ML22145A597
| ML22145A597 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/14/2017 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Entergy Nuclear Operations |
| Baker R | |
| Shared Package | |
| ML17142A223 | List: |
| References | |
| Download: ML22145A597 (2) | |
Text
NRC ILE Outline and Operating Test Submittal Comments 2017 Palisades Retake Examination CE: ME Bielby 1 of 2 Outline Submittal Comment Facility Action/Response JPMs-Admin 1A
- 1. Performance Step 24 - In the Comment section of this step, change the number.0964 to.7994.
- 2. In the Student Handout for Proc No DWO-1, Step 1.q, some of the numbers in the equation to calculate the Total PCS Leak Rate are incorrect.
Change.021732 to.021733 (to agree with number in Step 1.i). There are 2 instances of this number to change in the equation.
Change 0.2595 to 0.02595 (to agree with number in Step 1.g).
- 3. Make same changes to numbers in the Answer Key as shown in item 2 above.
Requested enhancements incorporated.
JPMs-Admin 1B
- 1. For GCL 11.2, in the STATUS block for steps 2.c, 6, 11 (for Containment Closure), 12, and 13, place an N/A (as required per Step 1.1.b of GCL 11.2).
- 2. Performance Step 6 - In the Comment section of this step, change last sentence to Candidate places N/A in both the STATUS and MEETS SPEC blocks for Step 6, Containment.
- 3. Performance Step 9 - In the Comment section of this step, change sentence to Candidate places N/A in both the STATUS and MEETS SPEC blocks for Step 9 per initial conditions of six by seven restricted area.
Requested enhancements incorporated.
JPMs-Admin 2 None JPMs-Admin 3 None JPMs-Admin 4 None
NRC ILE Outline and Operating Test Submittal Comments 2017 Palisades Retake Examination CE: ME Bielby 2 of 2 Operating Test Submittal Comments Admin JPMs Licensee Response/Resolution SRO 1A COO1 None SRO 1B COO2 None SRO 2 EC None SRO 3 RC None SRO 4 EP None