R.E. Ginna - Forwards Monthly Operating Status Report for Month of February 1976
ML18142B387
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/05/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B387 (10)


Text

NRC FqAM 106 f2-76t U.S.NUCLEnil BEOULn TOA V COMMiSSiON DOCKET NUMOLll SO-244 NFIC DISTRIBUTION FoR PAR vO DOCI<I:-T MATERIAL FROM.Of HEST R (rA'6 ELEC CORP ROCHESTER, NY FILE NUMQFR HONTIILY REPORT DATI: Ol: DOCUMENT 3-5<<76 NRC QI.ETTEB QOA iOINnL QCOPV QNOTOBIZED QUNCLnSSIFiED PROP C E PLATT INPUT FORM DATE RECEIVED 3-12-76 NUMIIEB OF COPIES RECEIVED 1 signed DESCRIPTION LETTER TRANS THE FOLLO>nNG:

ENCLOSURF HOATIILY REPORT FOR FEBRUARY 1976 PLANT 6 COHPONENT OPERABILXTY 6c AVAILABILITY'HIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS 6 OPERATXONS.

PLANT NAHE:.QxAAAl I,'f,'fbi~HXPC CYS FOR AC ON FOR ACT ION/INFO RViAT I ON BP~~GS INTERNAL D Isl Rl BUTION iQ)SM M~Q,Pdd BRANCH CHXE1+L ua(~.&1DR.'rc EXl ERNAL DISTRIBUTION CONTROL NUMBER NAC I:OflM 166 f2.76)

llilgf SS/'(igjzi zwzz////II/I/I

///SIFT///

ii ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, Rye iX ROCHESTER, N.Y.14649 TELEPHONE AREA cooE 7IE 546-2700 GINNA STATION March 5, 1976$<gi le."~"t LICCii8tQIf8, Director, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C, 20555 LOS tgegigq

Subject:

Monthly Report for February 1976 Operating Status Informatio'n R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 Gentlemen:

Pursuant to Technical Specification 6.9.l.c attached herewith is the monthly operating status report for Ginna Station for the month of February, 1976.Also, ten addition'al copies of the attachment are enclosed.Very truly yours, C~C.Charles E.Platt Superintendent CEP:bts Attachments cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2)/'(K(j)'hAQ]p)9)6~'~AlvR'Y E&llO'1$jQg*HEI$~(w 2533 0 I'~

OPERATING DATA REPORT DOCKET NO.50 2~4 OPERATING STATUS UNIT II1 Ginna Station DATE March 5, 1976 COMPLETED BY~~Andrew McNama a PERATI NS AIDE TELEPHONE Ext.291-214, at Ginna 1, REP0RTING PERI0D: Februar 1976 GRoss'HDURs IN REPDRTING PERIQD: 696 2.cURRENTLY AUTHDRlzED PowER LEvEL (pwt)t 1520 MAxe DEPEND cAPAcITY (Mwe-Net)t 470 DESIGN ELECTRICAL RATING (MWe-Net)t 470 3.POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe>et): 4.REASONS FOR RESTRICTION (IF ANY): THIS MONTH YR TO DATE CUMULATIVE 5.NUMBER OF HOURS REACTOR WAS CRITICAL 6.REACTOR RESERVE SHUTDOWN HOURS.~~7.HOURS GENERATOR ON LINE.;....

~~.~~~~0 0 0',376.89 66.2 371 41,545.59 358.33*40,283.63 8.UNIT RESERVE SHUTDOWN HOURS 0 9.GROSS THERMAL ENERGY GENERATED (MWH).~..~......~..0 0 532,560 8.5*50,903,434 10.GROSS ELECTRICAL ENERGY GENERATED (MWH)11.NET ELECTRICAL ENERGY GENERATED (MWH)~.........

~~, 0 175 205 16 981 066 166,526'.1 6,058,891 12.REACTOR SERVICE FACTOR 13.REACTOR AVAILABILITY FACTOR 14.UNIT SERVICE FACTOR 0 0 0 26%31%26%75%76%73%15.UNIT AVAILABILITY FACTOR 0 16.UNIT CAPACITY FACTOR (Uslntt MDC)...~~~17.UNIT CAPACITY FACTOR (Veiny Deslttn MWe)..'~~~~~~~~~~~0 18.UNIT FORCED OUTAGE RATE 0 25%50%66%10%~26'3%25%66%19.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)t 20.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE A ri1 1 1976 2'I UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIE VED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*Cumulative Date Commencing January 1, 1975 se ss Rtpv$0/75

~-w 8 o~V l/1 sk>>

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO..50 244 UNIT Nl@irma Station DATE March 5, 1976 COMPLETED BY Andrew McNamara, Operations Aide TELEPHON E 1-716-546-2700 Ext.291-214 at Ginna MONTH Februar, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY.AVERAGE DAlLY POWER LEVEL (M We-Net)0 17 18 10 11 12 13 14 15 16 20 21 22 23 24 25 26 27 28 29 ,30 31 INSTRUCTION S On this form, list the average daily unit power level in MWe<'et for each.day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may.'be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).'n such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

4 YY 4 g~41, 4 1 I f/~QY DOCKET NO.50-244

SUMMARY

Annual Re-fueling Outage Began.Work Continued on f2 Low Pressure Turbine Blades Repair."A"&"B" Steam Generators, Inspection and Repair-Other Maintenance.

February, 1976 NAME GINNA STATION, UNIT III March 5,1976 COMPLETED BY~~'ndrew McNamara, Operations Aide TELEPH0NE 1-716-546-2700 Ext.291-214 at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMVIENTS 14 760129$696C*Continuation of this outage for entire report month.*+Yearly outage fJl began on 1/29/76 as a forced unit shutdown.Unit shutdown hours beginning 2/1/76 at 0001 were designated as scheduled shutdown hours for annual re-fueling and other maintenance.(I)REASON: A-EQUIPMENT FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)(2)METHOD: I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM 4-OTHER (EXPLAIN)RKV.l 0 j75 i9 89

<.ri" ((~)~~~~~4 J.i I a~L u