Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3 ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3 ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS ML17313A3461998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3 ML17313A2521998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A2061998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Palo Verde Nuclear Generating Station,Unit 1,2 & 3 ML17313A1811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1351997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1821997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for Palo Verde Nuclear Generating Station,Unit 3 ML17312B7521997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17312B6641997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Pvngs,Units 1,2 & 3 ML17313B0621997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Pvngs,Units 1,2 & 3.With ML17312B1741996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Pvngs,Units 1,2 & 3 ML17312A9981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for PVNGS Unit 1,2 & 3 ML17312A9681996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Palo Verde Nuclear Generating Station Units 1,2 & 3 ML17312A9181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3 ML17312A8051996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Palo Verde Nuclear Generating Station Units 1,2 & 3 ML17312A9191996-04-30030 April 1996 Rev to MOR for Apr 1996 for PVNGS Unit 1 ML17312A6881996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for PVNGS ML17312B0001996-03-31031 March 1996 Revised Monthly Operating Rept for Mar 1996 for Palo Verde Nuclear Generating Station,Unit 2 ML17312A5371996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for PVNGS Units 1,2 & 3 ML17311B3121995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PVNGS Units 1,2 & 3 ML17311B2681995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Palo Verde Nuclear Generating Station ML17311B2221995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Palo Verde Nuclear Generating Station ML17311B1821995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station ML17311B0441995-06-30030 June 1995 Monthly Operating Repts for June 1995 for PVNGS Unit 1,2 & 3 ML17311B0451995-05-31031 May 1995 Revised Page 6 to Monthly Operating Rept for May 1995 for PVNGS Unit 2 ML17311A9471995-04-30030 April 1995 Revised Monthly Operating Rept for Apr 1995 for PVNGS ML17311A8721995-04-30030 April 1995 Monthly Operating Repts for Apr 1995 for PVNGS Units 1-3 ML17311A8061995-03-31031 March 1995 Monthly Operating Repts for Mar 1995 for Palo Verde Nuclear Generating Station ML17311A7101995-02-28028 February 1995 Monthly Operating Repts for Feb 1995 for Palo Verde Nuclear Generating Station ML17311A6601995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station ML17311A7121994-11-30030 November 1994 Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3 ML17311A2691994-08-31031 August 1994 Monthly Operating Repts for Aug 1994 for Palo Verde Nuclear Generating Station ML17310B2811994-04-30030 April 1994 Monthly Operating Repts for Apr 1993 for Palo Verde Nuclear Generating Station ML17310B2161994-03-31031 March 1994 Monthly Operating Repts for Mar 1994 for PVNGS Units 1,2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 05000528/LER-1999-002-01, :on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with1999-08-27027 August 1999
- on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with
05000528/LER-1996-009, :on 961027,identified That TS Violation May Have Occurred Due to Missed Surveillance Test.Caused by Personnel Error.Setpoint for Limit Switches for Valve 1SIAUV647 Corrected to Achieve 1-inch Stroke Length1999-08-18018 August 1999
- on 961027,identified That TS Violation May Have Occurred Due to Missed Surveillance Test.Caused by Personnel Error.Setpoint for Limit Switches for Valve 1SIAUV647 Corrected to Achieve 1-inch Stroke Length
ML17313B0511999-08-0505 August 1999 Safety Evaluation Supporting Amends 120,120 & 120 to Licenses NPF-41,NPF-51 & NPF-74,respectively ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 05000529/LER-1999-005, :on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure1999-07-16016 July 1999
- on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure
ML17300B2991999-07-0808 July 1999 SER Accepting Exemption from Updated Final Safety Analysis Report for Plant,Units 1,2 & 3 ML17300B3061999-07-0808 July 1999 SER Granting Relief for PRR-01,PRR-05,PRR-06,PRR-11,VRR-01, VRR-02,VRR-05 & VRR-08 Pursuant to 10CFR50.55a(f)(6)(i). Relief Requests PRR-07,VRR-03,VRR-04 & VRR-06 Authorized Pursuant to 10CFR50.55a(a)(3)(ii) ML17300B2921999-07-0202 July 1999 Safety Evaluation Accepting Licensee 950630 Submittal of Phase II Response to GL 88-20 Which Included Completed, Updated Plant,Units 1,2 & 3 IPEEE Consisting of Fire & Seismic Event Analyses & Updated Replacement Analyses ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With ML17313A9921999-06-21021 June 1999 Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated ML17313A9911999-06-18018 June 1999 Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 05000529/LER-1999-004, :on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs1999-05-0707 May 1999
- on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs
ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With ML17313A9001999-04-26026 April 1999 SER Accepting Licensee Proposed Relief Requests 11 & 12 for Second 10-year Inservice Insp Interval for Palo Verde Nuclear Generating Station,Units 1,2 & 3 05000528/LER-1999-003, :on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked1999-04-14014 April 1999
- on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked
05000530/LER-1998-003-02, :on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc1999-04-13013 April 1999
- on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc
05000528/LER-1999-001-02, :on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with1999-04-0909 April 1999
- on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with
ML17300B3071999-03-31031 March 1999 Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With ML17313A8661999-03-23023 March 1999 SER Accepting Licensee Request to Withdraw Proposed Charging System/Auxiliary Pressurizer Spray Sys Hardware Mods Committed to in Licensee ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207H7471999-03-10010 March 1999 1999 Emergency Preparedness Exercise 99-E-AEV-03003 ML17313A8441999-03-0808 March 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Replacement Requirements of Section III of ASME Code 05000529/LER-1999-001-01, :on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With1999-03-0101 March 1999
- on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With
ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With ML17313A7791999-02-0505 February 1999 Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies ML17313A7951999-02-0404 February 1999 Safety Evaluation Accepting Licensing Actions Associated with GL 92-08, Thermo-Lag 330-1 Fire Barriers ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 05000528/LER-1996-008, :on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised1999-01-15015 January 1999
- on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised
ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML17313A7251998-12-23023 December 1998 Safety Evaluation Supporting Amends 119 & 119 to Licenses NPF-41 & NPF-51,respectively ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with ML17313A6911998-11-25025 November 1998 Corrected Safety Evaluation Pp 13 & 50 to Plant Units 1,2 & 3,respectively.Change to Pp 13 Corrects Discussion in Paragraph L2.Change in Pp 50 Corrects Discussion Under ITS 3.5.2 ML17313A6701998-11-0404 November 1998 Rev 2 to PVNGS Unit 2 Colr ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 05000528/LER-1998-008, :on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements1998-10-24024 October 1998
- on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements
ML20154N2751998-10-19019 October 1998 Safety Evaluation Supporting Amend 119 to License NPF-74 ML17313A6311998-10-0202 October 1998 Safety Evaluation Supporting Amends 118 to Licenses NPF-41, NPF-51 & NPF-74,respectively ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 05000530/LER-1998-002-02, :on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired1998-09-14014 September 1998
- on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired
05000529/LER-1998-003, :on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters1998-09-0808 September 1998
- on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters
05000530/LER-1998-001-02, :on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to Svc1998-08-28028 August 1998
- on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to Svc
ML20151S0941998-08-21021 August 1998 Rev 6 to COLR for PVNGS Unit 3 ML20151S0901998-08-21021 August 1998 Rev 1 to COLR for PVNGS Unit 2 ML20151S0861998-08-21021 August 1998 Rev 4 to COLR for PVNGS Unit 1 ML17313A5401998-08-13013 August 1998 Special Rept:On 980715,declared PASS Inoperable.Caused by Failure of Offgas Flush/Purge Control Handswitch HS0101. Handswitch Replaced & Post Maintenance Retesting Was Initiated 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULRTC INFORMATION DISTRIBUTION STEM (RIDE)N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 ,SgN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
Arizona Public Service Co.(formerly Arizona Nuclear Power OVERBECK,G.R.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Mon ing repts for Aug 1997 for PVNGS,Units 1,2 a 3 970909 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.ENCL SIZE: E 05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS CENTER 1 P COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME THOMAS,K AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 EXTERNAL: LITCO BRYCEFJ H NRC PDR 1 1 1 1 NOAC 1 1 D E NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 0 Commttment./nnmmt/nn.
Eneyy.Palo Verde Nuclear Generating Station Greg g R.Overbeck Vice President Nuclear Production TEL 602/39341 48 FAX 602/3936077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 035-00482-6RO/JDF September 9, 1997 U.S.Nuclear Regulatory Commission ATi N: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for AUGUST 1997 Enclosed are the Monthly Operating Reports, for.August 1997, prepared and.submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications), to the.PVNGS Units 1, 2, and 3 Operating Licenses;By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)250-3549.Sincerely, G RO/JDF/clj
Enclosures:
AUGUST 1997 Monthly Operating Reports cc: E.W.Merschoff K.E.Perkins INPO Records Center Utility Data Institute t>" AP)$t~i 9709<70251.
97083'.~PDR ADQCK 05000528~R PDR I (all w/enclosures)
, II1llllllllfllillllllfllillllllllllllll 1~T'l t i NRC MONTHLY OPERATING DATA REPORT DOCKET NQ.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-528 PVNGS-1 09/09/97 J.D.Fulton 602 250-3549 Reporting Period: Au ust 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 916,165 Yr.to Date 5,743.1 5,730.6 0.0 7,097,620-Cumulative 71,068.3 69,883.1 0.0 82,563,182 Outage Method of Duration Shutting Down No.Date Type'ours Reason2 Reactor No reactor shutdowns occurred during the month of August 1997.Cause and Corrective Action to Prevent Occurrence
~F-Forced S-Scheduled
SUMMARY
- 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) f>F~~~1~+
~~t t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-529 PVNGS-2 09/09/97 J.D.Fuiton 602 250-3549 Reporting Period: Au ust 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 J', Unit 2 Generatin Statistics".,-;."j,.'".;.This Month'.-Yr.'to Date,-'-'.Cumuiative
-.3.Hours Reactor,was Critical","...'-':-.",".,"."='-.".'ours GeneratorwasOn-Line..'.',';"..'-Unit Reserve Shutdown Hours Net Electrical Energy.Generated MWh':,'.".UNIT SHUTDOWNS 744.0 744.0 0.0 771,291 5,832.0 5,832.0 0.0 7,166,226 71,565.7 70,402.9 0.0 84,273,118 Outage Method of Duration Shutting Down No.Date Type'ours Reason~Reactors No reactor shutdowns occurred during the month of August 1997.Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- On 7/28/97 unit commenced RX ower decrease for end of c cle coast down.
r k s P J1, e n 1I 4,'E IL'V'OY NRC MONTHLY OPERATING DATA REPORT DOCKET NQ.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-530 PVNGS-3 09/09/97 J.D.Fulton 602 250-3549 Reporting Period: Au ust 1997 1.Design Electrical Rating (Net MWe): 1269 2.Maximum DependableCapacity(Net MWe): 1247.;-, Unit-3 Gerieratin Statistics",;,:".'",'l'-".:,"', Hours Reactor'w'as Cilt1cal.;.',-,::;=:-=".".,".-'-:...'-:.'-'."':.-"".;
>-':;"'."'44.0 4,940.9 66,397.7'--,,":,.This;Morith
.:.-="',';, Yri-t'o'Date",.::
." Cumulative;
'ours'Gen'eratoi was On-Lin'e':-"-.
',',,'-"",".,"':;I,I"'-":-'">
".Unit Res'erve Shutdown Hou'rs",-.+",:
-.;".',,";,.'.;.,='.4:;;;'.",'""='-.,::,"-
'~: Net Electrical.
Eneigy.,'Generated (MWh'::".',':-!~-;"-','.
-',:-", UNIT SHUTDOWNS 744.0 0.0 895,881 4,902.3 0.0 5,827,637 65,579.8 0.0 79,126,782 Outage~Method of Duration Shutting Down No.Date Type'ours Reason2 Reactor No reactor shutdowns occurred during the month of August 1997.Cause and Corrective Action to Prevent Occurrence
'F-Forced S-Scheduled
~Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
SUMMARY
t a tl K