NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
ML091520482
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520482 (7)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM a TITLE: TERMINATE FROM EMERGENCY BORATION CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM-RO SYSTEM a JOB PERFORMANCE MEASURE DATA PAGE Task: Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)

Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance: RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:

Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time:5 minutes Time Critical: NO Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008

JPM-RO SYSTEM a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 1 STANDARD Grade Locate EOP Supplement 40, Charging EOP Supplement 40 located.

n/a Pump Suction Alignment S U Comment:

Evaluator hands operator a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade Open Charging Pumps Suction From MO-2160 handswitch taken to the open position 2.01 SIRWT Valve, MO-2160 (valve opens). S U Comment:

Note: MO-2160 will take a little time to stroke open.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade Stop the Boric Acid Pumps.

P-56A AND P-56B handswitces to the trip P-56A 2.02 position (Pumps off). S U P-56B Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 4 STANDARD Grade Close the following valves:

Boric Acid Pump Feed Valve, MO-2140 MO-2140, MO-2169, and MO-2170 Gravity Feed Valves handswitches taken to the closed position 2.03 (valves close) S U MO-2169 MO-2170 Comment:

Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade Ensure closed Charging Pumps Suction MO-2087 verified closed.

2.04 VCT Outlet Valve, MO-2087. S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade Operate each Charging Pump for at least Determines that all Charging pumps will be left in-2.05 five minutes. service (given in initial conditions). S U Comment:

PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 7 STANDARD Grade WHEN each pump has been operated at Determines that all Charging pumps will be left in-2.06 least five minutes, . service (given in initial conditions). S U Comment:

Evaluator Que: Inform Operator that another Operator will perform this step.

Proc. Step TASK ELEMENT 8 STANDARD Grade EOP Supplement 40 is Signed, EOP 40 Signed, Dated/Timed n/a Dated/Timed S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade Notify CRS of the completion of EOP CRS notified that EOP Supplement 40 complete n/a Supplement 40 S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008

JPM-RO SYSTEM a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008