ML22145A597

From kanterella
Jump to navigation Jump to search
2017 Palisades Retake Outline and Operating Test Comments (ES-301-7)
ML22145A597
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/14/2017
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Entergy Nuclear Operations
Baker R
Shared Package
ML17142A223 List:
References
Download: ML22145A597 (2)


Text

NRC ILE Outline and Operating Test Submittal Comments 2017 Palisades Retake Examination CE: ME Bielby 1 of 2 Outline Submittal Comment Facility Action/Response JPMs-Admin 1A

1. Performance Step 24 - In the Comment section of this step, change the number.0964 to.7994.
2. In the Student Handout for Proc No DWO-1, Step 1.q, some of the numbers in the equation to calculate the Total PCS Leak Rate are incorrect.

Change.021732 to.021733 (to agree with number in Step 1.i). There are 2 instances of this number to change in the equation.

Change 0.2595 to 0.02595 (to agree with number in Step 1.g).

3. Make same changes to numbers in the Answer Key as shown in item 2 above.

Requested enhancements incorporated.

JPMs-Admin 1B

1. For GCL 11.2, in the STATUS block for steps 2.c, 6, 11 (for Containment Closure), 12, and 13, place an N/A (as required per Step 1.1.b of GCL 11.2).
2. Performance Step 6 - In the Comment section of this step, change last sentence to Candidate places N/A in both the STATUS and MEETS SPEC blocks for Step 6, Containment.
3. Performance Step 9 - In the Comment section of this step, change sentence to Candidate places N/A in both the STATUS and MEETS SPEC blocks for Step 9 per initial conditions of six by seven restricted area.

Requested enhancements incorporated.

JPMs-Admin 2 None JPMs-Admin 3 None JPMs-Admin 4 None

NRC ILE Outline and Operating Test Submittal Comments 2017 Palisades Retake Examination CE: ME Bielby 2 of 2 Operating Test Submittal Comments Admin JPMs Licensee Response/Resolution SRO 1A COO1 None SRO 1B COO2 None SRO 2 EC None SRO 3 RC None SRO 4 EP None