SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467
ML13004A253
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/26/2012
From: Miktus P
Southern Nuclear Operating Co, Southern Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2267 SNCF164-RPT-02, Ver. 1.0
Download: ML13004A253 (86)


Text

{{#Wiki_filter:ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 UNIT 2- SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02 Equipment List Pages Unit 2 -Base List 1 2-16 Unit 2 -SWEL 1 17-21 Unit 2 -Base List 2 22-23 Unit 2 -SWEL 2 24-26 Page 1 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 -BASE LIST 1 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 -Base List 1 2-16 Unit 2 -SWEL 1 17-21 Unit 2 -Base List 2 22-23 Unit 2 -SWEL 2 24-26 Page 2 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 1 LINE NO.SYSTEM/EQUIPMENT CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM (1) (2)20 20 20 20 20 20 18 20 07 07 07 07 07 00 00 00 00 18 18 19 19 19 19 19 19 07 33 18 18 (3)A2TBOO1 A2TBO04 A2T8006 B2TB002 B2TB003 B2TBO04 NZE21LI0112-3 N2H11NGMCB2500A-AB N2P18PCV28B5A N2P18PCV28858 N2P18PCV2885C N2P19PCV2228A N2P19PCV2228B Q2BIIHOO1 Q2821HOO1A Q2B21HOOIB Q2B21HOO1C Q2B21PTO402-P1 Q2B21PT0403-P4 Q2B21TEO410-P2 Q2821TE0413-P1 Q2621TE0420-P2 Q2B21TE0423-P1 Q2B21TE0430-P4 Q2B21TE0433-P3 Q2B31HV8028-A Q2B31KO01 Q2B31LT0459-P1 Q2831LT0460-P2 (4)TERMINAL BOX TERMINAL BOX TERMINAL BOX TERMINAL BOX TERMINAL BOX TERMINAL BOX VCT LEVEL INDICATION MAIN CONTROL BOARD SECTION A PRESSURE CONTROL VALVE PRESSURE CONTROL VALVE PRESSURE CONTROL VALVE PCV TO PORV BACKUP AIR SUPPLY BOTTLE PCV TO PORV BACKUP AIR SUPPLY PRESSURE CONTROL REACTOR VESSEL STEAM GENERATOR 2A STEAM GENERATOR 2B STEAM GENERATOR 2C RCS LOOP 3 WIDE RANGE PRESSURE RCS LOOP I WIDE RANGE PRESSURE RCS LOOP 1 COLD LEG RTD RCS LOOP 1 HOT LEG RTD RCS LOOP 2 COLD LEG RTD RCS LOOP 2 HOT LEG RTD RCS LOOP 3 COLD LEG RTD RCS LOOP 3 HOT LEG RTD PRESSURE RELIEF TANK ISOLATION OUTSIDE CTNT VALVE RCS PRESSURIZER PRESSURIZER LEVEL (CONTROL ROOM)PRESSURIZER LEVEL (5) (6) (7)AB AB AB AB AB AB AB AB AB AB AB AB AS CS CB CB CS CS CS CB CB CS CB CB CB AB CB CB CB 100-00 100-00 121-00 121-00 100-00 100-00 121-00 155-00 100-00 100-00 100-00 121-00 121-00 129-00 104-00 104-00 104-00 110-00 110-00 123-00 123-00 123-00 123-00 123-00 123-00 121-00 155-00 129-00 2189 2194 2223 2235 2190 2192 2218 0401 2189 2189 2189 2218 2218 CT4T CThT C1NT CThT CThT CT1T CTMi CTNT CTNT CTNT CTNT CT4T 2223 CTNT CTMT 129-00 CTNT Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.O/ 02/27/95 / 16:24:54 Page 3 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 2 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 LINE NO. CLASS cc==== accum==(1) (2)18 0SA 07 07 18 18 18 02 02 18 18 18 18 e ',... 18 18 18 is 18 20 00 18 08A GSA 18 18 18 SYSTEM/EQUIPMENT MARK NO. DESCRIPTION 0m080n00Sf:lfl= s=in mobSO~bC=f.m........==.= (3) (4)BUILDING ELEV ROOM========(5) (6) (7 (5) (6) (7)Q2B31LT0461-P3 Q2B311MOV80D0A-A Q28311NOVSOOOB-8 Q2B31PCV044418-B Q2831PCV0445A-A Q2831PT0455-Pl Q2B31PT0456-P2 Q2B31PTO457-P3 Q2CI11EOO4A-AB Q2CI1EOO4B-AB Q2C22LT0474-P1 Q2C22LT0475-P2 Q2C22LT0476-P3 Q2C22LT0484-P1 02C22LT0485-P2 Q2C22LT0486-P3 Q2C22LT0494-P1 Q2C22T0495-P2 Q2C22LTO496-P3 Q2C51LOO1B-1 Q2C55NE0048-A Q2C55NM004S-A Q2E11FCVO6O2A-A Q2EI1FCVO602B-B Q2E11FIS6O2A-A Q2E11FIS6O2B-B Q2E1 IFTO6O5A-2 PRESSURIZER LEVEL PRESSURIZER POWER RELIEF ISOLATION VALVE PRESSURIZER POWER RELIEF ISOLATION VALVE PRESSURIZER POWER RELIEF VALVE PRESSURIZER POWER RELIEF VALVE PRESSURIZER PRESSURE PRESSURIZER PRESSURE PRESSURIZER PRESSURE REACTOR TRIP SWITCHGEAR NO. 1 REACTOR TRIP SWITCHGEAR NO. 2 STEAM STEAM GENERATOR 2A NARROW GENERATOR 2A NARROW STEAM GENERATOR 2A STEAM GENERATOR 2B STEAM GENERATOR 2B STEAM GENERATOR 2B STEAM GENERATOR 2C STEM GENERATOR 2C STEAM GENERATOR 2C NARROW NARROW NARROW NARROW NARROW NARROW NARROW RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL RANGE LEVEL CB CB CB CB C8 CB CB CB AS AS CB CB CB CB CB CB CB CB CB CB CB AB AS AS AS AS As AB 129-00 175-00 175-00 155-00 173-00 129-00 129-00 129-00 121-00 121-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 129-00 112-00 139-00 77-00 77-00 83-00 83-00 83-00 CT4T CTNT CTmT CTMT CThT CTNT CTMIT CTMT 2235 2235 CTNT CThT CTNT CThT CTNT CTINT CINT CTMT CTNT CTNT CThT 2332 2128 2122 2128 2128 2120 NIS NEUTRON DETECTOR BOX IB ALTERNATE SHUTDOWN NEUTRON FLUX DETECTOR ALTERN SHUTDOWN NEUTRON FLUX MON SIGNAL AMPLIFIER RHR PUMP HINI FLOW VALVE RHR PUMP MINI FLOW VALVE RHR PUMP FLOW INDICATING SWITCH RHR PUMP FLOW INDICATING SWITCH RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER 18 Q2E1IFTO605B-4 83-00 2120 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2NASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.0/ 02/27/95 / 16:24:54 Page 4 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 3 LINE NO. CLASS MARK NO.n.oqe a.=cnaw. .fflfw tSwo .-.......(1) (2) (3)21 Q2ElIH0O1A-A 21 Q2EllHOOIB-B 18 Q2E11LQ3594A-A 18 Q2EU1LQ35948-B 18 Q2E11LT3594A-A 18 Q2EI1LT35948-B 08A Q2E1lNOVS701A-A 08A Q2ElMOV8701B-B O0A Q2E1IMOV8702A-A O0A Q2E11MOV8702B-B OA Q2EI11OV8706A-A 08A Q2E1IMOVe706B-8 08A Q2E11MOV8809A-A O0A Q2EI1MOV88O9B-B 08A Q2EI1NOV8811A-A, O0A Q2EIIMOV8SIIB-B 08A Q2El1MOV8812A-A neA Q2E1uMOV812B-B 08A Q2E11MOV8888A-A O0A Q2EI1MOV88SSB-B 06 Q2E11POOtA-A 06 Q2E1IPOO1B-B 18 Q2EI3PTO950-P1 18 Q2E13PTO951-P2 18 Q2E13PT0952-P3 18 Q2E13PT0953-P4 SYSTEM/EQUIPMENT DESCRIPTION BUILDING ELEV ROOM fafnm..a..... oau..... *coca.......fbbb...fbb CCC 00l0 S wwou"l==(4) (5) (6) (7)RHR HEAT EXCHANGER 2A AD 83-00 2128 RHR HEAT EXCHANGER 2B AD 83-00 2128 CTMT SUMP LEVEL TRANSMITTER POWER SUPPLY AB 139-00 2318 CT14T SUMP LEVEL TRANSMITTER AS 139:00 2318 CT1T SUMP LEVEL TRANSMITTER CO 080-00 CTNT CTNT SUMP LEVEL TRANSMITTER CB 080-00 CTMT RHR INLET ISOLATION VALVE CB 105-00 CTMT RHR INLET ISOLATION VALVE CB 105-00 CT"T RHR INLET ISOLATION VALVE CB 105-00 CTMT RHR INLET ISOLATION VALVE CB 105-00 INS RHR LOOP NO. 1 DISCHARGE TO CVCS AD 83-00 2128 RHR LOOP NO. 2 DISCHARGE TO CVCS AB 83-00 2128 RWST TO RHR PUMP 2A SUCTION AS 77-00 2131 RWST TO RHR PUMP 2B SUCTION AD 77-00 2129 RHR PUMP SUCTION FROM CONTAINMENT TRAIN A AD 77-00 2131 RHR PUMP SUCTION FROM CONTAINMENT TRAIN B AS 77-00 2129 CONTAINMENT SUMP TO RHR PUMP 2A ISOLATION AD 77-00 2131 CONTAINMENT SUMP TO RMR PUMP 2B ISOLATION AD 77-00 2129 LHSI TO RCS COLD LEG AD 121-00 2223 LHSI TO RCS COLD LEG AS 121-00 2223 RHR PUMP 2A AS 83-00 2131 RAR PUMP 2B AR 83-00 2129 CONTAINMENT PRESSURE PROTECTION AD 121-00 2223 TRANSMITTER CONTAINMENT PRESSURE PROTECTION TRANSMITTER CONTAINMENT PRESSURE PROTECTION TRANSMITTER CONTAINMENT PRESSURE PROTECTION TRANSMITTER CHG/HHSI PUMP ROOM COOLER 2A (TRAIN A)CHG/NHSI PUMP ROOM COOLER 2C (TRAIN B)AD AS AD AD AB 121-00 2223 121-00 2223 121-00 2223 10 10 Q2E16HOO1A-A Q2E16*IOO1C-8 100-00 100-00 2181 2173 Report Date/Tine: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S)Program File Name & Version: SSEM vO.0/ 02/27/95 / 16:24:54 Page 5 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 4 LINE NO.alnna.(I)CLASS MARK NO.00c ... ... aa ..U ..fb =-b.(2) (3)10 Q2El6HOO3A-A 10 Q2E16HOO3B-B 10 Q2E16HOO4A-A 10 Q2E16HOO4B-B 10 Q2E16HOOSA-A 10 Q2E16HOO5B-B 10 Q2E16H006A-A 10 Q2E16HOO6B-B 10 Q2E16H007-A 10 Q2EI6HOOS-B 10 Q2E16HOO9-A 10 Q2E16HOI0-B 18 Q2E21FTO940 18 Q2E2IFTO943 21 Q2E21HOO3 21 Q2E21HO04 07 Q2E21HV8149A-A 07 Q2E21HV8149B-A 07 Q2E21HV8149C-A 07 Q2E21HV8152 07 Q2E21HV8942-A 07 Q2E21HV894SA-A O0A Q2E21LCVO115B-A 08A Q2E21LCVOL15C-A OSA Q2E21LCVO115D-B 08A Q2E21LCVO115E-B 07 Q2E21LCVO459-A 07 Q2E21LCVO460-A 18 Q2E21LT112 SYSTEM/EQUIPMENT DESCRIPTION acm ae m BUILDING ELEV ROOM wSe....... lb Cm aS*==.(5) (6) (7)(4)RHR PUMP ROOM COOLER 2A RHR PUMP ROOM COOLER 28 CCW PUMP ROOM COOLER TRAIN A CCW PUMP ROOM COOLER TRAIN B AUX FEEDWATER PUMP ROOM COOLER 2A AUX FEEDWATER PUMP ROOM COOLER 2B BATTERY CHARGING ROOM COOLERS BATTERY CHARGING ROOM COOLERS MCC 2A ROOM COOLER MCC-2B ROOM ACU 600V LOAD CENTER 2D ROOM COOLER 600V LOAD CENTER 2E ROOM COOLER HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER SEAL WATER HEAT EXCHANGER LETDOWN HEAT EXCHANGER LETDOWN ORIFICE ISOLATION LETDOWN ORIFICE ISOLATION LETDOWN ORIFICE ISOLATION CVCS ISOLATION OUTSIDE CONTAIINENT VALVE BORON INJECTION RECIRCULATION PIMP VALVE AB AS AB AS AB AS AS AS AB AS AB AS AS AB 83-00 83-00 100-00 100-00 100-00 100-00 121-00 121-00 139-00 121-00 139-00 121-00 77-00 2131 2129 2185 2185 2199 2192 2245 2244 2332 2209 2339 2228 2111 100-00 2175 BORON INJECTION SURGE TANK VALVE RWST TO CHARGING PUMP SUCTION VALVE VOLUME CONTROL TANK OUTLET ISOLATION V RWST TO CHARGING PUMP SUCTION VALVE VOLUME CONTROL TANK OUTLET ISOLATION V LETDOWN LINE ISOLATION VALVE LETDOWN LINE ISOLATION VALVE VOLU1E CONTROL TANK LEVEL TRANSMITTER fALl AL AB AS CB CB CB AB AB AB AS VE AD AS VIE AB CB CB AB 100-00 100-00 111-00 105-00 105-00 100-00 100-00 100-00 100-00 121-00 100-00 121-00 105-00 105-00 121-00 2170 2170 CThT CThT CYNT 2134 2186 2222 2172 2216 2172 2216 CThT CTNT 2218 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEN vO.O 02/27/95 / 16:24:54 Page 6 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 , 'APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 5 LINE NO.(1)CLASS (2)18 08A OBA 08A G8A 08A 08A 08A OBA 08A 08A 08A 0SA 08A 08A 08A 08A 08A 08A 08A 08A 08A 05 05 21 1i 1i 21 MARK NO.(3)Q2E21LT115 Q2E21MOVS100-B Q2E21MOVS106-A Q2E21MOV81O7-A Q2E21NOVBIOB-B Q2E2INOVSIO9A-B Q2E21M0V8109C-8 Q2E21N0V8112-A Q2E21MOVBI3OA-A Q2E+21MOV81308B-Q2E2 1MOV813 lA-A Q2E21M0OVS13IB-B Q2E21MOVS132A-A Q2E2 1MOVS 1326-S Q2E21MOVS133A-A Q2E21MOV8133B-B Q2E21MOV88OIA-A Q2EZLMOVS8O3A-A Q2E21MOV8808A-A Q2E21MOV88O8B-8 Q2E21NOV88O8C-A Q2E21MOVSSS5-8 Q2E21PGO2A-A Q2E21 POO2C-IB Q2E21T006 Q2FI6FTO50I-A Q2FI6LT0502-B Q2F16T501 SYSTEM/EQUIPMENT DESCRIPTION BUILDING*sCC0(4)euh= n0m SCzfl0=8=© fasfa(a=)(4) (5)VOLUME CONTROL TANK LEVEL TRANSMITTER RCP SEAL WATER RETURN ISOLATION CHARGING PIMP MINIFLOW ISOLATION CHARGING PUMP TO RCS ISOLATION CHARGING PUMP TO RCS ISOLATION CHARGING PUMP POO2A MINIFLOW VALVE CHARGING PUMP POOZC MINIFLOW VALVE RCP SEAL WATER RETURN ISOLATION CHG. PUMP SUCTION HDR. ISO. (MOVATS)CHG. PIMP SUCTION HDR. ISO (MOVATS)CHARGING PUMP SUCTION HEADER ISOLATION VALVE CHG. PUMP SUCTION HOR. ISO. (HOVATS)CHG. PIMP DISCH. HDR. ISO. (MOVATS)CHG. PUMP DISCH. HDR. ISO. (MOVATS)CHARGING PUMP DISCHARGE HEADER ISOLATION VALVE CHG. PUMP DISCH. HDR. ISO. (MOVATS)BORON INJECTION TANK OUTLET ISOLATION BORON INJECTION TANK INLET ISOLATION ACCUMULATOR 2A DISCHARGE VALVE ACCUMULATOR B DISCHARGE VALVE ACCUMULATOR C DISCHARGE VALVE HHSI TO RCS COLD LEG ISOLATION CHARGINGA/HSI PUMP P002 A TRAIN A CHARGING/HHSI PUIMP PO02C TRAIN B BORON INJECTION TANK RWST LEVEL TRANSMITTER RWST LEVEL TRANSMITTER REFUELING WATER STORAGE TANK AB AB AB AB AB AS AS CS AB AB AB AB AB AB AB AB AB AB CB CB CB AS AB AB AB VID YD YD 121-00 121-00 100-00 121-00 121-00 100-00 100-00 105-00 100-00 102-00 100-00 100-00 100-00 100-00 100-00 100-00 121-00 100-00 105-00 105-00 105-00 100-00 100-00 100-00 100-00 155-00 155-00 155-00 2218 2223 2170 2223 2223 2181 2173 CTMT 2183 2175 2175 2175 2173 2175 2175 2173 2223 2172 CTMT CTMT CTlT 2184 2181 2173 2172 YARD YARD YARD ELEV ROOM... 0.= ..b.. 0flag (6) (7)Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.0 02/27/95 / 16:24:54 Page 7 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPM4ENT LIST (SSEL)FARLEY UNIT 2 Page No. 6 LINE NO.(1)CLASS MARK NO.sflsssflsnain mmmmssnfamm.t (2) (3)07 Q2G21HV3377-A 07 Q2G2IHV7136-B SYSTEM/EQUIPMENT DESCRIPTION BUILDING as.. ...flfnfl 5fl~fl5 (4) (5)ELEV ROOM..0 m.......s. =.M.(6) (7)100-00 2184 Q2G24VO03A Q2G24VO038 Q2G24V003C Q2G31HOO1A:-B Q2G31HOO1B-A Q2H11NGASC2SO6C-B Q2H11NGASC2SO6D-A Q2H11NGB2504J-A Q2H11NGB2504K-B Q2H11NGCCM2523A-A Q2H11NGCCM2523B-B Q2H1INGNIS25O3A-1 Q2H11NGPIC25OSA-1 Q2H11NGPIC2505B-2 Q2H11NGPIC2505C-3 Q2H11NGPIC2505D-4 Q2H1INGPIC2505E-1 Q2HlINGPIC2505F-2 Q2H11NGPIC2505G-3 Q2H11NGPIC2SO5H-4 Q2H11NGR2504I-AB Q2H1INGSSP2506G-B Q2HIINGSSP2506J-B Q2H1INGSSP25O6K-A Q2H11NGSSP2506N-A Q2H21EOO4-A RADIOACTIVE DRAIN ISOLATION OUTSIDE CThT VALVE WASTE PROCESSING ISOLATION OUTSIDE CTNT VALVE SG 2A BLOWDOWN ISOLATION SG 28 BLOWDOWN ISOLATION SG 2C BLOWDOMN ISOLATION SPENT FUEL POOL HEAT EXCHANGER TRAIN B SPENT FUEL POOL HEAT EXCHANGER TRAIN A AUX SAFEGUARDS CABINET 'C'AUX SAFEGUARDS CABINET 'V'BALANCE OF PLANT PANEL 'J'(PROCESS ELECTRONICS) BOP INSTRIJMENTATION CABINET K ICCMS PROCESSOR CABINET TRAIN A ICCMS PROCESSOR CABINET TRAIN B NIS EXCORE DETECTOR CABINET PROCESS PROTECTION CABINET CHANNEL 1 PROCESS PROTECTION CABINET CHANNEL 2 PROCESS PROTECTION CABINET CHANNEL 3 PROCESS PROTECTION CABINET CHANNEL 4 PROCESS CONTROL CABINET CHANNEL 1 PROCESS CONTROL CABINET CHANNEL 2 PROCESS CONTROL CABINET CHANNEL 3 PROCESS CONTROL CABINET CHANNEL 4 RADIATION MONITOR PANEL SOLID STATE PROTECTION INPUT CABINET SOLID STATE PROTECTION TEST CABINET SOLID STATE PROTECTION INPUT CABINET SOLID STATE PROTECTION TEST CABINET 4.16KV SWITCHGEAR 2F LOCAL CONT PANEL AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AB AS AB AB AB AB AB AB AB AB AB AB AB 100-00 2134 121-00 121-00 121-00 155-00 165-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 155-00 139-00 2223 2223 2223 2445 2467 0471 0471 0471 0471 0471 0471 0416 0471 0471 0471 0471 0471 0471 0471 0471 0471 0471 0471 0471 0471 2343 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.0/ 02/27/95 / 16:24:54 Page 8 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 7 LINE NO. CLASS (1) (2)20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 07 07 07 07 07 07 18 18 18 18 18 18 18 MARK NO.(3)Q2H21EO05-B Q2H21E5O4-A Q2H21E505-B Q2H21E506-A Q2H21E507-B Q2H21ES27-B Q2H21NBAFP2605A-,A Q2H21NBNER2619-B Q2H22LOO1B-A Q2H22LO01D-B Q2H22LO02-A Q2H22LO03-A Q2H22LO04-B Q2H22L503-B Q2H25L008-A Q2H25L029-B Q2N11HV3369A Q2NU1HV3369B Q2N11HV3369C Q2N1IHV3370A-B Q2NI1HV3370B-B Q2NI1HV3370C-B Q2NIILT0477-A Q2NI1LT0487-A Q2NILT0497-B Q2NIIPTO474-P2 Q2N11PTO47S-P3 Q2N11PT0476-P4 Q2N11PT0484-P2 SYSTEM/EQUIPMENT DESCRIPTION (4)BUILDING ELEV (5) (6)4.16KV SWITCHGEAR 2G LOCAL CONT PANEL 4.16KV SWITCHGEAR 2H LOCAL CONTROL PANEL 4.16KV SWITCHGEAR 2J LOCAL CONTROL PANEL 4.16KV SWITCHGEAR 2K LOCAL CONT PANEL 4.16KV SWITCHGEAR 2L LOCAL CONT PANEL DIESEL GENERATOR 2B LOCAL CONTROL PANEL LOCAL HOT SHUTDOWN PANEL A STEAM GENERATOR 1C WIDE RANGE LEVEL MCB ISOLATOR MULTIPLYING RELAY CABINET 2B MULTIPLYING RELAY CABINET 2D TRANSFER RELAY CABINET 1 TRANSFER RELAY CABINET-2 TRANSFER RELAY CABINET-3 DIESEL LOCAL RELAY PANEL 2B TERMINATION CABINET TERMINATION CABINET PAIN STEAM ISOLATION VALVE MAIN STEAM ISOLATION VALVE MAIN STEAM ISOLATION VALVE MAIN STEAM LINE ISOLATION VALVE MAIN STEAM LINE ISOLATION VALVE MAIN STEAM LINE ISOLATION VALVE STEAM GENERATOR 2A WIDE RANGE LEVEL STEAM GENERATOR 29 WIDE RANGE LEVEL STEAM GENERATOR 2C WIDE RANGE LEVEL STEAM GENERATOR 2A PRESSURE STEAM GENERATOR 2A DISCHARGE PRESSURE STEAM GENERATOR 2A DISCHARGE PRESSURE STEAM GENERATOR 2B DISCHARGE PRESSURE AB OB DB SW SW DB AB As AB AB AB AB AB DB AB AS AB AB As As As AB CB CB CB AB AB AB AB 121-00 155-00 155-00 188-06 188-06 155-00 121-00 121-00 139-00 139-00 139-00 100-00 139-00 155-00 139-00 139-00 127-00 127-00 127-00 127-00 127-00 127-00 155-00 155-00 155-00 130-00 130-00 130-00 130-00 ROOM (7)2233 0056A 0056C 0072E 0072B 0059 2202 2227 2318 2318 2347 2190 2334 0058 2318 2318 2241 2241 2241 2241 2241 2241 CINT CTNT CTKT 2241 2241 2241 2241 Reprt Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEN vO.0/ 02/27/95 / 16:24:54 Page 9 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 8 LINE NO. CLASS MARK NO.(1) (2) (3)18 Q2N11PTO485-P3 18 Q2N11PTO486-P4 18 Q2N11PT0494-P2 18 Q2N11PT0495-P3 18 Q2N11PT0496-P4 18 Q2NU1PT3371A-A 18 Q2N1UPT3371B-A 18 Q2N11PT3371C-A 07 Q2N11PV3371A-A 07 Q2NI1PV3371B-A 07 Q2N11PV3371C-A O0B Q2N11SV3369AC-A 088 Q2Nl1SV3369BC-A OOB Q2NIISV3369CC-A 18 Q2N23FI3229AB-A 18 Q2N23FI3229CB-B 18 Q2N23FT3229A-A 18 Q2N23FT3229B-B 18 Q2N23FT3229C-B 07 Q2N23HV3227A SYSTEN/EQUI PIIENT DESCRIPTION (4)STEAM STEAM STEAM STEAM GENERATOR GENERATOR GENERATOR GENERATOR 28 2B 2C 2C PRESSURE DISCHARGE PRESSURE DISCHARGE PRESSURE DISCHARGE PRESSURE STEAM GENERATOR 2C PRESSURE STEAM GENERATOR 2A PRESSURE STEAM GENERATOR 28 PRESSURE STEAM GENERATOR 2C PRESSURE MAIN STEAM ATMOSPHERIC RELIEF VALVE MAIN STEAM AThOSPHERIC RELIEF VALVE MAIN STEAM AThOSPHERIC RELIEF VALVE SOLENOID FOR MAIN STEAM ISOLATION VALVE SOLENOID FOR MAIN STEAM ISOLATION VALVE SOLENOID FOR MAIN STEAM ISOLATION VALVE FEEDWATER INTAKE FLOW INDICATION FEEDWATER INTAKE FLOW INDICATION AUX FEEDWATER FLOW TRANSMITTER AUX FEEDWATIR FLOW TRANSMITTER AUX FEEDWATER FLOW TRANSMITTER MOTOR DRIVEN AUX FEEDWATER TO STEAM GENERATOR 2A MOTOR DRIVEN AUX FEEDWATER TO STEAM GENERATOR 2B MOTOR DRIVEN AUX FEEDWATER TO STEAM GENERATOR 2C SERVICE WATER ISOLATION VALVE TO AUX FEEDWATER SERVICE WATER ISOLATION VALVE TO AUX FEEDWATER SERVICE WATER TO AUX FEEDWATER PUMP 2A INTAKE SERVICE WATER TO AUX FEEDWATER PUMP 2B INTAKE BU AB AB AB AB AB AS AB AS AS AB AS AB AB AB AB As AB AB AS AS PILDING ELEV (5) (6)130-00 130-00 130-00 130-00 130-00 155-00 155-00 155-00 127-00 127-00 127-00 127-00 127-00 127-00 100-00 100-00 100-00 100-00 100-00 130-00 ROOM (7)2241 2241 2241 2241 2241 2464 2462 2462 2241 2241 2241 2241 2241 2241 2190 2190 2189 2194 2189 2241 07 Q2N23HV3227B 07 Q2N23HV3227C OBA Q2N23N0V3209A-A OBA Q2N23MOV3209B-B OA Q2N23N4V3210A-A OSA Q2N23NOV321OB-B AB AB As As AB As 130-00 2241 130-00 2241 100-00 2191 100-00 2192 100-00 2191 100-00 2192 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.O 02/27/95 / 16:24:54 Page 10 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 9 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 ECINE NO.CLASS (2)05 05 18 18 21 07 MARK NO.=.OaWUmaW..s.==. (3)Q2N23PO01A-A Q2N23PO01B-B Q2PI1LTO515-A Q2PIILTO516-B Q2PU1TO01 Q2P13HV2866C-A 07 Q2P13HV2866D-B 07 Q2P13HV2867C-A 07 Q2P13HV2867D-B 07 Q2P1SHV3103-A 07 Q2PISHV31OS-B 07 Q2P15HV3106-B 07 Q2P15V3332-B 07 Q2P1SHV3333-B 07 Q2P15HV3765-A 0 Q2P16F5O1A-A 0 Q2PI6F5O1B-B 07 Q2P16FV3009A-A 07 Q2P16FV3009C-B 20 Q2P16LOO1-A 20 Q2PI6L002-B O0A Q2PN6MOV3149-A 06 Q2P16POO1A-A 06 Q2PI6P00B-A 06 Q2Pl6P0O1D-B 06 Q2P16P0O1E-B SYSTEM/EPUIPMENT DESCRI TION (4)AUX FEEDWATER PUMP 2A AUX FEEDWATER PUMP 28 CONDENSATE STORAGE TANK LEVEL TRANSMITTER CONDENSATE STORAGE TANK LEVEL TRANSMITTER CONDENSATE STORAGE TANK CONTAINMENT PURGE ISOLATION OUTSIDE CTNT VALVE CONTAINMENT PURGE ISOLATION INSIDE CThT VALVE CONTAINMENT PURGE ISOLATION OUTSIDE CTMT VALVE CONTAINMENT PURGE ISOLATION INSIDE CTNT VALVE PRESSURIZER LIQUID SAMPLE LINE ISOLATION VALVE RHR HX A SAMPLE VALVE B RIR HX SAMPLE VALVE PRESSURIZER SAMPLE RCS HOT LEG SAMPLE LINE ISOLATION VALVE RCS SAMPLE SW STRAINER 2A SW STRAINER 2B CCW HEAT EXCHANGER SERVICE WATER DISCHARGE CCW HEAT EXCHANGER SERVICE WATER DISCHARGE SERVICE WATER DISCHARGE VALVE RELAY CABINET 2A SERVICE WATER DISCHARGE VALVE RELAY CABINET 2B BLOWDOWN HEAT EXCHANGER ISOLATION NOV SERVICE WATER PUMP 2A SERVICE WATER PUMP 20 SERVICE WATER PU1P 2D SERVICE WATER PUMP 2E BUILDING (5)AB AB YD YD YD AB 100-00 100-00 155-00 155-00 155-00 121-00 2191 2192 CST CST YARD 2223 ELEV ROOM.0-1-na ...i .s....(6) (7)CB AB CB CB AB AD AB AB CB SW SW AB AB AB AB AB Sw SW SW Sw 129-00 CTMT 121-00 2223 129-00 CTNT 129-00 CTMT 83-00 83-00 121-00 121-00 129-00 167-00 167-00 100-00 100-00 155-00 2128 2189 2223 2223 C1MT 0072A 0072A 2185 2185 2409 155-00 2405 121-00 188-06 188-06 188-06 188-06 2223 0072A 0072A 0072A 0072A Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Nwuber Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.O/ 02/27/95 / 16:24:54 Page 11 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 10 LINE NO.(1)SYSTEM/EQUIPMENT CLASS MARK NO. DESCRIPTION ..... l....l..l..... ....==*....a...lmU.......0.04a. (2) (3) (4)18 OBA Q2P16PDS62O-A Q2P16PDS621-B Q2P16V514-B 08A Q2P16V515-A OSA Q2P16V516-B OBA Q2P16V517-A O8 Q2P16V538-B OBA Q2P16V539-A O0A Q2P16V545-B 08A Q2P16V546-A 07 Q2P16V562-B 07 Q2P16V563-A 07 Q2P16V577-A 07 Q2P16V578-AB 07 Q2P16V579-B 21 Q2P17HOO1A-B 21 QZP17HO01B-AB 21 Q2P17HO01C-A 07 Q2P17HV2229 07 Q2P17HV3045-A 07 Q2P17HV3067-B 07 Q2P17HV3095-B 07 Q2P17HV3096A 07 Q2P17HV3096B DIFFERENTIAL PRESSURE SWITCH DIFFERENTIAL PRESSURE SWITCH SERVICE WATER TO TURBINE BLDG ISOLATION VALVE SERVICE WATER TO TURBINE BLDG TRAIN A ISOLATION SERVICE WATER TO TURBINE BLDG TRAIN A ISOLATION SERVICE WATER TO TURBINE BLDG TRAIN B ISOLATION SERVICE WATER EMERGENCY RECIRCULATION TO POND SERVICE WATER EMERGENCY RECIRCULATION TO POND SERVICE WATER DISCHARGE FROM AUXILARY BUILDING SERVICE WATER DISCHARGE FROM AUXILIARY BUILDING B TRN DIL BYP PCV A TRK OIL BYP PCV A TRI NIN FLOW 2C PUM MIN FLOW B TRN MIN FLOW CCW HEAT EXCHANGER TRAIN B SWING CCW HET EXCHANGER CCV HEAT EXCHANGER TRAIN A COM ENT COOLING WATER SUPPLY TO SA1PLE COOLERS CCW RETURN FROM RCP THERMAL BARRIER ISOLATION CCV RETURN FROM EXCESS LETDOWN CCV SUPPLY TO EXCESS LETDOWN HEAT EXCHANGER CCW NON-SAFETY ISOLATION CCW NON-SAFETY ISOLATION BUILDING (5)YD YD YD ELEV (6)155-00 155-00 155-00 ROOM (7)WODGB WODGB 2SVB1 YD YD YD YD YD YD 155-00 2SVB1 155-00 2SVB1 155-00 2SVBI 155-00 2SVB2 155-00 2SVB2 155-00 2SVB3 155-00 2SVB3 YD YD Sw SW Sw AB AB AB AB AB AB AB AB AB 155-00 155-00 188-00 188-00 188-00 100-00 100-00 100-00 100-00 2VB2B 2VB2A SW SW SW 2185 2185 2185 2162 121-00 2223 121-00 121-00 100-00 100-00 2223 2223 2161 2161 Re rt Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.0/ 02/27/95 / 16:24:54 Page 12 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 11'LINE NO.(1)CLASS MARK NO.(2) (3)07 Q2P17HV3184-B 07 Q2P17HV3443-A 08A Q2P17MOV3046-B OBA Q2P17MOV3052-A 00A Q2P17MOV3182-A OBA QZP17POV3185A-A OBA Q2PI7MOV3185B-B 05 Q2PI7POOIA-B 05 Q2PI7POO1C-A 21 Q2PI7TO01 12 Q2P18CO02A-A 12 Q2PL8CO02B-8 07 Q2P19HV2228-B 07 Q2P19HV3611-A 21 Q2PI9NCYL-A 21 Q2P19NCYL-B 04 Q2RIIBOO4-A 04 Q2RI1B005-B 04 Q2R1IB503-A 04 Q2R11B504-A 04 Q2R11B505-B 04 Q2R11B507-8 03 Q2R15A006-A 03 Q2RI5A007-B 03 Q2R1SA503-A 03 Q2RISA504-B 03 Q2RI5A505-A 03 Q2R15A5O6-B 02 Q2R160006-A SYSTEM/EQUIPNENT DESCRIPTION BUILDING ELEV ROOM (4)CCO RETURN FROM RCP THERMAL BARRIER CB ISOLATION CCW RETURN FROM EXCESS LETDOWN HEAT CB EXCHANGER CCW RETURN FROM RCPS Co CCW TO RCP THERMAL BARRIER ISOLATION AB CCW RETURN FROM RCPS AB CON INLET TO RHR HEAT EXCHANGER NO. 1 AS CCO INLET TO RHR HEAT EXCHANGER NO. 2 AB CCW PIMP 2A TRAIN B AB CCO PUMP 2C TRAIN A AB SURGE TANK (CCW) AB EMERGENCY AIR COMPRESSOR TRAIN A AB TRAIN B EMERGENCY AIR COMPRESSOR AB PRESSURIZER PORV BACK-UP AIR SUPPLY VALVE AB CThT INST AIR ISO AB NITROGEN CYLINDER AB NITROGEN CYLINDER AB LC TRANSFORMER 20 AB LC TRANSFORMER 2E AS LC TRANSFORMER 2R DB LC TRANSFORMER 2K SW LC TRANSFORMER 2L SW LC TRANSFORMER 2S DB 4.16KV SWITCHGEAR 2F AB 4.16KV SWITCHGEAR 2G AS 4.16KV SWITCHGEAR 2H DB 4.16KV SWITCHGEAR 2J DB 4.16KV SWITCHGEAR 2K SW 4.16KV SWITCHGEAR 2L SW 600V LOAD CENTER 20 AB (5) (6) (7)130-00 CTNT 129-00 CTNT 129-00 OHB 121-00 2223 121-00 2223 83-00 2128 83-00 2128 100-00 2185 100-00 2185 179-00 2506 100-00 2189 100-00 2189 121-00 2223 100-00 2184 121-00 2218 121-00 2218 139-00 2335 121-00 2229 155-00 0056A 188-06 0072E 188-06 0072B 155-00 0056C 139-00 2343 121-00 2233 155-00 0056A 155-00 0056C 188-06 0072E 188-06 0072B 139-00 2335 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.O 02/27/95 / 16:24:54 Page 13 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 12 LINE NO.CLASS MARK NO.(1) (2)(3)Q2R16B007-B Q2R17B001-A Q2R17B002-B Q2R17BO08-A Q2R17B009-B Q2R17B098-A QZR17BO99-B Q2R17B510-B Q2RISBO29-A Q2R1SBO30-A Q2R18BO31-A Q2R18B032-A Q2R18B033-B Q2R18BO34-B Q2R18BO35-1B Q2R18B036-B QZR18BO38-A Q2R1SB039-A Q2R18BO40-A Q2R18BO41-B Q2R18B042-B Q2R18B043-B Q2R21BOO1A-1 Q2R21001B-2 Q2R21BO01C-3 Q2R21BOO1D-4 Q2R21E009A-1 Q2R21E009B-2 Q2R21EO09C-3 Q2R21EO09D-4 SYSTEM/EQUIPMENT DESCRIPTION (4)600V LOAD CENTER 2E MCC 2A MCC 20 MCC 2U MCC 2V MCC 2CC 14CC 2W0 MCC 2T POWER DISCONNECT SWITCH POWER DISCONNECT SWITCH CIRCUIT BREAKER BOX CIRCUIT BREAKER BOX POWER DISCONNECT SWITCH POWER DISCONNECT SWITCH CIRCUIT BREAKER BOX POWER DISCONNECT SWITCH NOV POWER DISCONNECT SWITCH NOV POWER DISCONNECT SWITCH NOV POWER DISCONNECT SWITCH NOV POWER DISCONNECT SWITCH BUILOING (5)AB AB AB AB AB AB AB DB AB AB AB AB AB AB AB AB AB AB AB AB ELEV ROOM ulmyn .. l..o....(6) (7)121-00 2229 139-00 2332 121-00 2209 139-00 2347 139-00 2334 155-00 2409 155-00 2405 155-00 0059 139-00 2332 139-00 2332 139-00 2332 139-00 2332 139-00 2322 139-00 2322 139-00 2322 139-00 2322 139-00 2332 139-00 2332 139-00 2332 139-00 2312 02 02 14 14 14 14 16 16 16 16 NOV POWER DISCONNECT SWITCH NOV POWER DISCONNECT SWITCH 120 V REG. PANEL 2C 120 V REG. PANEL 2D 120 V REG. PANEL 2E 120 V REG. PANEL 2F INVERTER 2A INVERTER 2B INVERTER 2C INVERTER 2D AB AB AB AB AB AB AB AB AB AB 139-00 139-00 155-00 155-00 139-00 139-00 121-00 121-00 121-00 121-00 2312 2312 2416 2416 2318 2318 2224 2224 2226 2226 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEN vO.O 02/27/95 / 16:24:54 Page 14 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 13.LINE NO.(1)CLASS (2)16 16 14 SYSTEM/EQUIPMENT MARK NO. DESCRIPTION BUILDING ELEV (3) (4) (5) (6)14 14 14 14 14 03 03 03 03 14 14 14 14 14 14 14 14 02 14 18 18 16 16 15 15 17 Q2R21EO09F-A Q2R21EOO9G-B Q2R21LOOIA-1 Q2R21LOO1B-2 Q2R21L01C-3 Q2R21LOO1D-4 Q2R21LOOSA-A Q2R21LOO5B-B Q2R36ASOI-A Q2R36A502-B Q2R36A510-A Q2R36A511-B Q2R41LOOIA-A Q2R41LOO1B-A Q2R41LOOIC-A Q2R41LOO1D-B Q2R41LOO1E-B Q2R41LOOIF-B Q2R41L507-A Q2R41L508-B Q2R42BO01A-A Q2R42BO01B-B Q2R42B522A-A Q2R42B522B-B Q2R42E01A-A Q2R42EOOIB-B Q2R42EO02A-A Q2R42E002B-B Q2R43AS05-B INVERTER 2F INVERTER 2G 120V VITAL AC INSTRUMENT DISTRIBUTION PANEL 2A VITAL AC DISTRIBUTION PANEL 2B VITAL AC DISTRIBUTION PANEL 2C VITAL AC DISTRIBUTION PANEL 2D 120V VITAL AC DISTRIBUTION PANEL 2J 120V VITAL AC DISTRIBUTION PANEL 2K 4.16KV SWITCHGEAR 2K SURGE ARRESTOR 4.16KV SWITCHGEAR 2L SURGE ARRESTOR 4.16KV SWITCHGEAR 2K SURGE ARRESTOR 4.16KV SWITCHGEAR 2L SURGE ARRESTOR 125VDC DISTRIBUTION PANEL 2A 125VDC DISTRIBUTION PANEL 28 12SVDC DISTRIBUTION PANEL 2C 125VDC DISTRIBUTION PANEL 2D 125VDC DISTRIBUTION PANEL 2E 125VDC DISTRIBUTION PANEL 2F AB AS AB AS AB AS AS AB SW SW D8 DO AS AB AB AB AS AB SW SW AS AS SW SW AS AS AB AS D6 121-00 121-00 155-00 155-00 139-00 139-00 121-00 121-00 188-06 188-06 155-00 155-00 155-00 139-00 139-00 155-00 121-00 121-00 188-06 188-06 121-00 121-00 188-06 188-06 121-00 121-00 121-00 121-00 155-00 ROOM (7)2224 2226 0471 2471 2318 2318 2224 2226 0072A 0072A 0056A 0056C 0471 2343 2312 0471 2233 2209 0072E 00728 2224 2226 0074 0073 2224 2226 2214 2212 0059 125VDC DISTRIBUTION PANEL 125VDC DISTRIBUTION PANEL 125VDC BUS 2A 2M 2N 125VDC BUS 28 UNIT 2 SERVICE WATER BATTERY FUSE BOX UNIT 2 SERVICE WATER BATTERY FUSE BOX BATTERY CHARGER 2A BATTERY CHARGER 28 BATTERY 2A BATTERY 28 DIESEL GENERATOR 28 (SKID)Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM vO.O/ 02/27/95 / 16:24:54 Page 15 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)FARLEY UNIT 2 Page No. 14 LINE NO.(1)CLASS MARK NO.(2) (3)20 Q2R43E0O1A-A 20 Q2R43EO0IB-B 20 Q2R43EOO2A-A 20 Q2R43E0028-B 20 Q2R43E501A-A 20 Q2R43E501B-8 O Q2R43ES02B-B 04 Q2R43G510-B 21 Q2R43T503-B 21 Q2R43T504 21 Q2R43T505 09 Q2V47CO12A-A 09 Q2V47CO12B-B 06 Q2Y52P503B-8 21 Q2Y52T503 18 QSY418532B-B 18 QSY41B616E-B 18 QSY418616F-B 18 QSY41B616G-B 18 QSY41B616H-B 09 QSY41C507C-B 09 QSY41C5O7D-B 0 QSY41M542A-B 0 QSY41NS42B-B 0 QSY41M542C-B 0 QSY41N542D-B SYSTEM/EQUIPMENT DESCRIPTION flfla m aasmflfll aS~inS US f..M........ (4)SEQUENCER 82F SEQUENCER B2G SEQUENCER 82F AUX PANEL SEQUENCER B2G AUX RELAY PANEL 4KV BUS 2H SEQUENCER BUS 2J LOADING SEQUENCER DIESEL GENERATOR 28 NEUTRAL GROUNDING RESISTOR DIESEL GENERATOR TERMINAL CT JB FUEL OIL DAY TANK 2B DIESEL GENERATOR 2B STARTING AIR RECEIVER TANK DIESEL GENERATOR 28 STARTING AIR RECEIVER TANK AUXILIARY BLDG A TRAIN BATTERY ROOM EXHAUST FAN AUXILIARY BLDG B TRAIN BATTERY ROOM EXHAUST FAN DIESEL GEN 28 FUEL OIL STORAGE TRANSFER PUMP FUEL STORAGE TANK 2B DIESEL GEN. ROOM 2B FIRESTAT DIESEL GEN. ROOM 28 FIRESTAT DIESEL GEN. ROOM 28 FIRESTAT BUILDING (5)AB As As AB DB DB Do ELEV (6)139-00 121-00 139-00 121-00 155-00 155-00 155-00 155-00 155-00 155-00 ROOM (7)2335 2229 2343 2233 0056A 0056C 0059 0059 0064 0059 DB DB DB DB As AB YD YD DB DB DB DB DB DB D8 DB DB DB DB 155-00 0059 175-00 2501 177-00 2501 140-00 YARD DIESEL DIESEL DG RE DG RN DGRE D6 RE DG RE DG RM GEN. ROOM GEN. ROOM 28 EXHAUST 28 EXHAUST 28 INTAKE 2B INTAKE 2B INTAKE 2B INTAKE 25 FI: 28 Fi1 FAN FAN LOUVER LOUVER LOUVER LOUVER RESTAT tESTAT 155-00 155-00 155-00 155-00 155-00 155-00 177-00 177-00 155-00 155-00 155-00 155-00 YARD 0059 0059 0059 0059 0059 0059 0059 0059 0059 0059 0059 MOTOR MOTOR MOTOR MOTOR Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF /Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')Program File Name & Version: SSEM Y0.O 02/27/95 / 16:24:54 Page 16 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 -SWEL 1 NO. SNCF164-RPT-02 Equipment List Palzes Unit 2 -Base List 1 2-16 Unit 2 -SWEL 1 17-21 Unit 2 -Base List 2 22-23 Unit 2 -SWEL 2 24-26 Page 17 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0-UNIT 2 SWEL1 SWEL Revision Date -9/18/12/ I Origfnator: R~a. Unc Origin ator: " O z , Reviewer:' 1fL' /o Y-lu moD Ops Reviewer: 111. -LJ9uJ Date: 1117 Date: ;2-Date: 24 IZ-Date: __ -_,_-__Date,____Date: Peer Reviewer:~O ~4I/L/Peer Reviewer: l,4,i4-u-Peer Reviewer.,P A.~iiver, Peer Reviewer: 5 kiic '2k ]_, Date: ../t/LIZ _Page 18 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 U-e dginl/.pd-d P EE-/A46 ad,- App-eniF .Q en #4 Hea Vaiety Ef Equip ,ent -enhnFed No An. Bre -e Ieoa tye eurd' Walkd-w MPL d S,,-m/Eq.ipR-tDespd-~n Bidn E-DeVatonLo .T,-i R...., B-1.to .......Mane eupmn Varity f nvitonm b didenbfld` duin g t1heIPEFE (-,d If.s tgiiat uth R.ea,CEor Ec~oolntcolat h Fr (210 oseEE 5FEoFr C~moE)louae RaFtFO P Ul1-1OeO Vif rd ft..Control Con-o Control H-et S-k) Coninment S,0-teOs eupp.n d AppFendO) 7CoF...Ha,.h MiLd Outdoors/SWIO (-1EaEr Sldg, (Control, hl-ne SO-Fe, C0-A M..A) Dieel G-e RIdgi Y-,d V-.e POe) Ne .No OE S -I O1ESEMOVBOOE pRESSJURIZER POWER RELIEF ISOLATION VALVE CTMT 17 B X X 01 X CTMT-17 -N x (I) Ex DCF2OgOL601 JOG MODS LEIERITOL 0 ESEURIZEEPOWIE REElE VALVE CTMT 173' A A FI1 A 7 TN-17-l A A(1) X NEW STLE ACTUATOR AND DIAPHURGM PER WO I LC1OON REACTOR TRIP 5WITCHGEAR NO. 1 Auxlar Bldg. 11F'OF3S AO X CI 2 l A.1lE'/223 IOEE -CENL TlNLS NO 3OLGEOOTOETHEE;

  • L FI LI PUMP MINI FLOW VOLVE EF.FF 27;7X RESOLVE EY BOLTING CA0INETS TOGETHER F0-'F F 2IEEFFIF I I RHC PUMP FLOW C;I0ATFEOFWWFCO AEx!,ir Bldg. 010'/LEER 0 x *L OF RB-083'00F28 A O RHR 0H00 EATXCLANER DISCHARGE 0000 AuxNilEiEry
d. 0/2E2W B F F 000 OF OB-0FOO/2A2 0 O~U RUEOLE ROEA00LOOOOOROE,,E Bldg. oIAO B x R 010 OF AFFO1 IvF TRANSMITTER ITM 71GVEllHD1d RHER HEAT EXCHANGER 2B 1uiir Ai.51!11?
28. x X* TEOLO3594A COMTFSUMP LEVEL TRANS MTEPR PW IUPPLy Auxiiry Bldg I39'/3I A B OF 0 Ell A. O-/21E8 x X F WEOFLT3594B CMT SUMP LEVEL TFANSM-,E CMT ORO B C LE0 IF CMT' I x 00 -EEOW1-702A RHR IN LET ISOTION VALVO CTMT LOSO A R 0 FEE CNMF m(E) x O1 O2C1MOVFTOIB FTN LOOP NO, 2 DISCHARGE TO CVC5 Aliary RId .OFE02 x X 910 F OF-EOB00FF A) -OE OEllMOVFRF9B RWST TO OHR PUMP 2O FACTION AOEElma Fdg. 0771E2129 B X 0ll F 07-7'211A X 0(1) x 1 F -E F IM O V FI1 2 B C O F O S U M P T O F OE P U M P O F IO L VT IO N A u x l a ry B ld g .0 7 T / 2 1 2 9 B x El l F A -E07 7 7' 2 1 2 9 A R 0 x FR OFEENOV R 000LHSI TO RCS COLD LEG AuEili.a FIEd. 1271121 B F A10 F 0B-7772129EA F (10 10 O IIP0R RHFppA APOTliay Bldg. -F7-/129 B x F10 0 3BE837/2129 x X 1B QEOFIp~oSOS CTNT PRESSURE AEiary Bldg. E2l'/222 N R :13 OF OR-121'/2223 F 1O OOlE1H0d1C CHG/HHSI PUM P BOON 0000R 2C AuElary BOF- 100B000 F'/F7R X X X 00G 0 10 A-7'/2173 X F 1O 2E1OOO3R BOR PU MPROON COOLEOER 2E Aljiary Bldg. -'-lO F R R RO 0 00 AFG A oB-083'2129 E ES 0Q00000000 CCW PUMP ROOM COOLER TRAIN A Au!ilIar RId 10E'/2185FA R 5 000 00 xEI OO0Z2FS F X s0R 0 5CEOO 2O QOE16HOO5 AUX FEEOWATER PUMP BOON .OLEE 2B Auxiary BldgR 00000100 X 0 R10 10 B-1EO00'/219 R R F 2F2 0011007 MCC 2A ROOM COOLER IuxIhF, RId 139'S2332 EA R 01x 00 OR-O390IF33 F x 2; O2E1HOF MCC 23IROOMACU AExEEaryBRI.

1210022031 0 11 100 A-139'72332 K X 23 O2WOEIFTFF43 HIG0H HEADSA-FT INJECTION F-LOW AuEiliary BId. 10070005 B F 210 F 1F OF-EOO'0017 C PX TRANSMU -21EDREl 2O 1CVOI1B FWSTTO CHARGING PUMP SUCTION VALVE AuxLEiiry BdId. 1000/012 B X xBOO F AB 100'27 Fl x 25 Q2EOI LTL 12 VCT LEVEL TRANSM UITER Axiiry OidL 121'02218 N A R F2I OF ER-121' 7220F R 2E Q2E21MOV81FO RUP SEAL WATEO RETURN INO000 IO0 A'x X R 0 0 R 001SA1-/222E 0(1) X 10 OOE21MOV8OOR CHARGING PUMP TO 0- 15OL-TION Alia R .I0OVOOIF F R R 00 R 5 00-1001/2O2R 0 0 F 0 10 MOO OCTPASBER8OO 2R QOE21MOVENORC IIO _MA R00000 p 1U NIIFLOW VALO AuWiEir 00 'I R00/2170 F R R 01 I AI-GG...5 0P F-XF 2O Q2EO1MOV8112 NCP 0 'WATERRECLR.IFOLUTOO CTMT EAC 0 R R 00 R 8 LTNT-IRC F m I F X OC 2O42S21R0 00 OOE21MOVF1FOA OHG PUMP SUCTION H0R 00 0TION Au0ilia, Bldg. 1-lOOOF A 0 R OR F AF-100001F3 F F Ia F 31 Q2E21MOVF133A CHG PUMNP DICHARGEE HOR 00OLATIO 0uxiia0 RIdE 10 0 A R R O1 S S AB-IOOEO17 R 5)0) -ONVEROED ACOR PERBWO 2AEOORIA231 RR OOIAIOOVFROSE ACCUMULATOR BDISCHARGEVALVE COMT 000 0 0 0 000 8 CTO-IO' F FNT A 00 O2OSFMoVBi8 H0S1 TrO 0 EEG I1O0TI0 AuxIlFO RIdt 0000280 B F F 10 8 AB-- 11.1 0 X1)0) I 34 Q2E21 WIPOO2F COOAINOVH HS PLOP PO02B SWN SUP Bldgr IdI. 000/2174 B X 0 000 1 S AR-IOO'/20 0 -R IRPLUCEO PUNS PER NOCE707125010K IS GG FIGLTO50 LRIGHHIPU lPI .1DPOp A d ,L' 0/27 .LGl] RWST LEVEL TRANSMITTER Yar ER5 A A (1 X X61 S FA YI 0 00FAFE 05 A IPEEEC MISSING SCREW ATOTRNS-M1ER; RESOLVE F 36005011 000100 WATROR 0000000TARE F 155 N AX X x F16-155'INSTALLING MISSING SCREW 10 Q2000H000 SFP 0EAT EXCHANGER TRAIN A AuxiliF BldgI 16S'E1467 B R VIE 1C F 39 Q2HllNGASC25OGU AUX SAFEGUARDS CABINET D Iuiir Ilg I5'07 AI l A-S'O7 x ~IPEEE: POTENTIAL INTE RACTION WITH OVERHEAD LIGHT ANDFO PANELS AND O, M HIFG-dA GOPINTRUENTTIO XRESOLVEN.BY RETRAININ OVERHEADULGHTSAND -INC X -fl- Bld .IS /O4 1 x .B...TI NG CINET S TOG ETHER X PUTENTIL IET IOACTW-f VERHEAUD LIHTAD ADJACENT CABINETS NOT ROLTED TOGETHER; REOLTVBY REOTRA FIND OVERHEAD RFOGT AROESDOLVINE CABINSWTOGOEIR AB15/46IPEEE: POTENILITRCINWT OVERH gA 20IHT REOLVE BY RESTRINING OVERHEAD LIGHS Page 19 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 O2OAIEAPHCESEEO PROCESS PRTOECTSONCCEHRCTCOHSSLLS SS'/Ao71 N x ZO I ESOHEERL PICE25OH ROCESSCO eLCASINSE CHANNEL 4 AEi., .1Bd. 2554/.71 N X IL I0 1R-CO15L'/0471 x I x.A A3H11NASRA250N SOUESTATf PROTECTION TEST CAINET -XlA- BldB 15'/7041 A x x lE 2o IpEE- POTEENTIAL ITERACTIIO WITHOVERHEAD = ,ANADJACUNT CBAN- NOT BOLTED AS '32H2EEOOS 2.EV SWLCHGEAR IOCAL CONT PANEL AuxiiaryIdI. 121d. 2233 B S X HU S R IB.121Y223 RN WOATE2ESS

4. SNEWLOCHGEARS LUCALCONT PANEL XRR X GE5, 00 SS, ____S E GQO-E5.7 4.16EKVSWTCHGEAR O2 LOCALCCNT PANEL SWIS 18N/OOB72B B x HO1 2E-1-'/OO712.

S S ,EEEPRORHIHIRO=ETNWOOWO OIpFEI:ApUTNTIA DNEATO WTH W TS.H BOLTED TOGETHER; RESOLVE BY RESTRAINING OVERHEAD LIGHT AN D BOLTING CABIN ETS TOGETHER 47 Q2NH2NMER2619 SGA1C WIDE RANGE LEVEL MCB ITOLATAR Auii-y Id., 12E'1.22E B X 1 0-021IA2I7

4. T2H22LOGTD MULTITLYINA RELAyCABINET2D Auiiay BId,. 130112-1 E X 5B0 A. 19'23 490C11 22 L03 TRANFE RELAY CABINET 2 Aul ay BldgV .ILE'Ing. A X 022 AG-1./1- 0 PEEE: POTENTIAL INTERA-CCON FROM NEARBY IABLE; RESOLVE BY REMOVING TABLE SE .2.ESO0 DIESEL LOCAL RELAY PANEL 2A -NNIl Bldg -NcoS. x 20 -155'/005S O HPEEE: POTENTIAL INTERACTION FROM OVERHEAD LIGHT AND ADJACENT CABINETS NOT BOLTED TOGETER; RESOLVE BYRESTRAININGOVERREAD LIGHTS AN D BOLIHNG TOGETHER El 22 5LOOS TERMINATION LABINET AuxEAr, BIAS. 139 */2318 B X p0 A O1II1 11 x 1 IEER: POTENTIAL INTERACTION FRO PANEL U H2SLOSO. 1-3. 0&,11 A, 40-A, ES 40,C, 40P-0, AND 4(E; RESOLVE BY S O'ING EABINETS T-ETHEBR.I: IINIITC0SC MAIR 001dM NOLION VALVE A-7ilaB 12A'/2A41 A N 0011 7 AB0 -12241 x-E x 5!QNAS11UVsSOB MAIN ETEAMA ASI IOLETIO VALVE AIALNaEBId,.

-27'/-l41 B 511 7 AB-127'/H241 ( E REPLACED AIR CYLINDER WTH LAEGER AIR CYLINDER AND STIFFER SPRING CDP 2Dn-4401 14 M3RIVAP C 28 MISCHARGE PS RE H130/2241 N H ETE 1A A2-131T/2111 x X AS 2EAPT 37MB MAIN STEAM ATMWSPHERE RELIEF VALVE REd0 327'/2241 A x L _7 AAA7 /2S41 x xa) E IS QIN23E3229CC FEEIDVATER INTAKE FLOW INDICATION AANihar. RdA. 10O-'2190 A x RA3 S A 1B-2O012H90 x x S8 QAER2NDHZ SWB AUX FNEDWATER ULGA TRAISMNTT ER AA-iIary BIdA -100/194 B x N23 X 10 AGB-1RO194 X X 59 O2N230V3227C MOTOR DRIVEN AUX FEEDWVATER TO STEAM AuxiAiary Bldg. /L A N 023 7 AB -1WEV2241 XAPC(HH G ENGRATOR 2C TO --.209N2 2 MY ISOLATION VALVE TO AUX FEEAWATER IN.., 1d1. 1B/S1OR-B x N23 IB-1'OA/2192 x x 61 NT23MOV3210A TW TO AUX FEWTER PUMP 2A 0NAKE Bid, SAu RS2 A X P23 F TARE-I/2N X xAS 61 ý2-N23I p A8UX FEEDWATER PUMP 2B Auxiiar Bidi 100'/2192 8 X 12 S k8-100/219 x X 63 OPILSVS15 T EONDESATRE TA TANK LEVEL TRBANSMITTER A 155' A X 11 1B YARO-IS' B A x 4pAE CONDENAS TE STORAGV E TAN Y-r LSS' A 11 PE1 YAR-ITS5 I B NSTALLED TORNAO MISSILE PROTECON N THE H-CAN CEAAN D COVERPLATE DCP S3- 19 AIN 65 QAPAHO867c AWIMT PURG E EOSTAON OUITDE CTLT VALVE A-1., d -2B'/-3 A A PIE A AB- 1 " 11EI-1 11p 6F B TRAINE 1. SWlS X x 1, SW-167'IM72A x x X HE p16F-R -H C- HEAT EXCHANGER SW DISCHARGE ANEiLia- Bldg. AA00'/215 P16 N I E-J00UR/21-X() 0CP --8901WATER PUMP 2C IN S 189'/0A72A A X P6 SW-8810072A I X I REACED PER OLe 205157140 70 -IPGV514 SW TO TURRINe BLUG ISOHAXVtONVALVE -ad L155 B X P16 x YARD-155-X Ili M 7L S~1v] W TO TU RBINE -LD TBAN A ISOeLATION Yard lSSd X p16 x YARD-1S5' x x 1MDC29560 S2QPGV3 W EMERGENCY To PERU Y1rd 115' A -R1 B- yAxS' 1 7 2_P16V5d6 7W DCHARG EFROM AUXiTiARY BUILDG Yard 1.S4 A X P16 YARG-1S5' x (1)74 OP A TRIV D1L ByP I ad ]S'. A X Pil x 7 YAR-5SS' x X ) DC 2--93 722P6V1 C PUM P MIN FLOW 18IS IBB AB P16 7 W-1UH' X xll)7SQP7HI WING CCF HEAT EXCHANGER AuIl0r0-,12'DIS R X P17 21 x1- -RABCI -RI ..L TO .1-A -OMN A-I., Old, DRE-11L., .I I I x 7 A-/2-x L, OLRl11O7 C TRANS FORM ER 2S AiNI BSlBd 155'/2229 ALL DO-SSHAAN5C X X 1 87-16DE6A jDO LA D CENETER ___U- iABZ-fA39'/33 i xt X t~~ 1 x"f B'f FIR-OLOOE-RE SA.-ITSAB I -V-A1AR S AR-W-1 X I ANi PI-1 ED I Page 20 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02. VERSION 1.0 95 MARIBR34 POWER DISCONNECTSWITCH Auxil-N Bldg. E-N7E-E B x RIA 2 AB-139EN2322 A N RE -RENBOB3 NOV PAWEFR r-ONNECT -WICU Auxi-ir Bldg, LEN17NEN 8 A R11 2 AN-39'/2318 A N-11-R2SN]1 120V fEG pANEL 2F AuAildy idl 1nE'/23s N X R- 14 AE-139'72318 1 1 mR AlAE0D INVERTERA2D -Au1wa R., 121E12226 B x X R21 L, AB-121/2226 X x N 9A A2,LU-1 VITAL AC DISTRIBUTION PANEL 2D A--liary Rldg. 9'/2ELAN N X RAE 14 A-17S- .RL1 X NPEEC: SCREWS MISSING AT INTENVAL PANEL RESOLVE BY LASTALLING MINSSNG SCREWS 1. CO.S 4.16101.SWECHGNAR 2X SURGE ARRESTOR SWN 1E3-1001A A A .6 N SWENSCANA N A PEI-: INADEQUATE ANCHORAGE DUE TO LOAAE BO AND CRACKED CONCRETE; RESOLVE By TIGHTENING BOLTS AND REPAIRING CONCRETE CRACX 101 E2R4ALOOTA 125VKC DISTRIBUTION PANENL NA AuxlAR BlN. lSS-AN71 A X "1 NA ABESSIN7T E PEE: POTENTIAL INTERACTION FROM ADJACENT HLING CVBINET; AESOLVE BY RESTRGENING OR N REMOVING FILE -ARIANT SEE WE8TEASEA UNINV2 ERVICE WATER BETTERV FVSE BAA -WIS AR7T A N N N 14 EN1E S.ONENLANTA N A-AS 2.F2ENEA ATEERYCHARGER 2A AAAuilid BI. 1E1'EEE4 A X X N RE N EN AN-N11EEA4 x X x REPLACED PER -P20633147E E U0. .2R42OP21 BATIERy 2B Auxi~layBdg, L21'/22112 B X X X R42 15 AB.12r'/2212 XX EON V2R43AS05 DIESEL GENERATOA AR SKID) ies-I BId, TESL1.E" B N N N E4N A N 17 ORIIRE'/59 N N A MULTIPLE DAS5AN WON SINCE ITEEE REPORT ETC GER4SEAN SOVUENCER EEC SEECEN1E7 N X X E R43 N 2N AV 12E'/2229 N N N EPLACEE PER ACP 2091575SOA 107 ON4AEN2NA SEQUENCER ENF AUX PANEL NWlNrTy Bldg. INN VEINS A N N N RAN 2D A E-139'/2343 NN IPEE; PATENTIA GOTFRCTION WET OCEREAV LIGHT; BESALVE BY RESTRAINING AVERHNEO LIGHT E8 .ER1-E002. SEQUENCER N2G AUX RELAY PANEL NAulir Bid, 121'/2233 NEAR BX R43 NA AB-NEN'/2233 NNOTOY41CNCTD R G RMTB EXHAUST FAN DieI Ed, 177'M5dE9 E X A 141 N NANB77S NNC CAAT NE L41MNUND IE S RM ER INTAKE LAUVER MOTOR DieeI Bidg EAAN N NN X TEE A UB-1I5'RE (N) CAopoVneUnt snAt nchored R.EBIVlne EVNNROnAn such RIawive Page 21 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 -BASE LIST 2 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 -Base List 1 2-16 Unit 2 -SWEL 1 17-21 Unit 2 -Base List 2 22-23 Unit 2 -SWEL 2 24-26 Page 22 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 Farley Unit 2 SWEL 2 Spent Fuel Pool Related Items NTTF Recommendation 2.3: Seismic Walkdowns Variety of Environments Variety of types of Major new equipment MPL# System/Equipment Description or (21 Classes Variety of Not replcmnt from Systems Submerged Submerged Other equpmnt Appendix B) Location Class #102G31HOO01A SPENT FUEL POOL HX 2A 031 X 21 AB-155'/2445 2 Q2G31H0001B SPENT FUEL POOL HX 2B G31 X 21 AB-165'/2467 3 Q2G31P002A 2A SFP PUMP G31 X 5 AB-139'/2342 4 Q2G31P002B 2B SFP PUMP G31 X 5 AB-139'/2342 5 Q2G31V001A 2A SFP PUMP SUCT ISO G31 X 0 AB-139'/2342 6 Q2G31V001B 2B SFP PUMP SUCT ISO G31 X 0 AB-139'/2342 7 C2G31V002A 2A SFP HX INLET ISO G31 X 0 AB-155'/2445 8 Q2G31V002B 2B SFP HX INLET ISO J G31 X 0 AB-155'/9 Q2G31V003A 2A SFP HX OUTLET ISO G31 X 0 AB-155'/2445 10 Q2G31V003B 2B SFP HX OUTLET ISO G31 X 0 AB-165'/2467 11 Q2G31V004A 2A SFP COOLING LOOP TO SFP G31 0 PURIFICATION INLET ISO X AB-139'/2342 12 Q2G31V004B 2B SFP PUMP COOLING LOOP TO SFP G31 0 PURIFICATION INLET ISO X AB-139'/2342 13 Q2G31V005 SFP PURIFICATION OUTLET TO SFP G31 X 0 AB-155'/2445 14 Q2G31V006 SFP COOLING LOOP RETURN (KEY #V- G31 0 141) X AB-139'/2342 15 Q2G31V007 DW TO SFP ISO (KEY #V-231) G31 X 0 AB-139'/2342 16 Q2G31VO08A 2A SFP PUMP DISCH PI-652B ROOT G31 X 0 AB-139'/2342 17 Q2G31V008B 2B SFP PUMP DISCH PI-6520 ROOT G31 X 0 AB-139'/2342 18 Q2G31VO09A 2A SFP PUMP SUCT PI-652A ROOT G31 X 0 AB-139'/2342 19 Q2G31V009B 2B SFP PUMP SUCT PI-652C ROOT G31 X 0 AB-139'/2342 20 Q2G31V017 SFP COOLING LOOP RETURN DRN G31 X 0 AB-139'/2342 21 Q2G31VO21A 2A SFP PUMP CASING VENT G31 X 0 AB-139'/2342 22 Q2G31V021B 2B SFP PUMP CASING VENT G31 X 0 AB-139'/2342 23 Q2G31V022A 2A SFP PUMP CASING DRN G31 X 0 AB-139'/2342 24 Q2G31V022B 2B SFP PUMP CASING DRN G31 X 0 AB-139'/2342 25 Q2G31V023A 2A SFP PUMP SUCT DRN G31 X 0 AB-139'/2342 26 Q2G31VO23B 2B SFP PUMP SUCT DRN G31 X 0 AB-139'/2342 27 Q2G31VO24A 2A SFP PUMP SUCT VENT G31 X 0 AB-139'/2342 28 Q2G31V024B 25 SFP PUMP SUCT VENT G31 X 0 AB-139'/2342 29 Q2G31V025 2B SFP HX HIGH POINT VENT G31 X 0 AB-165'/2467 30 Q2G31V026 2B SFP COOLING LOOP DRN G31 0 AB-139'/ (DEMIN VLV (INACCESSIBLE T/0) X EXCLUSION AREA)31 Q2G31V027 2B SFP PUMP SUCT LINE ORN G31 X 0 AB-139'/2342 32 Q2G31V028 2B SFP HX OUTLET VENT G31 I X 0 AB-165'/2467 33 Q2G31V029 2B SFP COOLING LOOP DRN G31 0 AB-139'/ DEMIN VLV_(INACCESSIBLE T/0) I EXCLUSION AREA)34 Q2G31V030 SFP COOLING LOOP RETURN VENT G31 I 0 AB-139'/2342 Page 23 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 -SWEL 2 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 -Base List 1 2-16 Unit 2 -SWEL 1 17-21 Unit 2 -Base List 2 22-23 Unit 2 -SWEL 2 24-26 Page 24 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 I)SWEL Revision Date -9/18/12 Originator: Originator: Wcot t?&c'Reviewer: Ops Reviewer: b" ." LLm.Peer Reviewer: (j L Date: 4 41 -Date: q I+l '-Date:,, 1/.-Date:.Y-1q 17-.Date:______ Date: ; -.--__Date: .xow"L/Peer Reviewer: , -, ir, .( -,____Peer Reviewer,. -&oqer-7 Peer Reviewer: l-'c4GC. " L, _D ate:______ 14ýi i;-4 14 Page 25 of 26 ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 Farley Unit 2 SWEL 2 Spent Fuel Pool Related Items -Revision Date 9/18/12 NTIF Recommendation 2.3: Seismic Walkdowns Screen #3 Screen #4 Anchorage Variety of check MPL System/Equipment types of Variety of environments required?Description Major new equipment (50% of or (21 Classes Column B)Variety of replcmnt from Systems equpmnt Appendix B) Rapid Drain-Down Comments Hydraulic lines connected to the SFP and the equipment connected to Class # Submerged Not Submerged Other Yes No those lines 1 Q2G31P002A 2A SFP PUMP AUX BLDG / 139' / 2342 G31 5 X X 2 02G31VO02A 2A SFP HX INLET ISO AUX BLDG / 155' / 2445 G31 0 X Q2G31VO03B 2B SFP HX OUTLET AUX BLDG / 165'/ 2467 631 3 ISO 0 ix 4 02G31V021B ZB SFP PUMP CASING AUX BLDG / 139' / 2342 G31 0 VENT Page 26 of 26 ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 2 UNIT 2 -PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02 Page 1 of 3 ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 2 Peer Review Checklist for SWEL for Farley Unit 2 Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.1. Were the five safety functions adequately represented in the SWEL 1 selection? YI] NEI SWEL I for Farley Unit 2 meets the requirements of having 90 to 120 items and addresses allfive safety functions. Many components provide safety functions for multiple systems, and/or are part offrontline support systems. Allfive safety functions discussed in EPRI Report 1025286 are well represented in the SWEL 1.2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:

a. Various types of systems? YN Nr-Items included on the SWEL comprise a variety of systems such as Emergency Diesel Generators and Auxiliaries, Service Water System, Component Cooling Water System, Automatic Depressurization, Residual Heat Removal System, Vital A/C and DIC systems.b. Major new and replacement equipment?

YZ NEI New and replacement components are identified in SWEL 1.c. Various types of equipment? YZ NEI SWEL 1 includes at least one example of each of the 21 classes of equipment, except Classes 11 (chillers), 13 (Motor Generators) and 19 (Temperature Sensors). These components did not meet the screening criteria for incorporation in the SWEL as discussed in Section 6 of the submittal report.All other equipment classes were well represented. In general, the number of components in each class is proportional to the number of safety-related components of that class in the plant as a whole, except that the number of in-line valves is proportionally smaller than anchored equipment. Anchored equipment is more vulnerable to seismic loads.d. Various environments? YN NO The SWEL contains components in mild, harsh, and outdoor environments. The components are located in different buildings, rooms, and/or on different building elevations. The SWEL also includes components located inside primary containment.

e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YN Nr-1 The SWEL included equipment that had been modified as a result of the IPEEE program. Section 5 and Attachment 5 of the submittal report provides information on resolution of the IPEEE findings.

The SWEL and individual component checklists provide information about the IPEEE modifications and verification of modification incorporation. Page 2 of 3 ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 2 Peer Review Checklist for SWEL for Farley Unit 2 f. Were risk insights considered in the development of SWEL 1? YN NEI SWEL I includes high risk components based on risk significance in the plant probabilistic risk assessment (PRA) models. Section 6 of the submittal report discusses the risk insights used for SWEL development.

3. For SWEL 2: a. Were spent fuel pool related items considered, and if applicable included in YE N[1 SWEL 2?SWEL 2 includes components for maintaining cooling of the SFP, which are Seismic Category I components.
b. Was an appropriate justification documented for spent fuel pool related items not YN NE3 included in SWEL 2?Section 6.2 of the submittal report provides the justification for excluding items on SWEL 2. There were no components identified that could contribute to rapid SFP drain down. Note that there were no new/replacement equipment in SWEL 2 because there have been no major modifications to the Spent Fuel Pool systems that would have affected equipment that meets the screening requirements to be included on SWEL 2.4. Provide any other comments related to the peer review of the SWELs.The peer review team reviewed the initial SWEL I and SWEL 2 and provided comments and suggestions for enhancement of the SWELs. Comments included suggestions to include additional electrical components and more equipment mounted to the structure, since such equipment has shown more potential to be adversely impacted by seismic loads than in-line mounted components.

In addition, comments were made suggesting that certain equipment classes contain more components and that explanations be provided for not including certain equipment (e. g. there are no safety-related or Seismic Category I components in that equipment class installed in the plant). The peer reviewers ensured that the SWELs met the requirements of EPRI Report 1025286. Changes deemed necessary during the walkdown due to inaccessibility were reviewed by the peer reviewers to ensure that the changes did not impact the level of compliance to the EPRI report. The final SWEL meets all requirements of EPRI Report 1025286.5. Have all peer review comments been adequately addressed in the final SWEL? YN N[-I Peer Reviewer #1: Robert Ashworth el_14 PvýDate: 11/05/2012 Peer Reviewer #2: Melanie Brown lp Date: 11/05/2012 Page 3 of 3 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 3 UNIT 2 -SEISMIC WALKDOWN CHECKLISTS (SWCs)NO. SNCF164-RPT-02 Page 1 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdowti Checklist (SWO)U:~ ~c Equipment ID No. 92CI 1E004B Equip. Classi 2 ....... ._ .Enui pment Description REACTOR TRIP SWITCHGEAR NO. 1 Location: Bldg. AUXILIARY Floor El. I2L..__ Room, Area ___..Manufacturer, Model, Etc.(optibnal but. recommended) .......Instructions for Completing Checklist This checklist may be used to document the resuits-oftlie Seismic. Walkdowti of an item of equipnent on the SWEL. The space beloweach of the following qtiestihns may be used to record the resu.rlt ofjudgments and findings-kdditional space is provided at the end of this checklist for documenting other comments, Anchorage 1. Isthe anchorage configuration verificationlreqdired (i.e, is the item one YEI2 ND-of0the,50% of SWEL items requiring such verification)? 2; Is the~atichoage free ofbent, broken, missing ur loose hardware?* .t .. ..'J ~~ 7 3. Is ite anchorage free of corrosion that ismn.bred than oxidation?NO UD N/,D Yf NO:UD1Ni/.D

4. Is the anchorage free ofvIsible craloks iii the concrete near the.andhods?

Y0" ND' UD0 N`/AD 5. Is the anchorage,6ofifiguration coiistentwith plant docianehbtiaon?. Y [ND UliD N/AD (Not This question only applies* ifithe item is one of the 50% for wmhch an anchorage confir ration veification is ieqtired.) 6 Based on tLIc anchorage the ale'ichragc fr , ofo YEN, ND potentiallyadverse seismic Londitbons? Enter di~e luinmei class name from Appndit B: Classe iL Equipiintý Page 2 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet of;3/ o Status-: dN I U0 1iS&eismic Walkdown Checklist (SWC)E4uipment ID No. 02C.1EOO4B Equip. Classi 2 Equipment Description REACTOR TRIP SWITCHGEAR NO. I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? 8, Are overhead equipment, distribution systems, ceiling tiles and, lighting, and masdonry blockwalls not likely to collapse onto the equipment?

9. Do attached lines have adequate>

flexibility to avoid damage?I 6ý Based on the above seismic interaction evaluations,, is equipment free of potentially adverse seismic& interaction effects?YE3/Nfl U17 NlAF1 YJ NEI Ufi N/AE-YEDINF] UE1 ,Other Adverse Conditions U i. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of.the equipment? YEI NEI U.0 Comments (Additional pages may beiadded as necessary) Evyaluated by: '-_1 t Date: i Z d .~LI ~t)Page 3 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 4 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 5 of 467 T ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 6 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS O0 NO. SNCF164-RPT-02, VERSION 1.0 Page 7 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 8 of 467 3 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS O0 NO. SNCF164-RPT-02, VERSION 1.0 Page 9 of 467 A A-TTIACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 10 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 11 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i ofX Status: Y91\11 Uiii Seismic Walkdown Checklist.(SWC) Equipment 1D No. Q02E1 Fcvo662B Equip. Clat;s, 8 Equipment Description RHR PUMP MINI FLOW vALVE Location: Bldg. AUXILIARY Floor El. 77 Room, Area 2.17I;r Manufacturer, Model, Etc, (optional but recommended) Instructions for Completing Checklist This checklist may be used to dobduhent the results ofthe Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the endof'this checklist for documenting other conr ents.Anchorage I. Is the anchorage configuration verification required (tie., is the itemr one YO :N[9 of ther50% of SWEL items requiring such verification)?

2. Is theanchorage free of bent, broken, missing or loose hardware?Z- WE 3, Is the.anchorage free of corrosion that is more than mild surface oxidation?

4, Is the anchoiage free of visible cracks in the concrete uear the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This questiononly applies if the item is one of the 50%.for which an anchoiage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NE UE'I N/A[2Y YE NE U-E1 N/A[e YE3 NE UVE N/AEi YE NE UE] N/,Ag-YONEI UiE Enter the equipment class name from Appendix B: Classes of Eqoipement. Page 12 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 1 .4-Sheet 26fx Status: Ylf N'7 UD3 Seismic Walkdown Checklist (SWC)Equipment ID No. W2E11FCVOOO2B Equip. Classw 8 Equipment Description RH)RPUMP MiNt FLOW VAL VE _ _Interactioin Effects 7. Are soft targets free fromi impactbynearbY equipment or structures? Yf[f'Nt] Ut. N/At]8. Are overhead equipmentdistributin systems, Ceinig tiles and lightiing, and masormy block.walls nct:Iikely tteollapse onto the eqdipment? 9, Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interanetin evaluations, is equiptnent free ofpotentially adverse seismic inter~hti~ n effects?Other Adverse,

11. Have you looked for and found no other ýeismic conditions that could advelsely'affect the safety fmeCtions ofthe equipment?

Y[Yt]Nt] Ut] N/At];\1t]Nt] UE] N/At]Y0iNt] Ut Comments (Additional pages maybe. added as necessary) Evaluated by: 4 r\ AýDate:. 4j_5.... .Z ..Page 13 of 467 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS O0 NO. SNCF164-RPT-02, VERSION 1.0 Page 14 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 15 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic WalkdownChecklist (SWC)Sheet 1ofA'÷ ' ./', Status: YZ ND] UD-Equipment ID No. Q2EI1FIS602B, Pkq Equip. Class' '18 F2-5 Equipment Descrption RHR PUMP INDICATING SWITCH Location: Bldg., AUXILIARY Floor El. i_ __ koom,,Area 2128 Manrufacturer, Mode, Etc: (optional but-recommended) for Completing Checklist Thi s checklist may be used too lcinentie resultsofthe Seismid Walkddwn aifan itemn of equiphifiet of the'SWEL. The:space beloweach of the following questions may be used to record.the results of judgments and findings.Ad0itibnal spaceisprovied at the end ofthis checklist, for documenting other comments.: Anchoraek I. Is the~anchokage cnfiguration verification required (i:e., isJth6 itetffoim YE0 NZ ofthe 50% of SWEL items requiring such, verification)?

2. is theanacorage free of bent,:broken, migsiriR or loose hardware?3. Is the anchorage free ofcorosiion that is more thannmidIsutfricd oxidation?
4. Is the anchorage free 6fvisible:erakks-in.the c6ecrete nearthe anchors?ý5. Is the anchorage configiaration omnsisterit with (Note: This questionlonly applies if the iiem is one of the:50% for which an anchorage
configuration.

frifiTatioiins required)6. Based*0n theabove itchotageevaluatiorns, is the anchorage free of potentially adverse seismic conditions"? YN] NEI UO N/AE YN NO UE N/AE YNf NEI UO N/AE YE NE UE N/An Y9 NE U-Enter the epsipitent class nisue tiens Appendi.x:13::Cass~sS ofE quiornenLt Page 16 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Wa.lkdown Checklist (SWc)Sheet 2 of 4" /<Status: YO NR UFD1 Equipment ID No, Q2EIIFIS602B. Pkq Equip. Class, 18 F2-5 Equipment Description RHR, PUMP INDICA TING SWITCH Interaction Effects 7;., Are softtargets free'from, impact by nearbyequipmentorstructurs? Y0 Nil U- N/A[]8, Are overhead equipment, d.istribution systems, ceiling iilesand lighting, and masonry ,blockalls notlikelyto collapse onto.the equipment?

9. Do attached lines haye adequate flexibility to avoid damage?10. Based on the above seismicinteraction evaluations, is equipment free-of potentially adverse seismnic interaction effects?YZ NE3 US] N/AE1 Y0 NR US-1 N/AS]YZ NEI UES Other Adverse Conditions

.1. Have you 0ooked .for and found no other seismic conditions that could Y0 NO US adversely affect the'safety functions of thebequipment? Comments (Addiiionil pages may be: added as necessary) None This package was #riginallysigned on. 8-224-2 but retyped for plrtyon. i4-21-22.Evaluwated by> '8tePhen:V'uan'bv Tele~co~n.L~ i:Paul A, M hi~ s ... .........~i Date: 8/22/12 8/22/12 Page 17 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 1S SSeismic Walkdown,.Checklist (SWC)Sheet 1 of 4 Status: Y19. NE U[-L Equipment ID No. Q2E,1FT0O5B Pk.g Equip. Classr 18 F2-6 Equipment Description, RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER Location: Bldg. AUXILIARY Floor El,. 83 Room, Area 2120 Manufacturer, Model, Etc (opitonal but recommenided) fustructionsfor Completing Checklist This checklist may be used to document the results of theSeismic Walkdown.of an itemn of equipment on the SWEL. The space below each of the following questionsmay beIused to recordthe results-uf judgments and findings. Additional spzce is ptrided at the-end of thischecklist, fbr documenting other comments: Anchorage 1. Is the anchorage configuration verification iequired,(ix., is the item 0ine of the 50% of SWEL itemns requiring suchxerification)? YO:NZ 2. Is the anchorage freeof bent, broken,i missing ort6ose hardware?31 Is thie anchorage free of orrosion that is more than thildsurface oxidation?

4. Is the anchorage freý of visible cradks in the concretenear the anchors?5. Is the anchorageconfiguration consistent with plant documentation?(Note: This question 0niy) applies ifthe item is. one of the 5"0% for which an anch(nrage conIi isrequiredd) 6-. Based on'the above anchorage evaluations, is the anchorage free of potentially.adVerseseissmic conditions?

YZ NNO UO N/A-YZ NO UE N/AO YZ NEI UIE N/AE YE NO uOI NIAN Y( NE UE Enta .thre ec~juipnet~ctas sunme~fib Appoittx B: Ctisrýs otlEciaipmentn Page 18 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC)Sheet 2 of4 Status: Yj] .N-] NO ]Equipment 1D No, Q2EI1FT0605B, Pkq Equip. Clawss i8 F2-6 Equipment Description RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment Or structures? YZ NO] U[I N/AO 8. Are overhe:ad equipment, distribution systems, ceiling tilesahd lighting, and mashniry block walls hot.likely'to 6nto the equipment? 9, Do attached lines haveadequate flexibility to avoid damage?10. Based on theabove seismic interaction evaluations, is equipmentifree. of potentially adverse seismic interaction effects?YO NE uV .NY/A YO NE U1 N/AO YZ NO] UVEO Other Adverse Conditions 1I. Have you looked for and found no other seissmicconditions~that could adversely affect the safety functions of the equipment? YI No] uE]Corn mments (Additional pages may be added as necessary)-This package was originally sijned on. 822,12 but retyped for clarity on 10-15-12.Evaluated by: Paul Miklus e. ; loll 7 S3te-en Yuan bv Telecon Date: 8/22/12 8122112 Page 19 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 20 of 467 3 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION ql Page 21 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of/Status: YIT NIE] U1-2 Seismic Walkdown Checklist (SWC)Equipment ID No. 02EIIHOOIB -Equip. Class' 21 Equipment Descripiion RHR HEAT EXCHANGER 2B Location: Bldg. AUXILIARY Floor El. 83 Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification requhied (i.e., is the item one NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)tc/t /29/s9# 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y2'ND UD NIADUO N/AD YQI'/N UO N/A1 Y[E/NO UO N/A-Y[ N[I UD]I Enter the equipment class name from Appendix B: Classes of Equipment. Page 22 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2,Of,.Status: Yý'NF- ULr Seismic. Walkdown-Checklist (SWC), Equipment [DNo. 02EIIHOOIB Equip; Class, 21 Equipment Dscriptioni ,RH jHEAT EXCHANGER 28 interaction.Effects

7. Are sofitargetsfree from impact by-nearby equipment or structures?
8. Are overhead equipment, distribution systemns ceiling tiles and lighting, and masonry block Wa Ils~not likely to collapse onto the, equipment?
9. Do attached lines have adequate flexibility tf avoid damage?10. Based on the above.seismic interaction evaluations, iseqUipment free of potentially adverse seismic interaction effectS?'Y TNL1 U0 N/AEO Y/E]Unj N/AE]YE/NEY UJ] NT/AE YeN3Un other Adverse Conditions
11. Have you looked forand found nboother stismiic conditions thatrebuld adý/ersely.fiecttihe safety functions of the equipment?

YIgYNK Un.Coemm.ents (Additi0Ial page 'suy be added as necessary) Evaluated by: [ .Date: I"_-__________ Page 23 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 24 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 25 of 467 S ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 26 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 31 status :Yd ND uFi Seismic Walkdown.Checklist (SWC)Equipment ID No, Q2EIfLQ3594A Equip, CIass!, 18 ____ .Equipment Description CTMT SUMP LEVEL TRANSMITTER POWER SUPPLY Location: Bldg. AUXiLIARY Floor El. 139 Room, Area ý 3 1 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist may be used to doeument. theresults of the Seismic Walkdown of an item ofequipmenton the SWEL. The space below each of the following questions maybe.uged toi-cord the results ofjiidgmeiits and findings. Additional space is provided atthe end of this chiecklist for documenting other;comments. Anchorage I. Is the anchorage configuration verification required (je, is theeitem one YE] NQ'ofthe,50% of SWEL items requiring such verification)? 2, Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more thati mild surface oxidation? 4: Is the anchorage free, of visible eraeksin the concrete near the andcihrs?.

5. is thaeanchorage configui-ation conmitfent with plant documentation?

(.Note: This question only applies if ihe:iiera is one of ihe 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is~thc anchorage free of potentially adverse seismic conditions?

Yeý NEI: LTE NIAE YE'NE] UE] N/AE]Y NE] UE] N/AE]YE] NEI ulE YF4 NE] UE ,Enter the equiliment class name fron Appeidix B: Classes of Equipi'ent. Page 27 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Chiecklist (SWC)Sheet 2 of,3 Stats: N17 UL]Equipment ID No.. '02E1.LQ3594A Equip. Class :18 Equipment Description CTMT SUMP.LEVEL TRANSMITTER POWER SUPPLY ." Interaction Effects 7.. Are soft targets free from impact by nearby equipmCent or Structures? Y[ I Nf UL] N/A[]S. Are o-verhead equipment, distribution systems,.ceiling tile~sand ligting, and masonry block walls not likely to collapse ontodthe eqjuipmeuent? 9, D0oattaclind hifes havd idequate flexibility tiav did' damage?10. Based ontheeabove seismic interaction evaluations, is equipment free, of potentially adverse: seismic interaction effects?YrZf Nfl uO- Nw/At]'dN7U11 NiAE]Y~j NLI Ut])Other Adverse Condiions 11. Have you looked.fOr and found no otiler seismicconditions that could' YO'NE] Ut]adversely affect the safety functions of the equipmenit? CommentS'(Additional pages may be added as necessary) ...c-Evaliated by: '~ ~s~,1 2 j~iiiII)Patc., VI lo,-J~~~ I Page 28 of 467 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 29 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 17:ý7a -5?Page 30 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC)Shtes ofy Status: YE'/ND- UFýEquipment ID No. 92.1 1M0V8706B Equip. Class' 8 Equipment Description RHR LOOP NO. 2 DISCHARGE TO CVCS Locatioiu Bldg. AUXILIARY Floor El. 83 Room, Area Manufacturer, Model, Etc: (optiondl but recommended) ...... .Instructions for Completing Checklist This checklist may be'used to dcument .the results of the Seismic Walkd0\xn:of an item of equipnient on the.SWEL.The space below each of the following questions may be used to record the results ofjudgments and, findings. Additional space is proVided 4,t the end of this checklist for documenting ,other comnments. Axichorage I Is the anchorage configuration verification required (ije,, is the item one of the 50% of SWEL items requiring such verification)? 21 Is the anchorage free of bent, broken, missing or loose hardware?3. is:the:anchorage free ofcorrosion that is more thaninild surface oxidatiotn?

4. Islthe anrchbrage frre,of visible cracks in the concrete near ihe anIchors?52 Is the anchorage coufiguration consistent with plant documentation?(Nole:: This questiowohly applies if~the iteiln is one ofthe 50% fbr which an ancl6i6tgd ionifiiiratioi veiificatibn is required.)

6, Based oii the above anchorage evaluations, is the anchorage free of potentiailly adverse seismic conditions? Entier, the eq-iphit:ndats innmc fron Appendix'B: Clasws (f Eqiiipmert. YO] N&'YE] NEn UDo N/At YE] NO UE]- N/Au";YO NO ...Page 31 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shee~t 2 Of/' 4L Status: Y KNEI ull'Seismic Walkdown Checklist (SWC)EquipmentID No. Q2E11MOV8706B-Equip. Class'- .EquipmentDescription.RHR L.LOP NO. 2 DISCHARGE TOCVCS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? .8. Ate overhead equipment, distribution systems, deiliigtiles and lighting, and masomny block walls not likely to collapse onto the equipment? 9ý Do attached ines have adequate flexiiility to .avoid damage?10. Based on the abovescismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?, Y N1UE3 N/1A0 YEYNE1 LIE] N/ADl YEE(NEI UL- /A YfdNE] UE]Other Adverse Conditions. I L Have you looked for and found. no other seismic conditions that could adversely affect the salaety fu~ictions ofihe.equiipment? Comments (Additibnal pages may be added as Evaluatedby,:._______________________ -.,Dame 5,------------------------------Pa -výv Page 32 of 467 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 TI Page 33 of 467 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 10 Page 34 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shoet s ofi N[Y] U " Status: Y:] NO] UF!]Seismic Walkdown Checklist (SWC)Equipment.11) No. Q2E11MOV8809B, Equip. Classi 8 Equipment Description RWST TO RIR PUMP 2B SUCTION.Location: Bldg, AUXILIARY Floor El. 77 Room, Area Manufncturer, Model, Etc, (optional but recommended) instructions for Completing Checklist. This-checklist may be used to document the results ofthe S ismic Walkdo~whobfan item of equipment o0i the SWEL. The space below each:of the following questions:may be used to record the results ofjudgments and findings. Additional space is provi.ded at the end of this checklist for documenting other comments.Anchorage I fsthlie anchorage coniigutration Verification requiredd (i.e, is the'item one YE NM /of the 50% ofSWEhitems requiring such verification)?

2. Is the anchorage free ofbent, broken, missing or loose hardware?INS 4 1 UF 3. Is the~anchorage free ofcoirbsionthat is more than mild surface oxidation?

YD NE U NIA ?YCE, NE N/AC9 4. h the ainchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant docnmentation?(Note: This question only applies if (he item is one of the 50% for which an anchorage configuration.verification is required')

6. Based on the above anchorage evaluationsjis the anchorage free of potentially adverse seismic conditions.?

YD NE UE] N/AW YEI NEI UE-: NWAU1 Y[V NE UEo'Ent .er theccquipment class nasianeo kiAnpandixtB: Classe of Equinment. Page 35 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 0f " i-Status: 91 NW UE]U 511t V Seismic Walkdown Checklist (SWC)Equipment ID No, 02E11MOV8809B Equip. Class! 8 =___Equipment Description RWST TO RHR PUMP 2B SUCTION .Interaction.Effects

7. Are soft. fargets free from impact by nearby equipment or structures?

Y2'/NC u[] N/AC 8. Are overhead equiument. distribution systems, ceiling tiles and.lightingi and masohry)block walls'not likelyto collapse ontothe equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based oti the above seismic interaction evaluations; isequipment free of potentially adverse seismic interaction effects?YIZ NO UC N!A-Y9 NF1 LJC[ NiAC Y1NEI U-1 Other.Adverse Conditions 1]. Have you Jooked for and found: no other seismic conditions that could Y4 No U[adversel'y affect the safety fuhctions of the equipinent?

Comm.ents (Additional pages may be added as aecessary),Peo Evaluated by:. _ A2)1 &VI (Date: 6ý-7ý'gZ-n -o Page 36 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 rn-441 Sheet I , status: YE -NO1 U[-]SeisMic. Walkdowni Checklist (SWC)Equipnerit 1D No, Q2E11MQV88 12B Equip. ClassI 8 Equipment Description ctMT-SUMP TO HR PUMP 2B ISOLATION Location: Bldg. AUXILIARY lo .l. ... Rooms, Area 2129 Miuiufactmueii, Model, Etc. (optional but iecommended) Ins, uction... ... Co....t.ng C- I .... .. ..Thi'chegcktit may beused to d1cument the ThSuts.f the SeismriWalkdown ofan .,tetn of equiprent on tIhe SWEL. The spacebebow eah ,ofJte foloing questionVs may be used toreeid the tesultS of judgimnts and findings, Addiional ip;sace provided at the: end o;f thk. checklisi for documenting other commentss,:Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one ofxthe,50%

of SWEL items reqitiring such verification)?: 2.. Is the.anchorage-free: of6bent, broken, missing or !oose-hardwa.6? uV-L'4I O1A/6I 3. is the anchorage free of coro ion t atis more than mild surface oxidation' 4z Is .the anchorage free of visible crddks in the concrete near~ the anchors?*5. Is the anclhorage cofifiguration consi stent with pltInt documentatiibi?(Note: This question only applies- {Ifhe item is ine of t)e 50% for w~hich.an anchorage configuratiiOni vei jfication is required.)

6. Based on the above anchorage evaluations, is'the anchorage free of potentially:adverse seismic tonditons?

YQ YrI NEI Uo YCO No. Vo Yo NUJ U0 IA'YOJ No~ U0,1A--1'AnNEJ to Enter ttis~equipm~lit class ilmme from Appoiedix:13: Ctasseý of.Fquipment, Page 37 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC)Sheet 2 of:.4i A-Status: Y[' NEI U-;EquipmentJ DNo. 02E1iMOV88 128 Equip. Class', 8;Equiipment Descriiption CTMT SUMP TO RHR PUMP 28 ISOLA TION Interaction Effects 7. Are soft targets free from impactbynýearby~equipment or structureis?

8. Are overhead equipment, distrilf;ution systems, cei.lig tiles and lighting, ahd masoni-y block walls not likely to collapse onton the:equipment?

ý9: Do attached lines have-adequate.flexibility to avoid damage?10. Based on the aboveseismic interaction evaluationss is equipmentfree of adverse .eisrmc interaction effedts?Yý (Nl1 UO N/AEIýYg NFJ UE N/ACIJ Y/NCE IJElNE Other Adverse Conditions I],. Have you looked for and found no other seismic conditions that could adversely affect.the safety functions of the equipment? Y Lý/N /]U 0 Commfiients'(Additional pages may be added as necessary) Evaluated by: Date: ,23 f( Io 4'~e('u4" i". ._ _ __ _ _Page 38 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 39 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 40 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Siieeti of 3 Stat~us: .Z N] UM Seismic Walkdown Checklist (Swc)Equipment ID No. Q2E1 A4OVB88 8 Equip, Class, 8 Equipment Description, LHSt TO RCS'COLD LEG --_-_------- Location: .Bldg, AUXILIARY FloorEl:. 121 Room, Area. __-_ _Manufacturer, Model,' Etc. (optional but'reornmenddd),Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipmdent on the SWEL. The space below each of the following questions mayvbe used-to record the results of judgpments and findings. Additional space is provided at .the endof this checklist for documenting.other eominiets. Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one/ N of the 50%,of SWELitems requiring such verifietwion)?

2. Is the anchorage free of bent, broken, missing or loosethardware?

YD] NFI UE] NIA/3.Is thenchoage free of corrosion that ismore than mild surface YE] NE] UE] N/A{f oxidation.? 4, Is theanchorage free ofvisible cracks in dhe concretenear the anchors? YE] NE] U[]5. Is the anchorage configjuration consistent with plant documentation?. YE ,NE UE] .N/AW" (Note: rhis question.tnly applies if the itemris one t.flhe50% for which an anchorage configuration verification is require)d)

6. Based on the above an.!horage

&valuations, is the anchorage free of Y NE UE potentitAlly aerse 'cismic, conditions? Entr tie tpt luipme ci' Fuain App dix 13: Oisekof Equipuent. Page 41 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC), Sheetd.of3 Status. Y NF] u[t Eqpipment .I No.. 02EtI MOV8888B _Equip. Class .8 Equipmeni Description LHS1 TO RCS COLD LEG Interaction Effects 7. Are soft targets free fro0mimp act by nearby equipment or:structures?

8. Are oyerhead equipment, distribution systems, ceiling tilbs and lighting, and inofory block Walls not likely to collapse ono tlhe equipment.L
9. Do attachod lines have attnuate Mle,dxibiiity to a-void otagti.10. Basedbon thie above seismic evaluationsi is equipment free of potentially adverse. seismic interaction effects?Y!ND 01:1 N/Afl YEýX3E iE] N/ADl Y~'ýfNEl VjEJ N/ADn Yl~/N1 U13 Other Adverse Conditions i1; Havey.¢ou looked. for and f6ind. no other seismic conditions that couid affect the safety functions of the equipment'?

Comments (Additional pagesmay be added:as necessary) Yf:ND NUO Evalnate4 by, ffIA$N xsc~7 Kil/1 D~M 6/2.Page 42 of 467 E ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 43 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of/Status: Nf2U'Seismic Walkdown Checklist (SWC)Equipment IID)No. Q2E11P01B. FPquipl.. Clas _6 Equipnient Description R.HR ffLLM4F.28 ............... ..... _.. __Location: Bldg. AUXILIARY Floor El. 83 .. Room, Area 2129 Manufacturer Model, Etc: (optional but recommended) Instructions: for Completing Checklist This,checklist mayge t ddocument, the results of the Seismnie Waukdown of -item of equipment on the SWEL. Thi4 space below each of the folloWing questions may be used to rdcbrd the tesulis ofjti dtgments and findings. Additional spaceis provided'at the end'of this clhecklist-for documentingbther comments.1. Is the anchorage configuratjion verification required (i.e, is the item one YoýND-1 of the 50%"'f SWEI, iltems rcquiringsuch verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YVNK] D,!JC N/AD-3. Is the anchorge tre of crrosion that is,inore thanmild surface yvý'N' ULD N/1AD o~tiiation7

  • 4. fsthe anchoragýe fee of visiblc cracks in the concrete nearl-he anchors? Y. N0 UCID N/AD 5. Is iheanctorage configuiration consistent With plant documentation?

YDI No<KD N/AD].(Note: This qruestion onlv applies if tie, item iS one of thed50% for which.an anchorage conftiguration verification is required.)

6. Based on the anchytorage evaluaiions, is the anchorage free o4 y -c ur-D po ad"'s- seismic conditions?

EThCf h~e eqeiprneni dss fme from.4p~edi B; Clar.s Of Bquipmitm Page 44 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shee tof9, Status,:, Yo I 5 E Seismic Walkdown Checklist (SWC)Equipmnent ID.No. 02E1 IPOO18 Equip. Class, 6 Equipment Description RHR PUMP 2_Interaction =Effects 7. Are soft.targets fite from impact by nearby.equipmentor stIructures? YdN'ND UD NIAfl 8. Are overheadequipitnt,:distributon systems, ceiling ti Is and lighting, yfN!- UEJ N/Arj and inasonry block walls not tikely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoi~d damage? YO'/D UO] N/AD-r~o 1' A4 'Oe. j's M 10. Eased on the above, seismic interaction evaiuations, is equipment free YO 4 ND UD of potentially adverse seismic interaction effects?Other Adverse Conditions II, Have you looked forand found noother seismrio.condiuions that could adversely affect the safety fuiinctions of the equipment?

CLINE3UE Comments (Additional pages may be added as necessary) ,-/v' 1 r/.1L ( jp Evaluated by: kl,,14' j C?~ Jt I& i-Ahjl )//Date: zo.~Page 45 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 46 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 47 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 48 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC)Sheet i of A,"2- Status: YN Nnl U[[] Un , Ip /Equipment ID No. Q2E13PT0953. Pk, Equip. Class, 18 F2-17 Equipment Description CTMT PRESSURE PROTECTION TRANSMITTER Location: Bldg. AUXILIARY Floor El. 121 Room, Area 2223 Manufacturer,'Model, Etc..(optional but recommended) Instructions for Completing Checklist This:checklist may be used to document the results of the Seismic Walkdown of an item of equipment on. the SWEL. The space below each of the following questions maybe used to, record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (ixe., is the item one. Yr-J NZ of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?The answer to question #2 is yes. This question was further discussed with. Taylor Youngblood on:9-43412 and the team was confident that the transmitter was free of bent, broken, missing hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes. There is no evidence of cbrrosion on the transmitter supports.4. Is the anchorage free of visible cracks in the concrete near'the anchors?There were no cracks in the concrete near the support of the transmitter.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes YE NEI UIJ N/AlD YZ NMO1 UEJ N/AQ YZ NO UO] N/AE-Yo NOi U] N/AS YZ NO U0 I Enter th6 equipment class name from Appendix B: Classes of Equipment. Page 49 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 o[,4 ;4 1 41 f Status: YX N[D UD]Seismic Walkdown Checklist (SWC)Equipment ID No. Q2E13PT0953, Pka Equip. Class, 18 F2-17 Equipment Description CTMT PRESSURE PROTECTION TRANSMITTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? Y[D NEI UC N/AC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZI NCi UI N/AO and masonry block walls not. likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y9l NC UO N/AC YE NFI UO Other Adverse Conditions
11. Have you looked for and found no otherseismic conditions that could YZ NC. UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) See component Q2E1 1MOV8888B. This package was originally signed on 8-23-12 and revisited between the team and Taylor Youngblood on 9-13-12. Subsequently, it was retyped for clarity on 10-15-12, Evaluated by: Maggie Farah ff I '%-Date: 8/23.112 atw&i/(t444'/.tl4 Ron' Miranda &~j 7l/ 6j, ~ftrW2.Page 50 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic .Walkdown Checklist (SWC)Sheet I of 4 Status: YO NE! UL Equipment lDNo. Q2E6HOO IC, Pkqo Equip. ClaSs' i0 F2-18 Equipment Description CHG/HHSI PUMP ROOM COOLER 2C Location:'Bid,. AUXILIARY Floor E.L 100 Room Area 2173 Manufacturer, Model, Etc. (optional'but recommended) ...._...instructions for Completing Checklist This checklist may be, used to document the results of the Seismic Walkldown of an iterm of.equipment on the SWE[,. Thet space bllow each of the followifig quiestions may be used to record thie results ofjudgm i iits and findings-Additional space is provided at the:endo.fthis' checklist for documenting other coinmerns. Anchorage E Is the, anclhoage cotfiguratiodn verification required (i.e., is the itemione, Y NO of o50%of SWEL items.requiring such verification)?

2. Is the anchorage free of bent. brokden, miissing or loose hardware?.

The answer to question #2 is yes. This question was further discussed witht Taylor Youngblood on 943-12 and the team was confident that.the transmitter was free of bent, broken, missing hardware..

3. isthe anchorage free.of corrosion that is more than mild surface oxidation?

Yes. There is ho evidence Of corrosion oný the'transm~tter supports.4": Is the anchforage free of visible craicks in the concrt netear the anchors?There were, no cracks. in the concrete near the suppori of the transmitter. 5' Is the anchorage configuration..consistent with plantdbocumentation?(Note: This 4deftion only applies if the item i's one of the 50%.for which: an' anchorage

  • onfiguration ierificatioh is required;), 6. Based on th'e above anchorage evailuations, is the an hotage free of potenitially adverse seismic conditions?

Yes YZ NEI UF] N/AO YO NOl UF N/Ar-l Yfo Nti ufi N,/Arl Y1Fl NOl UOE N/AZ YZ NOl Uf'Enin ihecquip nani dies it me roiAtpi~idix 8::C.tasssof.Equiplnent' Page 51 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SWC)Equipment ID No.. 02E16HOOIC, Pka Equip. Class'F2-48 Equipment Description PUMPP ROOM COOL Sheet 2 of 4 Status: YN NI UEI ER 2C Interaction Effects.7. Are soft targets free from impact by nearby equipment or structures? Y& NE] U[] N/At]S. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block wpils not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to0avoid damage?l0, Based~on the above seismic is teraction evaluations, is equipment free of potentially adverse seismic interaction effects?YOl NO] Uit] N/At YN NEt UOt N/At]YZ NEI Ut]Other Adverse Conditions I. EHave you looked for and tbund no other seismic conditions that could Yo Nt] Ut]adversely affect the safety functions of the equipment?

Cotmments (Additional pages may be added as necessary) Onitially) unable to access the equipmernt for adeqaute review without fall porotection. This paickage-wasoriginally signed on 8-22-12 and revisited by the team on 9-13-12. Subsequently, it was retyped for clarity on 10-15-12.Evaluated by: Tenv A. Mullenix ' otJ l Date; 8/22/12" aura M7 U ..8/22/12 Page 52 of 467 A A'I-IACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 53 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 54 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 55 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 56 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 57 of 467}}