MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
REGULATO INFORMATION DISTRIBUTION STEM (RIDS)P ACCESSION NBR: 8709230343 DOC.DATE: 87/O'P/18 NOTARIZED:
NO FACIL: 50-335 St.Lucie Planti Unit ii Florida Poeer 5 Light Co.50-38'P St.Lucie Planti Unit 2i Florida Power 5 Light Co.AUTH.NAME AUTHOR AFFILIATION WOODY'.O.Florida Poeer 5 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 5 05000335 05000389
SUBJECT:
Forwards response to Generic Ltr 87-12'Loss oF RHR While RCS Partially Filled." Util will respond to certain aspects of generic ltr in future.DISTRIBUTION CODE: A061D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR/Licensing Submittal:
Loss of.Residual Heat Removal (RHR)GL-87-12 NOTES: REC IP IENT ID CODE/NAME PD2-2 LA TOURIQNYe E INTERNAL: ARM/DAF/LFMB NRR/DEST/ADE NRR/DOEA/TSB OQC/HDS2 RES SPANOi A EXTERNAL: EQhQ BRUSKEi 8 NRC PDR COPIES LTTR ENCL 1 0 1 1 1 0 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR LYONS W NRR/DEST/*DS NR/P S/ILRB 01 RES/DE/EIB LPDR NSIC COPIES LTTR ENCL 5 5 2 2 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 19 (I'I t.i III f(d P.O.14000, JUNO BEACH, FL 33408 0420@4lllgi c:I~illa@SEPTEMBER)8 igsy L-87-390 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gen t lemen: Re: St.Lucie Units I and 2 Docket Nos.50-335 and 50-389 Generic Letter 87-I2 Attached is Florida Power 8 Light Company's response to Generic Letter 87-l2 for St.Lucie Units I and 2.As identified in the attachment, FPL will respond to certain aspects of this Generic Letter in the future.This information is provided pursuant to I 0 CFR 50.54(f).If additional information is required, please contact us.Very truly yours, C.O.Wo Group Vice President Nuclear Energy COW/E JW/gp At tachmen ts cc: Dr.J.Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 8709230343 8 335 PDR ADOCK OSOOPODR P W4.osI E JW3/040/I an FPL Group company
~~l hhe e~~,~P I h~N e~, h h~~II'e h h t h hl h h p e he e 4 h STATE OF FLORIDA))ss.COUNTY OF PALM BEACH)~C.Q.d f ff f,*d That he is a Grou Vice President'f Florida Power&Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information,and belief,and that he is authorized to execute the document on behalf of said L i c e n s e e..Woo Subscribed and worn to before me this/8 day of 9~7.C I'd la NOTA'RY>PCUBL1C, in and for the County of Palm Beach, State of Florida NOTARY PU8L IC S TATE OF FLORIOA NT COMMISSION EXP SEPT 18~1989 My Comm jssion expires: 80NDED TMRU GENERAL INs.UNO.
C II'4 r ,p~)4~r E l LOSS OF RESIDUAl HEAT REMOVAL (RHR)WHILE THE REACTOR COOLANT SYSTEM RCS)I P RTI LLY FILLED GENERIC LETTER 87-I2 ITEM 8 I A detailed description of the circumstances and conditions under which your plant would be entered into and brought through a draindown process and operated with the RCS partially filled, including any interlocks that could cause a disturbance to the system.Examples of the type of information required are the time between full-power operation and reaching a partially filled condition (used to determine decay heat loads);requirements for minimum steam generator (SG)levels;changes in the status of equipment for maintenance and testing and coordinaton of such operations while the RCS is partially filled;restrictions regarding resting, operations, and ability of the RCS to withstand pressurization if the reactor vessel head and steam generator manway are in place;requirements pertaining to isolation of containment; the time required to replace the equipment hatch should replacement be necessary; and requirements pertinent to reestablishing the inte'grity of the RCS pressure boundary.RESPONSE The following is a summary of the sequence of events that'would occur when taking the plant from power operation to a partially drained condition.
Some of these steps may occur simultaneously: (a)PSL would be brought from l00%power to Hot Standby using Control Element Assembly (CEA)insertion and boration.(b)The RCS is borated to the required concentration for Shutdown Margin for a cooled down condition.(c)The RCS is cooled using the Atmospheric Dump Valves (ADVs)or the Steam Bypass Control System (SBCS)dumps to the main condenser.
Depressurization is accomplished using main or auxiliary spray.(d)When the RCS temperature is less than 500 F and pressure is less than l500 psia, the Safety Injection Tanks are isolated (325 F, 27S psia-PSL2).(e)The Shutdown Cooling System is warmed.(f)The LTOP (OMS-PSL 2)System is placed in service when RCS temperature is less than 340 F (286 F-PSL 2).These systems provide RCS overpressure protection while at low temperatures by opening PORVs on high RCS pressure.SDC relief valves are also in service to provide overpressure protection on PSL 2 once SDC is established.(g)RCS pressure is lowered further and SDC is estalished.
There is an interlock on the SDC suction valves which will isolate SDC when RCS pressure is excessive with respect to SDC piping requirements.
E J W3/040/2 N L h~~II, t II P h J F (h)RCPs are stopped.At this point all High Pressure Safety Injection (HPSI)pumps are racked out.(i)The pressurizer is taken solid with the charging pumps, and pressure is maintained at less than or equal to 200 psia.(j)All charging pumps are stopped, the, RCS is depressurized and vented.(k)The RCS is drained to either the Refueling Water Tank (RWT)or the Waste Holdup Tanks.Pressurizer level instrumentaion is monitored along with the tygon tube refueling level indicator during'his draining.Direct communications are established between the control room and the refueling level indicator while draining.(PSL 2 has'ontrol room refueling level indication
-See Item 2).(I)RCS level is maintained at the desired level.OTHER REQUESTED INFORMATION The minimum, total time to reach a drained condition from I00%power is approximately 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> utilizing a normal controlled shutdown.This includes two hours for power reduction, five hours for cooldown to SDC entry conditions, one hour to establish SDC, ten hours to cooldown and degas the RCS while on SDC, six hours to cool the pressurizer and ten hours to drain the RCS to mid nozzle (these times are based on outage experience).
Maintenance and testing is coordinated through the Nuclear Plant Supervisor (NPS)/Assistant Nuclear Plant Supervisor (ANPS)on shift.Any maintenance or tests performed while the RCS is drained would be done with extreme caution.The time required to close tbe equipment hatch depends on whether equipment is being transported through the hatch.During certain outages, an air driven sled that runs on rails is utilized to transport heavy equipment, motors or materials.
Once the load that is being transported is removed, FPL maintenance crews can secure the equipment hatch (4 bolts)in approximately 30 minutes.An additional 30 minutes would be required to completely bolt the hatch (time for testing requirements is not included).
ITEM 82 (2)A detailed description of the instrumentation and alarms provided to the operators for controlling thermal and hydraulic aspects of the NSSS during operation with the RCS partially filled.You should describe temporary connections, piping, and instrumentation used for this RCS condition and the quality control process to ensure proper functioning of such connections, piping, and instrumentation, including assurance that they do not contribute to loss of RCS inventory or otherwise lead to perturbation'f the NSSS while the RCS is partially filled.You should also provide a description of your ability to monitor RCS pressure,'emperature, and level after tbe RHR function may be lost.E JW3/040/3
I 4-~~~~I'N IN, 4 II-'I l 4~" lt 4 4" II'~tl I~4 4 v 4 IN, I II':'A Il 4'4 4 a 4,4'tlvv*~4~~*4 I 4 IN r-I'1'44 4 4 N, I l ,: 9' RESPONSE The following instrumentation and alarms are provided to the operators for controlling the RCS while drained: (a)(b)(c)RCS Level-PSL I Bc 2 are both provided with clear tygon tube refueling level indicators.
These are connected between a cold leg drain and the pressurizer vent.This tubing is routed through areas of low personnel traffic and is walked down to check for kinks prior to use.The pressurizer level and the tygon tube are compared during the first part of the drain to ensure proper functioning of the tube.Leakage from this tube could be detected and alarmed in the control room by the Reactor Cavity Leakage Detection System.PSL 2 also has a level transmitter that indicates refueling level in the control room.The reference leg system for this transmitter is planned to be upgraded and a similar remote indicator system is planned to be installed on PSL I.RCS Pressure-Low range RCS pressure indication is provided in the control room.Two instruments are provided on PSL I and four are provided for PSL 2.High RCS pressure shuts the Shutdown Cooling suction valves.Instrument range available is O-l 600 psia (0-750 psia-PSL 2).RCS Temperature
-Temperature is monitored using the suction and discharge temperatures of the shutdown cooling system.Instrument range is 0-400 F-PSL 2).This indication may not provide meaningful information should SDC flow be lost.ITEM 83 (a)Identification of all pumps that can be used to control NSSS inventory include: (a)pumps you require be operable or capable of operation (include Information about such pumps that may be temporarily removed from service for testing or maintenance);(b)other pumps not included in item a (above);and (c)an evaluation of items a and b (above)with respect to applicabl e TS requirements.
RESPONSE~(a)(b)(c)E J W3/040/4 Pumps required to be available to control RCA inventory are the charging pumps and Low Pressure Safety Injection (LPSI)pumps.Two charging pumps would normally be operable with the third charging pump tagged out of service to preclude dilution events.Two LPSI pumps would be operable.PSL I has three High Pressure Safety Injection (HPSI)pumps and PSL 2 has two Hl Sl pumps.These would be tagged out of service when the RCS loops are in a drained condition, but one pump could be utilized for inventory control if charging was unavailable.
Technical Specifications require at least one charging pump or one HPSI pump to be operable as a boration flow path.Two LPSI pumps are required to be operable with one operating.
The operating LPSI pump may be shut down for up to one hour provided the RCS is not diluted and it is maintained l I li I subcooled greater than IO F.The nonoperating loop can be inoperable for up to two hours for surveillance testing.If the RCS is open to atmosphere and normal RWT level is maintained makeup can be provided to the RCS from the RWT by gravity feed.ITEM 84 A description of the containment closure condition you require for the conduct of operations while the RCS is partially filled.Examples of areas of consideration are the equipment hatch, personnel hatches, containment purge valves, SG secondary-side condition upstream of the isolation valves (including the valves), piping penetrations, and electrical penetrations.
RESPONSE Containment integrity is not required or maintained except when the RCS temperature is greater than 200 F, during core alterations or during movement of irradiated fuel.If refueling operations are in progress and SDC capability cannot be restored, containment integrity is insured.As noted in response to item f/I, the time required to close the equipment hatch depends on whether equipment is being transported through the hatch.During certain outages, an air driven sled that runs on rails is utilized to transport heavy equipment, motors or materials.
Once the load that is being transported is removed, FPL maintenance crews can secure the equipment hatch (4 bolts)in approximately 30 minutes.An additional 30 minutes would be required to completely bolt the hatch (time for testing requirements is not included).
ITEM 85 Reference to and a summary description of procedures in the contol room of your plant which describe operation while the RCS is partially filled.Your response should include the analytic basis you used for procedures development.
We are particularly interested in your treatment of draindown to the condition where the RCS is partially filled, treatment of draindown to the condition where the RCS is partially filled, teatrnent of minor variations from expected behavior such as caused by air entrainment and de-entrainment, treatment of boiling in the core with and without RCS pressure boundary integrity, calculations of approximate time form loss of RHR to core damage, level difference in the RCS and the effect upon instrumentation indications, treatment of air in the RCS/RHR system, including the impact of air upon NSSS and instrumentaion response, and treatment of vortexing at the connection of the RHR suction line(s)to the RCS.Explain how your analytic basis supports the following as pertaining to your facility:.(a)procedural guidance pertinent to timing of operations, required instrumentation, cautions, and critical parameters: (b)operations control and communications requirements regarding operations that may pertrub the NSSS, including restrictions upon testing, maintenance, and coordination of operations that could upset the condition of the NSSS;and (c)response to loss of RHR, including regaining contol of RCS heat removal, operations involving the NSSS if RHR cannot be restored, control of effluent from the containment ifcontainment E JW3/040/5 14 rr 44~Ih 4 3 h I I\*'h'3 4 M 4 was not in an isolated condition at the time of loss of RHR, and operations to provide containment isolation if containment was not isolated at the time of loss of RHR (guidance pertinent to timing of operations, cautions and warnings, critical parameters, and notifications is to be clearly described).
RESPONSE FPL is evaluating this item and a draft report dated September I, l987, provided by Combustion Engineering that deals with loss of RHR.The response to this item will be provided in a separate letter.ITEM 86 A brief description of training provided to operators and other affected personnel that is specific to the issue of operation while the RCS is partially filled.We are particularly interested in such areas as maintenance personnel training regarding avoidance of pertrubing the NSSS and response to loss of decay heat removal while the RCS is partially filled.RESPONSE Reactor Operators are trained on the Shutdown Cooling (SDC)/Low Pressure Safety Injection System off normal Operating Procedure.
This procedure provides guidance to not start the redundant LPSI pump when SDC is lost until determining the reason for losing the running pump.It also gives specific instructions on reestablishing SDC flow should it be lost due to a lowering of RCS level in addition to other off normal events.PSL has SDC training modules that cover SDC operations and emergency response.The Reactor Operators are trained on the loss of SDC event and other industry events of this type.Maintenance and testing is coordinated through the NPS/ANPS on shift.Any maintenance of test performed while the RCS is drained would be done with extreme caution.Reactor Operators are also trained on the instructions provided in the Draining Reactor Coolant System Operating Procedure.
ITEM 87 Identification of additonal resources provided to the operators while the RCS is partially filled, such as assignment of additional personnel with specialized knowledge involving the phenomena and instrumentation.
RESPONSE Personnel with additional specialized knowledge beyond that of the Reactor Operators are not assigned.An additional person continuously monitors RCS level during level changes.E JW3/040/6 A I I 4 ITEM 88 Comparison of the requirements implemented while the RCS is partially filled and requirements used in other Mode 5 operations.
Some requirements and procedures followed while the RCS is partially filled may not appear in the other modes.An example of such differences is operation with a reduced RHR flow rate to minimize the likelihood of vortexing and air ingestion.
RESPONSE Technical Specifications require that when the RCS loops are not filled, two SDC loops must be operable with one operating.
With the RCS loops filled, only one SDC loop is required to be operable and operating.
If one SDC Loop is inoperable with the loops filled, the secondary side water level must be greater than IO'Fo indicated on the narrow range instruments for both steam generators.
Procedural requirements prohibit draining the RCS below the hot leg centerline.
Also, continuous monitoring of the refueling level is required while draining.lTEM 89 As a result of your consideration of these issues, you may have made changes to your current program related to these issues.If such changes have strengthened your ability to operate safety during a partially filled situation, describe.those changes and tell when they were made or are scheduled to be made.RESPONSE FPL considers that PSL, at this time, is adequately protected for the loss of SDC event.We are, however, planning enhancements to the RCS level remote indication on PSL I and PSL 2.PSL 2 has control room indication.
It will be provided with a reference leg connection to the pressurizer to eliminate level variations due to RCS pressure changes.PSL I will be provided with a similar design as it does not have remote indication at this time.The engineering design packages are currently scheduled for release on September l8, l987, and July IS, I 988, for PSL 2 and PSL I, respectively.
Procedures were reviewed and precaution and steps were added after reviewing prior industry operating event experience, specifically, Significant Operating Event Report 85-4, Significant Event Report (SER)60-83, SER 79-84, etc.E J W3/040/7 I It 4 Il N 4 Mk'" If i I A 4 I I A I~1 ()A 41 I 4&4 A)IA I I 4 I&)lf&I ff I,~f f 1.<f.i~I',I'f f A&I L ," l fl I I I li yt I II,'I f 4'fl I 4)&)IM~1&M&14 I i I'I I I'II 1 4 Il&~>>~I I 4~~