NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO SYSTEM a TITLE:
TERMINATE FROM EMERGENCY BORATION CANDIDATE:
EXAMINER:
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance:
RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:
Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.
Preferred Evaluation Location: Simulator
__X__
In Plant Preferred Evaluation Method:
Perform
__X__
Simulate
References:
EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time: 5 minutes Time Critical:
NO Candidate:
Time Start: ________
Time Finish:
Performance Time:
________ minutes Performance Rating:
SAT______
UNSAT ______
Comments:
Examiner: _______________________________
Date:
Signature
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- A Loss of Coolant Accident has occurred.
- SIS and CHR have occurred.
- PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
INITIATING CUES:
- During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.
S U Comment:
Evaluator hands operator a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade 2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).
S U Comment:
Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 2.02 Stop the Boric Acid Pumps.
P-56A P-56B P-56A AND P-56B handswitces to the trip position (Pumps off).
S U Comment:
CRITICAL STEP
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.03 Close the following valves:
Boric Acid Pump Feed Valve, MO-2140 Gravity Feed Valves MO-2169 MO-2170 MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)
S U Comment:
Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.
MO-2087 verified closed.
S U Comment:
Proc. Step TASK ELEMENT 6 STANDARD Grade 2.05 Operate each Charging Pump for at least five minutes.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment:
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.06 WHEN each pump has been operated at least five minutes,.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment:
Evaluator Que: Inform Operator that another Operator will perform this step.
Proc. Step TASK ELEMENT 8 STANDARD Grade n/a EOP Supplement 40 is Signed, Dated/Timed EOP 40 Signed, Dated/Timed S U Comment:
Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:
END OF TASK
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- A Loss of Coolant Accident has occurred.
- SIS and CHR have occurred.
- PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
INITIATING CUES: