NRC EXAM MATERIAL Page 1 of 21 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM a.

TITLE:

ALIGN CONTROL RODS TO ADDRESS DEVIATIONS

NRC EXAM MATERIAL Page 2 of 21 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-001 104 04 01 / Respond to Control Rod Deviations.

Alternate Path: No.

Facility JPM #: New.

K/A: 001A4.03 Importance:

RO: 4.0 SRO: 3.7 K/A Statement: Ability to manually operate and/or monitor in the control room: CRDS mode control. (CFR: 41.7/45.5 to 45.8).

Task Standard: Balance Group 4 Control Rods to < 2 inch deviation.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

SOP-6, Reactor Control System, revision 036 ARP-5, Primary Coolant Pump Steam Generator and Rod Drive Scheme EK-09 (C-12), revision 108 Validation Time: 10 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 21 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

ARP-5, Primary Coolant Pump Steam Generator and Rod Drive Scheme EK-09 (C-12),

revision 108 SOP-6, Reactor Control System, revision 036 Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Plant is stable at 87% power to reset UFM Correction Factors and perform a heat balance calculation.

GOP-5, Power Escalation in Mode 1, is the in-use procedure.

You have just relieved the At-The-Controls reactor operator.

EK-0911, Rod Position 4 Inches Deviation, was received during the last rod withdrawal.

INITIATING CUE:

State the following:

The Control Room Supervisor (CRS) directs you to address alarm EK-0911 per ARP-5, Primary Coolant Pump Steam Generator and Rod Drive Scheme EK-09 (C-

12) and align Group 4 control rods.

NRC EXAM MATERIAL Page 4 of 21 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of ARP-5, Primary Coolant Steam Generator and Rod Drives Scheme EK-09 (C-12)

Candidate locates ARP-5.

S U Comment:

Evaluator Cue: When Candidate locates ARP-5, provide a clean copy of ARP-5 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade N/A IDENTIFY affected Control Rod and extent of its deviation.

Candidate verifies Group 4 Rod #38 position selected on M/4200, Rod Select, at C-02.

AND Observes corresponding digital display of inches raised for Rod #38 at 119.0.

OR Accesses PPC Page 512.

AND Observes PPC display of inches raised for Rod #38 at 119.0.

S U Comment:

Evaluator Note: Candidate may verify rod position by either method listed above to meet Standard and may verify initial rod positions in a sequence different than listed here.

CRITICAL STEP

NRC EXAM MATERIAL Page 5 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade N/A IDENTIFY affected Control Rod and extent of its deviation.

Candidate positions M/4200, Rod Select, at C-02 to Group 4 Rod #39 position.

AND Observes corresponding digital display of inches raised for Rod #39 at 119.1.

OR Accesses PPC Page 512.

AND Observes PPC display of inches raised for Rod #39 at 119.1.

S U Comment:

Evaluator Note: Candidate may verify rod position by either method listed above to meet Standard and may verify initial rod positions in a sequence different than listed here.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade N/A IDENTIFY affected Control Rod and extent of its deviation.

Candidate positions M/4200, Rod Select, at C-02 to Group 4 Rod #40 position.

AND Observes corresponding digital display of inches raised for Rod #40 at 114.5.

OR Accesses PPC Page 512.

AND Observes PPC display of inches raised for Rod #40 at 114.5.

S U Comment:

Evaluator Note: Candidate may verify rod position by either method listed above to meet Standard and may verify initial rod positions in a sequence different than listed here.

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade N/A IDENTIFY affected Control Rod and extent of its deviation.

Candidate positions M/4200, Rod Select, at C-02 to Group 4 Rod #41 position.

AND Observes corresponding digital display of inches raised for Rod #41 at 118.9.

OR Accesses PPC Page 512.

AND Observes PPC display of inches raised for Rod #41 at 118.9.

AND Determines that Group 4 Rod #40 is deviating 4.6 inches from highest reading Group 4 Rod

  1. 39.

S U Comment:

Evaluator Note: Candidate may verify rod position by either method listed above to meet Standard and may verify initial rod positions in a sequence different than listed here.

CRITICAL STEP Proc.Step TASK ELEMENT 6 STANDARD Grade N/A COMPARE Group 4 Rod #40 position with secondary rod position.

Candidate reviews PPC Page 410, Regulating Rods Information, and identifies Rod #40 secondary rod position of 114.5 inches.

AND Identifies that Rod #40 digital and secondary positions are both reading 114.5 inches.

S U Comment:

NRC EXAM MATERIAL Page 8 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade N/A REPOSITION Control Rod in Manual Individual as necessary to clear alarm per SOP-6.

Candidate obtains a copy of SOP-6, and identifies that section 7.4, To Move A Single Rod in Manual Individual Mode, is the section for the alignment.

S U Comment:

Evaluator Notes: Plant Requirements and Precautions and Limitations sections of SOP-6 are expected to be reviewed for first time use. Additionally, the procedure is required to be in hand and place kept.

SOP-6 General Requirement 4.1.10 - Control Rods should be aligned when any two Control Rods in the same group are greater than or equal to two inches apart.

Evaluator Cue: When Candidate describes where a copy of SOP-6 can be obtained provide a copy of SOP-6 (JPM Attachment 2).

Proc.Step TASK ELEMENT 8 STANDARD Grade 7.4.a.

REFER TO Step 4.4.1 for Shutdown and Regulating Rods withdrawal requirements during steady state full power operation or long-term reduced power operation.

Candidate refers to Step 4.4.1 for Regulating Rod withdrawal requirements.

AND Reviews requirements.

S U Comment:

Proc.Step TASK ELEMENT 9 STANDARD Grade 7.4.b.

REFER TO Step 4.4.2 for Part-Length Rod withdrawal requirements.

Candidate determines that Step 4.2.2 is not applicable (N/A).

N/A Comment:

NRC EXAM MATERIAL Page 9 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 10 STANDARD Grade 7.4.c.

IF desired, THEN TURN Rod Selector Switch for the group selected through all positions to verify position of all rods in the group.

Candidate determines that this action was already performed as part of the alarm response by either positioning Rod Selector Switch or use of PPC page 512.

S U Comment:

Evaluator Note: Candidate may perform this step to verify position of all Group 4 rods if they used the PPC Page 512 initially. They will obtain same results as in Task Elements 2 - 5. (Rod #38 - 119.0, Rod #39

- 119.1, Rod #40 - 114.5, Rod #41 - 118.9)

Proc.Step TASK ELEMENT 11 STANDARD Grade 7.4.d.

IDENTIFY the rod to be moved.

Candidate identifies that Group 4 Control Rod

  1. 40 is to be moved.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 12 STANDARD Grade 7.4.e.

PLACE Rod Selector Switch in the position for the rod to be moved.

Candidate positions M/4200, Rod Select, at C-02 to Group 4 Rod #40 position.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 13 STANDARD Grade 7.4.f.

TURN Group Selector Switch to the Group 4 position.

Candidate ensures M/0300, Rod Control Group Select, at C-02 is in position 4.

S U Comment:

NRC EXAM MATERIAL Page 10 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 14 STANDARD Grade 7.4.g.

PLACE Mode Selector Switch to MI (Manual Individual) position.

Candidate positions M/0500, Rod Control Mode Select, to MI.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 15 STANDARD Grade 7.4.h.1 PERFORM the following to reposition the rod:

OPERATE the Raise-Lower Switch.

Candidate determines that Group 4 Control Rod #40 must be withdrawn to the 116.1 inch position to clear EK-0911 alarm.

AND Withdrawn to the 117.1 inch position to restore the SOP-6 < 2 inch deviation limit.

AND Positions M/0100, Raise - Lower Switch, to the Raise position at C-02.

AND Positions Group 4 Control Rod #40 to at least 117.1 inches and no more than 120.9 inches.

AND Releases Raise - Lower Switch.

AND Verifies rod motion has stopped.

S U Comment:

Evaluator Note: EK-0911 alarm will clear when Control Rod #39 and #40 are within 3 inches of one another.

CRITICAL STEP is to position Rod #40 to 117.1 to 120.9 inches.

Evaluator Cue: If Candidate reports EK-0911 alarm clear, acknowledge and repeat back information.

CRITICAL STEP

NRC EXAM MATERIAL Page 11 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 16 STANDARD Grade 7.4.h.2 MONITOR Nuclear Instruments and TAVE closely while repositioning rod.

Candidate monitors NI and TAVE indications at C-02 while repositioning Control Rod #40.

S U Comment:

Proc.Step TASK ELEMENT 17 STANDARD Grade 7.4.h.3 IF necessary, to maintain power level, THEN STOP single rod motion AND COMPENSATE with Regulating Rods.

Candidate determines that this step is not applicable (N/A).

S U Comment:

Proc.Step TASK ELEMENT 18 STANDARD Grade 7.4.i.

PLACE the Group Selector Switch to desired position.

Candidate ensures M/0300, Rod Control Group Select, at C-02 is in position 4.

S U Comment:

Proc.Step TASK ELEMENT 19 STANDARD Grade 7.4.j.

PLACE the Mode Selector Switch in MS (Manual Sequential) position or as directed by the Shift Manager.

Candidate positions M/0500, Rod Control Mode Select, to MS.

S U Comment:

Evaluator Note: This completes the SOP-6 actions to realign Control Rods. Candidate should return to ARP-5 to address Follow up Action.

NRC EXAM MATERIAL Page 12 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 20 STANDARD Grade N/A ARP-5, EK0911 Follow Up Action.

Candidate reviews Follow Up Actions.

S U Comment:

Evaluator Cue: Provide cue that another Operator will complete the Follow Up Actions.

If informed by candidate that Control Rods have been aligned, acknowledge and repeat back report.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 13 of 21 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-116 for LOI 2020
  • Verify Rod #38 - 119.0, Rod #39 - 119.1, Rod #40 - 114.5, Rod #41 - 118.9

NRC EXAM MATERIAL Page 14 of 21 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

Plant is stable at 87% power to reset UFM Correction Factors and perform a heat balance calculation.

GOP-5, Power Escalation in Mode 1, is the in-use procedure.

You have just relieved the At-The-Controls reactor operator.

EK-0911, Rod Position 4 Inches Deviation, was received during the last rod withdrawal.

INITIATING CUE:

The Control Room Supervisor (CRS) directs you to address alarm EK-0911 per ARP-5, Primary Coolant Pump Steam Generator and Rod Drive Scheme EK-09 (C-

12) and align Group 4 control rods.

NRC EXAM MATERIAL Page 15 of 21 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 16 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 17 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 18 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 19 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 20 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 21 of 21 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 1 of 23 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM b.

TITLE:

ESTABLISH HOT LEG INJECTION VIA ALTERNATE PATH (PZR)

NRC EXAM MATERIAL Page 2 of 23 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-000 431 05 01 / Establish Hot Leg Injection per in-use EOP.

Alternate Path: Yes.

Facility JPM #: PLJPM-LOR-EOP-18, revision 03.

K/A: 006A2.02 Importance:

RO: 3.9 SRO: 4.3 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flow path (CFR: 41.5 / 45.5).

Task Standard: Hot Leg Injection established via the pressurizer (PZR) per EOP Supplement 20 Section 1.0.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

EOP-4.0, Loss of Coolant Accident Recovery, revision 024 EOP Supplement 20, Hot Leg Injection Via PZR, revision 006 EOP Supplement 4, HPSI and LPSI Flow Curves, revision 006 Validation Time: 16 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 23 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP-4.0, Loss of Coolant Accident Recovery, revision 024 EOP Supplement 20, Hot Leg Injection Via PZR, revision 006 EOP Supplement 4, HPSI and LPSI Flow Curves, revision 006 Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant was tripped from 100% power.
  • The Control Room Supervisor (CRS) has entered EOP-4.0, Loss of Coolant Accident Recovery.
  • All conditions for initiating simultaneous hot and cold leg injection per EOP-4.0 Step 60 are met.

INITIATING CUE:

State the following:

  • The CRS directs you to establish simultaneous hot and cold leg injection per EOP-4.0, Step 60.

NRC EXAM MATERIAL Page 4 of 23 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of EOP-4.0, Loss of Coolant Accident Recovery.

Candidate locates EOP-4.0 and determines applicable Step 60.

S U Comment:

Evaluator Cue: As the CRS, provide Candidate with copy of EOP-4.0 Step 60 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 60 IF the elapsed time from event initiation (EOP Entry) is 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> AND Shutdown Cooling will NOT be in service prior to 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after event initiation (EOP Entry)

AND ANY of the following conditions are satisfied THEN ESTABLISH simultaneous hot and cold leg injection by performing ALL of the following in the order listed:

Candidate determines that all conditions are met to establish simultaneous hot and cold leg injection from Initial Conditions provided.

N/A Comment:

Proc.Step TASK ELEMENT 3 STANDARD Grade 60.a.

CLOSE HPSI Train 2 to Cold Leg Valve, MO-3080. (KEY: 117)

Panel C-03 Candidate obtains Key 117 and places it into MO-3080 handswitch HS-3080A.

AND Positions HS-3080A to the CLOSE position.

AND Verifies MO-3080 closed (red light OFF, green light ON).

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 5 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 60.b.

OPEN HPSI Train 2 to Hot Leg Valve, MO-3082. (KEY: 118)

Panel C-03 Candidate obtains Key 118 and places it into MO-3082 handswitch HS-3082A.

AND Places HS-3082A to the OPEN position.

AND Verifies MO-3082 OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 23 Palisades April 2020 Alternate Path: Begins when Candidate identifies that MO-3081 did not close.

Proc.Step TASK ELEMENT 5 STANDARD Grade 60.c.

CLOSE HPSI Train 1 to Cold Leg Valve, MO-3081. (KEY:115)

Panel C-03 Candidate obtains Key 115 and places it into MO-3081 handswitch HS-3081A.

AND Places HS-3081A to the CLOSE position.

AND Identifies that MO-3081 did not CLOSE (red light ON, green light OFF).

AND Informs the CRS of MO-3081 failure to CLOSE.

AND Transitions to Response Not Obtained (RNO)

Step 60.1 and transitions to EOP Supplement

20.

S U Comment:

Evaluator Cue: As CRS, acknowledge information provided by Candidate. If asked how to proceed, respond: What do you recommend? Agree with recommendation given.

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 60.1 IF hot leg injection can NOT be established via the normal path, THEN INITIATE hot leg injection via HPSI flow through the PZR.

Refer to EOP Supplement 20.

Candidate locates EOP Supplement 20.

AND Determines that Section 1.0, Performing Hot Leg Injection Using P-66A (Preferred Method),

will be used.

S U Comment:

Evaluator Note: With both P-66A and P-66B HPSI pumps available, EOP Supplement 20 Section 1.0 is the only section that will accomplish the task.

Evaluator Cue: When Candidate locates EOP Supplement 20, provide candidate with copy of EOP Supplement 20 (JPM Attachment 2).

CRITICAL STEP Proc.Step TASK ELEMENT 7 STANDARD Grade 1.01 RECORD each occurrence of PZR Spray operation with a T (PZR vapor phase temp minus spray temp) greater than 200 degrees F in the Narrative Log.

Candidate determines that this step will be performed by another Operator.

N/A Comment:

Evaluator Cue: Provide cue to candidate that another Operator will monitor and record T, when applicable, in the Narrative Log.

Proc.Step TASK ELEMENT 8 STANDARD Grade 1.02 ENSURE OPEN the following valves:

CV-2111, Charging Line Stop.

Panel C-02 Candidate verifies CV-2111 OPEN (red light ON, green light OFF).

S U Comment:

Proc.Step TASK ELEMENT 9 STANDARD Grade

NRC EXAM MATERIAL Page 8 of 23 Palisades April 2020 1.02 ENSURE OPEN the following valves:

CV-2117, Aux Spray (KEY: 151)

Panel C-02 Candidate obtains KEY 151 and places it into CV-2117 handswitch HS-2117.

AND Positions CV-2117 to the OPEN position.

AND Verifies CV-2117 OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 10 STANDARD Grade 1.02 ENSURE OPEN the following valves:

MO-3072, Charging Pump Discharge to Train 2 (KEY: 104)

Panel C-03 Candidate obtains Key 104 and places it into MO-3072 handswitch 42-217/CS.

AND Positions MO-3072 to the OPEN position.

AND Verifies MO-3072 OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 11 STANDARD Grade

NRC EXAM MATERIAL Page 9 of 23 Palisades April 2020 1.03 STOP ALL Charging Pumps.

Panel C-02 Candidate positions P-55A, Charging Pump, handswitch 52-1205CS to the TRIP position.

AND Verifies P-55A OFF (red light OFF, green light ON).

S U Comment:

Evaluator Note: Stopping Charging pumps may be performed in any order.

CRITICAL STEP Proc.Step TASK ELEMENT 12 STANDARD Grade 1.03 STOP ALL Charging Pumps.

Panel C-02 Candidate positions P-55B, Charging Pump, handswitch 52-1206CS to the TRIP position.

AND Verifies P-55B OFF (red light OFF, green light ON).

S U Comment:

Evaluator Note: Candidate may position P-55B Control Select switch 43-1206/SS on C-12 panel to MANUAL prior to stopping P-55B. This is not part of the Critical Step.

CRITICAL STEP Proc.Step TASK ELEMENT 13 STANDARD Grade 1.03 STOP ALL Charging Pumps.

Panel C-02 Candidate positions P-55C, Charging Pump, handswitch 52-1105CS to the TRIP position.

AND Verifies P-55C OFF (red light OFF, green light ON).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 14 STANDARD Grade

NRC EXAM MATERIAL Page 10 of 23 Palisades April 2020 1.04 CLOSE the following valves:

  • CV-2113, Loop 1A Panel C-02 Candidate positions CV-2113 handswitch HS-2113 to the CLOSE position AND Verifies CV-2113 CLOSED (red light OFF, green light ON).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 15 STANDARD Grade 1.04 CLOSE the following valves:

  • CV-2115, Loop 2A Panel C-02 Candidate positions CV-2115 handswitch HS-2115 to the CLOSE position.

AND Verifies CV-2115 CLOSED (red light OFF, green light ON).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 16 STANDARD Grade 1.04 CLOSE the following valves:

  • CV-1057, Spray Panel C-02 Candidate verifies CV-1057 CLOSED (red light OFF, green light ON).

S U Comment:

Proc.Step TASK ELEMENT 17 STANDARD Grade

NRC EXAM MATERIAL Page 11 of 23 Palisades April 2020 1.04 CLOSE the following valves:

  • CV-1059, Spray Panel C-02 Candidate positions CV-1059 handswitch AMS-1059 to the CLOSE position.

AND Verifies CV-1059 CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: Handswitch AMS-1059 taken to CLOSE is CRITICAL only if CV-1059 is not closed.

CRITICAL STEP Proc.Step TASK ELEMENT 18 STANDARD Grade 1.05 VERIFY OPEN the following valves:

  • CV-3059, HPSI Pump B Discharge To Train 1 (KEY: 103)
  • MO-3007, HPSI Train 1 Loop 1A
  • MO-3009, HPSI Train 1 Loop 1B
  • MO-3011, HPSI Train 1 Loop 2A
  • MO-3013, HPSI Train 1 Loop 2B Panel C-03 Candidate verifies CV-3059 OPEN (red light ON, green light OFF).

AND Verifies MO-3007 OPEN (red light ON, green light OFF).

AND Verifies MO-3009 OPEN (red light ON, green light OFF).

AND Verifies MO-3011 OPEN (red light ON, green light OFF).

AND Verifies MO-3013 OPEN (red light ON, green light OFF).

S U Comment:

NRC EXAM MATERIAL Page 12 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 19 STANDARD Grade 1.06 CLOSE the following valves:

  • MO-3062, HPSI Train 2 Loop 2B Panel C-03 Candidate positions MO-3062 handswitch 42-241 CS1 to CLOSE.

AND Verifies MO-3062 CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: Handswitch should be held in the CLOSE position for 5 seconds after the green CLOSE light is lit and the red OPEN light is extinguished (this is not part of the Critical Step).

CRITICAL STEP Proc.Step TASK ELEMENT 20 STANDARD Grade 1.06 CLOSE the following valves:

  • MO-3064, HPSI Train 2 Loop 2A Panel C-03 Candidate places MO-3064 handswitch 42-237 CS1 to CLOSE.

AND Verifies MO-3064 CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: Handswitch should be held in the CLOSE position for 5 seconds after the green CLOSE light is lit and the red OPEN light is extinguished (this is not part of the Critical Step).

CRITICAL STEP

NRC EXAM MATERIAL Page 13 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 21 STANDARD Grade 1.06 CLOSE the following valves:

  • MO-3066, HPSI Train 2 Loop 1B Panel C-03 Candidate places MO-3066 handswitch 42-257 CS1 to CLOSE.

AND Verifies MO-3066 CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: Handswitch should be held in the CLOSE position for 5 seconds after the green CLOSE light is lit and the red OPEN light is extinguished (this is not part of the Critical Step).

CRITICAL STEP Proc.Step TASK ELEMENT 22 STANDARD Grade 1.06 CLOSE the following valves:

  • MO-3068, HPSI Train 2 Loop 1B Panel C-03 Candidate places MO-3068 handswitch 42-261 CS1 to CLOSE.

AND Verifies MO-3068 CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: Handswitch should be held in the CLOSE position for 5 seconds after the green CLOSE light is lit and the red OPEN light is extinguished (this is not part of the Critical Step).

CRITICAL STEP

NRC EXAM MATERIAL Page 14 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 23 STANDARD Grade 1.07 ENSURE P-66B is operating within the limits of EOP Supplement 4.

Candidate obtains EOP Supplement 4 page 3 of 3.

AND Determines that the operating limits EOP Supplement 4 are met.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where EOP Supplement 4 can be found, provide a copy of EOP Supplement 4 (JPM Attachment 3).

Evaluator Note: Nominal values for Minimum HPSI Flow Post-RAS obtained during validation were:

Subcooling in-service with HLI (right train only) in-service Total Flow = 775 gpm Cold Legs total flow = 785 gpm Hot Leg total flow = 350 gpm

NRC EXAM MATERIAL Page 15 of 23 Palisades April 2020 Proc.Step TASK ELEMENT 24 STANDARD Grade 1.08 ENSURE HPSI flow of greater than or equal to 100 gpm to the Pressurizer through the charging line as indicated on FIA-0212, Charging Flow.

Panel C-02 Candidate ensures flow greater than or equal to 100 gpm to the Pressurizer through the charging line as indicated on FIA-0212.

S U Comment:

Proc.Step TASK ELEMENT 25 STANDARD Grade N/A Report to CRS that hot leg injection is lined up to the Pressurizer per EOP Supplement 20 section 1.0.

Candidate reports to the CRS that hot leg injection is lined up to the Pressurizer per EOP Supplement 20 section 1.0.

S U Comment:

Evaluator Cue: Repeat back report.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 16 of 23 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-117 for LOI 2020.
  • Ensure both trains of HPSI are running and all charging pumps are running.

NRC EXAM MATERIAL Page 17 of 23 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • Plant was tripped from 100% power.
  • The Control Room Supervisor (CRS) has entered EOP-4.0, Loss of Coolant Accident Recovery.
  • All conditions for initiating simultaneous hot and cold leg injection per EOP-4.0 Step 60 are met.

INITIATING CUE:

  • The CRS directs you to establish simultaneous hot and cold leg injection per EOP-4.0, Step 60.

NRC EXAM MATERIAL Page 18 of 23 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 19 of 23 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 20 of 23 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 21 of 23 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 22 of 23 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 23 of 23 Palisades April 2020 JPM ATTACHMENT 3

NRC EXAM MATERIAL Page 1 of 17 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM c.

TITLE:

OPEN PZR PORV ISOLATION VALVES

NRC EXAM MATERIAL Page 2 of 17 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-010 106 01 01 / Place In / Remove from Service Low Temperature Over Pressure System (SOP-1B/1C).

Alternate Path: Yes.

Facility JPM #: PLJPM-LOR-PZR-04, revision 04.

K/A: 010A4.03 Importance:

RO: 4.0 SRO: 3.8 K/A Statement: Ability to manually operate and/or monitor in the control room:

PORV and block valves. (CFR: 41.7 / 45.5 to 45.8)

Task Standard: MO-1042A is OPEN and MO-1043A is closed prior to PCS pressure lowering to 1605 psia and receipt of EK-1342, Safety Inj Initiated, alarm.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

In Plant

References:

SOP-1B, Primary Coolant System - Cooldown, revision 021 GOP-9, Mode 3 > 525oF to Mode 4 or Mode 5, revision 037 Validation Time: 10 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish: ________

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 17 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-1B, Primary Coolant System - Cooldown, revision 021 ARP-8, Safeguards Safety Inj and Isolation Scheme EK-13 (EC-13), revision 090 Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant is in Mode 3.
  • Primary Coolant System (PCS) is at 525oF and 2060 psia.
  • The Control Room Supervisor (CRS) is performing GOP-9, Mode 3 > 525oF to Mode 4 or Mode 5, Section 2.0, Initial Preparations for Plant Cooldown.
  • Plant is to be placed in Mode 5 for control rod drive seal package replacement.

INITIATING CUE:

  • The CRS directs you to open PORV Isolation Valves per SOP-1B, Attachment 6, Opening of PORV Isolation Valves, with MO-1042A placed in service first followed by MO-1043A.

NRC EXAM MATERIAL Page 4 of 17 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-1B, Primary Coolant System - Cooldown, Attachment 6.

Candidate simulates or describes where a copy of SOP-1B, Attachment 6 can be found.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where a copy of SOP-1B, Attachment 6 can be found, provide Candidate a copy of SOP-1B Attachment 6 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 1.0 Reviews SOP-1B, Attachment 6, Section 1.0 Precautions.

Candidate reviews SOP-1B, Attachment 6, Section 1.0 Precautions.

S U Comment:

Evaluator Note: SOP-1B, Attachment 6, Section 1.0 a. describes the contingency actions for PCS pressure action limit exceeded. For this JPM the PCS Pressure Action Limit is 1800 psia.

Proc.Step TASK ELEMENT 3 STANDARD Grade 2.1. a.1 PERFORM the following to OPEN MO-1042A, PZR Power Operated Relief Valve Isolation Valve.

ENSURE the following conditions:

HS-1042B, Pressurizer To Quench Tank T-73 Hand Switch in CLOSE position.

Panel C-02 Candidate verifies HS-1042B in CLOSE (red light OFF, green light ON).

S U Comment:

NRC EXAM MATERIAL Page 5 of 17 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 2.1 a.2 ENSURE the following conditions:

MO-1042A, Power Relief Valve Isolation Valve closed.

Panel C-02 Candidate verifies MO-1042A closed (red light OFF, green light ON).

S U Comment:

Proc.Step TASK ELEMENT 5 STANDARD Grade 2.1 a.3 ENSURE the following conditions:

PCS pressure control established (2010 to 2100 psia).

Panel C-02 Candidate verifies PCS pressure in band of 2010 - 2100 psia.

S U Comment:

Evaluator Note: Candidate may use PIA-0104, Pressurizer Pressure, or equivalent instrumentation to verify PCS pressure in band.

Proc.Step TASK ELEMENT 6 STANDARD Grade 2.1. b PLACE HS-1042B, Pressurizer to Quench Tank T-73 Hand Switch to OPEN for approximately 15 seconds, THEN PLACE TO CLOSE, AND leaving handswitch in CLOSE position when complete.

Panel C-02 Candidate positions HS-1042B to OPEN for approximately 15 seconds.

AND Verifies PRV-1042B OPEN (red light OFF, green light OFF).

AND Positions HS-1042B to CLOSE.

AND Verifies PRV-1042B CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: By design, red light will not come on due to lack of DP across valve.

NRC EXAM MATERIAL Page 6 of 17 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 2.1 c.

OPERATE HS-1042A, Power Relief Valve Isolation Valve, intermittently to OPEN position until either of the following conditions is observed:

MO-1042A, Power Relief Valve Isolation Valve red position indication lamp illuminates (indicates valve is 5% open, green position indication lamp is also illuminated at this point).

OR PRV-1042B, Power Operated Relief opens.

Panel C-02 Candidate positions HS-1042A to OPEN intermittently.

AND Identifies PRV-1042 is 5% open (red light ON, green light ON).

S U Comment:

Evaluator Note: Candidate may operate HS-1042A to OPEN several times to accomplish this step.

CRITICAL STEP Proc.Step TASK ELEMENT 8 STANDARD Grade 2.1 d.

IF PRV-1042B, Power Operated Relief Valve opens AND then reseats, THEN REPEAT Step 2.1c.

Panel C-02 Candidate determines that this step is not applicable (N/A).

S U Comment:

NRC EXAM MATERIAL Page 7 of 17 Palisades April 2020 Proc.Step TASK ELEMENT 9 STANDARD Grade 2.1 e.

WHEN the following conditions exist:

MO-1042A, Power Relief Valve Isolation Valve is 5% open (red position indication lamp lit).

PRV-1042B, Power Operated Relief Valve is closed.

THEN FULLY OPEN MO-1042A, Power Relief Isolation Valve.

Candidate positions HS-1042A to OPEN.

AND Verifies MO-1042A FULLY OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 10 STANDARD Grade 2.2 a.1 PERFORM the following to OPEN MO-1043A, PZR Power Operated Relief Valve Isolation Valve.

ENSURE the following conditions:

HS-1043B, Pressurizer to Quench Tank T-73 Hand Switch in CLOSE position.

Candidate verifies HS-1043B in CLOSE (red light OFF, green light ON).

S U Comment:

Proc.Step TASK ELEMENT 11 STANDARD Grade 2.2 a.2 ENSURE the following conditions:

MO-1043A, Power Relief Valve Isolation Valve closed.

Candidate verifies MO-1043A closed (red light OFF, green light ON).

S U Comment:

NRC EXAM MATERIAL Page 8 of 17 Palisades April 2020 Proc.Step TASK ELEMENT 12 STANDARD Grade 2.2 a.3 ENSURE the following conditions:

PCS pressure control established (2010 to 2100 psia).

Candidate verifies PCS pressure in band of 2010 - 2100 psia.

S U Comment:

Evaluator Note: Candidate may use PIA-0104, Pressurizer Pressure, or equivalent instrumentation to verify PCS pressure in band.

Proc.Step TASK ELEMENT 13 STANDARD Grade 2.2 b.

PLACE HS-1043B, Pressurizer to Quench Tank T-73 Hand Switch to OPEN for approximately 15 seconds, THEN PLACE TO CLOSE, AND leaving handswitch in CLOSE position when complete.

Candidate positions HS-1043B to OPEN for approximately 15 seconds.

AND Verifies PRV-1043B OPEN (red light OFF, green light OFF).

AND Positions HS-1043B to CLOSE.

AND Verifies PRV-1043B CLOSED (red light OFF, green light ON).

S U Comment:

Evaluator Note: By design, red light will not come on due to lack of DP across valve.

NRC EXAM MATERIAL Page 9 of 17 Palisades April 2020 Alternate Path: Begins when Candidate identifies PCS pressure lowering.

Proc.Step TASK ELEMENT 14 STANDARD Grade 2.2 c.

OPERATE HS-1043A, Power Relief Valve Isolation Valve, intermittently to OPEN position until either of the following conditions is observed:

MO-1043A red position indication lamp illuminates (indicates valve is 5% open, green position indication lamp is also illuminated at this point).

OR PRV-1042B, Power Operated Relief opens.

Candidate positions HS-1043A to OPEN intermittently.

AND Identifies PRV-1043B, Power Operated Relief, has opened.

AND Identifies PCS pressure lowering.

S U Comment:

Evaluator Note: Candidate may operate HS-1043A to OPEN several times to accomplish this step.

When MO-1043 is 5% open (red light ON, green light ON) malfunction will initiate causing PRV-1043B to lift and not reseat. PCS pressure will lower.

NRC EXAM MATERIAL Page 10 of 17 Palisades April 2020 Proc.Step TASK ELEMENT 15 STANDARD Grade Precautions 1.0 a.

IF a PORV opens during performance of this Attachment AND the applicable PCS pressure action limit of 1800 psia is exceeded, THEN the following actions SHALL BE TAKEN:

CLOSE affected PORV Isolation Valve.

RESTORE PCS pressure as directed by CRS.

Candidate identifies PCS pressure is rapidly trending towards pressure action limit of 1800 psia.

AND Positions MO-1043A to CLOSE (red light OFF, green light ON).

AND Verifies PCS pressure stabilizes.

S U Comment:

Evaluator Cue: When MO-1043A is closed and PCS pressure stabilizes, provide cue that another Operator will restore PCS pressure and complete this task.

Evaluator Note: If PCS pressure lowers to 1605 psia and EK-1342, Safety Inj Initiated, is actuated, terminate the JPM.

CRITICAL STEP Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 11 of 17 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-69 for LOI2020

NRC EXAM MATERIAL Page 12 of 17 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • Plant is in Mode 3.
  • Primary Coolant System (PCS) is at 525oF and 2060 psia.
  • The Control Room Supervisor (CRS) is performing GOP-9, Mode 3 > 525oF to Mode 4 or Mode 5, Section 2.0, Initial Preparations for Plant Cooldown.
  • Plant is to be placed in Mode 5 for control rod drive seal package replacement.

INITIATING CUE:

  • The CRS directs you to open PORV Isolation Valves per SOP-1B, Attachment 6, Opening of PORV Isolation Valves, with MO-1042A placed in service first followed by MO-1043A.

NRC EXAM MATERIAL Page 13 of 17 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 14 of 17 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 15 of 17 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 16 of 17 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 17 of 17 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 13 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM d.

TITLE:

PLACE THE ZERO POWER MODE BYPASS IN OPERATION

NRC EXAM MATERIAL Page 2 of 13 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-012 201 02 01 / Insert, Remove, or Test the Reactor Protection System Zero Power Mode Bypass (SOP-36).

Alternate Path: No.

Facility JPM #: PLJPM-LOR-RPS-03, revision 05.

K/A: 012A.4.05 Importance:

RO: 3.6 SRO: 3.6 K/A Statement: Ability to manually operate and/or monitor in the control room: Channel defeat controls. (CFR: 41.7 / 45.5 to 45.8)

Task Standard: Zero Power Mode Bypass placed in operation one Channel at a time on Channels A and B RPS Channels.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

SOP-36, Reactor Protective System and Anticipated Transient Without Scram (ATWS)

System, revision 013 Validation Time: 9 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish: ________

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 13 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-36, Reactor Protective System and Anticipated Transient Without Scram (ATWS) System, revision 013 RPS Keys #285, #286, #287, #288, and any two additional RPS Keys, obtained from Key Locker in old SE Office, and provided to Examiner.

Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant is in Mode 5.
  • Wide Range NIs (NI-1/3 and NI-2/4) are operable.
  • All Control Rod Drive clutch power toggle switches are in the OFF position.
  • Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.

INITIATING CUE:

  • The Control Room Supervisor (CRS) directs you to place the Zero Power Mode (ZPM)

Bypass in operation per SOP-36, Reactor Protective System and Anticipated Transient Without Scram (ATWS) System, Section 7.2.1 on Channels A and B ONLY.

NRC EXAM MATERIAL Page 4 of 13 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-36, Reactor Protective System and Anticipated Transient Without Scram (ATWS) System.

Candidate simulates or describes where SOP-36 is located and determines applicable section 7.2.1, To Place Zero Power Mode Bypass in Operation.

S U Comment:

Evaluator Cue: When Candidate simulates or describes locating SOP-36, provide a copy of SOP-36 Section 7.2.1 (JPM Attachment1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 7.2.1a.

ENSURE BOTH Wide Range NIs (NI-1/3 and NI-2/4) are operable. REFER TO Technical Specifications LCO 3.3.1.

Candidate determines that both Wide Range NIs (NI-1/3 and NI-2/4) are operable as stated in Initial Conditions.

N/A Comment:

Proc.Step TASK ELEMENT 3 STANDARD Grade 7.2.1b.

ENSURE power level less than 10-4% RTP.

Candidate uses available power instrumentation to verify power level less than 10-4% RTP.

S U Comment:

Evaluator Note: Candidate may use power indications on C-06 or C-02 panels for this step.

NRC EXAM MATERIAL Page 5 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 7.2.1c.

WHEN in Modes 3, 4, or 5, THEN VERIFY Primary System boron concentration is at refueling boron concentration OR no more than one full-length control rod is capable of being withdrawn.

Candidate verifies that no more than one full-length control rod is capable of being withdrawn as stated in the Initial Conditions.

S U Comment:

Evaluator Note: Either Channel may be bypassed first, however, in accordance with the USER ALERT just prior to Step 7.2.1d, the actions of step 7.2.1d should be performed in it is entirety ONE Channel at a time.

Evaluator Note: Refueling Boron concentration is 2807 per Technical Data Book figure 1.1 Proc.Step TASK ELEMENT 5 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:

INSERT key in Enable switch AND TURN clockwise to enable Channel A:

Channel A (Key 287)

C-06 Candidate obtains Key 287 for Channel A.

AND Inserts Key 287 in Channel A Enable Switch.

AND Positions ONLY Channel A Enable Switch clockwise to enable.

S U Comment:

Evaluator Note: EK-06 Rack D Annunciator #1, Zero Power Mode Bypass, will annunciate when this action is performed. Candidate is expected to announce alarm.

When Candidate announces expected alarm, repeat back as the CRS.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain OFF.

LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE C-06 Candidate presses the four test switches, one at a time, on Channel A and verifies the following lights remain OFF:

LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales.

C-06 Candidate presses the RPS Trip telltales on Channel A for:

Low Flow and verifies the Trip light goes out.

Low Level S/G 1 and verifies the Trip light goes out.

Low Level S/G 2 and verifies the Trip light goes out.

Thermal Margin/Low Pressure and verifies the Trip light goes out.

S U Comment:

Evaluator Note: The pre-trip light remains on.

Evaluator Note: Steps 7.2.1.d.1 through 7.2.1.d.3 are repeated for Channel B.

NRC EXAM MATERIAL Page 8 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 8 STANDARD Grade 7.2.1d.1 PERFORM the following on the desired Channel to place the ZPM Bypass in service:

INSERT key in Enable switch AND TURN clockwise to enable Channel B:

Channel B (Key 286)

C-06 Candidate obtains Key 286 for Channel B.

AND Inserts Key 286 in Channel B Enable Switch.

AND Positions ONLY Channel B Enable Switch clockwise to enable.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 9 STANDARD Grade 7.2.1d.2 PRESS EACH of the four test switches one at a time AND VERIFY the associated lights above each switch remain OFF.

LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE C-06 Candidate presses the four test switches, one at a time, on Channel B and verifies the following lights remain OFF:

LO FLOW ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-1 ZPM SW OFF and ZPM AUTO DABLE LO PRESS SG-2 ZPM SW OFF and ZPM AUTO DABLE TM/LP ZPM SW OFF and ZPM AUTO DABLE S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 9 of 13 Palisades April 2020 Proc.Step TASK ELEMENT 10 STANDARD Grade 7.2.1d.3 RESET the RPS Trip telltales.

C-06 Candidate presses the RPS Trip telltales on Channel B for:

Low Flow and verifies the Trip light goes out.

Low Level S/G 1 and verifies the Trip light goes out.

Low Level S/G 2 and verifies the Trip light goes out.

Thermal Margin/Low Pressure and verifies the Trip light goes out.

S U Comment:

Evaluator Note: The pre-trip light remains on.

Proc.Step TASK ELEMENT 11 STANDARD Grade N/A Notify CRS the Zero Power Mode Bypass is in operation for channels A and B.

Candidate informs the CRS that the Zero Power Mode Bypass is in operation for channels A and B.

S U Comment:

Evaluator Cue: Repeat back any communication.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 10 of 13 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-2 for LOI 2020.
  • Hang one Yellow Caution Tag in the vicinity of the CRD toggle switches.
  • Remove Yellow Caution Tag when complete.
  • Run all Candidates through this JPM sequentially.

NRC EXAM MATERIAL Page 11 of 13 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • Plant is in Mode 5.
  • Wide Range NIs (NI-1/3 and NI-2/4) are operable.
  • All Control Rod Drive clutch power toggle switches are in the OFF position.
  • Technical Specification requirements for LCO 3.3.1 and Table 3.3.1 are met.

INITIATING CUE:

  • The Control Room Supervisor (CRS) directs you to place the Zero Power Mode (ZPM)

Bypass in operation per SOP-36, Reactor Protective System and Anticipated Transient Without Scram (ATWS) System, Section 7.2.1 on Channels A and B ONLY.

NRC EXAM MATERIAL Page 12 of 13 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 13 of 13 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 18 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM e.

TITLE:

TRIP PRIMARY COOLANT PUMPS PER AOP SUPPLEMENT 16 (NFPA805)

NRC EXAM MATERIAL Page 2 of 18 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-000 067 05 01 / Respond to a Plant Fire on Site (AOP-40) (FPIP).

Alternate Path: Yes.

Facility JPM #: PLJPM-LOR-AOP-45, revision 00.

K/A: 003A.2.02 Importance: RO: 3.7 SRO: 3.9 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Conditions which exist for an abnormal shutdown of an RCP in comparison to a normal shutdown of an RCP.

(CFR: 41.5 / 43.5/ 45.3 / 45/13)

Task Standard: P-50A and P-50C, Primary Coolant Pumps, tripped from EC-02; and P-50B and P-50D, Primary Coolant pumps, tripped from EC-11A.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

AOP Supplement 16, NFPA805 Alternative Control methods, revision 001 AOP-40, Fire Which Threatens Safety Related Equipment, revision 004 Validation Time: 8 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 18 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

AOP Supplement 16, NFPA805 Alternative Control methods, revision 001 AOP-40, Fire Which Threatens Safety Related Equipment, revision 004 Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

There is an active fire in Fire Area 23 (Turbine Building).

Fire Brigade is engaged in fighting the fire.

The Turbine Building is inaccessible.

AOP-40, Fire Which Threatens Safety -Related Equipment, is the in-use procedure.

Reactor is tripped and EOP-1.0, Standard Post Trip Actions are complete.

The Control Room Supervisor (CRS) has determined that continued Primary Coolant Pump (PCP) operation is NOT desired due to fluctuating PCP amps and the potential to damage the pumps.

INITIATING CUE:

The CRS directs you to stop all PCPs per AOP-40 step 16.1.

NRC EXAM MATERIAL Page 4 of 18 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtains a copy of AOP-40, Fire Which Threatens Safety Related Equipment.

Candidate locates AOP-40 and determines applicable step 16.1.

S U Comment:

Evaluator Cue: When Candidate locates AOP-40 provide a clean copy of AOP-40 step 16.1 (JPM ).

Proc.Step TASK ELEMENT 2 STANDARD Grade 16.1a.

STOP PCPs using one of the following prioritized methods:

TRIP from EC-02.

Candidate positions P-50A, PCP, handswitch 252-103CS to TRIP.

AND Verifies P-50A stops (red light OFF, green light ON) and EAI-2103 amps lower to zero.

S U Comment:

Evaluator Note: There is no prescribed order for which PCPs are secured. Candidate may secure PCPs in an order different than listed here (P-50A, P-50B, P-50C, and P-50D).

CRITICAL STEP

NRC EXAM MATERIAL Page 5 of 18 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade 16.1a.

STOP PCPs using one of the following prioritized methods:

TRIP from EC-02.

Candidate positions P-50B, PCP, handswitch 252-203CS to TRIP.

AND Identifies that P-50B does not stop (red light ON, green light OFF) and EAI-2203 amps do not change.

AND Informs CRS that P-50B did not trip from EC-

02.

S U Comment:

Evaluator Cue: If notified as CRS that P-50B did not trip, repeat back and acknowledge information.

Proc.Step TASK ELEMENT 4 STANDARD Grade 16.1a.

STOP PCPs using one of the following prioritized methods:

TRIP from EC-02.

Candidate positions P-50C, PCP, handswitch 252-104CS to TRIP.

AND Verifies P-50C stops (red light OFF, green light ON) and EAI-2104 amps on lower to zero.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 18 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade 16.1a.

STOP PCPs using one of the following prioritized methods:

TRIP from EC-02.

Candidate positions P-50D, PCP, handswitch 252-204CS to TRIP.

AND Identifies that P-50D does not stop (red light ON, green light OFF) and EAI-2204 amps do not change.

AND Informs CRS that P-50D did not trip from EC-

02.

S U Comment:

Evaluator Cue: If notified as CRS that P-50D did not trip, repeat back and acknowledge information.

Proc.Step TASK ELEMENT 6 STANDARD Grade 16.1b.

STOP PCPs using one of the following prioritized methods:

TRIP from EC-11A. Refer to AOP Supplement 16, "NFPA 805 Alternate Control Methods."

Candidate identifies that P-50B and P-50D must be stopped from EC-11A.

AND Simulates or describes where AOP Supplement 16 can be obtained.

S U Comment:

Evaluator Cue: If asked as CRS how to proceed with securing the remaining PCPs, reply:

What do you recommend?

When candidate simulates or describes where AOP Supplement 16 can be located to secure PCPs from EC-11A, provide a copy of AOP Supplement 16 (JPM Attachment 2).

If candidate attempts to perform AOP-40 Step 16.1 c. to open Bus 1A and Bus 1B supply breakers from EC-04 or locally, provide cue as CRS that it is desired to keep these buses energized for condenser cooling and plant stability.

If candidate attempts to perform AOP-40 Step 16.1 d. to de-energize R-Bus, provide cue as CRS that ITC is not available at this time.

If candidate attempts to perform AOP-40 Step 16.1 e. to trip PCP breakers locally, provide cue as CRS that the Turbine Building is inaccessible due to the fire (as provided in Initial Conditions).

NRC EXAM MATERIAL Page 7 of 18 Palisades April 2020 Alternate Path: Initiates actions from EC-11A.

Proc.Step TASK ELEMENT 7 STANDARD Grade

7.

VERIFY PCP(s) operation from EC-11A panel has been directed by another procedure.

Candidate verifies that the direction to perform PCP operations from EC-11A was directed by AOP-40 step 16.1b.

S U Comment:

Evaluator Cue: If Candidate asks CRS if AOP Supplement 16 step 1 needs to be addressed, provide cue:

Alternate control of Letdown Orifice Stop Valves has NOT been directed by another procedure.

Proc.Step TASK ELEMENT 8 STANDARD Grade

8.

ENSURE alternate control PCP(s) trip handswitches are in NORM.

HS-0159, P-50A HS-0160, P-50B HS-0161, P-50C HS-0162, P-50D Candidate ensures that alternate control PCP(s) trip handswitches are in NORM:

Verifies HS-0159, P-50A in NORM.

AND Verifies HS-0160, P-50B in NORM.

AND Verifies HS-0161, P-50C in NORM.

AND Verifies HS-0162, P-50D in NORM.

S U Comment:

Proc.Step TASK ELEMENT 9 STANDARD Grade

9.

PLACE HS-0156, Primary Coolant Pump Alt Power Supply to ON.

Candidate positions Primary Coolant Pump Alt Power Supply HS-0156 to ON.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 8 of 18 Palisades April 2020 Proc.Step TASK ELEMENT 10 STANDARD Grade 9.a.

VERIFY amber light is illuminated.

Candidate verifies Primary Coolant Pump Alt Power Supply amber light is ON.

S U Comment:

Proc.Step TASK ELEMENT 11 STANDARD Grade

10.

VERIFY P-50A AND/OR P-50C is to be Tripped.

Candidate determines that this step is not applicable (N/A) as P-50A and P-50C have been tripped from EC-02.

AND Performs Response Not Obtained (RNO) step 10.1.

AND Goes to step 11.

S U Comment:

Proc.Step TASK ELEMENT 12 STANDARD Grade

11.

VERIFY P-50B AND/OR P-50D is to be tripped.

Candidate verifies that P-50B and P-50D need to be tripped.

S U Comment:

Proc.Step TASK ELEMENT 13 STANDARD Grade 11.a.

PLACE HS-0158, P-50B & P-50D Alt Control Selector to ALT.

Candidate positions HS-0158, P-50B & P-50D Alt Control Selector, to ALT.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 9 of 18 Palisades April 2020 Proc.Step TASK ELEMENT 14 STANDARD Grade 11.b.

PLACE desired handswitch(es) to TRIP:

HS-0160, P-50B AND HS-0162, P-50D Candidate positions HS-0160, P-50B to TRIP.

AND Verifies HS-0160 red light OFF, green light ON.

AND Positions HS-0162, P-50D to TRIP.

AND Verifies HS-0162 red light OFF, green light ON.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 15 STANDARD Grade 11.c.

VERIFY desired pumps are off.

Candidate verifies that P-50B is stopped as indicated by 252-203CS red light OFF, green light ON.

AND Verifies P-50B amps on EAI-2203 lower to zero.

AND Verifies that P-50D is stopped as indicated by 252-204CS red light OFF, green light ON.

AND Verifies P-50D amps on EAI-2204 lower to zero.

S U Comment:

NRC EXAM MATERIAL Page 10 of 18 Palisades April 2020 Proc.Step TASK ELEMENT 16 STANDARD Grade N/A Reports to the CRS that all PCPs have been stopped.

Candidate reports to the CRS that all PCPs have been stopped.

S U Comment:

Evaluator Cue: Repeat back communication.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 11 of 18 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Reset to IC-71 for LOI 2020
  • EK-2809, Turbine Basement Area Sprays (Htr Drain Pump pit)
  • EK-2807, Condensate Pump Room / M-18
  • Fluctuating amps P-50B and P-50D
  • Overrides on P-50B and P-50D control switches to prevent tripping

NRC EXAM MATERIAL Page 12 of 18 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

There is an active fire in Fire Area 23 (Turbine Building).

Fire Brigade is engaged in fighting the fire.

The Turbine Building is inaccessible.

AOP-40, Fire Which Threatens Safety -Related Equipment, is the in-use procedure.

Reactor is tripped and EOP-1.0, Standard Post Trip Actions are complete.

The Control Room Supervisor (CRS) has determined that continued Primary Coolant Pump (PCP) operation is NOT desired due to fluctuating PCP amps and the potential to damage the pumps.

INITIATING CUE:

The CRS directs you to stop all PCPs per AOP-40 step 16.1.

NRC EXAM MATERIAL Page 13 of 18 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 14 of 18 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 15 of 18 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 16 of 18 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 17 of 18 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 18 of 18 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 1 of 26 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: CONTROL ROOM: f.

TITLE: START AND LOAD A DIESEL GENERATOR IN PARALLEL CANDIDATE:

EXAMINER:

NRC EXAM MATERIAL Page 2 of 26 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-064 204 01 01 / Start and Load a Diesel Generator from Control Room.

Alternate Path: No.

Facility JPM #: PLJPM-LOR-DG-01, revision 06.

K/A: 064A4.06 Importance: RO: 3.9 SRO: 3.9 K/A Statement: Ability to manually operate and/or monitor in the control room: Manual start, loading, and stopping of the ED/G. (CFR: 41.7 / 45.5 to 45.8)

Task Standard: Diesel Generator 1-1 is loaded in parallel to greater than or equal to 1300KW and less than or equal to 1400 KW.

Preferred Evaluation Location: Simulator

__X __

In Plant Preferred Evaluation Method:

Perform

_X ___

Simulate ______

References:

SOP-22, Emergency Diesel Generators, revision 077 Technical Specifications Validation Time: 18 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish: ________

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 26 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-22, Emergency Diesel Generators, revision 77 Technical Specifications (T.S.)

Normal Control Room references Use IC-17 for LOI 2020.

Also see JPM Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • EDG 1-1 will be test started and loaded per System Engineering request.
  • Technical Specifications (T.S.) have been reviewed and LCO 3.8.1 Condition B will be entered for EDG 1-1 during the test run.
  • Outside air temperature is 75°F.
  • A pre-job brief has been completed with the Nuclear Plant Operator (NPO).
  • An Offsite Source Check was performed 15 minutes ago.
  • SOP-22 section 7.5.7, Cylinder Leak Test, was completed 15 minutes ago.
  • NPO will record the EDG 1-1 start time.

INITIATING CUE:

  • The CRS directs you to start EDG 1-1 from the Control Room (Panel EC-04) and parallel and load it to between 1300 KW and 1400 KW, IAW SOP-22 section 7.5.2.

NRC EXAM MATERIAL Page 4 of 26 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain copy of SOP-22.

Candidate simulates or describes where a copy of SOP-22 could be obtained.

S U Comment:

Evaluator Cue: When Candidate describes where a copy of SOP-22 can be found, provide Candidate a copy of SOP-22, Section 7.5.2 (JPM Attachment 1) and Attachment 6 (JPM attachment 2).

Proc.Step TASK ELEMENT 2 STANDARD Grade 7.5.2 a.

WHEN starting and operating a D/G, THEN DOCUMENT Diesel Generator readings and operability times on Attachment 6, "Diesel Generator Log Sheet."

Candidate fills in Attachment 6 Item 2 as 75°F.

AND Circles 1-1 as D/G started for item 3.

S U Comment:

Evaluator Note: Outside air temperature is given in the Initial Conditions.

Proc.Step TASK ELEMENT 3 STANDARD Grade 7.5.2 b.

IF it is NOT an emergency start, THEN PERFORM Section 7.5.7, "Cylinder Leak Test."

Candidate verifies that this step has been completed.

S U Comment:

Evaluator Note: This information was given in Initial Conditions.

NRC EXAM MATERIAL Page 5 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 7.5.2 c.

ENSURE the Parallel/Unit Selector switch for EDG 1-1 is in UNIT:

D/G 1-1 G1-1/DSR, Parallel/Unit Selector Candidate verifies that G1-1/DSR, Parallel/Unit Selector is in the UNIT position.

S U Comment:

Proc.Step TASK ELEMENT 5 STANDARD Grade 7.5.2 d.

IF at any time diesel fumes are detected in the DG 1-1 Room AND the standby V-24 is NOT operating, THEN PLACE V-24, Diesel Generator Room Supply Fan, (A, B, C, or D) Hand Switch for the fan that's in STANDBY to HAND if desired.

Candidate directs the NPO to monitor EDG 1-1 for fumes and take appropriate action.

S U Comment:

Evaluator Cue: If directed as NPO to monitor EDG 1-1 for fumes, acknowledge that you will.

NRC EXAM MATERIAL Page 6 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 7.5.2 e.

START the Diesel Generator using the following:

D/G 1-1 G1-1/CS, Engine Control (EC-04 panel)

Candidate may notify CRS of expected alarms for EDG 1-1 start.

AND Positions G1-1/CS to START.

AND Verifies EDG 1-1 starts by audible noise in the Control Room and 1-1 D/G RUNNING red light ON.

AND Records Attachment 6 data.

S U Comment:

Evaluator Note: EK-0551, DIESEL NO GEN 1-1 TROUBLE, will alarm when EDG 1-1 is started.

Timed start of EDG 1-1 is not required per SOP-22, Attachment 6, Item 5.

Operator may announce the start of 1-1 Diesel Generator via the public address system.

Placing G1-1/CS to START is the only CRITICAL portion of this step.

CRITICAL STEP Proc.Step TASK ELEMENT 7 STANDARD Grade 7.5.2 f.

IF Local Engine Control Switch was used to START the Engine, THEN Candidate determines that this step is not applicable (N/A).

S U Comment:

NRC EXAM MATERIAL Page 7 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 8 STANDARD Grade 7.5.2 g.

CHECK diesel engine and auxiliary systems for proper operation.

1.

IF D/G 1-1 was started, THEN VERIFY OPEN CV-0884, D/G 1-1 SW Inlet.

Candidate directs NPO to check EDG 1-1 engine and auxiliary systems for proper operation.

AND Directs NPO to verify CV-0884 open. (Local in EDG 1-1 room).

AND Directs NPO to complete Attachment 6 Diesel Generator Log Sheet every 15 minutes.

S U Comment:

Evaluator Cue: When directed as NPO to verify CV-0884 OPEN, reply that it is OPEN.

When directed as NPO to monitor EDG 1-1 every 15 minutes, acknowledge that you will monitor and record readings every 15 minutes.

Proc.Step TASK ELEMENT 9 STANDARD Grade 7.5.2 h.

The Diesel Generator is inoperable when operated loaded in parallel with offsite power. REFER TO Technical Specifications:

Modes 1, 2, 3 and 4 -LCO 3.8.1 Candidate determines that another Operator will refer to Tech Specs.

S U Comment:

Evaluator Cue: When Candidate refers to Tech Specs, provide cue that another Operator will address Tech Specs.

NRC EXAM MATERIAL Page 8 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 10 STANDARD Grade 7.5.2 i.

RECORD the completion of the initial offsite source checks with the Diesel Generator LCO log entry.

Candidate determines that another Operator will complete the initial offsite source checks.

S U Comment:

Evaluator Note: Provide cue that another Operator will perform initial offsite source checks.

Proc.Step TASK ELEMENT 11 STANDARD Grade 7.5.2 j.

PLACE the Parallel/Unit Selector switch for the affected D/G to PARALLEL:

D/G 1-1 G1-1/DSR, Parallel/Unit Selector Candidate positions G1-1/DSR to PARALLEL.

AND Verifies UNIT red light OFF.

AND Verifies PARALLEL green light ON.

AND Logs time on Attachment 6 item 10.b.

S U Comment:

Evaluator Note: Placing the D/G 1-1 Parallel Unit Switch to PARALLEL is the only CRITICAL portion of this step.

CRITICAL STEP

NRC EXAM MATERIAL Page 9 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 12 STANDARD Grade 7.5.2 k.

RESET the Diesel Generator Trouble Alarm OR have the Nuclear Plant Operator MONITOR the local panel.

Candidate directs NPO to reset the Diesel Generator Trouble Alarm.

OR Directs the NPO to MONITOR the local panel.

S U Comment:

Evaluator Cue: If asked as NPO to report the local EDG 1-1 alarms, respond that alarm EK-2013, Engine Trouble, has annunciated.

If asked as NPO to monitor the local panel, respond that the local panel will be monitored.

Simulator Operator Cue: If directed as NPO to reset Diesel Generator Trouble Alarm, on PIDAN02, set ED151, DG 1-1 ALARM PANEL K20 ACKNOWLEDGE, to ACKNLG and set ED27, D/G 1-1 TROUBLE ALARM CLEAR, to CLEAR and report when complete.

Proc.Step TASK ELEMENT 13 STANDARD Grade 7.5.2 l.

TURN ON Synchroscope for Breaker 152-107.

Candidate obtains Synchroscope switch handle from C-04.

AND Inserts switch handle into 125-107SS, Synchronize, switch for breaker 152-107.

AND Positions 125-107SS to ON.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 14 STANDARD Grade 7.5.2 m.

ADJUST INCOMING voltage (D/G) to match RUNNING voltage (+/- 1 volt on synchronizing voltmeter) by adjusting voltage with Field Rheostat switch.

Candidate positions EDG 1-1 Field Rheostat, G1-1/VSR, to RAISE or LOWER as necessary.

AND Adjusts INCOMING voltage to +/- 1 volt of RUNNING voltage on SYNCHRONIZING VOLTAGES voltmeters.

S U Comment:

NRC EXAM MATERIAL Page 10 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 15 STANDARD Grade 7.5.2 n.

ADJUST generator speed with Governor Set Point switch.

Candidate positions Governor Set Point control switch, 165-D2/CS, to RAISE or LOWER as necessary.

AND Verifies Synchroscope is turning slowly in the clockwise (FAST) direction no faster than 45 seconds per revolution.

S U Comment:

Proc.Step TASK ELEMENT 16 STANDARD Grade 7.5.2 o.

Repeat Steps 7.5.2m and 7.5.2n as necessary to obtain proper generator voltage and speed.

Candidate adjusts until Incoming voltage matches running voltage within 1 volt.

AND Synchroscope rotating slowly clockwise (fast) direction no faster than 45 seconds per revolution.

S U Comment:

Proc.Step TASK ELEMENT 17 STANDARD Grade 7.5.2 p.

WHEN synchroscope nears "1200" hours on meter, THEN CLOSE the appropriate Generator Breaker:

D/G 1-1 152-107, D/G 1-1 to Bus 1C.

Candidate positions breaker 152-107 to CLOSE when synchroscope nears "1200" hours on meter.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 11 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 18 STANDARD Grade 7.5.2 q.

CHECK CLOSED the Generator Breaker AND ADD approximately 50 KW to the generator with the generator Governor Setpoint switch.

Candidate verifies 152-107 CLOSED (red light ON, green light OFF).

AND Positions 165-D2/CS, Governor Setpoint, to RAISE.

AND Verifies 45 - 55 KW to EDG 1-1 by EWI-1107 Wattmeter reading.

S U Comment:

Evaluator Note: Diesel Generator output reads in Megawatts, so 50 KW would be read as 0.05 on EWI-1107.

Proc.Step TASK ELEMENT 19 STANDARD Grade 7.5.2 r.

TURN OFF Synchroscope.

Candidate positions 125-107SS to OFF.

AND Removes Synchronizing switch handle.

S U Comment:

NRC EXAM MATERIAL Page 12 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 20 STANDARD Grade 7.5.2 s.

ADJUST D/G load as follows:

1.

RAISE OR LOWER D/G load with the Governor Set Point switch.

Candidate positions 165-D2/CS to RAISE.

AND Ensures load is added in approximately 500 KW increments.

AND Allows EDG 1-1 to run approximately 5 minutes at each 500 KW load level.

AND Verifies proper current level before raising load another 500 KW.

AND Adds load until EWI-1107 wattmeter reads greater than or equal to 1300 KW and less than or equal to 1400 KW.

AND Records time EDG 1-1 is loaded above 1250 KW on Attachment 6 item 6.

S U Comment:

Evaluator Cue: After each 500 KW load increment, allow the examinee enough time to pause and demonstrate knowledge of procedural guidance to wait 5 minutes, then, using time compression, provide cue that 5 minutes has passed.

Evaluator Note: EWI-1107 meter reads in Megawatts, so 1300 KW would be 1.3 Megawatts and 1400 KW would be 1.4 Megawatts. Adding load to 1300 to 1400 Megawatts on D/G 1-1 is the only Critical Step.

CRITICAL STEP

NRC EXAM MATERIAL Page 13 of 26 Palisades April 2020 Proc.Step TASK ELEMENT 21 STANDARD Grade 7.5.2 t.

IF it is desired to separate Bus 1C/1D from offsite power, while leaving the bus energized by the Diesel Generator, THEN PERFORM following Candidate determines that this step is not applicable.

S U Comment:

Proc.Step TASK ELEMENT 22 STANDARD Grade 7.5.2 u.

REFER TO Section 4.6, "Diesel Generator Air Emission Requirements," for air emissions monitoring and logging requirements.

Candidate directs NPO to check EDG 1-1 air emissions.

AND Logs emission results on Attachment 6 item 7.

S U Comment:

Evaluator Cue: If asked as NPO to check EDG 1-1 air emission, provide cue that EDG 1-1 air emission is clear.

Evaluator Note: Section 4.6 requires that an emission inspection shall be made within one hour after starting a diesel.

Proc.Step TASK ELEMENT 23 STANDARD Grade 7.5.2 v.

WHEN D/G operation is no longer required, THEN GO TO Section 7.5.6, "To Unload and Stop a Diesel Generator."

Candidate determines that another Operator will perform this step.

S U Comment:

Evaluator Cue: Provide cue that another Operator will perform this step.

Proc.Step TASK ELEMENT 24 STANDARD Grade N/A Notify the CRS that EDG 1-1 was started and loaded on Bus 1C.

Operator notifies the CRS that EDG 1-1 was started and loaded on Bus 1C.

S U Comment:

Evaluator Cue: Acknowledge information and repeat back.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 14 of 26 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS Use IC-17 for LOI 2020.

Prepare copy of SOP-22, Attachment 6, Diesel Generator Log Sheet, to be provided to the Operator being evaluated.

NRC EXAM MATERIAL Page 15 of 26 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • EDG 1-1 will be test started and loaded per System Engineering request.
  • Technical Specifications (T.S.) have been reviewed and LCO 3.8.1 Condition B will be entered for EDG 1-1 during the test run.
  • Outside air temperature is 75°F.
  • A pre-job brief has been completed with the Nuclear Plant Operator (NPO).
  • An Offsite Source Check was performed 15 minutes ago.
  • SOP-22 section 7.5.7, Cylinder Leak Test, was completed 15 minutes ago.
  • NPO will record the EDG 1-1 start time.

INITIATING CUE:

  • The CRS directs you to start EDG 1-1 from the Control Room (Panel EC-04) and parallel and load it to between 1300 KW and 1400 KW, IAW SOP-22 section 7.5.2.

NRC EXAM MATERIAL Page 16 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 17 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 18 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 19 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 20 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 21 of 26 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 22 of 26 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 23 of 26 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 24 of 26 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 25 of 26 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 26 of 26 Palisades April 2020 JPM ATTACHMENT 2

NRC EXAM MATERIAL Page 1 of 14 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM g.

TITLE:

SAMPLE CONTAINMENT FOR HYDROGEN

NRC EXAM MATERIAL Page 2 of 14 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-103 206 05 01 / Place Containment Hydrogen Analyzer in Service and Sample Containment (SOP-38).

Alternate Path: No.

Facility JPM #: PL-OPS-HYR-003J, revision 01.

K/A: 028A4.03 Importance:

RO: 3.1 SRO: 3.3 K/A Statement: Ability to manually operate and/or monitor in the control room: Location and operation of hydrogen sampling and analysis of containment atmosphere, including alarms and indications. (CFR: 41.7 / 45.5 to 45.8)

Task Standard: Left Channel Containment Hydrogen Analyzer in service in ACCI position and sampling containment.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

In Plant

References:

SOP-38, Gaseous Process Monitoring System, revision 039 Validation Time: 11 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 14 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

  • SOP-38, Gaseous Process Monitoring System, revision 039
  • Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The Plant was been tripped due to a primary coolant system (PCS) leak.
  • EOP-4.0, Loss of Coolant Accident Recovery, is the in-use procedure.
  • Both channels of Hydrogen Monitoring are available and have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUE:

  • During performance of EOP-4.0, the Control Room Supervisor (CRS) directs you to PLACE at least one Hydrogen Monitor in operation, ensuring the appropriate Key Switch in the "ACCI" position. Refer to SOP-38, "Gaseous Process Monitoring System."

NRC EXAM MATERIAL Page 4 of 14 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-38, Gaseous Process Monitoring System.

Candidate locates SOP-38 and determines applicable section 7.4.2, To Sample Containment for H2.

S U Comment:

Evaluator Cue: When Candidate locates SOP-38 provide copy of SOP-38 Section 7.4.2 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 7.4.1a.-

d.

To Place in Service (Both Channels)

Candidate determines that this prerequisite information was provided in Initial Conditions.

N/A Comment:

Proc.Step TASK ELEMENT 3 STANDARD Grade 7.4.2a.

ENSURE sampling system has been in STANDBY at least six hours.

Candidate verifies sampling system has been in Standby for at least six hours per Initial Conditions.

S U Comment:

Proc.Step TASK ELEMENT 4 STANDARD Grade 7.4.2b.

CHECK Left Channel handswitch in NORMAL position.

Left Channel HS-2419 C-11A Rear Candidate verifies Left Channel HS-2419 is in NORMAL position.

S U Comment:

NRC EXAM MATERIAL Page 5 of 14 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade 7.4.2c.

CHECK "H2 DUAL RANGE SELECTOR SWITCH" to the "0 - 10% range, for Left Channel.

Left Channel HS-2422L C-11A Rear Candidate verifies the H2 DUAL RANGE SELECTOR SWITCH for Left Channel HS-2422L is set to the 0 - 10% range position.

S U Comment:

Proc.Step TASK ELEMENT 6 STANDARD Grade 7.4.2d.

IF CHP or CHR signal present or imminent, THEN ENABLE the sample valves to be opened by turning the Left Channel Key Switch to the ACCI position.

Left Channel HS-2419 (Key 364)

C-11A Rear Candidate identifies CHP IS present as indicated by actuated alarm EK-1361, Containment Hi Press.

AND Obtains Key 364 and inserts it into HS-2419.

AND Positions Left Channel Key Switch HS-2419 to the ACCI position.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 7 STANDARD Grade 7.4.2e.

For the Left Channel, OPERATE the following handswitch to the OPEN position AND RELEASE:

Left Channel HS-2417 C-11A Rear Candidate positions Left Channel HS-2417 to the OPEN position then releases HS-2417.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 14 Palisades April 2020 Proc.Step TASK ELEMENT 8 STANDARD Grade 7.4.2f.

For the Left Channel, PLACE the following handswitches to the OPEN position:

Left Channel HS-2413A C-11A Rear Candidate positions SV-2413A handswitch HS-2413A to the OPEN position.

AND Verifies SV-2413A OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 9 STANDARD Grade 7.4.2f.

For the Left Channel, PLACE the following handswitches to the OPEN position:

Left Channel HS-2413B C-11A Rear Candidate positions SV-2413B handswitch HS-2413B to the OPEN position.

AND Verifies SV-2413B OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 10 STANDARD Grade 7.4.2f.

For the Left Channel, PLACE the following handswitches to the OPEN position:

Left Channel HS-2415A C-11A Rear Candidate positions SV-2415A handswitch HS-2415A to the OPEN position.

AND Verifies SV-2415A OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 14 Palisades April 2020 Proc.Step TASK ELEMENT 11 STANDARD Grade 7.4.2f.

For the Left Channel, PLACE the following handswitches to the OPEN position:

Left Channel HS-2415B C-11A Rear Candidate positions SV-2415B handswitch HS-2415B to the OPEN position.

AND Verifies SV-2415B OPEN (red light ON, green light OFF).

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 12 STANDARD Grade 7.4.2g.

PLACE Left Channel handswitch to the ANALYZE position.

Left Channel HS-2427L C-11A Rear Candidate positions Left Channel HS-2427L to the ANALYZE position.

S U Comment:

Evaluator Note: This step will result in the receipt of alarm on EK-0227, CONT H2 MONT C-161 FAIL and illumination of the Common Alarm light on Panel C-161. Alarm EK-0227 immediately clears.

If Candidate does not recognize receipt of EK-0227 as an expected alarm, ARP-33 at panel EC-11A is available for Candidate to use. Ensure pages are erased after use.

Evaluator Cue: If alarm EK-0227 is announced to the CRS, repeat back announcement.

CRITICAL STEP

NRC EXAM MATERIAL Page 8 of 14 Palisades April 2020 Proc.Step TASK ELEMENT 13 STANDARD Grade 7.4.2h.

PUSH ALARM RESET pushbutton to clear any alarms.

C-11A Rear Candidate pushes ALARM RESET pushbutton HS-2424L on left channel hydrogen monitor.

S U Comment:

Evaluator Note: C-161 Common alarm light will clear.

Proc.Step TASK ELEMENT 14 STANDARD Grade 7.4.2i.

IF the SAMPLE light does NOT light, THEN C-11A Rear Candidate determines the SAMPLE light is lit and that this step is not applicable (N/A).

S U Comment:

Proc.Step TASK ELEMENT 15 STANDARD Grade 7.4.2j.

WHEN H2 Monitor has been in ANALYZE for at least 15 minutes, THEN READ % H2.

Candidate determines that another Operator will read the monitor.

N/A Comment:

Evaluator Cue: Provide cue to Candidate that another Operator will read the monitor in 15 minutes.

Proc.Step TASK ELEMENT 16 STANDARD Grade N/A Report to the CRS that Left Channel Containment Hydrogen Monitor is in service in the ACCI position.

Candidate reports to the CRS that Left Channel Containment Hydrogen Monitor is in service in the ACCI position.

S U Comment:

Evaluator Cue: Repeat back report.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 9 of 14 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS Use IC-117 for LOI 2020.

NRC EXAM MATERIAL Page 10 of 14 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • The Plant was been tripped due to a primary coolant system (PCS) leak.
  • EOP-4.0, Loss of Coolant Accident Recovery, is the in-use procedure.
  • Both channels of Hydrogen Monitoring are available and have been in standby for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

INITIATING CUE:

  • During performance of EOP-4.0, the Control Room Supervisor (CRS) directs you to PLACE at least one Hydrogen Monitor in operation, ensuring the appropriate Key Switch in the "ACCI" position. Refer to SOP-38, "Gaseous Process Monitoring System."

NRC EXAM MATERIAL Page 11 of 14 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 12 of 14 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 13 of 14 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 14 of 14 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 21 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

CONTROL ROOM SYSTEM h.

TITLE:

STOP ALL AUXILIARY BUILDING VENTILATION

NRC EXAM MATERIAL Page 2 of 21 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-088 004 01 01 / Operate the Plant Ventilation and Air Conditioning System (SOP-24).

Alternate Path: No.

Facility JPM #: PLJPM-LOR-SRO-Admin 4, revision 01.

K/A: 060AA1.02 Importance: RO: 2.9 SRO: 3.1 K/A Statement: Ability to operate and / or monitor the following as they apply to the Accidental Gaseous Radwaste: Ventilation system. (CFR 41.7 / 45.5 /

45.6)

Task Standard: All Auxiliary Building ventilation secured in accordance with SOP-24, Ventilation and Air Conditioning System, step 7.1.2.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

SOP-24, Ventilation and Air Conditioning System, revision 080 Validation Time: 10 minutes Time Critical:

NO Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 21 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-24, Ventilation and Air Conditioning System, revision 080 AOP-17, Loss of 125V DC Panel(s), revision 006 Normal Control Room references Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant is at full power.
  • There are no gaseous Radwaste Batches, Resin Sluices, large Radwaste transfers, RVR Operation, or fuel handling activities in progress.
  • A loss of DC Bus, D11-1, has occurred.
  • AOP-17, Loss of 125V DC Panel(s) has been entered by the Control Room Supervisor (CRS).
  • Technical Specifications have been reviewed for applicability.

INITIATING CUE:

  • The CRS directs you to stop all Auxiliary Building ventilation in accordance with SOP-24, Ventilation and Air Conditioning System, step 7.1.2.

NRC EXAM MATERIAL Page 4 of 21 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-24, Ventilation and Air Conditioning System.

Candidate simulates or describes where a copy of SOP-24 can be obtained.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where SOP-24 can be obtained, provide a copy of SOP-24, Section 7.1.2 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 7.1.2a.

ENSURE no gaseous Radwaste Batches, Resin Sluices, large Radwaste transfers, RVR Operation, or fuel handling activities are in progress. LCO 3.7.12 may apply.

Candidate ensures that no gaseous Radwaste Batches, Resin Sluices, large Radwaste transfers, RVR Operation, or fuel handling activities are in progress as given in Initial Conditions.

N/A Comment:

Evaluator Cue: If asked about LCO 3.7.12, inform Candidate that the CRS will evaluate all Technical Specifications and ODCM actions.

Proc.Step TASK ELEMENT 3 STANDARD Grade 7.1.2b.

PLACE to the OFF position, Main Power to RGEM switch (located on East side of RGEM skid, inside larger upper right motor starter box, just left of pump motor starters).

Candidate directs Nuclear Plant Operator (NPO) to place the Main Power to RGEM switch to the OFF position.

S U Comment:

Evaluator Cue: When directed as NPO to place Main Power to RGEM switch to OFF, coordinate with SIM Booth Operator to insert TRIGGER #1 to de-energize RGEM. Using time compression, provide cue that RGEM is de-energized.

NRC EXAM MATERIAL Page 5 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 7.1.2c.

REMOVE STANDBY, V-6B, Main Exhaust Fan as follows:

1. PLACE in TRIP position V-6B, Main Exhaust Fan.
2. OBSERVE the yellow Standby light goes out.

C-13 Candidate identifies that V-6B does not have control power due to the loss of D11-1.

N/A Comment:

Evaluator Note: D11-1 supplies control power to LCC-11 which powers V-6B. Candidate may still take V-6B control switch 52-1111CS to TRIP, but yellow Standby light will already be extinguished.

Proc.Step TASK ELEMENT 5 STANDARD Grade 7.1.2d.1 IF above Mode 5, THEN CLOSE Engineered Safeguards Vent Dampers as follows:

PLACE to the CLOSE position, HS-1810A (Key 310) OR HS-1810B (at Panel EC-33).

C-03 Candidate obtains Key 310 and inserts into HS-1810A.

AND Positions HS-1810A to the CLOSED position.

AND Verifies PO-1810 light indication changes to red light OFF, green light ON.

S U Comment:

Evaluator Note: Either HS-1810A or HS-1810B closes dampers PO-1810 and PO-1817. HS-1810A is located on Panel EC-03 in Control Room and HS-1810B is located on Panel EC-33 Redundant Safety Injection Panel, in Auxiliary Building.

Evaluator Cue: If Candidate chooses to operate HS-1810B at Panel EC-33, inform them that Panel EC-33 is not accessible.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 7.1.2d.2 IF above Mode 5, THEN CLOSE Engineered Safeguards Vent Dampers as follows:

PLACE to the CLOSE position, HS-1811A (Key 311) OR HS-1811B (at Panel EC-33).

C-03 Candidate obtains Key 311 and inserts it into HS-1811A.

AND Positions HS-1811A to the CLOSED position.

AND Verifies PO-1811 light indication changes to red light OFF, green light ON.

S U Comment:

Evaluator Note: Either HS-1811A or HS-1811B closes dampers PO-1811 and PO-1812. HS-1811A is located on Panel EC-03 in Control Room and HS-1811B is located on Panel EC-33 Redundant Safety Injection Panel, in Auxiliary Building.

Evaluator Cue: If Candidate chooses to operate HS-1811B at Panel EC-33, inform them that Panel EC-33 is not accessible.

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 7.1.2d.3 VERIFY Engineered Safeguards Vent Dampers Close:

PO-1810 PO-1811 PO-1817 PO-1812 C-03 / Locally Candidate verifies damper PO-1810 CLOSED (red light OFF, green light ON).

AND Verifies damper PO-1811 CLOSED (red light OFF, green light ON).

AND Verifies damper PO-1817 CLOSED (sends NPO to locally verify).

AND Verifies damper PO-1812 CLOSED (sends NPO to locally verify).

S U Comment:

Evaluator Note: Dampers PO-1817 and PO-1812 have local indication only.

Evaluator Cues: When sent as NPO to locally verify damper PO-1817 CLOSED, using time compression, provide cue that damper PO-1817 indicates CLOSED.

When sent as NPO to locally verify damper PO-1812 CLOSED, using time compression, provide cue that damper PO-1812 indicates CLOSED.

NRC EXAM MATERIAL Page 8 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 8 STANDARD Grade 7.1.2.e STOP the following fans in the order listed (preferred) and as quickly as possible:

V-70A or V-70B Fuel Handling Area Exhaust Fan C-125 Candidate positions handswitch for V-70A to STOP.

OR Positions handswitch for V-70B to STOP.

AND Verifies V-70A/B OFF (red light OFF, green light ON).

AND Performs as first action.

S U Comment:

Evaluator Note: The remainder of the JPM steps needs to be performed in the order listed. The intent of this step is to STOP ONE of these two normally operating exhaust fans first in order to maintain the negative pressure necessary. Then the one supply fan is stopped, followed by the remaining Exhaust Fan.

CRITICAL STEP Proc.Step TASK ELEMENT 9 STANDARD Grade 7.1.2e Stop V-69, Fuel Handling Area Supply Fan.

C-125 Candidate positions handswitch for V-69 to STOP.

AND Verifies V-69 OFF (red light OFF, green light ON).

AND Performs as second action.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 9 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 10 STANDARD Grade 7.1.2e Stop remaining V-70.

C-125 If V-70A was stopped, then candidate stops V-70B by positioning handswitch for V-70B to STOP.

OR If V-70B was stopped, then candidate stops V-70A by positioning handswitch for V-70A to STOP.

AND Verifies V-70A/B OFF (red light OFF, green light ON).

AND Performs as third action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 11 STANDARD Grade 7.1.2e Stop V-68A or V-68B, Radwaste Area Exhaust Fan.

C-125 Candidate positions handswitch for V-68A to STOP.

OR Candidate positions handswitch for V-68B to STOP.

AND Verifies V-68A/B OFF (red light OFF, green light ON).

AND Performs as fourth action.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 10 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 12 STANDARD Grade 7.1.2e Stop V-67, Radwaste Area Supply Fan.

C-125 Candidate positions handswitch for V-67 to STOP.

AND Verifies V-67 OFF (red light OFF, green light ON).

AND Performs as fifth action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 13 STANDARD Grade 7.1.2e Stop remaining V-68.

C-125 If V-68A was stopped, then candidate stops V-68B by positioning handswitch for V-68B to STOP.

OR If V-68B was stopped, then candidate stops V-68A by positioning handswitch for V-68A to STOP.

AND Verifies V-68A/B OFF (red light OFF, green light ON).

AND Performs as sixth action.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 11 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 14 STANDARD Grade 7.1.2e Stop V-8A or V-8B, Fuel Handling Area Exhauster.

C-13 Candidate positions handswitch 42-729CS for V-8A to TRIP.

OR Candidate positions handswitch 42-837CS for V-8B to TRIP.

AND Verifies V-8A/B OFF (red light OFF, green light ON).

AND Performs as seventh action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 15 STANDARD Grade 7.1.2.e Stop V-7, Fuel Handling Area Supply Fan.

C-13 Candidate positions handswitch 42-723CS for V-7 to TRIP.

AND Verifies V-7 OFF (red light OFF, green light ON).

AND Performed as eighth action.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 12 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 16 STANDARD Grade 7.1.2.e Stop remaining V-8.

C-13 If V-8A was stopped, then candidate stops V-8B by positioning handswitch 42-837 to TRIP.

OR If V-8B was stopped, then candidate stops V-8A by positioning handswitch 42-729CS to TRIP.

AND Verifies V-8A/B OFF (red light OFF, green light ON).

AND Performed as ninth action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 17 STANDARD Grade 7.1.2.e Stop V-14A or V-14B, Radwaste Area Exhauster.

C-13 Candidate positions handswitch 42-739CS for V-14A to TRIP.

OR Candidate positions handswitch 42-847CS for V-14B to TRIP.

AND Verifies V-14A/B OFF (red light OFF, green light ON).

AND Performed as tenth action.

S U Comment:

Evaluator Note: EK-1154, Radwaste Area Vent Fan V10, V14A, B Tripped, alarm will annunciate when first V-14 is stopped.

CRITICAL STEP

NRC EXAM MATERIAL Page 13 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 18 STANDARD Grade 7.1.2e Stop V-10, Radwaste Area Supply Fan.

C-13 Candidate positions handswitch 42-777CS for V-10 to TRIP.

AND Verifies V-10 OFF (red light OFF, green light ON).

AND Performed as eleventh action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 19 STANDARD Grade 7.1.2e Stop remaining V-14.

C-13 If V-14A was stopped, then candidate stops V-14B by positioning handswitch 42-847CS to TRIP.

OR If V-14B was stopped, then candidate stops V-14A by positioning handswitch 42-739CS to TRIP.

AND Verifies V-14A/B OFF (red light OFF, green light ON).

AND Performed as twelfth action.

S U Comment:

CRITICAL STEP

NRC EXAM MATERIAL Page 14 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 20 STANDARD Grade 7.1.2e Stop V-6A, Main Exhaust Fan.

C-13 Candidate positions handswitch 52-1215CS for V-6A to TRIP.

AND Verifies V-6A OFF (red light OFF, green light ON).

AND Performed as thirteenth action.

S U Comment:

CRITICAL STEP Proc.Step TASK ELEMENT 21 STANDARD Grade 7.1.2f WHEN no Main Exhaust Fans are operating, THEN DECLARE NON-FUNCTIONAL RIA-0631, Off Gas Radiation Monitor Indicator (REFER TO ODCM, Table 1-1).

Candidate determines that the CRS will evaluate ODCM actions for RIA-0631.

N/A Comment:

Evaluator Cue: Provide cue to Candidate that CRS will address the ODCM action for RIA-0631 as given in Task Element 21.

NRC EXAM MATERIAL Page 15 of 21 Palisades April 2020 Proc.Step TASK ELEMENT 22 STANDARD Grade 7.1.2g ISOLATE steam from coils for fans listed in Step 7.1.2d by ensuring CLOSED the valves listed below as applicable Determines that another Operator will perform this step.

N/A Comment:

Evaluator Cue: Provide cue to Candidate that another Operator will isolate the steam/cooling water from the fan coils.

Proc.Step TASK ELEMENT 23 STANDARD Grade N/A Notify the CRS that all Auxiliary Building ventilation has been stopped.

Candidate notifies the CRS that all Auxiliary Building ventilation has been stopped.

N/A Comment:

Evaluator Cue: Acknowledges the information.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 16 of 21 Palisades April 2020 SIMULATOR OPERATOR INSTRUCTIONS

  • Use IC-118 for LOI 2020

NRC EXAM MATERIAL Page 17 of 21 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • Plant is at full power.
  • There are no gaseous Radwaste Batches, Resin Sluices, large Radwaste transfers, RVR Operation, or fuel handling activities in progress.
  • A loss of DC Bus, D11-1, has occurred.
  • AOP-17, Loss of 125V DC Panel(s) has been entered by the Control Room Supervisor (CRS).
  • Technical Specifications have been reviewed for applicability.

INITIATING CUE:

  • The CRS directs you to stop all Auxiliary Building ventilation in accordance with SOP-24, Ventilation and Air Conditioning System, step 7.1.2.

NRC EXAM MATERIAL Page 18 of 21 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 19 of 21 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 20 of 21 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 21 of 21 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 9 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

In-Plant JPM i.

TITLE:

MANUALLY START P-9A FIRE PUMP

NRC EXAM MATERIAL Page 2 of 9 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-086 205 01 04 / Start and Stop Electric Fire Pump P-9A.

Alternate Path: Yes.

Facility JPM #: ISDB-JPM-01, revision 01.

K/A: 086A4.01 Importance:

RO: 3.3 SRO: 3.3 K/A Statement: Ability to manually operate and/or monitor in the control room: Fire water pumps.

Task Standard: P-9A, Electric Fire Pump, manually started in accordance with SOP-21.

Preferred Evaluation Location: Simulator In Plant

___X___

Preferred Evaluation Method:

Perform Simulate

__ X___

References:

SOP-21, Fire Protection System, revision 036 ARP-7, Auxiliary Systems Scheme EK-11 (C-13), revision 105 FPIP-4, Fire Protection Systems and Fire Protection Equipment, revision 041 Validation Time: 15 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 9 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-21, Fire Protection System, revision 036 Personal Protective Equipment (PPE)

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Plant is shutdown for a refueling outage.

P-9B and P-41, Diesel Fire Pumps, are tagged out and not available due to contaminants in their fuel day tanks.

A fire develops in the Training Building.

Control Room alarm EK-1135, Fire System Header Lo Press, has annunciated.

Jockey Pump P-13 is operating and there are NO Service Water Booster Pumps (P-25A/B/C) in service.

INITIATING CUES:

The Control Room Supervisor (CRS) directs you to manually start P-9A, Electric Fire Pump, per SOP-21, Fire Protection System, Section 7.2.1.

NRC EXAM MATERIAL Page 4 of 9 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of SOP-21, Fire Protection System.

Candidate simulates or describes where a copy of SOP-21 can be located.

AND Identifies Section 7.2.1 is the appropriate section.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where a copy of SOP-21 can be located, provide a copy of SOP-21 Section 7.2.1 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 7.2.1 a.

PRESS START pushbutton on EC-36, Motor Driver Fire Pump Control Panel.

Candidate simulates or describes pressing the START pushbutton on EC-36.

AND Identifies that P-9A is not running.

S U Comment:

Evaluator Note: Candidate may check multiple P-9A indications including noise, rotation, discharge pressure, or red indicating light ON, to identify whether pump has started or not.

Candidate may attempt to push START button again. If so, the pump does NOT respond.

Evaluator Cue: When Candidate simulates or describes pressing the START pushbutton, provide the following clues: The component identified is in the condition described.

AND P-9A has no noise, no rotation, zero discharge pressure, green light ON.

CRITICAL STEP.

NRC EXAM MATERIAL Page 5 of 9 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade 7.2.1 b.1 IF pump fails to start electrically, THEN PERFORM the following:

PULL the MANUAL OPERATOR T HANDLE all the way out to start pump mechanically.

Candidate simulates or describes pulling the MANUAL OPERATOR T HANDLE all the way out to start pump mechanically.

S U Comment:

Alternate Path: Y-Begins when Candidate determines that P-9A has NOT started via the START pushbutton and the MANUAL OPERATOR T HANDLE has to be used.

Evaluator Cue: When Candidate simulates or describes pulling the MANUAL OPERATOR T HANDLE all the way out, provide cue: The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 9 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 7.2.1 b.2 ROTATE the MANUAL LATCH handle counter-clockwise in order to latch the MANUAL OPERATOR T HANDLE.

Candidate simulates or describes rotating the MANUAL LATCH handle counter-clockwise in order to latch the MANUAL OPERATOR T HANDLE.

S U Comment:

Evaluator Note: Pulling out the MANUAL OPERATOR T HANDLE (larger lower handle) will cause P-9A motor to start. Rotation of the MANUAL LATCH handle (smaller upper handle) 1/4 turn in the counter-clockwise direction maintains the MANUAL OPERATOR T HANDLE withdrawn and thus maintains P-9A running. If MANUAL OPERATOR T HANDLE is released prior to capturing it in the withdrawn position by the MANUAL LATCH handle P-9A motor will stop. MANUAL LATCH handle only operates 1/4 turn in the CCW direction by design and cannot be rotated in the CW direction from neutral.

Evaluator Cue: When Candidate simulates or describes rotating the MANUAL LATCH handle counter-clockwise in order to latch the MANUAL OPERATOR T HANDLE, provide cue: The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 9 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade N/A Verify P-9A running.

Candidate simulates or describes verifying P-9A running by noise, rotation, pump discharge pressure.

S U Comment:

Evaluator Note: Candidate may check multiple P-9A indications including noise, rotation, discharge pressure, or red indicating light ON, to identify whether pump has started or not.

Evaluator Cue: If previous step was performed correctly and when Candidate simulates or describes verifying P-9A running, provide cue:

P-9A has noise, rotation, discharge pressure of 153 psig, and red light ON.

Proc.Step TASK ELEMENT 6 STANDARD Grade 7.2.1 c.

IF Attachment 2, "Supply Fire Header Pressure with Service Water Booster Pump," is in effect, THEN STOP selected P-25A, B, or C, Service Water Booster Pump.

Candidate determines that this step is not applicable (N/A) because P-13, Jockey Fire Pump, was in service.

S U Comment:

Proc.Step TASK ELEMENT 7 STANDARD Grade N/A Notify the CRS that P-9A has been started locally.

Candidate notifies the CRS that P-9A has been started locally.

S U Comment:

Evaluator Cue: When Candidate notifies the CRS that P-9A has been started locally, repeat back notification.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 8 of 9 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

The Plant is shutdown for a refueling outage.

P-9B and P-41, Diesel Fire Pumps, are tagged out and not available due to contaminants in their fuel day tanks.

A fire develops in the Training Building.

Control Room alarm EK-1135, Fire System Header Lo Press, has annunciated.

Jockey Pump P-13 is operating and there are NO Service Water Booster Pumps (P-25A/B/C) in service.

INITIATING CUES:

The Control Room Supervisor (CRS) directs you to manually start P-9A, Electric Fire Pump, per SOP-21, Fire Protection System, Section 7.2.1.

NRC EXAM MATERIAL Page 9 of 9 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 12 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE:

EXAMINER:

JPM:

In-Plant JPM j.

TITLE:

SUPPLY AFW PUMP FROM SERVICE WATER

NRC EXAM MATERIAL Page 2 of 12 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-000 115 05 01 / Respond to a Loss of All Feedwater (EOP-7.0).

Alternate Path: No.

Facility JPM #: PLJPM-LOR-AFW-04, revision 02.

K/A: 061K4.01 Importance:

RO: 4.1 SRO: 4.2 K/A Statement: Knowledge of AFW design feature(s) and/or interlock(s) which provide or the following - Water sources and priority of use.

Task Standard: P-8C, AFW pump, suction aligned from Service Water System.

Preferred Evaluation Location: Simulator In Plant

___X___

Preferred Evaluation Method:

Perform Simulate

__ X___

References:

EOP-7.0, Loss of All Feedwater Recovery, revision 017 EOP Supplement 31, Supply AFW From Alternate Sources, revision 010 Validation Time: 15 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 12 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 31, Supply AFW From Alternate Sources, revision 010 Radiological Work Permit (RWP)

Personal Protective Equipment (PPE)

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • EOP-1.0, Standard Post Trip Actions, is complete.
  • T-2, Condensate Storage Tank, is at 0%.

INITIATING CUES:

  • During performance of EOP 7.0 step 16, the CRS directs you to align P-8C suction to Service Water per EOP Supplement 31, Section 1.0.
  • You are issued a locked valve key at this time.

NRC EXAM MATERIAL Page 4 of 12 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of EOP Supplement 31, Supply AFW Pumps from Alternate Sources.

Candidate simulates or describes where a copy of EOP Supplement 31 can be found.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where EOP Supplement 31 can be found, provide a copy of EOP Supplement 31 Section 1.0 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 1.01 PLACE HS-P8C, Selector Switch for Aux FW Pump P-8C to MANUAL.

Candidate contacts the CRS or Control Room and asks to have HS-P8C placed to MANUAL.

AND Determines that HS-P8C is in MANUAL.

N/A Comment:

Evaluator Cue: When Candidate asks to have HS-P8C placed to MANUAL, provide cue that HS-P8C is in MANUAL.

Proc.Step TASK ELEMENT 3 STANDARD Grade 1.02 UNLOCK MV-FW750, AFW Pump P-8C Suction from SWS.

LOCATION: CCW Lower Level outboard CCW Heat Exchangers KEY: Locked Valve Key Candidate simulates or describes unlocking MV-FW750.

S U Comment:

Evaluator Cue: When Candidate describes unlocking MV-FW750, provide cue: The component identified is in the condition described.

Evaluator Note: Entry into the Auxiliary Building is necessary for this JPM. This will require a Radiological Work Permit (RWP).

CRITICAL STEP

NRC EXAM MATERIAL Page 5 of 12 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 1.03 THROTTLE OPEN MV-FW750, AFW Pump P-8C Suction from SWS until water issues from Leak-off valve MV-FW759 AFW Pump P-8C SWS Supply Leak Test.

Candidate simulates or describes throttling open MV-FW750 by rotating in the counter clockwise direction.

AND Simulates or describes identifying water issuing from Leak-off valve MV-FW759.

S U Comment:

Evaluator Cue: When Candidate simulates or describes throttling open MV-FW750, provide cue:

The component identifies is in the condition described with water issuing.

CRITICAL STEP Proc.Step TASK ELEMENT 5 STANDARD Grade 1.04 WHEN water issues from MV-FW759, THEN CLOSE MV-FW759.

LOCATION: CCW Lower Level outboard CCW Heat Exchangers.

Candidate simulates or describes closing MV-FW759 by rotating in the clockwise direction after water issues from MV-FW759.

AND Simulates or describes water flow stopped.

S U Comment:

Evaluator Cue: When Candidate simulates or describes closing MV-FW759, provide cue:

The component identified is in the condition described with no water flow.

CRITICAL STEP Proc.Step TASK ELEMENT 6 STANDARD Grade 1.05 OPEN MV-FW750, AFW Pump P-8C Supply from SWS.

Candidate simulates or describes opening MV-FW750 by rotating handwheel in the counter clockwise direction.

S U Comment:

Evaluator Cue: When Candidate simulates or describes opening MV-FW750, provide cue:

The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 12 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 1.06 UNLOCK AND OPEN MV-FW750A, AFW Pump P-8C Suction from SWS.

Candidate simulates or describes unlocking MV-FW750A.

AND Simulates or describes opening MV-FW750A by rotating handwheel in the counterclockwise direction.

S U Comment:

Evaluator Cue: When Candidate simulates or describes unlocking MV-FW750A, provide cue: The component identified is in the position described.

When Candidate simulates or describes opening MV-FW750A by rotating handwheel in the counterclockwise direction, provide cue: The component identified is in the position described.

CRITICAL STEP Proc.Step TASK ELEMENT 8 STANDARD Grade 1.07 NOTIFY Control Room Supervisor or Nuclear Control Operator P-8C AFW pump service water supply is aligned.

Candidate notifies Control Room Supervisor or Nuclear Control Operator P-8C AFW pump service water supply is aligned.

S U Comment:

Evaluator Cue: Repeat back notification.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 7 of 12 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

  • EOP-1.0, Standard Post Trip Actions, is complete.
  • T-2, Condensate Storage Tank, is at 0%.

INITIATING CUES:

  • During performance of EOP 7.0 step 16, the CRS directs you to align P-8C suction to Service Water per EOP Supplement 31, Section 1.0.
  • You are issued a locked valve key at this time.

NRC EXAM MATERIAL Page 8 of 12 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 9 of 12 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 10 of 12 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 11 of 12 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 12 of 12 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 1 of 24 Palisades April 2020 PALISADES 2020 INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE CANDIDATE: ______________________________________________

EXAMINER:

JPM:

In-Plant JPM k.

TITLE:

OUTSIDE CONTROL ROOM B S/G ESDE ISOLATION IAW EOP SUPPLEMENT 18

NRC EXAM MATERIAL Page 2 of 24 Palisades April 2020 JOB PERFORMANCE MEASURE DATA PAGE Task: PL-000 040 05 01 / Respond to an Excessive Steam Demand Event (EOP-6.0).

Alternate Path: Yes.

Facility JPM #: PLJPM-LOR-EOP-10, revision 05.

K/A: 040AA1.03 Importance:

RO: 4.3 SRO: 4.3 K/A Statement: Ability to operate and / or monitor the following as they apply to the Steam Line Rupture - Isolation of one steam line from header.

Task Standard: B S/G isolated per EOP Supplement 18 Section 2.0.

Preferred Evaluation Location: Simulator In Plant

___X___

Preferred Evaluation Method:

Perform Simulate

__ X___

References:

EOP Supplement 18, B S/G ESDE Isolation Checklist, revision 008 SOP-7, Main Steam System, revision 085 Validation Time: 25 minutes Time Critical: No Candidate:

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

NRC EXAM MATERIAL Page 3 of 24 Palisades April 2020 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 18, B S/G ESDE Isolation Checklist, revision 008 SOP-7 Attachment 21, revision 085 Interior photographs of EC-182, Steam Dump Cabinet Photo of CV-0744 Radiological Work Permit (RWP)

Personal Protective Equipment (PPE)

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The plant has been manually tripped due to a B S/G steam leak.

A loss of panel ED-11-1 has occurred.

EOP-1.0, Standard Post Trip Actions, have been completed.

Both MSIVs are closed.

The Control Room Supervisor (CRS) has entered EOP-6.0, Excessive Steam Demand Event Recovery, and AOP-17, Loss of 125V DC Panel(s).

EOP Supplement 18, Section 1.0, Isolation from the Control Room, is being performed.

INITIATING CUES:

The CRS directs you to perform EOP Supplement 18, Section 2.0, Isolation Outside the Control Room.

NRC EXAM MATERIAL Page 4 of 24 Palisades April 2020 Time Start: ________

Proc.Step TASK ELEMENT 1 STANDARD Grade N/A Obtain a copy of EOP Supplement 18, Section 2.0, Isolation Outside the Control Room.

Candidate simulates or describes where a copy of EOP Supplement 18, Section 2.0 can be obtained.

S U Comment:

Evaluator Cue: When Candidate simulates or describes where EOP Supplement 18 Section 2.0 can be found, provide a copy of EOP Supplement 18 Section 2.0 (JPM Attachment 1).

Proc.Step TASK ELEMENT 2 STANDARD Grade 1.a.

PERFORM the following to isolate S/G E-50B from outside the Control Room:

IF either MSIV did NOT close from the Control Room Candidate identifies that both MSIVs are closed as stated in the Initial Conditions.

AND The step is not applicable (N/A).

S U Comment:

NRC EXAM MATERIAL Page 5 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 3 STANDARD Grade 1.b. 1)

PERFORM the following to isolate S/G E-50B Atmospheric Steam Dump Valves:

ISOLATE control air by closing the following valves:

MV-CA779, A/S to CV-0779.

LOCATION: Roof Outside CCW Upper Level inside Cabinet C-182.

Candidate simulates or describes closing MV-CA779 by turning the valve hand wheel in the clockwise direction until valve motion stops.

S U Comment:

Evaluator Note: Cabinet EC-182 is a High Energy Line Break component and shall not be opened in Modes 1, 2, and 3.

Evaluator Cue: When Candidate simulates or describes opening EC-182, provide cue that the panel is open. Provide all interior photographs of panel EC-182 for valve identification. (JPM Attachment 2 - pages 1 - 4).

When Candidate simulates or describes closing MV-CA779, provide the cue:

The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 6 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 4 STANDARD Grade 1.b. 1)

PERFORM the following to isolate S/G E-50B Atmospheric Steam Dump Valves:

ISOLATE control air by closing the following valves:

MV-CA780, A/S to CV-0780.

LOCATION: Roof Outside CCW Upper Level inside Cabinet C-182.

Candidate simulates or describes closing MV-CA780 by turning the valve hand wheel in the clockwise direction until valve motion stops.

S U Comment:

Evaluator Note: Cabinet EC-182 is a High Energy Line Break component and shall not be opened in Modes 1, 2, and 3.

Evaluator Cue: When Candidate simulates or describes opening EC-182, provide cue that the panel is open. Provide all interior photographs of panel EC-182 for valve identification. (JPM Attachment 2 - pages 1 - 4).

When Candidate simulates or describes closing MV-CA780, provide the cue:

The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 7 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 5 STANDARD Grade 1.b. 2)

CLOSE the following Atmospheric Steam Dump Isolation Valves:

MV-MS102, Steam Dump Isolation Valve, CV-0779.

Candidate simulates or describes closing MV-MS102 by turning the valve hand wheel in the clockwise direction until valve motion stops.

S U Comment:

Evaluator Cue: When Candidate simulates or describes closing MV-MS102 by turning the valve hand wheel in the clockwise direction until valve motion stops, provide cue:

The component identified is in the condition described.

Evaluator Note: About 150 turns are required to close MV-MS102 from full open.

CRITICAL STEP

NRC EXAM MATERIAL Page 8 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 6 STANDARD Grade 1.b. 2)

CLOSE the following Atmospheric Steam Dump Isolation Valves:

MV-MS104, Steam Dump Isolation Valve, CV-0780.

Candidate simulates or describes closing MV-MS104 by turning the valve hand wheel in the clockwise direction until valve motion stops.

S U Comment:

Evaluator Cue: When Candidate simulates or describes closing MV-MS104 by turning the valve hand wheel in the clockwise direction until valve motion stops, provide cue:

The component identified is in the condition described.

Evaluator Note: About 150 turns are required to close MV-MS104 from full open.

CRITICAL STEP

NRC EXAM MATERIAL Page 9 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 7 STANDARD Grade 1.c.

VERIFY S/G E-50B Safety Valves are CLOSED.

LOCATION: Roof outside CCW Upper Level Candidate identifies that S/G E-50B Safety Valves are CLOSED.

S U Comment:

Evaluator Cue: When Candidate looks to see if B S/G Safety valves are closed, provide SOP-7 (JPM Attachment 3) for reference and provide cue: The components identified have no steam coming out of them.

NRC EXAM MATERIAL Page 10 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 8 STANDARD Grade 1.d.

CLOSE the following S/G E-50B Steam Dump Drain Trap valves:

MV-MS527, ST-0790 Inlet.

MV-MS529, ST-0790 Bypass.

LOCATION: Middle Level CCW Room.

Candidate simulates or describes closing MV-MS527 by turning the valve hand wheel in the clockwise direction until valve motion stops.

AND Verifies MV-MS529 is Locked Closed.

S U Comment:

Evaluator Note: The CRITICAL STEP is to simulate or describe closing MV-MS527 as it is OPEN. The SOP-7 Section 7.1.1 Initial System Line-Up position for MV-MS529 is LOCKED CLOSED. The Candidate is not expected to unlock MV-MS529 to verify its position, but to verify that the lock is intact, verifying the CLOSED position of the valve.

Evaluator Cue: When Candidate simulates or describes closing MV-MS527 provide cue: The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 11 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 9 STANDARD Grade 1.d.

CLOSE the following S/G E-50B Steam Dump Drain Trap valves:

MV-MS523, ST-0789 Inlet MV-MS525, ST-0789 Bypass LOCATION: Middle Level CCW Room.

Candidate simulates or describes closing MV-MS523 by turning the valve hand wheel in the clockwise direction until valve motion stops.

AND Verifies MV-MS525 is locked closed.

S U Comment:

Evaluator Note: The CRITICAL STEP is to simulate or describe closing MV-MS523 as it is OPEN. The SOP-7 Section 7.1.1 Initial System Line-Up position for MV-MS525 is LOCKED CLOSED. The Candidate is not expected to unlock MV-MS525 to verify its position, but to verify that the lock is intact, verifying the CLOSED position of the valve.

Evaluator Cue: When Candidate simulates or describes closing MV-MS523 provide cue: The component identified is in the condition described.

CRITICAL STEP

NRC EXAM MATERIAL Page 12 of 24 Palisades April 2020 Alternate Path: Starts when Candidate identifies that CV-0744 is found OPEN by local indication.

Proc.Step TASK ELEMENT 10 STANDARD Grade 1.e.

IF CV-0744, 'B' S/G Main Feed Reg Block Valve, did NOT close from the Control Room Candidate contacts the Control Room and asks if CV-0744 is closed.

AND Checks CV-0744 position locally.

AND Determines that CV-0744 is OPEN by checking local indications.

S U Comment:

Evaluator Cue: When Candidate contacts Control Room regarding CV-0744 position, provide cue:

CV-0744 Control Room position indication has been lost as a result of the loss of ED-11-1, and its position is NOT known. You will need to verify position locally.

If the actual Plant is online: CV-0744 is normally OPEN and Candidate can be given cue: The component identified is in the position seen.

If the actual Plant is offline: Provide the Candidate the photos which show CV-0744 OPEN (JPM Attachment 4).

Evaluator Note: On a loss of ED-11-1, CV-0744 fails OPEN and loses Control Room position indication.

Candidate must verify CV-0744 position locally.

NRC EXAM MATERIAL Page 13 of 24 Palisades April 2020 Proc.Step TASK ELEMENT 11 STANDARD Grade 1.e.

IF CV-0744, 'B' S/G Main Feed Reg Block Valve, did NOT close from the Control Room, THEN CLOSE:

MV-FW706, Heater E6A Outlet Isolation Simulates or describes closing MV-FW706 by turning the handwheel in the clockwise direction until valve motion stops.

S U Comment:

Evaluator Cue: When Candidate simulates or describes closing MV-FW706 provide cue: The component identified is in the position described.

CRITICAL STEP Proc.Step TASK ELEMENT 12 STANDARD Grade 1.e.

IF CV-0744, 'B' S/G Main Feed Reg Block Valve, did NOT close from the Control Room, THEN CLOSE:

MV-FW209, Htr E6A Outlet Valve MV-FW706 Bypass Valve Candidate identifies that MV-FW209 is Green Sealed in the CLOSED position.

S U Comment:

Evaluator Note: MV-FW209 is CLOSED and Green Sealed as inaccessible per SOP-12 Checklist 12.1.

Proc.Step TASK ELEMENT 13 STANDARD Grade N/A Inform CRS that EOP Supplement 18 Section 2.0 is complete.

Candidate informs CRS that EOP Supplement 18 Section 2.0 is complete.

S U Comment:

Evaluator Cue: Acknowledge completion of EOP Supplement 18 Section 2.0.

Time End: ________

END OF TASK

NRC EXAM MATERIAL Page 14 of 24 Palisades April 2020 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Special Note: Assume that all Plant Requirements and Precautions and Limitations have been reviewed and complied with. You are NOT expected, nor are you required to consult the Plant Requirements and Precautions and Limitations section of any procedure for this JPM.

INITIAL CONDITIONS:

The plant has been manually tripped due to a B S/G steam leak.

A loss of panel ED-11-1 has occurred.

EOP-1.0, Standard Post Trip Actions, have been completed.

Both MSIVs are closed.

The Control Room Supervisor (CRS) has entered EOP-6.0, Excessive Steam Demand Event Recovery, and AOP-17, Loss of 125V DC Panel(s).

EOP Supplement 18, Section 1.0, Isolation from the Control Room, is being performed.

INITIATING CUES:

The CRS directs you to perform EOP Supplement 18, Section 2.0, Isolation Outside the Control Room.

NRC EXAM MATERIAL Page 15 of 24 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 16 of 24 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 17 of 24 Palisades April 2020 JPM ATTACHMENT 1

NRC EXAM MATERIAL Page 18 of 24 Palisades April 2020 JPM ATTACHMENT 2 (1 of 4)

NRC EXAM MATERIAL Page 19 of 24 Palisades April 2020 JPM ATTACHMENT 2 (2 of 4)

NRC EXAM MATERIAL Page 20 of 24 Palisades April 2020 JPM ATTACHMENT 2 (3 of 4)

NRC EXAM MATERIAL Page 21 of 24 Palisades April 2020 JPM ATTACHMENT 2 (4 of 4)

NRC EXAM MATERIAL Page 22 of 24 Palisades April 2020 JPM ATTACHMENT 3

NRC EXAM MATERIAL Page 23 of 24 Palisades April 2020 JPM ATTACHMENT 4

NRC EXAM MATERIAL Page 24 of 24 Palisades April 2020 JPM ATTACHMENT 4