data Book Figure 1.1.
Candidate reviews that the Refueling Boron concentration from Technical Data Book Figure 1.1 is recorded as 2807.
S U Comment:
CRITICAL STEP
NRC EXAM MATERIAL Page 6 of 16 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 1.04 ADD boron requirements for stuck control rods and required Shutdown Boron concentration.
- a. Stuck control rod boron requirement (Step 1.01): = _____
ppm
- b. Required Shutdown Boron concentration (Step 1.02): + _____ ppm
- c. Final required boron concentration:
= _____
ppm Candidate identifies that the incorrect value is recorded for Stuck control rod boron requirement.
AND Circles 675 in red pen. (ERROR)
AND Documents 450 as correct value in red pen.
AND Reviews that 1395 is recorded for Required Shutdown Boron Concentration.
AND Identifies that the incorrect value is recorded for Final required boron concentration (due to the error carried forward from step 1.01).
AND Circles 2070 in red pen. (ERROR)
AND Documents 1845 as correct value in red pen.
S U Comment:
CRITICAL STEP
NRC EXAM MATERIAL Page 7 of 16 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade 1.05 SUBTRACT latest PCS boron concentration from final required boron concentration.
- a. Final required boron concentration:
ppm
ppm
- c. Required boron change:
=
_____ppm Candidate identifies that the incorrect value is recorded from step 1.04 recorded as the Final required boron concentration.
AND Circles 2070 in red pen (ERROR)
AND Documents 1845 as correct value in red AND Verifies 1000 is recorded as the Latest PCS boron concentration.
AND Candidate identifies that the incorrect value is recorded for the Required boron change.
AND Circles 1070 in red pen (ERROR)
AND Documents 845 as correct value in red Comment:
Evaluator Cue: Provide cue to Candidate to determine and document the correct values in red pen adjacent to any errors identified, if any.
CRITICAL STEP
NRC EXAM MATERIAL Page 8 of 16 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 1.06 DETERMINE the change in CBAT level required to raise PCS boron concentration to final required boron concentration.
- b. Amount of CBAT level change (%)
per 100 ppm (from Table A):
_____ %/100 ppm
- c. Required change in CBAT Level (%):
______ X ______ X 0.01 =____%
(Step 1.06.a.) (Step 1.06.b.)
Candidate identifies that the incorrect value is recorded value of 1070 is recorded for 1.06a.
AND Circles 1070 in red pen (ERROR)
AND Documents 845 in red pen AND Identifies that an incorrect value has been recorded for CBAT level change (%) per 100 ppm in 1.06b and circles 9.9 in red pen.
(ERROR)
AND Documents the correct value of 11.0 in red pen.
AND Identifies that incorrect value from 1.06a and 1.06b has been recorded in 1.06c and circles 1070 and 9.9 in red pen. (ERROR)
AND Documents the correct value of 845 and 11.0 in red pen.
AND Identifies that the recorded value is incorrect for the required change in CBAT level in 1.06c and red circles 105.93. (ERROR)
AND Documents the correct value of 92.95 in red pen.
S U Comment:
Evaluator Note: Per NOTE 2: If CBAT Boron Concentration is between two numbers or if both tanks are being utilized, then use the lower concentration in the calculation.
Candidate should have used the Initial Conditions value of 12400 ppm for CBAT Boron concentration and determined that 12000 ppm (lower value) in Table A must be used in determining % level change in CBAT. The performer incorrectly interpolated the Table A values.
Correct value in 6b should be 11.0 CRITICAL STEP
NRC EXAM MATERIAL Page 9 of 16 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 1.07 REQUEST Reactor Engineering perform an EM-04-08 calculation as time permits.
Candidate verifies that Reactor Engineering has been notified.
S U Comment:
Evaluator Cue: When requested as Reactor Engineering to perform an EM-04-08 calculation, provide cue that the calculation is being performed.
Proc.Step TASK ELEMENT 8 STANDARD Grade N/A Completed By and Date/Time are filled out.
Candidate verifies that the Completed By and Date/Time information are signed.
S U Comment:
Proc.Step TASK ELEMENT 9 STANDARD Grade N/A CRS informed of completion of review and errors found.
Candidate informs CRS of completion of review and errors found.
S U Comment:
Evaluator Cue: Provide cue that the performer will correct the errors identified and another Operator will review that calculation.
Time End: ________
END OF TASK
NRC EXAM MATERIAL Page 10 of 16 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.
INITIAL CONDITIONS:
The plant is at 8900 MWD/MTU (MOL).
PCS boron concentration is 1000 ppm.
The reactor has been manually tripped due to a PCS leak.
Three (3) full length control rods did not fully insert on the reactor trip.
Emergency Manual Boration has been initiated from both boric acid flow paths per SOP-2A, Attachment 14.
EOP-1.0, Standard Post Trip Actions, is complete.
The Control Room Supervisor (CRS) has entered EOP-4.0, Loss of Coolant Accident Recovery.
A PCS cooldown is in progress with PCS temperature currently at 514oF.
CBAT Boron Concentration is 12400 ppm.
INITIATING CUE:
The CRS directs you to review, in its entirety, the completed EOP Supplement 35, Determination of Emergency Boration Requirements, which used the Technical Data Book data for this event. You are to identify errors, if any, by circling in red pen and provide the correct value.
NRC EXAM MATERIAL Page 11 of 16 Palisades April 2020
NRC EXAM MATERIAL Page 12 of 16 Palisades April 2020
NRC EXAM MATERIAL Page 13 of 16 Palisades April 2020
NRC EXAM MATERIAL Page 14 of 16 Palisades April 2020 JPM ATTACHMENT 1
NRC EXAM MATERIAL Page 15 of 16 Palisades April 2020 JPM ATTACHMENT 1
NRC EXAM MATERIAL Page 16 of 16 Palisades April 2020 JPM ATTACHMENT 1
NRC EXAM MATERIAL Page 1 of 13 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: CONDUCT OF OPERATIONS: A.1b TITLE: AUTHORIZATION REQUIREMENTS TO EXCEED WORK HOURS CANDIDATE:
EXAMINER:
NRC EXAM MATERIAL Page 2 of 13 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-343 123 03 03 / Ensure Shift Manning and Work Hour limitations are met IAW EN-OM-123.
Alternate Path: No.
Facility JPM #: New.
K/A: 2.1.5 Importance:
SRO: 3.9 K/A Statement: Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. (CFR: 41.10 / 43.5 / 45.12).
Task Standard: Identify work hour limits exceeded and complete EN-OM-123 per answer key.
Preferred Evaluation Location: Classroom __X__
In Plant Preferred Evaluation Method:
Perform
_X___
In Plant
References:
EN-OM-123, Fatigue Management Program, revision 015.
Validation Time: 12 minutes Time Critical: No Candidate:
Time Start: ________
Time Finish: ________
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
NRC EXAM MATERIAL Page 3 of 13 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EN-OM-123, Fatigue Management Program, revision 015.
JPM Attachment 1, 14-day work history for the Shift Manager (SM)
JPM Attachment 2, EN-OM-123 Attachment 7 blank.
JPM Attachment 3, EN-OM-123 Attachment 7 answer key.
Normal Control Room References READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Plant is at 100% power.
National Weather Service has issued a notification for Van Buren County of a winter storm with sustained winds of 45 mph and considerable falling snow for the next four (4) hours.
Van Buren County Officials have notified the Palisades that attempts to keep major roadways clear have been suspended.
AOP-38, Acts of Nature, has been entered.
Exterior activities have been restricted due to wind chills and blowing snow.
It is 1740 on Saturday and the oncoming nightshift Shift Manager (SM) was unable to make it to work.
The dayshift SM is the only SRO onsite with SM qualifications and is not expected to be relieved for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
eSOMS PQ&S software is not available.
INITIATING CUE:
Given a 14-day work history, you are directed to evaluate work hour limits for the SM per EN-OM-123, Fatigue Management Program, and take required actions, if any.
NRC EXAM MATERIAL Page 4 of 13 Palisades April 2020 Time Start: ________
Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtains a copy of EN-OM-123, Fatigue Management Program, and 14-day work history for the SM.
Candidate simulates or describes where a copy of EN-OM-123 can be found.
S U Comment:
Evaluator Cue: When Candidate simulates or describes where a copy of EN-OM-123 can be found provide candidate with a copy of EN-OM-123 and the SMs 14-day work history (JPM Attachment 1).
Proc.Step TASK ELEMENT 2 STANDARD Grade N/A Reviews work hour limits for individuals performing Covered Work Candidate determines that the SM will violate the work hour limit of:
Maximum of 72 work hours in any 7-day (168-hour) period.
AND Determines that Section 5.9, Waiver Process, must be performed.
S U Comment:
Evaluator Note: Work hour limitations are listed in EN-OM-123 section 5.2, and Attachment 6. The NOTE above Section 5.2 Step 1 states:
Work hour limits for covered workers may only be exceeded during Exceptions (Reference Section 5.3) or when evaluated and approved using the Waiver Process (Reference Section 5.9).
CRITICAL STEP
NRC EXAM MATERIAL Page 5 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade 5.9 Determine that prior authorization is required to any Covered Worker exceeding work hour limits while performing covered work.
Candidate determines that the waiver process shall be used to provide authorization for the SM to continue performing covered work.
AND Determines that documentation per, Waiver Basis and Approval, must be completed for the SM.
S U Comment:
Evaluator Cue: When Candidate identifies that Attachment 7 must be completed, provide Candidate with a copy of Attachment 7 (JPM Attachment 2).
If Candidate identifies that Attachment 8, Covered Worker Capability Assessment, must also be completed, provide cue that another Operator will complete.
CRITICAL STEP
NRC EXAM MATERIAL Page 6 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade Att. 7 Complete Attachment 7, Waiver Basis and Approval, Section A, Adverse Condition Requiring A Waiver.
Refer to Procedure Section 5.9.
Candidate fills in their name, date/time.
AND Completes Section A by checking boxes:
Necessary to mitigate or prevent a condition adverse to safety AND Describes circumstances and basis for approval (should include adverse conditions preventing relief of the only SM onsite).
AND Obtains Manager, Shift Operations, approval per telecom and documents.
S U Comment:
Evaluator Cue: When Candidate seeks signature from the Manager, Shift Operations (B Baker),
provide cue:
Manager, Shift Operations, has authorized and signed per telecon.
CRITICAL STEP Proc.Step TASK ELEMENT 5 STANDARD Grade Att. 7 Complete Attachment 7, Waiver Basis and Approval, Section B, Scope of Work.
Refer to Procedure Section 5.9.
Candidate fills out Section B with brief description of work for the SM including performing all the license duties and responsibilities.
AND Signs Completed by.
S U Comment:
CRITICAL STEP Proc.Step TASK ELEMENT 6 STANDARD Grade
NRC EXAM MATERIAL Page 7 of 13 Palisades April 2020 Att. 7 Complete Attachment 7, Waiver Basis and Approval, Section C, Authorization.
Refer to Procedure Section 5.9.
Candidate fills out:
Effective Date / time as TODAY and CURRENT TIME.
AND Expiration Date / time as TODAY and a minimum of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and no more than 14 days.
AND Obtains SVP approval per telecom and records Date / Time and records.
S U Comment:
Evaluator Cue: When candidate seeks out SVP or GMPO for approval, provide cue:
The SVP has approved the waiver at the current date and time.
Evaluator Note: Duration should encompass a reasonable time for the storm to pass and a relief to get on site. BUT EXPIRATION TIME/DATE IS NOT CRITICAL CRITICAL STEP Proc.Step TASK ELEMENT 7 STANDARD Grade Att. 7 Complete Attachment 7, Waiver Basis and Approval, Section D, Condition Reporting.
Refer to Procedure Section 5.9.
Candidate simulates or describes initiating the condition report and performing.
AND Identifies that another Operator will perform these actions.
S U Comment:
Evaluator Cue: When Candidate simulates or describes initiating a condition report, provide cue:
Another Operator will initiate the condition report and perform Attachment 8.
Time End: ________
END OF TASK
NRC EXAM MATERIAL Page 8 of 13 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.
INITIAL CONDITIONS:
Plant is at 100% power.
National Weather Service has issued a notification for Van Buren County of a winter storm with sustained winds of 45 mph and considerable falling snow for the next four (4) hours.
Van Buren County Officials have notified the Palisades that attempts to keep major roadways clear have been suspended.
AOP-38, Acts of Nature, has been entered.
Exterior activities have been restricted due to wind chills and blowing snow.
It is 1740 on Saturday and the oncoming nightshift Shift Manager (SM) was unable to make it to work.
The dayshift SM is the only SRO onsite with SM qualifications and is not expected to be relieved for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
eSOMS PQ&S software is not available.
INITIATING CUE:
Given a 14-day work history, you are directed to evaluate work hour limits for the SM per EN-OM-123, Fatigue Management Program, and take required actions, if any.
NRC EXAM MATERIAL Page 9 of 13 Palisades April 2020 JPM ATTACHMENT 1 14-day work history for the Shift Manager (In the following Table DAY 1 means today, DAY 2 means yesterday, etc).
DAY 14 13 12 11 10 9
8 7
6 5
4 3
2 1
Shift schedule (a)
N N
N D
D D
D D
D Shift start time 1800 1800 1800 0600 0600 0600 0600 0600 0600 Shift end time 0600 0600 0600 1800 1800 1800 1800 1800 1800 Hours worked (b) 12 12 12 12 12 12 12 12 12 (a) Indicate D for a day-shift schedule and N for a night shift schedule (b) Approximate work hours each day
NRC EXAM MATERIAL Page 10 of 13 Palisades April 2020 JPM ATTACHMENT 2
NRC EXAM MATERIAL Page 11 of 13 Palisades April 2020 JPM ATTACHMENT 2
NRC EXAM MATERIAL Page 12 of 13 Palisades April 2020 JPM ATTACHMENT 3 - ANSWER KEY
NRC EXAM MATERIAL Page 13 of 13 Palisades April 2020 JPM ATTACHMENT 3 - ANSWER KEY
NRC EXAM MATERIAL Page 1 of 10 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: EQUIPMENT CONTROL: A.2 TITLE: LCO BOARD AND LCO ANNEX REVIEW DURING SRO TURNOVER CANDIDATE:
EXAMINER:
NRC EXAM MATERIAL Page 2 of 10 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-341 001 03 03 / Conduct SRO Turnover.
Alternate Path: No.
Facility JPM #: New.
K/A: 2.2.23 Importance:
SRO: 4.6 K/A Statement: Ability to track Technical Specification limiting conditions for operations.
Task Standard: Identify two errors during the SRO review of LCO Board and LCO Annex log entries during shift turnover.
Preferred Evaluation Location: Classroom __X__
In Plant Preferred Evaluation Method:
Perform
_ X__
In Plant
References:
Admin 4.00, Operations Organization, Responsibilities and Conduct, revision 063 Admin 4.02, Control of Equipment, revision 082 EN-OP-115-03, Shift Turnover and Relief, revision 005 ODCM ORM FPIP-4 Validation Time: 7 minutes Time Critical: No Candidate:
Time Start: ________
Time Finish: ________
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
NRC EXAM MATERIAL Page 3 of 10 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
Admin 4.00, Operations Organization, Responsibilities and Conduct, revision 063 Admin 4.02, Control of Equipment, revision 082 EN-OP-115-03, Shift Turnover and Relief, revision 005 ODCM ORM FPIP-4 READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Plant is at 100% power.
It is 12/17/2019 at 0545.
The oncoming dayshift Crew is preparing for shift turnover.
INITIATING CUE:
You are to perform the LCO Status Board, Tech Specs, ODCM, and Operating Requirements Manual Verbatim Review.
Identify any errors and correct as appropriate.
NRC EXAM MATERIAL Page 4 of 10 Palisades April 2020 Time Start: ________
Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of LCO Board and LCO Annex.
Candidate obtains a copy of the LCO Board and LCO Annex for shift turnover.
S U Comment:
Evaluator Cue:
Provide Candidate with a copy of the LCO Board and LCO Annex (JPM Attachment 1).
NRC EXAM MATERIAL Page 5 of 10 Palisades April 2020 Proc.Step TASK ELEMENT 2 STANDARD Grade N/A Review LCO Board P-8B entry.
Candidate simulates or describes where a copy of Admin 4.02 can be obtained.
AND Reviews LCO Board P-8B entry.
AND Identifies that the P-8B, Steam Driven Auxiliary Feedwater Pump, entry has incorrect Technical Specification Action Statement duration.
AND Determines that the LCO 3.7.5 Action should be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as recorded on the LCO Board and NOT 7 days. (Error #1).
S U Comment:
Evaluator Cue: When Candidate simulates or describes where a copy of Admin 4.02 can be obtained, provide a copy of Admin 4.02.
Evaluator Note: The CRITICAL STEP is to identify that the LCO Action is incorrectly logged.
The eSOMS LCO Board Log shall identify equipment required to be OPERABLE by Technical Specifications and the Operating Requirements Manual (ORM) for the current mode of Plant operation that meet all of the following criteria:
Equipment is INOPERABLE.
Equipment condition enters the Plant in a Technical Specification action requirement specifying a time limit in which conformance to the conditions of the Limiting Condition for Operation must be met.
Equipment INOPERABILITY that may require a change in mode of Plant operation if the equipment cannot be made OPERABLE within the time limit specified by the Limiting Condition for Operation.
Evaluator Note: Review of the LCO Board and LCO Annex entries may occur in an order different than listed here.
CRITICAL STEP
NRC EXAM MATERIAL Page 6 of 10 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade N/A Review LCO Board RIA-0833, Service Water Discharge Monitor Candidate reviews LCO Board RIA-0833 AND Identifies this component is on the wrong board and should be on the LCO Annex.
(ERROR #2)
S U Comment:
Evaluator Note: Review of the LCO Board and LCO Annex entries may occur in an order different than listed here.
CRITICAL STEP Proc.Step TASK ELEMENT 4 STANDARD Grade N/A Review LCO Annex P-9B entry as part of shift turnover.
Candidate reviews LCO Annex P-9B entry as part of shift turnover.
AND Identifies no issues with the P-9B entry.
S U Comment:
Evaluator Note: Review of the LCO Board and LCO Annex entries may occur in an order different than listed here.
NRC EXAM MATERIAL Page 7 of 10 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade N/A Review LCO Annex TIA-0107 entry as part of shift turnover.
Candidate reviews LCO Annex TIA-0107 entry as part of shift turnover.
AND Identifies no issues with the TIA-0107 entry.
S U Comment:
Evaluator Note: Review of the LCO Board and LCO Annex entries may occur in an order different than listed here.
Proc.Step TASK ELEMENT 6 STANDARD Grade N/A Report completion of LCO Board and LCO Annex.
Candidate reports completion of LCO Board and LCO Annex review.
AND Identifies the two items that need to be addressed.
S U Comment:
Evaluator Cue: Acknowledge information.
Time End: ________
END OF TASK
NRC EXAM MATERIAL Page 8 of 10 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.
INITIAL CONDITIONS:
Plant is at 100% power.
It is 12/17/2019 at 0545.
The oncoming dayshift Crew is preparing for shift turnover.
INITIATING CUE:
You are to perform the LCO Status Board, Tech Specs, ODCM, and Operating Requirements Manual Verbatim Review.
Identify any applicable actions required as a result of your review.
NRC EXAM MATERIAL Page 9 of 10 Palisades April 2020 JPM ATTACHMENT 1 LCO Board Log Continuous Tuesday, December 17, 2019 EN-OP-115 12/15/2019 Component (Train): Left Train Auxiliary Feedwater.
08:04:00 Comments: Inoperable for P-8B, STEAM DRIVEN AUXILIARY FEEDWATER PUMP, maintenance.
Per Admin Proc. 4.11, all redundant equipment remains operable. There are no supported systems associated with the Tech Spec. LCO. All safety functions are maintained.
Condition when required OPERABLE: Modes 1, 2, 3, and 4 when SG are relied on for heat removal.
Tech. Spec./ ORM
Reference:
Tech. Spec. LOC 3.7.5 Required Action A.1 7 day Action Statement to restore trains to operable.
Item(s) for resolution (CR, CA WO): WO 337337 Required completion/further action time: 12/22/2019 @ 0804 [CRS26, MISC]
12/10/2019 Component (Train): RIA-0833, SERVICE WATER DISCHARGE MONITOR 07:13:53 Comments: Failed MR-14 surveillance checks.
Condition when required to be OPERABLE: During releases.
Tech. Spec./ORM/ODSM/GOP-14/FPIP/EI-17
Reference:
ODCM, E-17 Item(s) for resolution (CR, CA, WO): CR-PLP-2019-12345 Required completion time/further action: Effluent releases via this pathway may continue provided that, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, grab samples are collected and analyzed for radioactivity per ODCM/EO-17. [CRS26, MISC]
NRC EXAM MATERIAL Page 10 of 10 Palisades April 2020 JPM ATTACHMENT 1 LCO Annex Log Continuous Tuesday, December 17, 2019 EN-OP-115 12/16/2019 Component (Train): P-9B, DIESEL DRIVEN FIRE PUMP 08:04:00 Comments: P-9B, Non-Functional for planned maintenance.
Condition when required OPERABLE: At all times.
Tech. Spec./ ORM
Reference:
FPIP-4 Item(s) for resolution (CR, CA WO): WO 24681012, 1357911 Required completion/further action time: P-41, Diesel Fire Pump, test run completed SAT at 1530 on 12/15/2019. No further action required. [CRS26, MISC]
12/17/2019 Component (Train): TIA-0107, RELIEF AND SAFETY VALVE DISCHARGE TEMP IND, for RV-1039 02:10:05 Comments: Failed High Condition when required to be OPERABLE: Modes 1-3 Tech. Spec./ORM/ODSM/GOP-14/FPIP/EI-17
Reference:
ORM 3.17.6 Condition 8 Item(s) for resolution (CR, CA, WO): CR-PLP-2019-54321 Required completion time/further action: Required Action 8.a-Restore TIA-0107 to operable status prior to next Mode 3 entry from Mode 4. [CRS26, MISC]
NRC EXAM MATERIAL Page 1 of 9 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RADIATION CONTROL: A.3 TITLE: RESPOND TO STACK EFFLUENT RADIATION ALARMS CANDIDATE:
EXAMINER:
NRC EXAM MATERIAL Page 2 of 9 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-341 262 05 03 / Implement the Requirements of the Off-Site Dose Calculation Manual (ODCM)
Alternate Path: No.
Facility JPM #: New.
K/A: 2.3.15 Importance:
SRO: 3.1 K/A Statement: Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Task Standard: RIA-2326 is identified as failed and ODCM Table 1-1 action 3 is entered.
Preferred Evaluation Location: Simulator
__X__
In Plant Preferred Evaluation Method:
Perform
_ X___
In Plant
References:
ARP-33, Auxiliary Systems Scheme EK-02 (C-11A), revision 028 Offsite Dose Calculation Manual (ODCM), revision 030 SOP-38, Gaseous Process Monitoring System, revision 039 Validation Time: 10 minutes Time Critical: No Candidate:
Time Start: ________
Time Finish: ________
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
NRC EXAM MATERIAL Page 3 of 9 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
ARP-33, Auxiliary Systems Scheme EK-02 (C-11A), revision 028 Offsite Dose Calculation Manual (ODCM), revision 031 SOP-38, Gaseous Process Monitoring System, revision 039 Normal Control Room References Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Plant is at 100% full power.
EK-0231, Stack Eff/HT C-169/C-172 Fail/Trouble, alarm is received.
A Nuclear Plant Operator reports that Heat Trace panels C-172 and C-195 are normal.
INITIATING CUE:
The Control Room Supervisor (CRS) has directed you to determine the condition(s) that resulted in the receipt of EK-0231 and take any required actions.
NRC EXAM MATERIAL Page 4 of 9 Palisades April 2020 Time Start: ________
Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtains a copy of ARP-33, Auxiliary Systems Scheme EK-02 (C-11A).
Candidate simulates or describes where a copy of ARP-33 can be found.
S U Comment:
Evaluator Cue: When Candidate simulates or describes where a copy of ARP-33 can be found provide Candidate with a copy of ARP-33.
Proc.Step TASK ELEMENT 2 STANDARD Grade ARP-33 Window 31 CHECK RIAs for failed channel.
Candidate checks RIA-2325, RIA-2326, and RIA-2327 indications.
AND Identifies RIA-2326 indicates 0.00 E0.
AND Identifies RIA-2326 Range Alarm Indicator red light illuminated.
AND Identifies RIA-2326 has gone into Fail mode. (Fail red light ON.)
S U Comment:
Evaluator Note: Candidate may reference SOP-38 Attachment 1, System Malfunctions, to assist in evaluating monitors. Allow Candidate to use Simulator copy of SOP-38 Attachment 1 if requested. Erase when JPM complete.
CRITICAL STEP
NRC EXAM MATERIAL Page 5 of 9 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade ARP-33 Window 31 CHECK the following on RGEM Control Panel on back of C-11A:
VERIFY Communications light ON (indicates local controller connected and operating).
Candidate verifies that the RGEM Communications white light is ON.
S U Comment:
Proc.Step TASK ELEMENT 4 STANDARD Grade ARP-33 Window 31 VERIFY sample pump operating.
Candidate verifies sample pump operating by light indication (red light ON).
S U Comment:
Evaluator Note: Candidate may direct NPO to check RGEM pump operating locally.
Evaluator Cue: If asked as Nuclear Plant Operator (NPO) to check sample pump operating locally, using time compression, provide cue that sample pump has been verified running locally.
Proc.Step TASK ELEMENT 5 STANDARD Grade ARP-33 Window 31 VERIFY "Low Flow" alarm clear.
Candidate verifies that the System Low Flow alarm is clear (amber light OFF).
S U Comment:
NRC EXAM MATERIAL Page 6 of 9 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade ARP-33 Window 31 IF RIA(s) OR RGEM System failed, THEN REFER TO Palisades Offsite Dose Calculation Manual, Table 1-1.
Candidate simulates or describes where Palisades ODCM Table 1-1, Radioactive Gaseous Effluent Monitoring Instrumentation, can be located.
AND Refers to ODCM.
S U Comment:
Evaluator Cue: If Candidate simulates or describes where Palisades ODCM Table 1-1, Radioactive Gaseous Effluent Monitoring Instrumentation, can be located, provide Candidate with copy of ODCM.
Proc.Step TASK ELEMENT 7 STANDARD Grade ODCM Determine applicable actions from ODCM Table 1-1.
Candidate determines that ODCM Table 1-1 Action 3 is applicable. (With the number of channels operable less than required by the Minimum Operable Channels requirement, effluent releases via this pathway may continue provided grab samples are taken at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and these samples are analyzed for gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.)
AND Informs Chemistry of the need to perform grab samples.
AND Inform CRS of ODCM action entry.
S U Comment:
Evaluator Cue: If informed of the need to perform grab samples as Chemistry, provide cue that grab samples will be performed as directed.
If EI-17 required actions are mentioned by the Candidate, provide cue that another Operator will evaluate EI-17.
If informed as CRS of ODCM action entry, provide repeat back of information.
Evaluator Note: The CRITICAL STEP is to determine that ODCM Table 1-1 Action 3 is applicable.
CRITICAL STEP Time End: ________
END OF TASK
NRC EXAM MATERIAL Page 7 of 9 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.
INITIAL CONDITIONS:
Plant is at 100% full power.
EK-0231, Stack Eff/HT C-169/C-172 Fail/Trouble, alarm is received.
A Nuclear Plant Operator reports that Heat Trace panels C-172 and C-195 are normal.
INITIATING CUE:
The Control Room Supervisor (CRS) has directed you to determine the condition(s) that resulted in the receipt of EK-0231 and take any required actions.
NRC EXAM MATERIAL Page 8 of 9 Palisades April 2020 SIMULATOR SETUP INSTRUCTIONS
- Reset to IC-121 for LOI2020
NRC EXAM MATERIAL Page 9 of 9 Palisades April 2020
NRC EXAM MATERIAL Page 1 of 11 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: EMERGENCY PLAN: A.4 TITLE: CLASSIFY A MODE 5 EVENT CANDIDATE:
EXAMINER:
NRC EXAM MATERIAL Page 2 of 11 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-344 019 05 03 / Classify Emergency Events.
Alternate Path: No.
Facility JPM #: New.
K/A: 2.4.41 Importance:
SRO: 4.6 K/A Statement: Knowledge of the emergency action level thresholds and classifications Task Standard: Event is classified as an Alert under CA3.1 within 14 minutes and the Notification Form is completed per the Answer Key and sent within 15 minutes.
Preferred Evaluation Location: Simulator __X__
In Plant Preferred Evaluation Method:
Perform
__X___
In Plant
References:
EI-1, Emergency Classification and Actions, revision 060 EI-3, Communications and Notifications, revision 036 EAL Basis, Emergency Action Level Technical Bases, revision 008 SEP Supplement 1, EAL Wall Charts, revision 004 Validation Time: 10 minutes Time Critical: Yes - 14 minutes for Event classification and 15 minutes for completion of Notification Form and sending.
Candidate:
Time Start: ________
Time Finish: ________
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
NRC EXAM MATERIAL Page 3 of 11 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EI-3, Communications and Notifications, revision 036 EAL Basis, Emergency Action Level Technical Bases, revision 008 SEP Supplement 1, EAL Wall Charts, revision 004 InForm computer program open.
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The plant is in Mode 5 with PCS level at 624 6 (66% by LIA-0105 Wide Range indication) and PCS temperature at 189 oF.
The PZR manway is removed and PZR is vented to atmosphere.
P-67B, LPSI Pump, is the in-service pump for Shutdown Cooling (SDC).
At 10:00 P-67B trips.
The CRS has entered AOP-30, Loss of Shutdown Cooling, and identifies neither P-67A, LPSI Pump, nor P-67B will start.
At 10:02 Containment closure is achieved.
At 10:03 Containment Sump level is noted to be rising rapidly and EK-1351, Containment Sump Hi Level has annunciated.
At 10:04 LIA-0105, Reactor Vessel Level, and LIA-0106, Hot Leg Level, both indicate 0%.
RVLMS A and B red lights are lit for Sensors #1 - #6.
At 10:04 PCS temperature is noted to be 201oF and rising.
INITIATING CUE:
It is now 10:05 and you have been directed to classify the event in progress and generate a Notification Form using InForm, if required.
THIS JPM IS TIME CRITICAL
NRC EXAM MATERIAL Page 4 of 11 Palisades April 2020 Time Start: ________
Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtains a copy of SEP Supplement 1, EAL Wall Chart, for Mode 5, 6, or Defueled.
Candidate simulates or describes where a copy of SEP Supplement 1 can be found.
S U Comment:
Evaluator Cue: When Candidate simulates or describes where a copy of SEP Supplement 1 can be found, provide a copy of SEP Supplement 1.
Evaluator Note: Candidate may ask for additional references including EI-1, Emergency Classification and Actions, and EAL Basis, Emergency Action Level Technical Bases. Provide if requested.
TIME CRITICAL action clock for Event Classification within the remaining 14 minutes starts when JPM Time Start is recorded above. (EAL CU4.1 and CA3.1 thresholds were met at 10:04 and it is now 10:05).
Record Start time here: __________.
Proc.Step TASK ELEMENT 2 STANDARD Grade N/A Review SEP Supplement 1 for Category C - Cold Shutdown / Refueling System Malfunctions, and Subcategory 1 - Loss of AC Power for classification.
Candidate reviews CG3.1:
Reactor vessel level < 614 ft 0 in. (Sensor
- 8 RVLMS red light) for > 30 min. (Note 4)
AND Any Containment Challenge Indication, Table C-2.
AND Identifies CG3.1 is not met for plant conditions.
S U Comment:
Evaluator Cue: If the candidate asks to see plant stack radiation levels hand them Evaluator Note: Candidates should review SEP Supplement 1 for Modes 5, 6, or Defueled from left to right (highest classification to lowest).
The order in which the Candidate evaluates SEP Supplement 1 categories may occur in an order different that listed here.
NRC EXAM MATERIAL Page 5 of 11 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade N/A Review SEP Supplement 1 for Category C - Cold Shutdown /
Refueling System Malfunctions, and Subcategory 4 - PCS Temperature for classification.
Candidate reviews CG3.2:
Reactor vessel cannot be maintained with core uncover indicated by any of the following for > 30 min. (Note 4):
Containment High Range Radiation Monitor > 40 R/hr AND Any Containment Challenge Indication, Table C-2.
AND Identifies CG3.2 is not met for plant conditions.
S U Comment:
Evaluator Note: Candidates should review SEP Supplement 1 for Modes 5, 6, or Defueled from left to right (highest classification to lowest).
The order in which the Candidate evaluates SEP Supplement 1 categories may occur in an order different that listed here.
Proc.Step TASK ELEMENT 4 STANDARD Grade N/A Review SEP Supplement 1 for Category C - Cold Shutdown /
Refueling System Malfunctions, and Subcategory 4 - PCS Temperature for classification.
Candidate reviews CS3.1:
With CONTAINMENT CLOSURE not established, Reactor Vessel level < 616 ft 6 in. (Sensor #7 RVLMS red light).
AND Identifies CS3.1 is not met for plant conditions.
S U Comment:
Evaluator Note: Candidates should review SEP Supplement 1 for Modes 5, 6, or Defueled from left to right (highest classification to lowest).
The order in which the Candidate evaluates SEP Supplement 1 categories may occur in an order different that listed here.
NRC EXAM MATERIAL Page 6 of 11 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade N/A Review SEP Supplement 1 for Category C - Cold Shutdown /
Refueling System Malfunctions, and Subcategory 4 - PCS Temperature for classification.
Candidate reviews CS3.2:
With CONTAINMENT CLOSURE established, Reactor Vessel level < 614 ft 0 in. (Sensor #8 RVLMS red light).
AND Identifies CS3.2 is not met for plant conditions.
S U Comment:
Evaluator Note: Candidates should review SEP Supplement 1 for Modes 5, 6, or Defueled from left to right (highest classification to lowest).
The order in which the Candidate evaluates SEP Supplement 1 categories may occur in an order different that listed here.
NRC EXAM MATERIAL Page 7 of 11 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade N/A Review SEP Supplement 1 for Category C - Cold Shutdown /
Refueling System Malfunctions, and Subcategory 4 - PCS Temperature for classification.
Candidate reviews CA3.1:
Loss of inventory as indicated by Reactor Vessel/PCS water level < 617 ft (0% on LIA-0105 or LIA-0106).
AND Determines that CA3.1 threshold has been met.
AND Classifies the event in progress as an Alert under CA3.1.
AND Makes the classification within the remaining 14 minutes.
S U Comment:
Evaluator Cue: When Candidate makes classification and declaration, repeat back information.
Record Time of classification: __________.
Evaluator Note: TIME CRITICAL action clock for classification stops here.
Evaluator Note: Candidate may evaluate EALs CA3.2 and CA4.1 and determine that they are currently not met.
Candidate may evaluate EAL CU4.1 and determine it IS met, but CA3.1 would be the correct call because it has escalation criteria to a Site Area Emergency whereas CU4.1 /
CA4.1 path does not.
CRITICAL STEP
NRC EXAM MATERIAL Page 8 of 11 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade EI-3 Step 5.1.4a.-c.
Generate a Notification Form.
Candidate may request a copy of EI-3, Communications and Notifications.
AND CLICKS on Smartform Notification Form tab and ENTERS information.
AND AFTER all information has been entered, THEN SELECT View Message.
AND OBTAINS a peer check of the completed form.
AND Depresses SEND on InFORM within 15 minutes.
S U Comment:
Evaluator Cue: If Candidate requests a copy of EI-3, provide a copy of EI-3.
When asked for a peer check of the form, review Notification Form contents and agree with whatever the Candidate has entered.
Start time for Notification is the completion time recorded for Classification from Task Element 6. Record here: __________.
End time for Notification is when SEND is depressed on InFORM.
Record time here: _________.
Evaluator Note: CRITICAL STEP is to complete the Notification Form per the attached Answer Key within 15 minutes and send.
Note: Call Back Telephone Number, and ACTUAL or DRILL is not CRITICAL.
Note: Classification Declared At and Licensee Approval Authority fields will populate present date and time of day and is not gradable.
CRITICAL STEP Time End: ________
END OF TASK
NRC EXAM MATERIAL Page 9 of 11 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.
INITIAL CONDITIONS:
The plant is in Mode 5 with PCS level at 624 6 (66% by LIA-0105 Wide Range indication) and PCS temperature at 189 oF.
The PZR manway is removed and PZR is vented to atmosphere.
P-67B, LPSI Pump, is the in-service pump for Shutdown Cooling (SDC).
At 10:00 P-67B trips.
The CRS has entered AOP-30, Loss of Shutdown Cooling, and identifies neither P-67A, LPSI Pump, nor P-67B will start.
At 10:02 Containment closure is achieved.
At 10:03 Containment Sump level is noted to be rising rapidly and EK-1351, Containment Sump Hi Level has annunciated.
At 10:04 LIA-0105, Reactor Vessel Level, and LIA-0106, Hot Leg Level, both indicate 0%.
RVLMS A and B red lights are lit for Sensors #1 - #6.
At 10:04 PCS temperature is noted to be 201oF and rising.
INITIATING CUE:
It is now 10:05 and you have been directed to classify the event in progress and generate a Notification Form using InForm, if required.
THIS JPM IS TIME CRITICAL
NRC EXAM MATERIAL Page 10 of 11 Palisades April 2020
NRC EXAM MATERIAL Page 11 of 11 Palisades April 2020 ANSWER KEY