MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14051A7342014-02-20020 February 2014 Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 22014-02-20020 February 2014 Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 2 ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 2024-06-14
[Table view] Category:Miscellaneous
MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0145, Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0)2014-02-18018 February 2014 Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0) NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-09-30030 September 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B NL-13-0954, Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance.2013-05-16016 May 2013 Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. NL-13-0171, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation. ML12355A7862012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 331 of 561 - Page 373 of 561 ML12355A7872012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 374 of 561 - Page 415 of 561 ML12355A7852012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 284 of 561 - Page 330 of 561 ML12355A7842012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 234 of 561 - Page 283 of 561 ML12355A7832012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 184 of 561 - Page 233 of 561 ML12355A7822012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 141 of 561 - Page 183 of 561 ML12355A7812012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 104 of 561 - Page 140 of 561 ML12355A7802012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 of 561 NL-12-2266, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 ML13004A2632012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 130 of 143 Through End NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Pag2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Page NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page 7 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 12012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 NL-12-2267, SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 462012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 46 ML13004A2612012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 431 of 467 Through Attachment 4, Page 63 of 143 ML13004A2602012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 373 of 467 Through Attachment 3, Page 431 of 467 ML13004A2582012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 307 of 467 Through Attachment 3, Page 372 of 467 ML13004A2572012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 232 of 467 Through Attachment 3, Page 306 of 467 ML13004A2562012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 177 of 467 Through Attachment 3, Page 231 of 467 ML13004A2552012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 123 of 467 Through Attachment 3, Page 176 of 467 ML13004A2542012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 ML13004A2532012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467 ML13004A2622012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 64 of 143 Through Page 129 of 143 ML12355A7952012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 118 of 161 - End 2024-06-14
[Table view] |
Text
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
!Sheet f of8
ý'
Statu~s: 7 YE~ N UFi Seismic Walkdown; Checklist (SWC).
EqUipment tD No., ýQH INGEPB2508 Equip.
Equipment Deslcripioft EMERGENCY POWER B. )ARDIY .. .....
Lociation: Bldg'. AUXILIARY Flobor El. 155 ... R6oo, Area, Manufactufer, Model,.Etc. (optional ýbut recommended)
Instructions for ComplifingtChe Cklist
'This checklist may be, used to document the results ofthe:Seismic Walkdown ofan itemof equipment onthe:
SWEL. The space below each of .theIfollowing questi ons ma~y be used;to ec~ord. thei'rdgsults of judgpmensand_
Iiifdiigs. Additional space is pr6vided at the enldLof thiS checklist for documenting other comments.
Ancborage:
- 1. Is the anchorage configuratiimn.verificationrequired,(ie., is thetemnone YC-oftlhe5boxwof SWEL items§ reqiuiring scveflati~j.
.2., I.sth~e.anchoragefree orf bent,ý b~roken, misisinigoprlooyse ha~rdwaret?
e1v-'r W;V f' ý p.i YE*NC UC N/A0
'3 Isi9he anchoragefree of corroqsionthatis morethan mild surface oxidation?
.4; Is the anqjiorag freeof visible cracks in the concrete near. the anchors'? YEI'NC :_ DN/AC
- 5. Is the anchorage conffguration conistniwth plant documentajioi? YCr ,NC] UC3, l.id (Note: Tii iquestion oily appliesif the iteii iso.6ne of th6 50%.1for which an an6horage configuration verification is -required.)
7Ht, Z t.-j jcýFý 4ýt;PA~r A.
- 6. Based onmthe above anchorage evaluailons, is the anchorage free of potehtia.l* t*derse Seics condition s.?
- 1Eae ip~ctia~~tefrom t AýPqcdiB:ýlsc ~f E4qiwihent; Page 445 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
- Sheet 2ofý;v Status: Yd NO UL Seismicl Wakdown Checklist-(SWC)
Equipm'ent ID'No QSHiI1NGEPB2508: Equip. Cjass' Equipment. .
. ri.tion. MERGNCY POWER BOARD Interaction Effects
- 7. Are soft targetsfree fromnimpact by nearby equipment or.structures? YCZI ND UrD, N/ARD 8': Are overhead equipment, distribution systems; ceiling iilesand lighting, Y24 ND U N/WAD and nias'onry block walls not likely to collap eonhto teIequip¢ent7:
- 91. Do attached lines have adequate flexibility to avoid: damage? YdI ND :U N/AD1 0,0Based on .he above seinic if.teraction evaluations, iscquipment free N4,ND Url fýpotentially ad% re ses*mSIc interaction effects?
Other Advkerse Coinditions 11- :Have youlooked for and found no other seismic conditions that could Y9 ND u1D
'adversely affect the safety functipons of lie equipment?
Cbmininitns(Additional pages.may be added as necessar y)
V~~~~~~ t ~h TH E < 7~
p ~
Evaluated by: Dateý._________
T j.
Page 446 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
'Shtet 8of3'll (SWC)I Status:; YZ' Klu-- UfJ, Wat Seismic Walkdown Checklist Equipmenet IDNo. 'ESHIMENGEPBN258 Equip. BOassR
.. iEquiipment
Description:
EMER'GENCY" POWER BOARD e-Rhaý i COMP1'15 A~)io ~ WI
~:h~ Tn" ~LU
~Lt5 ~ V ~ A ~ ~DP H5
~ i A A) '~ '), ~AbLt~5 U 4 5 U Note:
I Note:. Note:
Page 447 of 561
C ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS S 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 448 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 449 of 561
ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 450 of 561
E ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 451 of 561
0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-01, VERSION 1.0 Page 452 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 453 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 454 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 O0 NO. SNCF164-RPT-01, VERSION 1.0 Page 455 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 9 NO. SNCF164-RPT-01, VERSION 1.0 Page 456 of 561
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 457 of 561
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 458 of 561
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 459 of 561
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
~1~
Page 460 of 561
A ATTIACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 461 of 561
A 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 462 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
tof 1 2. 7
-Statuis-: YZN- UFi Seismic Wa Ikdown.Checki,.st.,(SWC)
Equipment 1D'No. :QSH2YE525,: :Equip. Class'ý- 26 Pkgq Fl-lOSd F.qUqipmentDesribipin. DIESEL GENERATOR 1-2A LOCAL CONTROL PANEL
.:Leoctioh> :Bldg., DIESEL .o El 155 Room; Arda 1 4Ajtifadturr, Moddel,1Et. J(6'pti6ial but recommiended) ÷
!nstructions ifor Completing Checklist This checklist may be used to document the.results of the Seismic Walkdownof an item of equipment on the, SWEL. The~space below each of the followiIng qetis may be used to record It Iei rcsulIts~of judgments And findliigs. Additioial sace is provided at the end of this checklist for documenting other comments.
Anchbrage
- 1. Is theanchorage configuration vcrification required (i.e., isiihe item one YMNNI o9fthe 50%/ of' SWL items reqqujrmng suc~h verificatioin)?
S'ee,.SEWSifor QSU2IE525A (DiesetlGenerator 1-2A LocadlControl Pae)for de-t1'ails.
- 2. Is the-anchorage free ofbent, broken, missing or loose hardware? YZ Nr UD1 ýN/AD
- 3. Is the anchoragefree of corrosion that is, more thamnmild surface YO Nn UD N./A oxkidationi?
-4. Is the anchorage£freeýof visible:cracksi*nthe concrcetenear the a*chors?
- 5. Is the anchorage configuraiionwconsist~eni withplant documeniation? YM ND 0,1DJ N,/AD
.. ote:;'Thi§s questjon;9onlyiapplies ifithe item is one df:the 50% for.
which an anchorageconrfiguration verificafion is required.)
- 6. Based on the -above ancliorage:evaluations, is the anchoragc frceof Y.Z ND UD]
potenitiadly dderse seismnic donditions?
E~ntci,,t1ce, quibi.)Ieiin clas iiame from Appurndj*{B1: Clwaset~f ýqvipicnt, Page 463 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 sa eet 2 o[*fN[
J4 Status:: Y[J NE] UD Seismic Walkdown Checklist (SWC)
Equipment 11) No, QSH21E525, Equip. Class1 20 Pkq F14-66 Equipmentf Description DIESEL GENERA TOR 1-2A LOCAL CONTROL PANEL Interaction Effects
- 7. Are soft targets free fromimpact by nearby equipment or structures? Y[ NE UE NIAEi Tubing too close to piping, see Dix, entered in *AP (CR505553, CR504972)ý 8- Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NO. UE] N/AE aInd masonry block walls n6t likely to collapse onto the equipment?
nothing noted overhead thiat can collapse, see #7.
- 9. Do attached lines have adequate flexi~ility to avqid.dýmage? YE NE UE3 N/AE electrical, tubing, ppg insp;ected 10.B on the above seismic interaction evaluatioans, is equipment free Y[92NE]UE1
..of potentially adveise seismic interaction, effects?:
see #7 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YMýNO U0 aniersely affac the safety functions of the equipment?
nothing found, see AWE f'por Rm 189 Comments (Aldditional pages may be added as necessary)i See component QSH22L502 for AWC This package wasI originally signed on: 8-29-1,2but retyped'for clarty,fom10-23-12.
- Evaluated by-: fda oie-Farahby Telecon Date: 8/29/12..
'R nira~abyTelecoh: 8/29/12 Page 464 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
-1 Sheet 1 of-&-
Status: Y NE] U[-
Seismic Walkdown Checklist (SWC)
Equipment ID No. QSH21E525 Equip. Class' 20 Equipment Description DIESEL GENERATOR 1-2A LOCAL CONTROL PANEL Location: Bldg. DIESEL Floor El. 155' Room, Area 0061 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one Yg[l NE of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YZNO] UD N/AO
- 3. Is the anchorage free of corrosion that is more than mild surface Y/'**N UC N/AO oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors'? YdNQ UD N/AQ
- 5. Is the anchorage configuration consistent with plant documentation? Y4NO U'- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Y/* uO potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment.
Page 465 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
-7 Sheet of-a-Status: 7 N Uf-Seismic Walkdown Checklist (SWC)
Equipment ID No. QSH21E525 Equip. Class, 20 Equipment Description DIESEL GENERATOR 1-2A LOCAL CONTROL PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Y2/N- UO N/A-
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJA'NO UQ N/AO and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? YrKND UO N/AD
- 10. Based on the above seismic interaction evaluations, is equipment free Yg(NDNEU of potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could NEl UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) j~Ef.t~ -c ~ 4 cc rf Evaluated by: R ,* Date: ICA 25/(_.
I IA'o t$ /2~
Page 466 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 467 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 468 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 z- A "--
Page 469 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 F(- i&S - &.AA -A,- 2 1
- r. -P Page 470 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 I=zl -.I I/,c
Page 471 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Shee I Statusii 'y IN 0 Seismic Walkdowon Checklist (SWC)
Eqipet)INo. 02F`nip1 Ca ýs`
Lcuioniei: BlDgscrption :,+Q'+Q-1Q O " 1C {(',. \ &Y\
Location: Bldg.*k?-% Flo..Eor E1. *) Roomn. are. __s Ma nufactrurer . Mbdel. Etc. (optional but'recomiended) ...... - ______._- ..- .. -. --
hustructions forrnnplting Checklit This checklis't may be used t o ocument the results of th .Limic WaIkdwit .of an item of eqttipthnet on the SW*EL. The space be~ow'each of the following questions may be used to record eheiresuihS of judgm3ents and finldings, Additio}ial space is provided at the end of this checklist fbr docufh~ditihg other comment.S Anchorage t, Is the anchorage configuration verification required (i e., is theitem onr YE]
of the 50%= of SWEL items requiring such verification)?
- 2. Is the anchorage freeof bent, broken, missing orrloose hardwaree? Y!'a NE] E] N/AL 3, Is the anchorage:.frite 6f corrosion that is more than mild~surface Y&IN[] GUE] N/AD oxidýation?
- 4. Is the anchorage fi6*f visible-racks in the coni-ete neat the anchots? Y, NE] GD N/AD
- 5. :is the. anchora:ge
(=NOte: configuration5 This question onlIy applies conisistddt'[wit if the item h plant:ofdocumentasibh?L is~one the :5O%'for YO] NO UD NAIQ
- 6. B ased on th*e atbve ancho0rhge. e~gitidatiot*:s.*is~t~e: anchor!age ffit stf Ye/KND LiD potenti!all~y adversse seismic conlditio0ns?
.me~r ~the equ ipinoW5tiss n~ame ho Appt) ttdn .tý~t pn Page 472 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 IStatus: YJ N-N ,
Seismic Walkdewh Checklist (SWC)
Equipment DsNo, 9SH21E528 EquTip. Class,'20 qupent Descrip 4nPIELGNRTRI OA ONTROLPAE Interaction Effects 7.Are soft targets free from im-padtby ncarby equippmcntxr.,stmtru ?
- 8. Are overh'cd equipmeht, distribution systems, ceiling tles anud, lightinig, amd masony block wails not likeiy t6 collapse ontothe quipmentb ?
90.DBatd chd lines have inteqaefibiita'to avoi dge? YE NCI UC/A 1.0. 'Based '6in the abwive seismic iniIterac 1ti1on eV~al aitionsi isequipmentn free
'of potentially adverse seismic interlaction effects?
Other Adverse Conditions r no inhaicould, t NA NC U Ad 61e'selaffect 'the safety fmfictiofis :of theequiph'eýiit?
,Comments (Additibnai pages :may be~adI das necessary)"
12-N-01, 6Q~ A/r6,' ~
Page 473 of 561
A 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 1 -2 ;-,- ( I Page 474 of 561
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
,rinc>*r U 0>* '--A Page 475 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 status: :Ye.
YNE! UE Seismic Walkdwn; Cbecklist (SWC)
Equiprnierit ID No., QSH2IL503B Iquip- Cl~ass, 20 Equti'~e~niT escriptioc.SýERVICE WA TER3'BTR.AIN BATTE.RYAROOMHVAC LCS
- tion: 'B]od'g..SWlS: c FooriElbt 8 ...........Re -
- Mannfactnrer,IModel,:Etc. (optional but recomendeidg) ...........
ItnstruCtiOns for Completing CheCl~ist This checklist may be used To document itfslhe'U)ts of the S m'iciWa-,dlkdown ofrii.item of'equipmenii onthe SWEl -The sprace below ecof thi fllowitng lustions may he I'used to record ee tofudgtents and
-findings. Addilional space is provided a.t the end of thi. ciieklist'for docuning'other comments.
Anchorame I. Is the anehporage configuraltion verification r-equired, is th'e item one IYE] Na oft'e50% of SVEL, itm' requiring such veriflicationi)?
2.*iS the anchorage free of bent,-broken, misng or looeI hardware? Ylý .NE]: UE] N/AE]
3.Is the a'nehorage.free -- corros~io
,of Ithtimoetaiid rf&
-P moefif~idSurface.
oxidation?
4;. &Istheafiphorage free of Wvisile *racksz in,hteI co-e icreten:near the anchors3 YE] NE]UE] N40n
- 5. is te1anchorage :configuarati'onsistiii t with p1lnt documentati*n?
(Note:- Thils question oni% 2spplies if The itemn is One of tlhie50% fo~r
.which. anranchorage colnfigtii'nion verification is requiled.)
6.* BJased'onhihe aboveancho rag is the.achorage:
-evaluaions,,
free of potentiallyl adverse seismic *onditios?;
!-1 e Ezttrwheceqipimenfit c~lass ,~name fromnAppenix~iiB: Ch,'sses ýof Equipntient.
Page 476 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
-ý - f07.
See2 fA Seismlic Walkdown Checkklt(SWC) uipment q"r, IIDN0o. u FEquipmerit DescripItion SERVICE WATER BTRAIN BRA TTER-YROOMW 1H.VAC LOý,S Interaction Effects
- 7. A~i-dsofl targetf free from impae bf*iiia~rby equipment or :structures?: O /E
-7N 8, Are o hec ec/imentcdisriuiibuti sstyms, ceilingiiiles andghting, 1W NE:) 1-TE o
ý.and masor block wals not!!ikely *o!a tdwto6t:equip*n*nt?
9,bo attached Iin s have 1detate lexibility to avoid aa ge? YRNn U'] NIAO fiS Based oniteia by1/2e sejISiriteractio ,ea ti? i equip..e.nt free. Y'a -NQ IJU Other Adverse Conditions 1.1.Have you 1i6oked for and found nt othUr seiSnio conditi*ns that cbuld Y{*q NEý UC-adversely affect the safety function w'ifthe equipmenit?
!Commenls (Additionalpages niQy be ad!ded as,eessary),
~
Evalutdby C~, Y ad "A.
-ae Page 477 of 561
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 478 of 561
A is ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION 1.0 Page 479 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: Y1 NEIUCI Seismic Walkdown Checklist (SWC)
EquipmentID:No. 0SH22L502 Eqip. Ciass. 20 Equipment Description DIESEL LOCAL RELAY PANEL 1-2A Locttion: Bidg, DIESEL Floor El 155 Room, Area 0061 Manufacturezr. Model. EtL. (optional hu*tirecomme~ided) ___
Instructions for Completing Chlecklist This checklist may be used to document h-e resuhs of-te Seismic' Wakdownno an item ocfeqpme n h SWEL. The spae below each orthe following questions may, 1 used tod rcrld the results of judgmentsNad findings*..Add~iinal space is provided at the enid of this'hecklist for documenting olher comments.
Anchorage
- 1. jIqfthe anchorage configuraiion verificati'o" requ.C!1,(irell is the itemone Y0 NQj of lhe 50% of SWEL items requtiringjsukLh enfiýati-w?
2.Is the anchorage fee,cofbent, broken, missing orloose ihardware? YZNEIf U1N!'.
3..isthe anchorage freeeof corrosion that i moi'e.tean c mild surfaeh YM N[: tEl N/AED
'tidatiion?
- 4. I!sthI!e anchorage fr'ee of'.vitiibie, cracnks ini the, concrete ocar thieanchiors?
YNZ NEI CIEMAE]
- 5. :s the anchorage confi*guratioa consistenit w~ith plant documentation?-
,E NO 00 N/A[
(0Nte: This quest jion ly applies if the iotem is oneo0f tho e 50% for WhiCh an ;choi3ageconifigration verioicti on is requiredf)
- 6. :Based' anthe :above.!ancho~r'ae e*vab ati:ons, L the. a:choa*ge: fr'ee of YO NEI [iE Enter ~he equipment class osane.froasAppssdicB: Classes oiEquipnnesL Page 480 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 bheet 2 off 3 status: Yz NF1 U11 Seismic Walkdown Check!ist (SWC)
Equipme;t D.No.. .SH22L502Equip. Cla*Wa20-iE-qu*pinenta *ic"ptiqn .DiESEL LOCAL :RELAY PANEL 1-2A
.iteraction Effects T Aie 'offt -'gets il from impa by ear y equipment orssIuctur 'F Thereis a l/'" gap b tween panel aýn QSH21E525-A. Panel E525-A, is veý.l ong in thal,di ection ancdcano expect to have neqfigible delctci.h Dee L l ea Panel will also have small Y0@ NEJ1 UO N/AQ3 deflectionS~s-a t is,restralined bY four anchor bolts and rigid conduits a~t
- 8;.Are.o 'erhiea et~ipnlent, d. ist utioh S'ystems, ceilirng tite and iigh ipg.
ndmasonry llnt w! v collapse ontoIkhe e4uipmen1 Y9 NCI UF /A 9, PD attachAed ine hwve ndequat flexibility to avoid damage?
YO NO UO /,.
10, Based.ofithe abuve .ýeismic interýtcidn evaluations, is equipment free -
.of potentialy adver sel imic interaction effects?
Oher Adverse Conditions
- 11. Hfave you looked for and found no ot-Pr seismic conditions tiant could YN NF1 UD admee*efy affect the safety fcion of t equipmisnt?
All IPEEE concerns were resclved. ..A new anhor,boltwas.added to ttie outside of the panel to resolve thd missing anchorbolt found in the IPEEE walkdowns, Also overhadlights hae been adequately restrained,therefore this configurations i- judged to be fre of eisrnic inter ction.-
Cominents(Additional pages-may be add.d ash. ess,,,-)
EvAfiawtd~by: 'FrvAulnk/ .i'XQ/Iate: 8/30/12012 7 'y /a2a12
~rnM Iy 83/2J Page 481 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 A-O%
Page 482 of 561