November 20, 2024
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2024401
Dear David Rhoades:
On October 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant and discussed the results of this inspection with Daren Blankenship, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2024-401-0031
Licensee:
Constellation Energy Generation, LLC
Facility:
R.E. Ginna Nuclear Power Plant
Location:
Ontario, NY
Inspection Dates:
October 28, 2024 to October 31, 2024
Inspectors:
K. Hussar, Senior Physical Security Inspector
C. Davis, Physical Security Inspector
J. Edwards, Physical Security Inspector
Approved By:
Daniel L. Schroeder, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R.E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, f, g)
- Tier III: 1 Requirement (02.09)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 8 requirements (02.09 a, b, 2.11 a - d, 02.12 a, 02.13 a)
- Tier III: All Requirements
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
===procedure elements:
Security Training===
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
===procedure elements:
Security Plan Changes===
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 15 was implemented. Based on Ginna's evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) September 1, 2023 through August 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 31, 2024, the inspectors presented the security baseline inspection results to Daren Blankenship, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Security Sealing Operations
Revision 14
Exelon Security Search Process
Revision 38
SY-AA-101-112-
1004
Protected Area Search Processes
Revision 5
SY-AA-101-112-
1005
Owner Controlled Area Inspection Processes
Revision 4
Processing and Escorting of Personnel and Vehicles
Revision 34
SY-GI-101-119
Ginna OCA Warehouse Search Activities
Revision 10
Corrective Action
Documents
04786337
04786339
04788589
04791365
04711026
04708183
04793832
04702333
04760538
04694898
04760721
Corrective Action
Documents
Resulting from
Inspection
04813802
Procedures
R.E. Ginna Nuclear Power Plant Security Plan
Revision 15
Design Input and Configuration Change Impact Screening
Revision 35
CC-AA-601-F-04
Critical System Identification Questionnaire
Revision 3
CC-AA-601-F-05
Digital Asset SSEP Function Determination Questionnaire
Revision 03
STP-E-11.2
Security 60 Cell Battery Bank
Revision 07
STP-E-12.3
Security Emergency Diesel Test
Revision 16
Compensating for Security System Failures
Revision 20
Testing Security Equipment
Revision 23
Safety/Security Interface
Revision 7
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SY-GI-101-102-
1001
Site Specific Security System Component Degradation
Compensatory Measures
Revision 13
SY-GI-101-122-
1001
Ginna Security Equipment Testing
Revision 23
Work Screening and Processing
Revision 21
Corrective Action
Documents
04691597
04774300
04786339
04791365
Procedures
Firearms Background Check Plan
Revision 1
Firearms Maintenance, Testing, and Accountability
Revision 3
Constellation Nuclear Security OJT Program
Revision 2
SY-AA-150-105-
F-15
Ginna PFT
Revision 2
71151
Procedures
Security Events and Nuclear Regulatory Commission
Performance Indicators
Revision 11