ML22146A026

From kanterella
Jump to navigation Jump to search
JPM 4
ML22146A026
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/08/2017
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Operations
Baker R
Shared Package
ML17142A234 List:
References
Download: ML22146A026 (11)


Text

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility: Palisades Task No: PL-344 107 05 03 Task

Title:

Perform Protective Action Job Performance Measure No: 2017 Remediation Recommendations ADMIN JPM 4 K/A

Reference:

2.4.38, Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required.

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance _______________

Actual Performance _______X________

Classroom ______X_______

Simulator ______________

Plant __________

Appendix C Job Performance Measure Worksheet Form ES-C-1 Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. The crew is implementing EOP-9.0 due to a large break LOCA
2. The following radiation monitors have been steady for approximately 15 minutes:
a. Stack Gas High Range Monitor:

RIA-2327 reads 4.0 x102 R/hr

b. Containment High Range Radiation Monitors:

RIA-2321 is failed low RIA-2322 reads 4.0 x103 R/hr

3. Containment pressure is 4.2 psig with NO Containment Spray Pumps or Containment Coolers available
4. Containment isolation was verified successful
5. The Shift Manager/Emergency Director has declared an Emergency Event
6. The Event Notification Form is complete
7. The weather is sunny with no rain Task Standard:

Candidate reviews completed Palisades Event Notification Form and determines the event is correctly classified but the initial PAR is incorrect.

Required Materials:

EI-1, Emergency Classification and actions EI-6.13, Protective Action Recommendations for Offsite Populations Completed EI-3 Attachment 1, Palisades Event Notification Form General

References:

EI-1, Emergency Classification and actions EI-6.13, Protective Action Recommendations for Offsite Populations Initiating Cue:

Shift Manager directs you to verify completed EI-3, Attachment 1 for the current plant conditions.

Time Critical Task:

YES 15 minutes for declaration and 12 minutes for notification form Validation Time:

10 minutes

Appendix C 3

Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 1 START TIME: ____________

Note: Evaluator writes the date and start time on form EI-3 and block above and hands this form to the candidate. This starts the 15 minute time critical clock.

Standard:

Key corrected EI-3, Attachment 1 Comment:

Candidate determines that the GE classification is correct. Verifies date and time are correct.

Performance step: 2 Standard:

Key corrected EI-3, Attachment 1 Comment:

Candidate determines that the reason for classification is INCORRECT.

Candidate determines correct reason for classification is FG1.1 and checks Box for Fission Product Barrier Degradation.

NOTE:

Evaluator may prompt the correction if candidate only declares the classification is incorrect. Correct call is FG1.1 due to Fuel Clad Loss C2, PCS Loss C3 AND Containment Potential Loss B5 causing two losses and a potential third loss.

STOP TIME: __________

NOTE: Time to complete must NOT be more than 15 minutes for satisfactory performance.

START TIME: ____________

Note: Following identification of the correct reason for classification. This starts the 12 minute time critical clock.

Appendix C 4

Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 3 Standard:

Key corrected EI-3, Attachment 1 Comment:

Candidate verifies Radiological Release in Progress Due to Event YES box is correctly checked. This is due to excessive dose from stack vent.

Performance step: 4 Standard:

Key corrected EI-3, Attachment 1 Comment:

Candidate Determines the PAR is INCORRECT.

Candidate corrects the PAR to recommend initial Evacuation Areas 1, 2, 3, and lake area 6 NOTE:

Evaluator may prompt the correction if candidate only declares the PAR is incorrect.

Performance step: 5 Standard:

Key corrected EI-3, Attachment 1 Comment:

Candidate determines the Meteorological Data is INCORRECT.

Candidate corrects the Wind Direction From 269º To 89º NOTE:

Evaluator may prompt the correction if candidate only declares the wind direction is incorrect.

Appendix C 5

Form ES-C-1 Performance Information Denote critical steps with a check mark Performance step: 6 Standard:

Initiating Cue Comment:

Candidate presents corrected Palisades Event Notification Form to the Evaluator STOP TIME: __________

NOTE: Time to complete must NOT be more than 12 minutes for satisfactory performance.

Terminating cue: EI-3, Attachment 1 is corrected to match the key and the evaluator receives the corrected form.

Appendix C 6

Form ES-C-1 Verification of Completion Job Performance Measure No.

ADMIN JPM 4 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

NOTE: Must be <15 minutes for SATISFACTORY completion.

Question Documentation:

Question: __________________________________________________________________

Response: _________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________

Appendix C 7

Form ES-C-1 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Initial Conditions:

1. The crew is implementing EOP-9.0 due to a large break LOCA
2. The following radiation monitors have been steady for approximately 15 minutes:
a. Stack Gas High Range Monitor:

RIA-2327 reads 4.0 x102 R/hr

b. Containment High Range Radiation Monitors:

RIA-2321 is failed low RIA-2322 reads 4.0 x103 R/hr

3. Containment pressure is 4.2 psig with NO Containment Spray Pumps or Containment Coolers available
4. Containment isolation was verified successful
5. The Shift Manager/Emergency Director has declared an Emergency Event
6. The Event Notification Form is complete
7. The weather is sunny with no rain Initiating Cue:

Shift Manager directs you to verify completed EI-3, Attachment 1 for the current plant conditions.

Appendix C 8

Form ES-C-1 Student Handout

Appendix C 9

Form ES-C-1 Student Handout

Appendix C 10 Form ES-C-1 Answer Key