MONTHYEARML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 IR 05000266/20220062023-03-0101 March 2023 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22256A3182022-09-13013 September 2022 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection Report 05000266/2023010 05000301/2023010 IR 05000266/20220052022-08-26026 August 2022 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) ML22175A2002022-06-27027 June 2022 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information: Inspection Report 05000266/2022004: 05000301/2022004 ML22173A0172022-06-22022 June 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Point Beach Nuclear Plant ML22172A2132022-06-22022 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000266/20210062022-03-0202 March 2022 Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 IR 05000266/20210052021-09-0101 September 2021 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) ML21214A2812021-08-0202 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21180A2302021-06-29029 June 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2021004 and 05000301/2021004 ML21074A3962021-03-15015 March 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000266/2021010; 05000301/2021010 IR 05000266/20200062021-03-0404 March 2021 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) IR 05000266/20200052020-09-0101 September 2020 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020005 and 05000301/2020005) ML20218A4322020-08-0505 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2020004 ML20168A8912020-06-15015 June 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20190062020-03-0303 March 2020 Annual Assessment Letter for Point Beach Nuclear Plants, Units 1 and 2 (Report 05000266/2019006 and 05000301/2019006) IR 05000266/20190052019-08-28028 August 2019 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2019005 and 05000301/2019005) ML19190A1532019-07-0909 July 2019 Ltr. 07/09/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000266/2019012; 05000301/2019012 (DRS-G.Hausman) ML19136A1402019-05-15015 May 2019 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Garza) ML19094B1182019-04-0404 April 2019 Ltr. 04/04/19 Point Beach Nuclear Plant, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the EQ Program; Inspection Report 05000266/2019013 and 05000301/2019013 (DRS-B.Jose) IR 05000266/20180062019-03-0404 March 2019 Annual Assessment Letter for Point Beach Nuclear Plant (Report 05000266/2018006 and 05000301/2018006) ML19037A3102019-02-0505 February 2019 Ltr. 02/05/19 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection; Inspection Report 05000266/2019412; 05000301/2019412 (DRS-G.Hausman) ML19024A2772019-01-24024 January 2019 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2019001 (DRS-M.Domke) IR 05000266/20180052018-08-28028 August 2018 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2018005 and 05000301/2018005) IR 05000266/20170062018-03-0202 March 2018 Annual Assessment Letter for Point Beach Plant, Units 1 and 2 (Report 05000266/2017006 and 05000301/2017006) IR 05000266/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000266/2017005 and 05000301/2017005) ML17088A7242017-03-29029 March 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000266/2017007; 05000301/2017007 IR 05000266/20160062017-03-0101 March 2017 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2016006 and 05000301/2016006) ML17039B0182017-02-0808 February 2017 Information Request to Support Upcoming Temporary Instruction 2515/191 Inspection at Point Beach Nuclear Plant, Units 1 and 2 - Inspection Report 05000266/2017008; 05000301/2017008 IR 05000266/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant Units 1 and 2 (Report 05000266/2016005; 05000301/2016005) IR 05000266/20150062016-03-0202 March 2016 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Inspection Report 05000266/2015006 and 05000301/2015006) IR 05000266/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2015005; 05000301/2015005) ML15131A3132015-05-0808 May 2015 Ltr. 05/08/15 Point Beach Nuclear Plant, Units 1 and 2 - Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (Mod/50.59) Baseline Inspection 05000266/2015010; 05000301/2015010 (Jjc) ML15124A9012015-05-0101 May 2015 Ltr. 05/01/15 Point Beach Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information (Msh) IR 05000266/20140012015-03-0404 March 2015 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2014001; 05000301/2014001) ML15050A2702015-02-19019 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Point Beach Nuclear Plant, Units 1 and 2 ML14245A1662014-09-0202 September 2014 Mid-Cycle Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 IR 05000266/20130012014-03-0404 March 2014 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2013001; 05000301/2013001) ML14038A3472014-02-0606 February 2014 ISI Request for Information ML13246A2212013-09-0303 September 2013 2013 Point Beach MOC Letter Combined 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000266/20244022024-11-14014 November 2024 Security Baseline Inspection Report 05000266/2024402 and 05000301/2024402 IR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 2024-09-09
[Table view] |
See also: IR 05000266/2019001
Text
January 24, 2019
Mr. Robert Craven
Site Director
NextEra Energy Point Beach, LLC
6610 Nuclear Road
Two Rivers, WI 54241
-9516 SUBJECT: POINT BEACH
NUCLEAR PLANT, UNIT 1-NOTIFICATION OF NRC BASELINE INSPECTION AND REQUEST FOR
INFORMATION; INSPECTION REPORT 05000 266/20 19 00 1 Dear Mr. Craven: The U.S. Nuclear Regulatory Commission (NRC) will soon begin the Baseline Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed March 25, 2019, through April 12, 2019. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your onsite resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups.
The first group identifies information necessary for inspection preparation. The second group
identifies information the inspector will need upon arrival at the
site. It is important that all of
these documents are up
-to-date and complete
to minimize requests during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms.
Kim Locke, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector
Mr. Matt hew Domke at 630-829-9562, or via e-mail at MJD4@nrc.gov
. This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and
Budget Control Number.
R. Craven -2- This letter and its enclosure will be made available for public inspection and copying
at http://www.nrc.gov/reading
-rm/adams.html
and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely, /RA/ Matt hew Domke, Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-266 License No. DPR-24 Enclosure:
Document Request for Inservice Inspection
cc: Distribution via LISTSERV
R. Craven -3- Letter to
Robert Craven from Matthew Domke dated January 2 4, 2019. SUBJECT: POINT BEACH NUCLEAR PLANT, UNIT 1
-NOTIFICATION OF NRC BASELINE INSPECTION AND REQUEST FOR
INFORMATION; INSPECTION REPORT 05000266/20 19 00 1 DISTRIBUTION
- Aida Rivera-Varona RidsNrrDorlLpl3
RidsNrrPMPointBeach
RidsNrrDirsIrib Resource
Darrell Roberts
John Giessner
Jamnes Cameron
Allan Barker
DRPIII DRSIII ADAMS Accession Number: ML19024A277
OFFICE RIII NAME MDomke:jw DATE 0 1/24/19 OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR INSERVICE INSPECTION
Enclosure Inspection Report
- 05000 266/20 19 00 1 Inspection
Dates: March 25, 2019
, through April 12, 2019
Inspection
Procedures
- Inspection Procedure 71111.08, Inservice Inspection
Lead Inspector
- Matt hew Domke, DRS 630-829-9562 MJD4@nrc.gov
A. Information for the
i n-office preparation
w eek The following information is requested by February 25
, 2019 , to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed onsite to your staff. The following information is applicable to the outage Unit 1 unless otherwise indicated
. If you have any questions regarding this information, please call the inspector.
1. For the upcoming outage, a detailed schedule and description of:
a. Non-Destructive Examination (NDE) planned for ASME Class 1 and 2 systems and containment performed as part of the Inservice Inspection (IS I) program (please indicate applicable code edition and
addenda) and NDE s planned for other systems including risk
-informed, augmented, license renewal, and industry initiative inspection programs
. b. Reactor vessel upper head examinations required by Title 10 of the Code of Federal Regulations
(CFR), Part 50.55a(g)(6)(ii)(D) and Code Case N
-729; c. Steam generator (SG) tube inspection and repair activities for the upcoming outage or SG secondary side examinations
1; and d. Welding on Code Class 1, 2, or 3 components.
For each weld examination, include the weld identification number, description of weld (component name), category, class, type of exam and procedure number, and date of examination
.
1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur and no further information is required for the items identified above requesting SG related information.
DOCUMENT REQUEST FOR INSERVICE INSPECTION
2 2. A copy of the NDE procedures, SG eddy current examination (ET) acquisition
and analysis procedures
, and welding procedures used to perform the activities identified
in Item A.1. For NDE procedures, please include calibration and flaw characterization/sizing procedures
, and , for welding procedures, please include applicable qualification records with the weld procedure specification. For ultrasonic examination procedures qualified in accordance with ASME Section XI, Appendix VIII, provide documentation supporting the
procedure qualification (e.g., the Electric Power Research Institute
performance demonstration qualification
summary sheets).
3. A copy of ASME Section XI, Code
relief requests applicable to the examinations identified in Item A.1. 4. A copy of the 10
-year ISI Program showing those required exams scheduled to be performed this outage
and those which have been completed.
5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant)
which have identified relevant indications on
Code Class 1 an
d 2 systems since the beginning of the last refueling outage.
6. A list with short description of the welds in Code Class 1 and 2 Systems
which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage. Please identify the system, weld number, and reference applicable documentation for each (e.g., NIS
-2 forms with definitions of system and component acronyms).
7. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examination. 8. A list of corrective actions initiated since the beginning of the last refueling outage with description of ISI and SG
-related issues such as piping or SG tube degradation or damage (e.g., cracks, wall thinning, wear, and microbiologically
induced corrosion) or errors identified during piping/SG tube examinations. Also, please include a list of corrective actions associated with foreign material identified in the reactor vessel, primary coolant system, SG
, or feed systems for the same timeframe. 9. A copy of any 10 CFR 21 reports applicable to your structures, systems, or components within the scope of ASME Section XI that have been identified since the beginning of the last refueling outage.
10. A copy of SG history documentation given to vendors
performing ET of the SGs during the upcoming outage
1. 11. A copy of procedure containing screening criteria used for selecting tubes for in
-situ pressure testing and the procedure to be used for in
-situ pressure testing
1. 12. A copy of previous outage SG tube operational assessment completed following ET of the SGs
(provide this document even if no SG ET is planned for current outage)
.
1 Note 1- If no SG examinations are planned for this outage, simply state
when the next SG examination will occur.
DOCUMENT REQUEST FOR INSERVICE INSPECTION
3 13. A copy of most recent SG Degradation Assessment
(provide this document even if no SG ET is planned for current outage).
14. A copy of most recent SG Condition Monitoring Assessments
1. 15. A copy of the document defining the
planned SG ET scope (e.g., 100
percent of unrepaired
tubes with bobbin probe and 20
percent sample of hot leg expansion transition regions with rotating probe) and identify the scope expansion criteria, which will be applied. Also identify and describe any deviations in this scope or expansion criteria from the Electric Power Research Institute Guidelines
1. 16. A copy of the document describing the ET acquisition equipment to be applied including ET probe types. Also identify the extent of planned tube examination coverage with each probe type (e.g., rotating probe
- 0.080 inches, 0.115
inches pancake coils and mid
-range + point coil applied at the top
-of-tube-sheet plus
3 inches to minus 12
inches) 1. 17. Provide procedures with guidance/instructions for identifying (e.g.
, physically locating the tubes that require repair) and plugging SG tubes
1. 18. Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition.
19. Point of contact information (name and
site number) for the following activities:
a. ISI-Site and vendor leads
- b. Boric Acid Inspection
s and Evaluations
- c. Reactor Vessel Head Inspection
-Site and vendor leads
- d. SG Inspection
-Site and vendor leads
- e. Aging Management Programs; and f. Site Welding Engineer
. B. On site information to be
provided to the Inspector on the
first day of the
inspection (e.g., following the
entrance meeting). Please provide hard copies (e.g., paper records) of the
following documents. 1. For welds selected by the inspector from Item A.1.d and A.6 above, provide copies of the following documents:
a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing);
1 Note 1- If no SG examinations are planned for this outage, simply state
when the next SG examination will occur.
DOCUMENT REQUEST FOR INSERVICE INSPECTION
4 c. Applicable portions of the Design Specification and applicable Code of
Construction for the weldment (e.g., B31.1 or ASME Section III);
d. Applicable Code Edition and Addenda for weld procedure qualification;
e. Applicable weld procedure
specifications
and weld data sheets
used to fabricate the welds;
f. Copies of procedure qualification records supporting the weld procedure specifications
- g. Copies of welders' performance qualification records;
h. Copies of mechanical test reports identified in the weld procedure qualification records above; i. Copies of the nonconformance reports for the selected welds;
j. Access to radiographs and equipment to view radiographs of the selected welds;
k. ASME Code Section XI repair replacement plan and reconciliation for replacement components/materials;
l. Certified Material Test Reports for replacement pressure boundary materials; and
m. Copies of the
NDE required by the construction Code and the pre
-service examination records required by the ASME Code Section XI for the selected welds. 2. For the ISI
-related corrective action issues selected by the inspector from Item A.8 above, provide a copy of the corrective actions and supporting documentation.
3. For the NDE reports
with relevant indications on Code Class
1 and 2 Systems selected by the inspector from
Item A.5 above, provide a copy of
the examination records and associated corrective action documents.
4. Updated schedules for Item
A.1 (including schedule showing contingency repair plans if available).
5. Fabrication
Drawings (D size) of the reactor vessel welds (including vessel head
J-groove welds)
, if any are to be examined during the outage. Also provide any drawings used by NDE vendors to locate these welds.
6. Copy of the procedures which govern the scope, equipment used, and implementation of the inspections required to identify boric acid leakage from systems and components above the vessel head.
7. Copy of: a. Engineering evaluations/assessments of boric acid related deposits and associated wastage or corrosion for safety significant components; and
DOCUMENT REQUEST FOR INSERVICE INSPECTION
5 b. Corrective action records for coolant leakage including boric acid deposits on safety-related components identified since the beginning of the last refueling outage. 8. Copy of the plant procedures used to perform inspections to identify reactor coolant system leaks or boric acid deposits and the procedures for resolution of leaks or boric acid deposits.
9. Copy of the documents which demonstrate that the procedures to be used for volumetric examination of the reactor vessel head penetration J
-groove welds were qualified by a blind
demonstration test in accordance with 1
0 CFR 50.55a(g)(6)(ii)(D).
10. Copy of volumetric, surface and visual examination records for the prior inspection of the reactor vessel head and head penetration
J-groove welds
. 11. Provide a copy of the Electric Power Research Institute
Examination Technique Specification Sheets and vendor
related documents, which support qualification
of the ET probes to be used during the upcoming SG tube inspections
1. 12. Provide a copy of the guidance to be followed if a loose part or foreign material is identified in the SGs 1. 13. Identify the types of SG tube repair processes
, which will be implemented for defective SG tubes (including any U.S. Nuclear Regulatory Commission
reviews/evaluation/approval of this repair process).
Provide the
flaw depth sizing criteria to be applied for ET indications identified in the SG tubes
1. 14. Copy of document describing actions to be taken if a new SG tube degradation
mechanism is identified
1. 15. Provide document which defines the scope of SG secondary side examinations (if any are planned) and identify site specific operational history related to degradation of SG secondary side components (if any).
16. Provide procedures
with guidance/instructions for identifying
(e.g., physically locating the tubes that require
repair) and plugging
SG tubes 1. 17. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory Commission
inspection location for the duration of the inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the ISI Program and the Repair/Replacement
Program; b. Copy of the performance demonstration initiative (PDI) generic procedures with the latest applicable revisions that support site qualified ultrasonic examination of piping welds and components (e.g., PDI
-UT-1, PD I-UT-2, PDI-UT-3, PDI-UT-10 etc.);
1 Note 1- If no SG examinations are planned for this outage, simply indicate
when the next SG examination will occur.
DOCUMENT REQUEST FOR INSERVICE INSPECTION
6 c. Electric Power Research Institute
and industry standards referenced in the site procedures used to perform
the SG tube
ET, which includes Electric Power Research Institute
documents: S
G Examination Guidelines, SG
Integrity Assessment Guidelines, S G In-Situ Pressure Test Guidelines
1; and d. Boric Acid Corrosion Guidebook Revision 1
-Electric Power Research Institute Technical Report 1000975
. 18. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if required to access the non
-destructive examinations selected by the inspector for observation.
If you have questions regarding the information requested, please contact the lead inspector
.
1Note 1- If no SG examinations are planned for this outage, simply indicate
when the next SG examination will occur.