ML062280052

From kanterella
Revision as of 14:54, 26 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Sequoyah Nuclear Plant (Sqn) - Unit 1 Cycle 14 (U1C14) 90-Day Inservice Inspection (ISI) Summary Report
ML062280052
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/04/2006
From: Pace P L
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML062280052 (127)


Text

{{#Wiki_filter:Tennessee Valley Authodty, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 August 4, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: In the Matter of Tennessee Valley Authority))Docket No. 50-327 CYCLE 14 (UIC14) 90-DAY)RT SEQUOYAH NUCLEAR PLANT (SQN) -UNIT 1 INSERVICE INSPECTION (ISI)

SUMMARY

REP(In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Article IWA-6230, TVA is providing the SQN ISI Summary Report within 90 days from completion of the inspections performed during the UlCI4 refueling outage. The summary report contains an overview of the in-service examinations and augmented non-destructive examination results that were performed on ASME Class 1 and 2 components from November 20, 2004, to May 15, 2006. This report also contains a summary of steam generator tube examinations (Appendix A), a report of the repair and replacement activities (Appendix B), a pressure test report (Appendix C), and the IWE metal containment evaluations (Appendix D). This report completes the ASME Section XI examinations for ASME Code Class 1 and 2 components for SQN's second 10-year interval.This report does not contain TVA commitments. Please direct any questions concerning this issue to or J. D. Smith at (423) 843-6672.Sincerely, P .L .P a c eýManager, Site Licensing and Industry Affairs-Ac04 Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 August 4, 2006 Enclosures cc (Enclosures): Mr. Edgar D. Hux 94 Ridgetree Lane Marietta, Georgia 30068 Mr. Douglas V. Pickett, Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop 08G-9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. William T. Russell 400 Plantation Lane Stevensville, Maryland 21666 ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA)SEQUOYAH NUCLEAR PLANT (SQN)UNIT 1 ASME SECTION XI INSERVICE INSPECTION

SUMMARY

REPORT FROM UNIT 1 CYCLE 14 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED ASME SECTION XI INSERVICE INSPECTION

SUMMARY

REPORT FOR SEQUOYAH NUCLEAR PLANT-UNIT 1 CYCLE 1427/20oo(o DATE OF COMPLETION OF REPORT PREPARED BY REVIEWED BY REVIEWED BY REVIEWED BY APPROVED BY pSTM FGINEER, COMPONENT (ISI)-ISO NDE LEVEL III ISOISSI/UNDUPERVSOR MA"RIALS TECHNOGAND CODESI ENGINEERING PROGRAMS MANAGER/&o4 121 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED TABLE OF CONTENTS Form NIS-1 Owners Data Report Scope, Introduction and Summary of Inservice Examinations Section 1 Examination Summary 0 Examination Credit Summary* Examination Code Category and Item Number Summary Section 2 Examination Plan (Inservice Post Outage ISI Report and Preservice Report)Section 3 Summary of Notification of Indications Section 4 Additional Samples Section 5 Successive Examinations Section 6 Augmented Examinations Section 7 Analytical Evaluations Section 8 Request For Relief Appendix A Summary of Steam Generator Tubing Examinations Appendix B NIS-2 Owners Data Report For Repair and Replacement Appendix C Pressure Test Report Appendix D IWE Metal Containment Evaluations

  • .-ý o I21 Form NIS-I FORM NIS-1 OWNERS' REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1. Owner Tennessee Valley Authority, 1101 Market St. Chattanooga, TN. 37402-2801 (Name and Address of Owner)2. Plant Sequoyah Nuclear Plant, P.O. Box 2000, Soddv Daisy, Tennessee 37384-2000 (Name and Address of Plant)3. Plant Unit ONE (1)4. Owner Certificate of Authorization (if required)

Not Required 5. Commercial Service Date July 1, 1981 6. National Board Number for Unit No Number Assigned 7. Components Inspected: Component or Manufacturer Manufacturer State or National Appurtenance or Installer or Installer Province No. Board No.Serial No.Reactor Vessel Westinghouse 30616 N/A N/A Pressurizer Westinghouse 1331 N/A 68-102 See Section 2 Tennessee Valley N/A N/A N/A (Examination Plan) for Authority remaining components See Appendix C for Tennessee Valley N/A N/A N/A pressure test Authority.........Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (I) size is 8'/2 in. X I I in., (2) information in items I theough46 oritlhis report is included on each sheet, and (3) each sheet is-numbered and the.number of sheets is recorded at the top of this form.,3 cac 12-q Form NIS-I FORM NIS-1 (back)8. Examination Dates-November 20, 2004 to May 15. 2006 9. Inspection Period Identification:

10. Inspection Interval Identification:

Third Period ,Second Interval I1. Applicable Edition of Section XI 1989 Addenda N/A 12. Date/Revision of Inspection Plan: Scan Plan Revision 1, dated May 16,2006 13. Abstract of Examinations and Tests. Includes a list of examinations and tests and a statement concerning status of work required for Inspection Plan. See Introduction/Summary of Inservice Inspections. Examination status is on schedule.Examinations performed complete the third outage of the third period of the second inspection interval. This completes the examinations for the second interval.14. Abstract of Results of Examinations and Tests. See Introduction/Summary of Inservice Inspections

15. Abstract of Corrective Measures.

See Introduction/Summary of Inservice Inspections We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by ASME Code, Section Xl, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.Certificate of Authorization No. (ifapplicable) N/A I)ate 7 72 -) 6 Signed TVA Expiration Date N/A B3y 0(ft 1- -4 Owner CERTIFICATE OF INSERXVICE INSPECTION I, tile undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HISB CT of I lartford CT have inspected the components described in this Owners' Data Report during the period[zo-ar" to 5" /S--O(0 and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, and tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector now his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,jr a-0w & 0ývl ýCommissions 7_ý),*003 (_)InspectoDs Signature National Board, State, Province and Endorsements Date 7-LI' 7.7 206)(o I. o-F- 12 1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SCOPE, INTRODUCTION AND

SUMMARY

OF INSERVICE EXAMINATIONS 5 -7 121 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED Scope: This overview is for the Inservice Examinations performed during the Unit 1 Cycle 14 for Class 1 and 2 components as required by 0-SI-DXI-000-1 14.2"ASME Section Xl ISI/NDE Program Unit 1 and Unit 2", SPP-9.1 "ASME Section Xl and Augmented Nondestructive Examination Program", and IWA-6220 of ASME Section XI, 1989 Edition. This report also includes steam generator tubing eddy current examinations in Appendix A, repairs and replacements performed in Appendix B, pressure test examinations in Appendix C, and the IWE metal containment evaluations in accordance with 10CFR 50.55a(b)(2)(ix) in Appendix D. This report completes the ASME Section Xl examinations for the ASME Code Class 1 and 2 components for the second 10 year interval.Introduction: The code of record for the second inspection interval which began December 16, 1995, is the 1989 Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Division 1. Starting April 12, 2002 the NDE techniques, qualification of personnel, weld reference system, and standards for examination are in accordance with 1995 Edition of ASME Section XI through the 1996 Addenda.The Unit 1 Cycle 14 inservice examinations were performed during the period from November 20, 2004 to May 15, 2006. This report also includes repairs and replacements and pressure tests performed during this period. The Unit 1 Cycle 14 Refueling Outage began when the generator was taken off line on April 10, 2006. The outage was completed on May 15, 2006, when the generator was tied to the power grid. The inservice examinations, which include risk-informed inservice inspection examinations were, performed to the implementing plant Surveillance Instruction, 0-SI-DXI-000-1 14.2, "ASME Section Xl ISI/NDE Program Unit 1 and Unit 2" revisions 21 thru 28. The steam generator tubing eddy current examinations are discussed in Appendix A. Repairs and replacements are discussed in Appendix B. Pressure test examinations are discussed in Appendix C. The IWE metal containment evaluations are discussed in Appendix D. Examinations performed during this cycle satisfy the inspection requirements for the third outage of the third period of the Second 10 Year Inspection Interval as defined in 0-SI-DXI-000-1 14.2.(V C)f/ 2- L OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED The Authorized Inspection Agency (AIA), Hartford Steam Boiler Inspection and Insurance Company of Connecticut (HSB CT), provided the following ANIls: Jim Myhan HSB CT 200 Ashford Center North, Suite 205 Atlanta, Georgia 30338-4860 Summary: The Unit 1 Cycle 14 refueling outage was the third scheduled refueling outage during the third inspection period of the second Ten Year ISI Interval. Class I and 2 components were examined in accordance with 0-SI-DXI-000-1 14.2,"ASME Section XI ISI/NDE Program Unit 1 and Unit 2". A summary listing of examinations performed for code credit are listed in SECTION 1. The examinations were performed to TVA approved procedures. The class 1 and 2 components examined and results for this inservice inspection outage are listed in SECTION 2. There were three Notice of Indications generated for ASME Section XI, Class 1 and 2 examinations. See SECTION 3 for the notice of indications summary. See SECTION 4 for the additional samples summary.See SECTION 5 for the successive examinations summary. Regulatory required augmented examinations on the reactor vessel cladding were performed which require submittal to the regulatory authority (Reference SECTION 6). There were no ASME Class 1, 2, or 3 equivalent components for which examination results required acceptance by analytical evaluation (IWB-3132.4, IWB-3142.4, IWC-3122.4, IWC-3132.4 or IWD-3000) (Reference SECTION 7). There were ten components that did not receive the code required examination coverage (see SECTION 8).For Unit 1 Cycle 14 there were no steam generator tubing eddy current examinations performed see Appendix A.For repairs and replacements performed see Appendix B.For Unit 1 Cycle 14 pressure test results see Appendix C.For Unit 1 Cycle 14 IWE metal containment evaluations see Appendix D.7 o4 l2ý OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SECTION 1 EXAMINATION

SUMMARY

  • Examination Credit Summary" Examination Code Category and Item Number Summary 2, OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION:

NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

The examinations as required by the inspection plan for the third outage of the third period of the second inspection interval were completed as scheduled.The examination category and number of examinations for the second inspection interval and the third period for the following summary are based on 0-SI-DXI-000-114.2 revision 28. This outage completes the examinations for the second 10 year interval. OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY. TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (UIC14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL CATEGORY TOTAL TOTAL TOTAL TOTAL TOTAL EXCLUSIONS NUMBER NUMBER NUMBER NUMBER NUMBER EXCEPTIONS REQUIRED CREDITED REQUIRED CREDITED CREDITED OR FOR FOR THE FOR FOR THE FOR U1C14 DEFERRALS INTERVAL INTERVAL THIRD THIRD OF THE PERIOD PERIOD THIRD (U1C12, (U1C12, PERIOD U1C13 and U1C13 and U1C14) U1C14)B-A 14 14 13 13 13 deferral permissible B-B 5 5 2 2 0 B-D 36 36 24 24 16 Code Cases seepnote 12 see notes 12 see note 19 see note 19 see note 19 N-521 and 19 N-648-1 B-E See see note 31 see note 31 Appendix C B-F 22 4 N/A N/A N/A Code Case see note 11 see note 11 see note 11 see note 11 see note 11 N-521.B-G-1 RV (216) RV (216) RV (72) RV (72) RV (0) RCP only when B-L-2 RCP (25) RCP (25) RCP (0) RCP (0) RCP (0) examination see note 10 performed B-G-2 PZR (1) PZR (1) PZR (0) PZR (0) PZR (0) valves when B-M-2 SG (2) SG (2) SG (1) SG (1) SG (0) examination see note 20 see note 20 see note 20 performed or in RCP (2) RCP (2) RCP (0) RCP (0) RCP (0) place during Valves (6) Valves (6) Valves (2) Valves (2) Valve (2) cycle .14 see notes 1, 34, see notes 34, 35 35 and 36 and 36 Piping (13) Piping (13) Piping (6) Piping(6 )B-H, see B-K of Code Case N-509 B-i 261 81 N/A N/A N/A see notes 2, 11 see notes 3, 11 see note 11 see note 11 see note 11 and 27 and 13 _/0 4?/21t OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (UIC14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued) CATEGORY TOTAL TOTAL TOTAL TOTAL TOTAL EXCLUSIONS NUMBER NUMBER NUMBER NUMBER NUMBER EXCEPTIONS REQUIRED CREDITED REQUIRED CREDITED CREDITED OR FOR FOR THE FOR FOR THE FOR U1C14 DEFERRALS INTERVAL INTERVAL THIRD THIRD OF THE PERIOD PERIOD THIRD (U1C12, (U1C12, PERIOD U1C13 and U1C13 and ULC14_ U1C14) _ _ _ _ _ _B-K-l, see B-K of Code Case N-509 B-K of 7 7 3 3 0 Code Case N-509 B-L-1 per 1 -internal 1 (internal deferral Code Case surface when surface) permissible: examine N-481 disassembled only if pump 1 -external 1- external 1- external 1- external disassembled 1-external surface surface surface surface surface _ see note 18 B-L-2 1 0 0 0 deferral permissible: examine only if pump disassembled B-M-1 N/A B-M-2 6 5 2 1 1 deferral see note 32 see note 32 see note 32 permissible: examine only if valve_ _ _disassembled, B-N-1 1 each period 1 (first period) 1 (third period) 1 (third period) 1 (third period)1 (second 'period)1 (third period)B-N-2 6 6 6 6 6 deferral SI_ I_ I permissible B-N-3 1 1 1 deferral permissible // 6-, 12 q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (UIC14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued) CATEGORY TOTAL TOTAL TOTAL TOTAL TOTAL EXCLUSIONS NUMBER NUMBER NUMBER NUMBER NUMBER EXCEPTIONS REQUIRED CREDITED REQUIRED CREDITED CREDITED OR FOR' FOR THE FOR FOR THE FOR U1C14 DEFERRALS INTERVAL INTERVAL THIRD THIRD OF THE PERIOD PERIOD THIRD (U1C12, (U1C12, PERIOD ULC13 and U1C13 and UC14) U1C14)B-O 2 2 2 2 2 deferral, permissible B-P, see Appendix C B-Q, see Appendix A C-A 19 19 8 8 3 see notes 4, 14 see note 14 and 21 C-B 14 14 6 6 3 see note 4 and see note 15 see note 15 see note 15 see note 15 15 C-C see C-C of Code Case N-509 C-C of 31 31 14 14 2 Code Case see note 4, 16 N-509 and 17 C-D 1 1 0 0 0 C-F-1 143 45 N/A N/A N/A see notes 5, 9 and 11 see note 11 see note 11 see note 11 see note 11 C-F-2 29 9 N/A N/A N/A see note 11 see note 11 ee note 11 see note 11 see note 11/17 -0/24 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (UIC14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued) CATEGORY TOTAL TOTAL TOTAL TOTAL TOTAL EXCLUSIONS NUMBER NUMBER NUMBER NUMBER NUMBER EXCEPTIONS REQUIRED CREDITED REQUIRED CREDITED CREDITED OR FOR FOR THE FOR FOR THE FOR U1C14 DEFERRALS INTERVAL INTERVAL THIRD THIRD OF THE PERIOD PERIOD THIRD (U1C12, (U1C12, PERIOD U1C13 and U1C13 and U1C14) U1C14)C-G N/A C-H, see Appendix C F-A see F-A of Code Case N-491 F-A of 195* 195 70 70 3 Code Case *Class 1 N-491 and 2 only see notes 4, 7 see notes and 22 6, 8 and 23 R-A 70 49 24 24 8 R1.11 (UT) Elements (49 required for see notes 25 the 2nd and and 33 3rd periods)see notes 11 and 24 R-A 50 All each See See See R1.11 (VT) Segments refueling Appendix C Appendix C Appendix C see notes 11 and 28 outage R-A 29 All each See See See R1.12(VT) Segments refueling Appendix C Appendix C Appendix C see notes 11 outage and 29 outage R-A N/A R1.13 R-A N/A R1.14 1 _ _ 1 _L I/3 0 /12 1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (U1C14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued) CATEGORY TOTAL TOTAL TOTAL TOTAL TOTAL EXCLUSIONS NUMBER NUMBER NUMBER NUMBER NUMBER EXCEPTIONS REQUIRED CREDITED REQUIRED CREDITED CREDITED OR FOR FOR THE FOR FOR THE FOR U1C14 DEFERRALS INTERVAL INTERVAL THIRD THIRD OF THE PERIOD PERIOD THIRD (U1C12, (ULC12 and PERIOD UlC13and U1C13)R-A N/A R1.15 R-A 6 Elements 1 -second period 2 2 0 R1.16 (3 total 2-third period required for the 2nd and see note 30 3rd periods)see notes 11, 26 and 30 R-A N/A R1.17 R-A 16 As As As As R1.18 Segments scheduled scheduled scheduled scheduled see note 11 in FAC in FAC in FAC in FAC program program program program (3 segments examined)Notes: 1. Credit taken only for the studs on valve 63-632 examined in examination category B-G-2 during U1C8. PSI was performed on the new super nuts.2. Piping modification in U1C10 of the second period added 12 examination category B-J welds to the total number required for the interval increased from 247 to 259.3. Due to piping modifications in the second period and the increase in the total number of welds required for examination in examination category B-J for the interval these welds were added over the three periods -(4) first, (3) second, (5) third. The 4 welds in the first period are counted as credit for the interval./ I o-P 12 q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (U1C14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued)

4. Containment spray heat Exchanger 1 B was replaced in U 1 C9 of the first period and the totals for examination category C-A increased from 17 to 20, examination category C-B increased from 12 to 14, examination category C-C increased from 28 to 29, and examination category F-A increased from 203 to 204 in the U1C9 report 5. Use of code paragraph IWC-1 221 (e) reduced the total number required for examination in examination category C-F-1 from 146 to 142 in the U1C9 report.6. Removed from credit 2 supports (1-SIH-031 and 1-SIH-160) reported in examination category F-A in UlC8 in the U1C9 report.7. Due to the support modifications in the second period, the total number of required examinations in examination category F-A for the interval decreased from 204 to 202 during U1C10 in the U1C10 report.8. Removed from credit one support in examination category F-A (1-SIH-065) in the first period due to its removal in U1C10 in the U1C10 report.9. Due to piping modification in the second period, the total number of required examinations in examination category C-F-1 increased by one weld for the interval from 142 to 143 in the U1C10 report.10. Increased total number of examinations in examination category B-G-1 for RCP from 24 to 25 in the U1C10 report to include the examination of the RCP flange surface when the connection is disassembled.
11. The RI-ISI Program was approved for the second and third periods for examination categories B-F, B-J, C-F-i, and C-F-2. The RI-ISI examinations are performed under examination category R-A item numbers R1.11, R1.12, R1.16 and R1.18. There were no examinations performed in the first period for examination category R-A.12. For examination category B-D, item number B3.140, Steam Generator Primary Side Nozzle Inside Radius Section, two examinations that were originally scheduled for the second period were not required to be examined due to replacement of the steam generators in the third period, (see request for relief 1-ISI-16).

Added two welds to the total number credited for the interval in U1C12 for interval tracking.13. Removed from credit two welds in examination category B-J in the second period UlC1l report due to implementation of the RI-ISI program in the second and third periods.15 z /2,q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (UIC14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued)

14. For examination category C-A, item number C 1.10, Steam Generator Pressure Retaining Shell Circumferential Welds, the one weld scheduled for the second period was not required to be examined due to the replacement of the steam generators in the third period, (see request for relief 1-1S1-16).

Added one weld to the total number credited for the interval in U1C12 for interval tracking.15. The nozzle-to vessel weld examination, Examination Category C-B, Item Number C2.20, .for the residual heat removal (RHR) heat exchanger will be used to satisfy the Item Number C2.21 RHR heat exchanger nozzle inside radius section examination. See request for relief 1-1S1-15. Two RHR heat exchanger nozzle inside radius sections were added to the total number of examinations credited for the interval for tracking. This includes one examination for the second period and one examination for the third period.The RHR nozzle inside radius sections were not examined per request for relief 1-ISI-15. These were added to the totals for tracking. The three examinations listed for Examination Category C-B in the U1C14 outage includes two RHR heat exchanger nozzle to vessel examinations that were performed and one RHR heat exchanger nozzle inside radius section examination that was not performed, but was added for tracking. The six examinations listed for Examination Category C-B in the third period includes five RHR heat exchanger nozzle to vessel examinations that were performed and one RHR heat exchanger nozzle inside radius section examination that was not performed, but was added for tracking. The total number of fourteen examinations listed for Examination Category C-B for the interval includes twelve examinations that were performed and two RHR heat exchanger nozzle inside radius section examinations that were not performed, but were added for tracking.16. Increased total number of examination category C-C examinations required for the interval from 29 to 31 to correct number of integrally welded attachments in the Ul Cl I report.17. Removed from credit one integrally welded attachment (1-CVCH-560-IA) reported in examination category C-C in U1C10 in the UlC1 1 report./& c ~/ 21 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA. TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (U1C14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued)

18. RCP # 4 internal casing surface was examined during UICl 1 forced outage per Code Case N-481; the evaluation report for part (d) of Code Case N-481 has previously been submitted in the Unit 1 Cycle 6 report for part (e) of Code Case N-481.19. Replacement steam generator preservice examinations are being credited for the period on the primary side nozzle inside radius section (4 welds, on 2 steam generators)
20. Replacement steam generator preservice examinations are being credited for the period on the primary pressure retaining bolting, credited one steam generator manway 21. Due to the steam generator replacement in U 1 C 12 the number of examination category C-A for the interval changed from 20 to 19 in the U 1 C 12 report.22. Due to support modifications the number of examinations required for the interval for examination category F-A changed from 202 to 195 in UIC12.23. Due to support modifications one support credited during the interval in the second period for credit is being removed from credit due to the deletion of the support in U1C12 in the UIC12 report.24. Examination category R-A item number R1 .1.1 examinations for the second period was 75, but was revised by the periodic update to 70 in the U1C12 report.25. For examination category R-A, the number of welds credited in the second period was 25 welds.26. Examination category R-A, item number R1.16 for the total number examinations required for the interval in the second period was 3, but was revised by the periodic update to 6 in the U1C12 report./I7 ck/ 2 'q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION:

NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CREDIT

SUMMARY

ASME SECTION XI EXAMINATIONS FOR THE THIRD OUTAGE (U1C14) OF THE THIRD PERIOD OF THE SECOND TEN-YEAR INSPECTION INTERVAL (continued)

27. Examination category B-J examinations changed from 259 to 261 for total number required for the interval due to the steam generator replacement in the UIC12 report.28. Examination category R-A, item number R1.11 (VT) examinations for the second period was 62 segments, but was revised by the periodic update to 50 segments in the U1C12 report.29. Examination category R-A, item number R1.12 examinations for the second period was 34 segments, but was revised by the periodic update to 29 segments in the UIC12 report.30. Due to the changes in the RI-ISI program for the periodic update the examinations category R-A, item number R1.16 the number required for credit for the second interval was 3.31. Examination category B-E, was moved to Appendix C in the U1 C1 3 report.32. Only 5 of the 6 groups had a valve disassembled in the second interval.33. Examination category R-A, item number R1. 11, the number of welds credited in the third period was 24.34. Valve 63-632 bolting B-G-2 was examined in U1C14. Credit had been taken for the bolting (studs) in U1C8 (see note 1).35. Valve FCV-74-2 bolting was examined in place in U1C14.36. Valve 63-641 bolting was examined when disassembled in U1C14./ 6a( /> z 9 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION:

NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

cc izz1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT 1 CYCLE 14 CLASS I COMPONENTS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER Reactor Vessel Shell Welds- UT B-A B1.11 4 Circumferential Reactor Vessel Head Welds (Closure UT B-A B1.21 2 and Lower)Reactor Vessel Head welds UT B-A B1.22 6 (Meridional) Reactor Vessel Shell to Flange Weld UT B-A B1.30 1 Reactor Vessel Inside Radius Section VT-1 B-D B3.100 8 Code Case N-648-1 Reactor Vessel Nozzle to Vessel UT B-D B3.90 8 Welds RHRS Valve Bolting <= 2" in Diameter VT-1 B-G-2 B7.70 2 SIS Valve Bolting <= 2" in Diameter VT-1 B-G-2 B7.70 see note 1 RCP Casing Weld VT-1 B-L-1 B12.10 1 Code Case N-481 RHRS Valve Body Interior Surface VT-3 B-M-2 B12.50 1 Reactor Vessel Interior Accessible VT-3 B-N-1 B13.10 1 Areas Reactor Vessel Interior Attachments VT-3 B-N-2 B13.60 6 Beyond Beltline Region Reactor Vessel Core Support VT-3 B-N-3 B13.70 1 Structure Accessible Surfaces Reactor Vessel Welds in CRD UT B-0 B14.10 2 Housing Reactor Vessel Class 1 Equipment VT-3 F-A F1.40 1 Support I I Note: 1. Valve 63-632 bolting B-G-2 credit had super nuts taken in U1C14.been taken on the studs in UlC8 and credit for 2o C)~ I(ý12 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT I CYCLE 14 CLASS 2 COMPONENTS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER CSS Heat Exchanger 18-B UT C-A C1.10 2 CSS Heat Exchanger 1B-B UT C-A C1.30 1 CSS Heat Exchanger 11B-B UT/PT C-B. C2.21 2 RHRS Heat Exchanger see note 1 C-B C2.21 1 see note 1 CSS Heat Exchanger 1A-A MT C-C C3.10 1 CSS Heat Exchanger lB-B PT C-C C3.10 1 CSS Heat Exchanger 1A-A and 11B-B VT-3 F-A F1.40 2 Note 1. See Examination Credit Summary note 15, one insided radius section was added for tracking.21 ! /a OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT I CYCLE 14 CLASS I AND 2 RI-ISI COMPONENTS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER RV Piping Welds UT R-A R1.11 8 SGBS FAC Piping Areas UT-THK R-A R1.18 1 FWS FAC Piping Areas UT-THK R-A R1.18 2 22. e /2?-- OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT I CYCLE 14 STEAM GENERATORS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER TUBING

  • ET B-Q B16.20* See Appendix A for Summary of Steam Generator Eddy Current Examinations.

During UIC14 there were no examinations performed on the tubing.23 i2q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT I CYCLE 14 PRESSURE TESTS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER PRESSURE TEST* VT-2 * ** See Appendix C for Summary of Pressure Tests.1- 2'4 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMINATION CODE CATEGORY AND ITEM NUMBER

SUMMARY

ASME SECTION XI CREDIT UNIT 1 CYCLE 14 SUCCESSIVE EXAMINATIONS COMPONENTS COMPONENT EXAM CODE CODE Total METHOD CATEGORY ITEM NUMBER SIS Class 2 Supports-Function B VT-3 F-A F1.20B 1 CVCS Class 2 Supports-Function C VT-3 F-A F1.20C 1 SG Class 1 SG Supports VT-3 F-A F1.40 2 SG Class 2 SG Supports VT-3 F-A F1.40 1 RHRS Class 2 Valves Supports VT-3 F-A F1.40 1 2's cli / - OWNER: TENNESSEE VALLEY AUTHORITY 1101 MARKET STREET CHATTANOOGA, TENNESSEE 37402-2801 UNIT: ONE COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED PLANT: SEQUOYAH NUCLEAR PLANT P.O. BOX 2000 SODDY DAISY, TENNESSEE 37384-2000 CERTIFICATE OF AUTHORIZATION: NOT REQUIRED SECTION 2 EXAMINATION PLAN (POST OUTAGE INSERVICE REPORT AND PRESERVICE REPORT)2 o 1- ,Z4 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED This Section contains a standardized Post Outage ISl Report to satisfy the Reporting Requirements of IWA-6000 of the ASME Section Xl Code. This report contains the inservice and preservice inspection data for Class 1 and 2 components defined in O-SI-DXI-000-114.2, "ASME Section Xl ISI/NDE Program Unit 1 and Unit 2".For Unit 1 Cycle 14 no steam generator tubing eddy current examination were performed see Appendix A.For Unit 1 Cycle 14 system pressure testing results see Appendix C.2 ?7 o-:/z4 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED POST OUTAGE INSERVICE REPORT e?7 ,4/ Zq OWNER: TENNESSEE VALLEYAUTIIO! NUCLEAR POWER GROUP 1101 MARKET STREET CHlATTANOOGA, TENNESSEE EXAM REQUIREMENT: 89E-02 UNIT: I CYCLE: 14 m Component ISO Catego Number Drawing RITY PLANT: SEQUOVAII NUCLEAR PLANT P.O. BOX 2000 SODDY DAISY, TENNESSEE 37384-2000 37402 CERTIFICATION OF AUTIIORI7ATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY I, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIREI)Syste ry Iter Num m Exam NDE Calibration Exam Exam Exam NOI Comments'ber Scheduled Procedure Standard Date Report Results Number RV RV RV RV RV RV RV RV'N) RV RV RV RV RV RV RV RV RV RV RV W02-03 W03-04 W04-05 W05-06 W01-02 W09-10 W2A W2B W2C W2D W2E W2F W06-07 NiI-IR N12-IR N13-IR N14-IR N15-IR N16-IR ISI.0504-C-02 ISI-0504-C-02 ISI.0504-C-02 IS1-0 504-C-02 IS1-0 504-C-02 ISI-0504-C-09 ISI-0504-C-02 ISI-0 504-C-02 ISI-0504-C-02 IS I-C504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 ISI-0504-C-02 B-A B-A B-A B-A B-A B-A B1.11 81.11 B1.11 B1.11 B1.21 B1.21 UT UT UT UT UT UT B-A 8-A B-A B-A B-A B-A B-A B-D B-D B-D B-D B-D B-D 81.22 B1.22 BI.22 BI.22 81.22 81.22 81.30 B3.100 83.100 B3.100 83.100 83.100 83.100 UT UT UT UT UT UT UT VT-1 VT.1 VT-1 VT-i VT-1 VT-1 VENDOR SO-43 20060426 R-8386 VENDOR SQ-44 20060425 R-8386 VENDOR S0-44 20060429 R-8386 VENDOR SO-44 20060426 R-8386 SQ-45 VENDOR S0-43 20060427 R-8386 N-UT-78 SQ-46 20060423 R-8365 VENDOR S0-43 20060427 R-8386 SQ-45 VENDOR SQ-43 20060427 R-8386 SQ-45 VENDOR SQ-43 20060427 R-8386 S0-45 VENDOR SQ-43 20060427 R-8386 SQ-45 VENDOR SQ43 20060427 R-8386 S045 VENDOR SQ-43 20060427 R-8386$0-45 VENDOR SQ.45 20060427 R-8386 N.VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 N-VT-8 20060428 R-8379 Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 THIS WELD HAD A FLAW (W09-10B-FLAW) THAT WAS PREVIOUSLY EXAMINED FOR THREE SUCCESSIVE INSPECTION PERIODS AND REMAINED ESSENTIALLY UNCHANGED. 95% EXAMINATION COVERAGE ACHIEVED.REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-00

1.0 REFER

TO PROCEDURE 1.V1-ISI-068-001.0 REFER TO PROCEDURE 1-V.-ISI-068-001.0 REFER TO PROCEDURE 1-V1-ISI-068-001.0 REFER TO RFR PDI-4, L44050808030 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 ENHANCED VT-1 EXAMINATION PER CODE CASE N-648-1 RV N17-IR ISI-0504-C-02 B-D B3.100 VT-1 07/19/2006 NIS-I Page 1 OWNER: TENNESSEE VALLEY AUTHORITY NUCLEAR POWER GROUP 1101 MARKET STREET CI IAiTANOOGA, TENNESSEE 37402 EXAM REQUIREMENT: 89E-02 UNIT: I CYCLE: 14 CO.%I PLANT: SEQUOYAII NUCLEAR PLANT P.O. BOX 2000 SODDY DAISY, TENNESSEE 37384-2000 CERTIFICATION OF AUTilORIZATION: NOT REQUIRED IERCIAL SERVICE DATE: JULY I. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIREI)System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results Number RV N18-IR ISI-0504-C-02 B-D 83.100 VT-1 N-VT-8 20060428 R-8379 Passed ENHANCED VT-1 EXAMINATION PER CODE RV RV RV RV RV RV RV RV RHRS Nl1 N12 N13 N14 N15 N16 N17 N18 63-641-BC ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D ISI-0504-C-02 B-D CHM-2336-C-06 B-G-2 83.90 8390 83.90 8390.83.90 83.90 83.90 83.90 87.70 UT UT UT UT UT UT UT UT VT-i VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR N-VT-1 SQ-53 SO-53 S0-53 SQ-53 SQ-53 S0-53 SO-53 SO-53 RHRS FCV-74-2-BC SIS 63-632-BC W cj RCP RHRS RV* RV t' RV RV RV RV RV RV RV RV RV RCW-RCP-4 63-641 RVINT RVINT RVIA-1 RVIA-2 RVIA-3 RVIA.4 RVIA-5 RVIA-6 RVCSUPST RVCSUPST CRDW-62 CHM-2336-C-01 B-G-2 87.70 CHM-2333-C-10 B-G-2 87.70 IS"-0325-C-02 B-L-1 812.10 CHM-2336-C-06 B-M-2 .812.50 ISI-0504-C-03 B-N-1 B13.10 ISI-0504-C-03 B-N-1 813.10 ISI-0504-C-03 B-N-2 813.60 ISI-0504-C-03 B-N-2 813.60 ISI-0504-C-03 B-N-2 813.60 ISI-0504-C-03 B-N-2 813.60 ISI-0504-C-03 B-N-2 81360 ISI-0504-C-03 B-N-2 813.60 ISI-0504-C-03 B-N-3 B13.70 ISI-0504-C-03 B-N-3 813.70 ISI-0504-C-10 B-0 814.10 ISl-0504-C-10 B-0 814.10 ISI-0462-C-02 C-A C1.IO ISI-0462-C-02 C-A C1.10 ISI-0462-C-02 C-A C1.30 VT-1 N-VT-1 VT-1 N-VT-1 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060429 R-8386 20060420 R-8360 20060422 R-8358 20060419 R-8359 20060421 R-8357 20060419 R-8378 20060421 R-8355 20060428 R-8380 20060428 R-8381 20060428 R-8381 20060428 R-8381 20060428 R-8381 20060428 R-8381 20060428 R-8381 20060421 R-8356 20060428 R-8382 Passed Passed Passed Passed Passed Passed Passed Passed Passed Failed VT-1 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 CASE N-648-1 REFER TO PROCEDURE I-V1-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE i-Vi-ISl-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 REFER TO PROCEDURE 1-VI-ISI-068-001.0 PERFORM WHEN REMOVED. REF WO#05-776060-000 I-SO-472 N-VT-1 N-VT-1 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 N-VT-8 Passed EXAMINED SUPER NUTS FOR CREDIT.(COMMENT ADDED TO DATABASE ON 6-27-06.)Passed CODE CASE N481, EXTERNAL SURFACE Passed WO# 05-776060-000 Engineering 1-SQ-469 SEE REPORT R-8380 Passed SEE REPORT R-8355 Passed Passed Passed Passed Passed Passed Engineering 1-SQ.470 SEE REPORT R-8382 Passed SEE REPORT R-8356 Passed Passed Passed Passed Passed RV CRDW-74 CSS CSHXW-5-8 CSS CSHXW-9-B CSS CSHXW-8-B UT N-UT-18 SO-82 20060423 R-8366 SQ-83 UT N-UT-18 SO-82 20060423 R-8377 SO-83 UT N-UT-18 S-15 20060322 R-8308 UT N-UT-18 SO-104 20060320 R-8305 UT N-UT-18 S0-105 20060320 R-8304 07/19/2006 NIS-! Page 2 07/19/2006 NIS-1 Parge 2 OWNER: TENNESSEE VALLEY AUTIIORITY PLANT: SEQUOYA11 NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000 1101 MARKET STREET SODDY DAISY, TENNESSEE 37384-2000 CIIA'rrANOOGA, TENNESSEE 37402 CERTIFICATION OF AUTIIORIZ'ATION: NOT REQUIRED EX.\M REQUIREMENT: 89E-02 UNIT: I CYCLE: 14 COMMERCIAL SERVICE DATE: JULY I, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing " Number Scheduled Procedure Standard Date Report Results Number CSS CSS CSS csS CSS CSS CSS CSS RV CSHXW-6-B CSHXW-6-B CSHXW-7-B CSHXW-7-B CSHXH-A-I-IA CSHXH-B-2-1A CSHXH-A-1 CSHXH-B-2 RVH-1 ISI-0462-C-02 ISI-0462-C-02 IS 1-04 62-C-02 IS 1-04 62-C-02 ISI-0462-C-Oi ISI-0462-C-02 ISI-0462-C-01 ISI-0462-C-02 ISI-0504-C-04 (jRV RV RV t RV NRV RV RV RV RV FWS FWS SGBS RC-01-SE RC-08-SE RC-09-SE RC-16-SE RC-17-SE RC-24-SE RC-25-SE RC-32-SE FW-005 SEGMENT FW-010 SEGMENT BD-010 SEGMENT ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 ISI-0504-C-03 FAC PROGRAM FAC PROGRAM FAC PROGRAM C-B C-B C-B C-B C-C C-C F-A F-A F-A R-A R-A R-A R-A R-A R-A R-A R-A R-A R-A R-A R1.1i RI.11 R1.11 R1.11 R1.11 R1.11 111.11 R1.11 R1.18 R1.18 R1.18 C2.21 C2.21 C2.2i C2.21 C3.10 C3.1i0 Fi.40E1 Fi.40E1 F1.40E4 PT UT PT UT MT PT VT-3 VT-3 VT-3 UT UT UT UT UT UT UT UT UT-THK UT-THK UT-THK N-PT-9 N-UT-18 N-PT-9 N-UT-18 N-MT-6 N-PT-9 N-VT-1 N-VT-1 N-VT-1 VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR VENDOR N-UT-26 N-UT-26 N-UT-26 20060421 20060422 20060422 20060422 20060422 20060422 20060422 20060422 20060421 20060418 20060415 20060321 BNP-17 20060323 20060321 BNP-17 20060323 20060430 20060323 20060430 20060323 20060413 R-8291 R-8309 R-8292 R-8310 R-8385 R-8293 R-8384 R-8290 R-8316 R-8386 R-8386 R-8386 R-8386 R-8386 R-8386 R-8386 R-8386 R-8362 R-8353 R-8352 Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed ALSO EXAMINE FOR BORIC ACID CORROSION, PREPARE SPP-9.7-3 FORM IF NEEDED REFER TO PROCEDURE l-VI-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE I1VI-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE I-VI-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE 1-V1-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE I-VM-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L29 050322 800 REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L29 050322 800 INSPECTION LIST NUMBER 03-10, ID#103BT177 INSPECTION LIST NUMBER 03-11, ID#103BE222 INSPECTION LIST NUMBER 05-04, ID# 115N219 SEE RFR 1-ISI-14 (144991006005) SEE RFR 1-ISI-14 (L44991006005); 68.4%EXAMINATION COVERAGE ACHIEVED SEE RFR I-ISI-14 (L44991006005) SEE RFR 1-ISI-14 (L44991006005); 68.4%EXAMINATION COVERAGE ACHIEVED N/A N/A NIA S-. ---.. ---. -. ~- -~. -~. -'-~.- ~ -~ ~07/19/2006 NIS-I Page 3 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED POST OUTAGE PRESERVICE REPORT OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAII NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000 S1101 MARKET STREET SODDY DAISY, TENNESSEE 37384-2000 CIIATfANOOGA, TENNESSEE 37402 CERTIFICATION OF AUTIIORIZATION: NOT REQUIRED EXAM REQUIRIEMENT: i'08-02 UNIT: I CYCLE: 14 COMMERCIAL SERVICE DATE: JULYI , 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results Number RHRS 63-641-BC CHM-2336-C-06 8-G-2 07.70 VT-1 N-VT-1 20060418 R-8336 Passed 12 SUPERNUTS & 12 WASHERS; WO#05-776060-000 SIS 63-633-BC CHM-2333-C-09 8-G-2 87.70 VT-1 N-VT-1 20060418 R-8337 Passed 12 SUPERNUTS & 12 WASHERS; WO# 05.779154-000 SIS 63-634-BC CHM-2333-C-10 B-G-2 87.70 VT-I. N.VT.1 20060418 R-8338 Passed 12 SUPERNUTS & 12 WASHERS; WO# 04.783562-000 0 N 0711912006 NIS-1 Page)07/19/2006 NIS-I Page I OWNER: TENNESSEE VALLEY AUTIHORITY PLANT: SEQUOYA1l NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000 1101 MARKET STREET SODI)Y DAISY, TENNESSEE 37384-2000 CHlAT'TANOOGA, TENNESSEE 37402 CERTIFICATION OFAUTIIORIZ7ATION: NOT REQUIRED EXAM REQUIREMENT: R04-02 UNIT: I CYCLE: 14 COM\IERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Component ISO Category Item Exam NDE -Caibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results Number RHRS FCV-74-2-BC CHM-2336-C-01 B-G-2 B7.70 VT-1 N-VT-1 20060429 R-8383 Passed EXAMINATION AFTER REMOVING LEAKAGE BUILDUP; NOI 1-SQ-472 W~-4\..a.s~,......... ~ ' a.e..4.aa.&.t4AA....... .a Lia....ALL~...at.aa.s4-e~A.....*I.sb.AaAa..aJ...aat~..L~,j- ~ ~-,---.07119/2006 NIS-I Page 1 07/19/2006 NIS-I Page I OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SECTION 3

SUMMARY

OF NOTIFICATION OF INDICATIONS 2-s~ /2 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED

SUMMARY

OF NOTIFICATION OF INDICATIONS The Unit 1 Cycle 14 Inservice Inspection of Class 1 and 2 components at Sequoyah Nuclear Plant included a total of three Notification of Indications (NOls) identified during inservice examinations. The following is a listing of the NOIs and a brief summary of the corrective measures taken for each. OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED

SUMMARY

NOTIFICATION OF INDICATIONS IDENTIFIED DURING INSERVICE EXAMINATIONS ON CLASS I AND 2 COMPONENTS NOI COMPONENT DISCREPANCY WORK RE-EXAMINATION NUMBER IDENTIFIER INSTRUCTION 1-SQ-469 RVINT Gouging on the No actions No re-examination outlet nozzle (N-18) required required Class 1 mating surface I _(VT-3)DISPOSITION:

The relevant conditions renorted did not exceed the acceptance criteria of IWB-3520.2 DISPOSITION:.TReferelevancetA.... (Wesin document diR ............... D.a c......Reference TVA-06-34 (Westinghouse document LTR-RIDA-06-29) 1-SQ-470 RVSUPST Gouging on the No actions No re-examination outlet mating required required Class 1 surface at RV nozzle N-18 (VT-3) I I DISPOSITION: The relevant conditions reported did not exceed the acceptance criteria of IWB-3520.2. Reference TVA-06-34 (Westinghouse document LTR-RIDA-06-29) 1-SQ-472 FCV-74-2-BC Coolant leakage WO# Yes buildup around the 06-773568-000 R-8383 Class 1 bolting (VT- 1)DISPOSITION: Bolting cleaned and re-examined. 37 o4 1/2'1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SECTION 4 ADDITIONAL SAMPLES 3~ 8 o4:/2/ OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED ADDITIONAL SAMPLE

SUMMARY

There was one examination requiring an additional sample for Unit 1 Cycle 14.3cJ C OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED ADDITIONAL SAMPLE

SUMMARY

ADDITIONAL SAMPLE

SUMMARY

CODE SYSTEM ORIGINAL REPORT NUMBER OF COMPONENTS REFERENCE COMPONENT EXAM EXAMINED REQUIREMENT REFERENCE B-G-2 RHRS FCV-74-2-BC A09-02 1 Valve B7.70 FCV-74-1-BC DESCRIPTION: Notification of indication number 1-SQ-472, first additional sample per IWB-2430.-ý C) 0-ý- /a I OWNER: TENNESSEE VALLEY AUTIIORITY PLANT: SEQUOYAII NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000.1101 MARKET STREET SODDY DAISY, TENNESSEE 37384-2000 CIIATrANOOGA, TENNESSEE 37402 CERTIFICATION OF AUTIIORIZATION: NOT REQUIRED EXAM REQUIREMENT: A09-02 UNIT: I CYCLE: 14 CO31.%IERCIAL SERVICE DATE: JULY I, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results Number RHRS FCV-74-1-BC CHM-2336-C-01 B-G-2 B7.70 VT-1 N-VT-I 20060425 R-8363 Passed ADDITIONAL SAMPLE FOR NOI 1-SO-472 0-f-I 07119/2006 NIS-I lPage I OWNER: TENNESSEE VALLEY AUTHORITY 1101 MARKET STREET CHATTANOOGA, TENNESSEE 37402-2801 UNIT: ONE COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED PLANT: SEQUOYAH NUCLEAR PLANT P.O. BOX 2000 SODDY DAISY, TENNESSEE 37384-2000 CERTIFICATE OF AUTHORIZATION: NOT REQUIRED SECTION 5 SUCCESSIVE EXAMINATIONS 0-;:/ 2 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SUCCESSIVE EXAMINATIONS COMPONENT CATEGORY EXAM PROGRAM RESULTS AND ITEM METHOD O-SI-DXI-000-1 14.2 NUMBER REFERENCE SECTION 1-CVCH-502 F-A VT-3 Attachment 8 Acceptable F1.20C I I I Note: This is the a voluntary successive examination. 1-SlH-453 F-A VT-3 7.2.E.9 Acceptable 171.20131B Note: This is the additional preservice examination required by Code Case N-491, paragraph -2220. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _SGH-1-2 F-A VT-3 Attachment 8 Acceptable IF1.40 I Note: This is a voluntary successive examination. SGH-4-2 F-A VT-3 Attachment 8 Acceptable IF1.40 Note: This is a voluntary successive examination. SGH-4-1 F-A VT-3 Attachment 8 Acceptable 1F11.4011 Note: This is the additional successive examination. 1-RHRH-449A F-A I VT-3 Attachment 8 Acceptable N F1.40 kNote: his is a voluntary successive examination. -13 o{ 121f OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOVAII NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000 1101 MARKET STREET SODDY DAISY, TENNESSEE 37384-2000 CIIA'iTANOOGA, TENNESSEE 37402 CERTIFICATION OF AUTIIORIZATION: NOT REQUIREi)ENIENT: S02-02 UNIT: I CYCLE: 14 CO.MIMERCIAL SERVICE DATE: JULY I, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED EXAMI REQUIRI System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results Number SIS CVC: SG 1-SIH-453 S 1-CVCH-502 SGH-1-2 CIIM-2436-C-03 ISI-0448-C-29 ISI-0399-C-02 F-A F1.20B F-A F1.20C F-A F1.40E1 VT-3 VT-3 VT-3 VT-3 VT-3 Vr-3 N-VT-1 20060316 N-VT-1 20060329 N-VT-1 20060424 R-8286 R-8307 R-8364 R-8361 R-8340 R-8289 Passed Passed Passed Passed Passed Passed SG SG RHRS SGH-14-2 SGH-14-1 1-RHRH-449A ISI-0399-C-02 ISI-0399-C-02 CHM-2435-C-03 F-A F-A F-A F1.40E1 F1.40E2 FI.40E9 N-VT-i N-VT-I N-VT-1 20060421 20060418 20060321 VOLUNTARY SUCCESSIVE; RANGE 1-27164"- 1-59/64" OR 172#-190#CLARIFY EXAM BOUNDARY, SEE R-8198 UIC13; VOLUNTARY SUCCSSIVE EXAMINATION CLARIFY EXAM BOUNDARY. SEE R-8199 U1C13, VOLUNTARY SUCCESSIVE CLARIFY EXAM BOUNDARY, SEE R-8216 U1C13 VOLUNTARY SUCCESSIVE; RANGE: 518"-55/64" OR 330# -364#07/19/2006 N1S-1 Page 1 07/19/2006 NIS-I.Page I OWNER: TENNESSEE VALLEY AUTHORITY 1101 MARKET STREET CHATTANOOGA, TENNESSEE 37402-2801 UNIT: ONE COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED PLANT: SEQUOYAH NUCLEAR PLANT P.O. BOX 2000 SODDY DAISY, TENNESSEE 37384-2000 CERTIFICATE OF AUTHORIZATION: NOT REQUIRED SECTION 6 AUGMENTED EXAMINATIONS 45 12-l OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED Augmented Examinations The reactor vessel nozzle cladding augmented examination per TVA Commitment was performed during Unit 1 Cycle 14 as part of the Inservice Inspection Program, O-SI-DXI-000-1 14.2, and requires submittal to the regulatory agency. The extent of examination was the length and depth sizing of all flaws identified during the previous examination in UlC6 using a NDE procedure qualified in accordance with ASME Section Xl, Appendix VIII, Supplement

4. The re-examination results of the reactor vessel nozzle cladding flaws identified during the U1C6 examination remained essentially unchanged.

1(D o-F.2 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAII NUCLEAR PLANT NUCLEAR POWER GROUP P.O. BOX 2000 1101 MARKET STREET SODDY DAISY, TENNESSEE 37384-2000 CIIATTANOOGA, TENNESSEE 37402 CERTIFICATION OF AUTHORIZATION: NOT REQUIREI)EXA.M REQUIREMENT: D01-02 UNIT: I CYCLE: 14 COMMIERCIAL SERVICE DATE: JULY I, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Component ISO Category Item Exam NDE Calibration Exam Exam Exam NOI Comments Number Drawing Number Scheduled Procedure Standard Date Report Results. Number RV N11CLAD ISI-0504.C.02 3.0 N/A UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND 118 051005 000 RV N12CLAD ISI-0504-C-02 3.0 NIA UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L18 051005 000 RV N13CLAD ISI-0504-C-02 3.0 N/A UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND 118 051005 000 RV N14CLAD ISI-0504-C-02 30 NfA UT VENDOR VENDOR 20060428 R-8386 Passed -REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L18 051005 000 RV N15CLAD ISI-0504-C-02 3.0 N/A UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L18 051005 000 RV N16CLAD ISI-0504-C-02 3.0 N/A UT VENDOR VENDOR 20060423 R-8386 Passed REFER TO PROCEDURE 1oVI.ISI-068-001.0 AND L18 051005 000 RV N17CLAD ISI-0504-C-02 3.0 NIA UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L18 051005 000 RV N18CLAD ISI-0504-C-02 3.0 N/A UT VENDOR VENDOR 20060428 R-8386 Passed REFER TO PROCEDURE 1-VI-ISI-068-001.0 AND L18 051005 000-.1-)07/19/2006 NIS-I I'age I OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SECTION 7 ANALYTICAL EVALUATIONS There were no analytical evaluation assessments required for acceptance during Unit 1 Cycle 14 reporting period. OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED SECTION 8 REQUEST FOR RELIEF OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED During Unit 1 Cycle 14 there were ten code class 1 and no code class 2 components that did not receive code required examination coverage due to design configuration, access limitations, etc.. Requests for relief will be submitted to the Regulatory authority in accordance with 1OCFR 50.55a. The percentage of examination coverage was derived from methods established in the TVA NDE Procedures Manual or the IS Southwest Technologies Nondestructive Examination Procedures. The following is a component summary.REQUEST FOR RELIEF

SUMMARY

ASME SECTION Xl UNIT 1 CYCLE 14 COMPONENT CODE CODE CODE EXAMINATION PERCENT CLASS CATEGORY ITEM METHOD COVERAGE NUMBER W02-03 1 B-A B1.11 UT 77%Examination report R-8386. Examination is limited due to the location of the reactor vessel core support lugs. _ _[ 52%W01-02 [1 JB-A 1B1.21 UT 52%Examination report R-8386, Examination is limited due to the configuration of the instrumentation tubes which penetrate the lower head.W2C 11 1B-A JB1.22 JUT 187%Examination report R-8386. Examination is limited due to the configuration of the instrumentation tubes which penetrate the lower head.W2E 11_ _ B-A 1 B1.22 JUT 186%Examination report R-8386. Examination is limited due to the configuration of the instrumentation tubes which penetrate the lower head.W2F 11 1B-A 1B1.22 [UT 181%Examination report R-8386. Examination is limited due to the configuration of the instrumentation tubes which penetrate the lower head.so 0F /z29 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED REQUEST FOR RELIEF

SUMMARY

ASME SECTION XI UNIT 1 CYCLE 14 (continued) COMPONENT CODE CODE CODE EXAMINATION PERCENT CLASS CATEGORY ITEM METHOD COVERAGE NUMBER N-15 1 B-D B3.90 UT 81%N-16 N-17 N-18 Examination report R-8386. Examination is limited due to the configuration of the nozzle integral extension and the location of the adjacent nozzles.RVH-1 f1 1 F-A F1.40 VT-3 Accessible area Examination report R-8316. Examination is limited due to support configuration and design access to the reactor vessel support area.51 /rr /ZI OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED APPENDIX A

SUMMARY

OF ASME SECTION XI STEAM GENERATOR TUBING EXAMINATIONS There were no inspection plan examinations required for the third outage of the third period of the second interval per Technical Spectification change TSC 05-07.-PREPARED BY i----U"Q -/sa o-F / - OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2901 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED APPENDIX B FORM NIS-2 "OWNERS REPORT FOR REPAIRS OR REPLACEMENTS" P ,53. oF 12 f Owner: Tennessee Valley Authority Nuclear Power Group 1101 Market Street Chattanooga, Tennessee 37402 Plant: Unit 1 Owner Certificate of Authorization: Not Required Commercial Service Date: July 1, 1981 National Board Number for the Unit: Not Required Plant:. Sequoyah Nuclear Plant P. 0. Box 2000 Soddy-Daisy, Tennessee 37384-2000 Sheet _ of _7_7 Appendix B*An index of the work documents which required reporting under the inclusion of the NIS-2 Report is as follows: Work Initiating Document Work Initiating Document WO 02-010318-000 WO 02-010330-000 WO 02-010331 -000 WO 02-010336-000 WO 04-770676-001 WO 04-770676-003 WO 04-770730-000 WO 04-783155-000 WO 04-783562-000 WO 05-774055-000 WO 05-775462-000 WO 05-776060-000 WO 05-777746-000 WO 05-777764-000 WO 05-778031-000 WO 05-778031-002 WO 05-778031-012 WO 05-778031-013 WO 05-778409-000 WO 05-778411-000 WO 05-778412-000 WO 05-779153-000 WO 05-779154-000 WO 05-780062-000 WO 05-783363-001 WO 06-774017-001 i1 511r 12F /2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system C, VC , ( ,ft-A!S 2._Date 51/fZ, Sheet 2.- of Unit (kýY J46Z O3 /OSI-onC Reoair Oraanization P.O. No- Job No. etc..Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code 19 A,ý5Edition, Addenda, Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No/_-__ _ c_ ____sy f47 ____ ,Z r tMac:_____ ___ ___ (\IA /o_ _7. Description of Work P f .LACEI--VAL-VCýI ! m I I 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure e--Other c Pressure psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8'1/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.5_5 &r--2q FORM NIS-2 (Back)9. Remarks "C o -- (, 41/17)2/V3_. ) /C).4 -D Appi, MlanurdWf, e, UdLd KOPCC.S 10 W e ^'11dQ1le, CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this /(L--C&1C,4 -4'F conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate o Authori tion No. NA Expiration Date NA Signed CA-CJ1-t Ct I- Date P5 2006 Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 3 3 7/07/ to .5//6 / ob and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied.concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -/Commissions

77) #06 93 J Inspector's Sig ture National Board, State, Province, and Endorsements Date (0 2006 PJA o# oz-oo 0 10 8-coo 3~(a &~ /2~~

FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section X!1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet Unit (of ZT-D/c-35 l -cZoc Address Reoair Oroanization P.O. No. Job No.. etc.3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp N/A Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system ./ =- -mf $ a 5. (a) Applicable Construction Code 19 LY dition, /\..._Addenda, /\AA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No-&3&'2' gs. 6,6A N4 AlA C9 5 (J At..6:A71 -_______oz 1_ _ -41\ Al A ?x& ~fI 7. Description of Work r y/_LVe 8. Tests Conducted: Hydrostatic o Pneumatic c Nominal Operating Pressure Other L, Pressure psi Test Temp °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8Y in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.57 `F/2 FORM NIS-2 (Back)9. Remarks 6 -'2 : 6 .1"v-/-ACr'-" ,pi4cryaccHcLlzulaLure KepujSS L M' e. AilaDna 1)/c3 +ID CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this -- ,'ir-'_"MENT-conforms to repair or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorizan No. NA Expiration Date Signed / / eo4 Date Own or iner% Designee. Title NA i Z_ 2006 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 3/07/03 to ,1110 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied.concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A- XWAZ mill Z~3 C m r, c; e;l'.UIIIIII3JII3

  1. Z61 InspectorlYSig nature ma Iy National Board, State, Province, and Endorsements Date 2006 WI 0 d oZ- 01033 0"0 0 0-I S 8 n-e / 2- -1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet Unit__of_t/,Mo¢l`02

-0/ C3-5 / -oC)0:: Address Reoair Oroanization P.O. No.. Job No., etc.3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp -N/A Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system '7 ---) -( L2 5. (a) Applicable Construction Code 19 t,-4Edition, /LJ Addenda, ( Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No./ --(o5- -cz 7. Description of Work , 8. Tests Conducted: Hydrostatic o Pneumatic c Nominal Operating Pressure Other n Pressure psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.,5 0- 1z21 FORM NIS-2 (Back)9. Remarks C('a 5rlZUcQRcYJ CDE6: (C:-T cT f) AND*ppiP¢ald Ni[an lurdz;U~e[b Udid f W De Aiir.s ;ne(CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this /7-/2LAC(-&.L F conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate of ,uthorizat n No. NA Expiration Date NA/" t\AA-'-1 I Owner r 0 er's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I; the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 3/07/03 to_ _ _/_ _ _/ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 7")Inspector'eSignature National Board, State, Province, and Endorsements Date MlcII 17, 2006 W1 #-0-(03-0 60 0+ (?- FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system /2./-,2., 2 Date 2/&Sheet 5 of Unit I vio/J 0 2-0i053&, -cf=Reoair Oroanization P.O. No. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code It19 efEdition, R Addenda, (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989&.0 Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No N,.72 30'7-7. Description of Work Pffa7ACET) VAL.V 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure Other a Pressure psi Test Temp _ F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used. provided (1) size is 8/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.61/ o-r /219 FORM NIS-2 (Back)9. Remarks (ý 5772L?4-{(C> 4!5DQQ e AIMPAC') C 4 ,,j 7ipii~duvi Nidfliur, =,uf s Mida HePQIrb LQ Ut^id~VQ -r---~ &.?78 SA r ~7~CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this }:2--Ca--IG'(- conforms to repair or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate, 1 Authodjztion No. NA Expiration Date NA Signed PFAecA C7- RL Date Z5 3 \4aoy 2006 Oyqnerp( Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 12-/0 Z/0 2O to _"/_.._/O__ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,Aý- .0, -N4C."', Commissions "" 3 (a Date Inspector's Si$ature mex&a 21-.National Board, State, Province, and Endorsements w/o 0o1.- O3 ,-oOO 2006~4:~ /~ FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner .Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date 5-X , Sheet j of V7 Unit IýQ .ý 64 -? ?C)67(,~ Oo Reoair Oroaniz-ation P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system 121 t 6 :t> f" " 5. (a) Applicable Construction Cod 19 EjLrdition,. Addenda., Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.-V cpz&-t_ __ A 7. Description of Work pur-ý(ý:)I l I

  • I 8. Tests Conducted:

Hydrostatic o Pneumatic o Nominal Operating Pressure Other o Pressure _ psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 811/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.63 o. - FORM NIS-2 (Back)9. Remarks (?crq s~wLpnokicfer &Cara C~eo r vstoe rz/)cc-7' -- ~ )A'4ro E6'5o;Do (,,-&771-Z5 /~-79-W CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and thi&'S Q",CFJ'\ -cFonforms to repair or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of uttorizatin No. NA Expiration Date NA Signed -? ft jf'5-, M cL -G=C H- Date Q0 2006 Owner,ol Owneis De~ignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford. Connecticut have inspected the components described in this Owner's Report during the period "3/3alo(o to -5//" 6 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.)rA~ ii.Commissions 7"ýJOýtZl--3 (Date Inspector'stignature Maw1¶1 National Board, State, Province, and Endorsements 2006 W/0 0.-770,&7,-001 6 1 of: /i2A FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN. 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name -P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date 2/L/6 Sheet of -7 Unit Reair O ronztio PO N,7- o .Jo No.ec Reoair Orcanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system (24-w-z Z--5. (a) Applicable Construction Code AV\S( a1.3 19 _nEdition, -7c> Addenda, t Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.7. Description of Work ~Jplr~W-3b'( VWir~4C~8. Tests Conducted: Hydrostatic o Pneumatic ominal Operating Pressure o Other o Pressure .- psi Test Temp °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8y in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.63 6f/2,Q FORM NIS-2 (Back)9. Remarks / -m" AppIca&Ie Manu~a~tucers uata reports to be CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this :.PA --- conforms to rel air or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificatfutho,~zation No. NA Expiration Date NA Signed 1 " Date r5 2006 O,,ier or Owner's Designee. Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period .t_ ______ to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A~6& 04, 7 K J Date Inspector's Gignature.co Commissions 71/-# Z&'93 National Board, State, Province, and Endorsements 2006 /0o #o4-77Ob76-0C 3 0 I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga. TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date 51/.010 (, Sheet 0 of 2-7 Unit [4 - -75 X ReDait Orcianization P 0. No Job No. etc Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system (_ _ .7 5. (a) Applicable Construction Code 19,,4 Edition, ^L4 Addenda, Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No t4-13:3 70 ot-7. Description of Work -VLA D VA ' V C'8. Tests Conducted: Hydrostatic o Pneumatic c Nominal Operating Pressure .g-"Other o Pressure psi Test Temp _ 'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used,; provided (1) size is 8% in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form. FORM NIS.2 (Back)9. Remarks ntM-7?W1C7'/D/ (b C b ~'~v-{ C/c 4 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this .Q1 conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certifica uthori tion No. NA Expiration Date Signed (es6nee TDate[ Own 4~~r'-bws Designee. Title NA 2chý') 2006 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 3LoL/o5s, to & IoZ./o (a' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. J ACommissions 7;t)f Z'&3 Inspector' Signature National Board, State, Province, and Endorsements Date J-gde- 2., 2006 W10 o4-- 7 70730- 000 (0 cf3 -/ 2 - FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Date Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address Sheet C) of Unit I S-7 Reoair Oraanization P.O. No.. Job No.. etc.Reoair Oroanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 4. Identification of system 'I"_ 5 I 5. (a) Applicable Construction Code ,- .19 _'-Edition, Kw Addenda, t4- Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Rep!acement (Yes or No)No.________ o.-c~ hA ___ _, 7. Description of Work iP'1U/..AC VA LA..e 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure Other o Pressure psi Test Temp °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8/ in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.,61 12 /q FORM NIS-2 (Back)9. Remarks 2t"ý,E_ TF2-(- %-vC -AppAICaDle Manulactluers 5Iata NepOd o 0M 3e A5FA )ea_t:=_ Ix us _A~ec _JA0 m,3-64 Att-7 6, 2-7qý: CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and -- A- r 7-'- conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate Anttoriz ti n No. NA Expiration Date NA Signed --3---t P -Date 2 JA A--( 2006 owne!]i'Ownr'rs Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 11/Z7/0L-to ( /5/0 ' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,m -z Commissions T7/A *0(0?3 Inspector's sig'nature National Board, State, Province, and Endorsements Date ." oCJe 2006'4/0 4--78.31S5"-0o0 70 Of / 2-q FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Date 5/2z/oc: Sheet (0 of Z-7 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Unit/Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Reoair Oroanization P.O. No. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system ". -y /5 61A7- , (..S /h'cableC ~ ~ -nsr io o e -1 5. (a) Applicable Construction Code 19 t/-Edition, rq,1_.denda, (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.V5 A NkýVQ260-_ný ID'7. Description of Work VA~veý /T&pAT 4in TRA4\/er7 8. Tests Conducted: Hydrostatic o Pneumatic c Nominal Operating Pressure Other o Pressure psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.7/ o0 /z71 FORM NIS-2 (Back)9. Remarks CAIrLC~7c' 6C,&> 772pAc-cý /ý) 5 ' A,.rr L~J APPn a e1T5-n-ud-; =Ufet b WdidrMepoiS 1U Oe UditCPCU~-~L'~ (-2a 7&o~ A7, D (7 ,,f4 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and ,(7- conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate o rizatn No. A Expiration Date-z;.,tI~ I L"l. 10 = :' I-VIC,' 1 F L I .K rlnlý .NA-7.. 2VA- IA -, nne-Owne/oL9Cner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period Io/2./o" to 6/o7/06P and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. 1",, /11 Commissions 7A1/#'Z, 3 Inspector'signature National Board, State, Province, and Endorsements Date 44(4,A 7e 2006 Wo #o*-763Sz-.ooo 72 cf I21 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet U of Z7 Unit/<J10 05-774055 -<CDzC Address Reoair Oroanization P O No Job No etc 3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp N/A Name P. 0. Box 2000, Soddy-Daisy, TN. 37384-2000 Authorization No N/A Address *Expiration Date N/A 4. Identification of system /-,,.'I- /,4 5-r I7.Li -- 2.5. (a) Applicable Construction Code A4s% 7 19 .,.Edilion, -7,' Addenda. ,j Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No' _ _ iNv_MA,- S&1T2\ ,1 ___ _7. Description of Work -l,:)i/,J. BV 4 3D,~. : /.. z 8. Tests Conducted: Hydrostatic o Pneumatic o .V 6 minal Operating Pressure a Other c Pressure p s'i"-psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the nurfber of sheets is recorded at the top of this form.73 /2-FORM NIS-2 (Back)9. Remarks f.--CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and thisdPA-iLp--- conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Cerfi uto fatio. No. NA Expira LJAgL(1 da6a tion Date Date NA f P',/r\"A 2006 Owýer's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in thfis Owner's Report during the period to 6/ 7/P7 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 7"/tJ Z1'& U 3 (j Date Inspector'VSignature ZInsA-e -7, National Board, State, Province, and Endorsements 2006 W1o *- 7-ý -F/2 q FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000"Date (Sheet 1 2- of Unit (ki D4 65-- 57-7$ 2 -CO6?Address Reoair Oroanization P.O. No.. Job No.. etc.3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp NIA Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system ./-5. (a) Applicable Construction Code 19 rJEdition, r Addenda, I Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.No 7. Description of Work " (1 CC VAL-Vt"-Th 1 ,vi I-8. Tests Conducted: Hydrostatic o Pneumatic o /Nominal Operating Pressure 0 Other Pressure / "psi Test Temp NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81z in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.75 o (?-q FORM NIS-2 (Back)9. Remarks (YV- Y-fiToA 6? .?I~lAPT A .AA e 1&Dc CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and f FN -conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Sined / W ,izat No. NA Expiration Date NA I.Owne r0ý r's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 4l1s/0, to _ /__--../_ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 7A/ 410 6 '13 Inspector's Signature National Board, State, Province, and Endorsements Date ..-'T io e, , 2006 LW1l #'5-"-77546 Z-eooo 7-/ o-F 12. FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Date Sheet Unit of Z7 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 VJoyk 65 -7? C&t~O -oeX Address Reoair Oroanization P.O. No.. Job No.. etc.3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp N/A Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system 'A ". I ! Cj---, -'+/-.. /5. (a) Applicable Construction Code 19 ,A Addenda, 6 Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No i-E A-i 3A- &AG _ _ _ _ k- 2o&~ J t 7. Description of Work p&cA CEOL-v & JDj&'AL B:>QAJ,1r-7

8. Tests Conducted:

Hydrostatic o Pneumatic o Nominal Operating Pressure Other o Pressure psi Test Temp _ OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.77 OP 12-4 FORM NIS-2 (Back)9. Remarks 6A15-gt-7zo&7C4 Co):, 6 oni EA cT. ý) /1; 34 ATQDZ^PPI) (,UIC J~J1lUld ,&JfFb, Udid MCUi LU UC ,i,dJAIdU~-~cs&r78--7&CO /Virý(c7619241. ~1~CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and 7V. I7 conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA No. NA Expiration Date NA Z2T/1A- ( 2006-Date I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 1I6 14?, (a5" to (0/60/O (0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector not his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ~a~4 /2- 1~(V)~A44 Commissions "7Wr 0ý26? 3 (U Date Inspectors Signature National Board, State, Province, and Endorsements 2006 W/o 0 05-- 71bO060O" I 78 &F12 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Date DA /0 Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address Sheet 14 of'Z-7 Unit (14b&:"-0 --777'2746~- -OC)Reoair Orcanization P.. No.. job NO.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 4. Identification of system C04/,+(-,y-AIt T I "( c--AZ$5 Z _5. (a) Applicable Construction Code 19 44Edition, .4 Addenda, (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989/44A Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification " Built or Replacement (Yes or No)No.7. Description of Work 1;?ýD6 ___D aP-'C T 'Je-7 4V 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure -Other c Pressure psi Test Temp °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/22 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.7q of /2,2 FORM NIS-2 (Back)9. Remarks 0C /"5'.)_0"TrO,( 6 3 Da"; 12i34, Z: Asm T EE c,&7 ff~.~ppc e fuciurer u '~p s ii Gil CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and thiso to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificat u hatzat No. NA Expiration Date Signed /" r Date' " r'sDesignee, Title NA t\- A 2006 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period _ /Z_3/__5" to 5-/Ih/Or, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. 0e4. Commissions 7 __/_,_ _2_,_ __3 S Inspector' ignature .National Board, State, Province, and Endorsements Date 10 2006 04-F / 2 - FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner .Tennessee Valley Authority Date Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address Sheet (t of 4t 7_.Unit Reoair -T7776 -C0 _raiainP N. o o.ec Reoair Oroaniz~ation P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 4. Identification of system C. VC5 (fLA:5ý a-5. (a) Applicable Construction Code 19 ,J45dition, Addenda, (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 IAJA Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.7. Description of Work 'q .p-/- 0 D PW6 1.--l 8. Tests Conducted: Hydrostatic o Pneumatic o ominal Operating Pressure c Other c Pressure-psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.6/ '! ~,/01 FORM NIS-2 (Back)9. Remarks -5ur 0,4 6rOý(ý 6T' PLt7AC-T crr) 19 3~L4 House ApphCarile NlanuidCtuiui b uaia nepolis to be AulaCneu E5ý-Q--:> 6o?6:, 2--7 C) ATr4 f=> (!:ý,? LS -76, CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and thi to r6pair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate ofAuthorza~on No. NA Expiration Date NA Signed f'T \, J't--_.4 i-,. Date 6 1'1AsY 2006 I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 4 /15"10(o to 5"i 0 1/Ob and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. I Inspector' Signature Date /Y' C/ /0..Commission 2006 is-7;D 4 0 2 6'ý3 National Board, State, Province, and Endorsements i/o # 0- 77776,4-o 1# 1 652o-5 12( FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet of 2-7 Unit W.cw* c'-7c -c>c;'RearranainPO.N.JoNo.tc Reoair Orcanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system 724+2, C ,-( A!5 /5. (a) Applicable Construction Code AA(5( 15-1.7 19 -7o, Addenda, aA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.1_00_-0 _- 6_ _ e6-~ /\1 NA- JCr ZCP~E /1 x 0 1oi4 NA NA Nb 7. Description of Work X. C 1U 8. Tests Conducted: Hydrostatic o Pneumatiq Nominal Operating Pressure o Other o Pressure .psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.6&3 0,,pZ2, FORM NIS-2 (Back)9. Remarks ./pr AppiicaDle heanuTaClurerS L.awa Repons to De Anacrea CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and th is tl,91CO t,\Lf(- conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate of uthorization No. NA Expiration Date NA Signed F 6 Date '6- 2006 S Ownd oI.O.ner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period +1/ /0& to /--I/0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section X1.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Inspector's~ r Date Commissions 7;V # Z,6 7-3 National Board, State, Province, and Endorsements 2006 V.J/V #05-778031-e0oo ' IF- " 7/~, 2 9 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Date ,5//c 0 /, r: Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system i " DV.,-T,5r Sheet 1-7 of 1-7 Unit j2i~______________ Reoair Oroanization P.O. No.. Job No.. etc.Reoair Oroanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code M, 1/ .j53 , 7 19 /. -dition, -7 .(b) Applicable Edition of Section XI Utilized for Repairs or Replacements Addenda, 1989 t,-/4. Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No./(5QA -24 3 t44_ ____ ____ _______ ___ 1 -7 _A___ -( 2Zý MC5 7. Description of Work P~v~3cEz ~ae~2-.s 8. Tests Conducted: Hydrostatic o Pneumatic r Nominal Operating Pressure o Other o Pressure AA- .psi Test Temp_ _ OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8Y in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.8S ~12 1 FORM NIS-2 (Back)9. Remarks IA-Applicapie Manuracturers Data Repons [o De Anaaore CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this)QA(-A46AJ7" conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificato A th zat)Qn No. NA Expiration Date NA Signed W____________________ Date /0 ('4 A ( 2006 Ownq or Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period to 5 z1 /7 (a and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions A7) #-i?'3 (J Date Inspectore' Signature National Board, State, Province, and Endorsements 2006 v4/o6# 778 031-0OOZ2 6o o4 124 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner .Tennessee Valley Authority Date 4L-IZ610 Name 1101 Market Street, Chattanooga, TN 37402-2801 Sheet /1( of_ Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Unit t Roir n5t- O77no O N.- 0J N --t Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address Reoair Oroanizatjon P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 4. Identification of system )J H2._,LA ~'-~t 5. (a) Applicable Construction Code J5 ./ 3 3/-,,7 19 .,9 Edition, 7c, Addenda, t,,A= Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.7. Description of Work _jC&D.§4UJ5~t~ -8. Tests Conducted: Hydrostatic o Pneumalic Nominal Operating Pressure o Other o Pressure tJ psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form. FORM NIS-2 (Back)9. Remarks -ApplcaDle Manulaclurers Uala p.<epors E0 ae A;.ac-heo CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this -/TA4.F T conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificateo rit tion No.. NA Expiration Date SignedM 2-,' -2 (f1\Ar=7Zk1 Efk3f NA)ate Z8 APO2-c-,=2006\O4,tr.4d Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford. Connecticut have inspected the components described in this Owners Report during the period +k5/04 to 4',/Z_5/.0 _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. A~~-A Commissions 7;t) *06. ýQ nspectoresignature Date ,psI~National Board, State, Province, and Endorsements 2006 W/o#:05*-778 032-01Z a 4 i2 )- /- FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system /\/A1.4,' 7CSt41 Date /Sheet (' of "17 Unit (Recai -77 0ra3zto /-O N.JoN..ec.- Reoair Oroanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code A.i5/ 3./. 19 ..:dition, -7c Addenda, ) Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.I-M-5f--432-R5A 45s/ /-4 &AW o Pc tý,o 7. Description of Work PC:R2L/CZ"/_

8. Tests Conducted:

Hydrostatic o Pneumatic in Nominal Operating Pressure o Other c. Pressure /.. "psi Test Temp .... OF NOTE: Supplemental sheets in form of lists, s etches, or drawings may be used, provided (1) size is 8Y in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.c-:1 FORM NIS-2 (Back)9. Remarks t A~ppicaDle Manuda~C uers l.ata N~eports 10o e Ar acnlea CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this I9A-q2A-,, t=' 6-(7-" conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate of Authorizatio

o. NA Expiration Date NA Signed wAr oecwts Dete /signeeLTAtl 2006 Owner or/p'wnpts Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period _ .___ 8__o_ _ to -_.2-/ 6' and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

K Inspector'signature Date P 1 4'a,, /Z, Commissions 7;D ftý'9 3 National Board, State, Province, and Endorsements W/otO"- 7 7 903/- t/3 2006 (70 Of11 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system .67r' ..5 ".Date Sheet 10 of Z-7 Unit I RL1 a" r 05- r7oa 79atn 4-0 No -o.e Reoair Oroanization P.O. No.. Job No. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code 5 19 /\,4Edition, Addenda, 44.(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No Board Identification Built or Replacement (Yes or No)No___ __ _ __ _ 5*7 M- /j{ r?2~ e-"geto 'c-S.47 64 -1: NA- _____ /,, -o O~ g,ý AJCz, 7. Description of Work PiCf-QA-ZaE) VAIVF, Ra,/-,. A--,.r--') 5 MX/JrLT7 /?)v.--.--I-( 5 1 A .-i / (f -- -f. -8. Tests Conducted: Hydrostatic a Pneumatic D Nominal Operating Pressure c Other a Pressure ..../L-"- psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.9/ o-F /24 FORM NIS-2 (Back)9. Remarks. (J5-rfW(..T'i .L Appioii L.d-- r:pOq O .rian~o VALY6 ý Awe1 JD, 7 1t LT4$ 1111,17 LOLFI)Ig4, .57r-A')v~I Ii CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this L?'_ ._____[_-conforms to repair or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate ofAuthorizption No. NA Expiration Date C~ tL. ,--H W ll ),NA=-J AI ~NA/C) MvAYnr Own Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 4/So/of, to 5"/13/0 b and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions 7" # 6?-3 SInspect National Board, State, Province, and Endorsements Date A'& Z, 2006 VJ/o # 0 5"-7714 " 07.9-0 q ? v,ýz / 2,1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address Date Sheet 2,1 of Z-7 Unit I Reoair Orcanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 4. Identification of system 0 /- S, 66 A--5-5 I!-5. (a) Applicable Construction Code A" 1C&_ 19"7-7Edition, ,.'7c.(b) Applicable Edition of Section XI Utilized for Repairs or Replacements Addenda, 1989 t-1,j- Code Case 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No).No.3C-)5& r~~rr 2-1IR (e 6 P 7. Description of Work 0f)&2Wi To 8,4~ ZL T/L 8. Tests Conducted: Hydrostatic o Pneumat cq, Nominal Other o Pressure /- psi Operating Pressure o Test Temp _ OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.oe 121 FORM NIS-2 (Back)9. Remarks Nil-Applica~ie Manutaurers mjata rsepOns 10 De Arfaneal CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this &2 PAIZ__ conforms to repair or replacement the rules of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of uthorizatqn No. NA Expiration Date NA Signed k7-~ ~~k b16F I~ Date /1 ~4 Y2006 zSOwnerr er's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by .HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period I io/O0( to .5"//f"LOb and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection., \N-"all Commissions 7;J),,ft'-3 C Date National Board, State, Province, and Endorsements 2006 V',lo Ir OS- 7 6 1- 0 0o qb of / FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date /6 Sheet of Z-7 Unit i -4 D -7 --/C Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Reoair Oroanization P.O. No. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system -55 "Z-5. (a) Applicable Construction Code A 45 : 5 1 1,"719 7-Edition,"0 Addenda, 14Al Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No 47A 4&5 -Zj TFVIA N+_ tmI IIJ 1J 1 7. Description of Work /(tz pj Abpp T I ,.f fr4..8. Tests Conducted: Hydrostatic a Nominal Operating Pressure c Other o Pressure A- psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.°7' I- 1 t J FORM NIS-2 (Back)9. Remarks P, a e epo ý-Q , a t CERTIFICATE OF COMPLIANCE I We certify that the statements made in the report are correct and this L?-Ar/fL-conforms to r6pair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certifica t orizan No. NA Expiration Date Signed O W!d/ , F _:64 R-+'12- Date On(dbr_0ner's Designee. Title NA L-) t\17AY 2006 I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 4-/11/013 to 5_/Z__/_ _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspectornor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ,ýgzo J Date Inspector's 19ignature WAYz -3 Commissio 2006 ns National Board, State, Province, and Endorsements P41/o.# 05--778412-cooo I 12: FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant D ate 5/23 /b(=Sheet 2-3 of t-7 Unit I Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 uce05 --779/5-3 -C-e)Reoair Oroanization P.O. No. Job No. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system _- ("c c-- -. , (L.,s5. i 5. (a) Applicable Construction Code 19 rJ,-Edition, r Addenda, t Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No 7. Description of Work R,7LACEYýVA LYE /Ir- ThtA-8. Tests Conducted: Hydrostatic c .Pneumatic, A Nominal Operating Pressure c Other o Pressure /J IA- psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8%, in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.T'7 04/Z2q FORM NIS-2 (Back)9. Remarks (a67-5-La 0 t4 (f ',Ct-D- (b4 7 72 -C Appic.auke NlanuIdrufer$ Uala i-eponi to De ^Ucn, CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this' CF4'.647 repair or replacement the rules of the ASME Code, Section XI.conforms to Type Code Symbol Stamp NA Certifica~teof Auth ization No. NA Expiration Date Signed +tkci'i z NA 52006)ate OTne,,r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period /p/Z.'/oA. to S-/./ho 0, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ~L.6 4%I/ ~1 4Z---.J 11......Commissions 7TV#Z61 3.National Board, State, Province, and Endorsements K J Date InspectOr's Signature lnaa 30 2006 W"o # 05-771/5"3-O00 9ý8 of/12 4 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 4. Identification of system 1,4, Ixh.Date Sheet Unit SYa/o~Z+of (t4 --,0,C 5 ---Reoair Oroanization P.O. No.. Job No. etc.Type Code Symbol Stamp N/A Authorization No N/A Expiration Date N/A 5. (a) Applicable Construction Code 19 / Edition, .Addenda, Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Componehts Repaired. ASME Code Name of Name of Manufacturer National Other Year Replaced. Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.7. Description of Work 12=iACFe-D VALNVE&: /4--:2-N/t" A/1D I 3 ,[r-T 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure c.-Other o Pressure , psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/z in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.9 1? O-FORM NIS-2 (Back)9. Remarks G&~7U6-T?0C~4 CDCC-: 6('7ZACT ~~~LAMaluiaCiuJeres LUdd Rep. "o 1 e Allactll CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this lMA/' conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Cerifica Autr n No. NA Expiration Date C I1-M aiPvi NAV AY nr Ownt or 0 er's tbesignee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 4- A- (a to 4/0 7/O and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions T_ __-_ _ _ __ _ _ _spector's'tig nature National Board, State, Province, and Endorsements Date e- 7, 2006 w/0 ltoS-779154--oo /0 eO /2 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet Unit.5 of lz.'W,0405- 76Cc_&z-0cx2_ Address Reoair Oroanization P.O. No. Job No.. etc.3. Work Performed by Sequoyah Nuclear Plant .Type Code Symbol Stamp N/A Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system cc-/o4 (-,1 2 5. (a) Applicable Construction Code _19 ,4&Edition, Addenda, , Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No_____________ __________ _________ No ____d o_7. Description of Work 'Fey--)LA C -- C- T- JC--I-7 V 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure L-7 Other o Pressure psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 1/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form./0/ tzj FORM NIS-2 (Back)9. Remarks C54aZi2OC7f f ~ 0 6 Jt C-2i-r% ) 2-App,.,;d e mnuinfld1uers Lidia pjRUM to Se ~z (o:73 767 o ,4-1jD &,7 24 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this i -----A6(-'Ai "- T conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate Authori tion No. NA Expiration Date NA Signedm /\4. I4 f t L... Date (/ l~ 2006 0 , wner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION IL the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period II/Ozl0 to 5 /D ( and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commissions___ __ __ ___ __ __Inspector' Signature National Board, State, Province, and Endorsements Date Mf% /is' 2006 0/o 5--7 SOD -COO/02- / izq FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner .Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Address 3. Work Performed by Sequoyah Nuclear Plant Name -P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date 5" Sheet 2.:. of 17 Unit (ý\&t C~5 -3~3 Reai Oroniztio I..N. oo.ec Reoair Oroanization P.O. No.. Job No.. etc.Type Code Symbol Stamp N/A Authorization No N/A Address Expiration Date N/A 4. Identification of system -(LA "5 5. (a) Applicable Construction Code 19 \14Edition, ,..4 Addenda, Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 6. Identification of Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No.___ __ __ ____ Af- C'Y.CAAi 7. Description of Work 'QýD--AC&VA (- V-12N/v 8. Tests Conducted: Hydrostatic o Pneumatic Nominal Operating Pressure o Other o Pressure psi Test Temp O °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form./03 3 / FORM NIS-2 (Back)9. Remarks (b fPVciQ.Y( (b.Qe! f0ir- AQ-.1 ro oe- I5Z P 1,4'r-/'~4Q V U~t?~'APPICaole manuiaCriJers uala rmeporis io oe Anawinea CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this ,E,'. e./T- conforms to repair or replacement the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certificate of AuthOri tionNo. NA Expiration Date TiNA Signed UL- wne KMecii Er46r Date M~ tAA 2006 Ow*ý-r Ower'ýDesignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period *!HL 3/23/pOb to b1510 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. (Inspector's Vignature Date -LA ..7Xve-Commissions 7"J O 3 National Board, State, Province, and Endorsements 2006 WI0 # o5l-783363-0.1 / oF FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owner Tennessee Valley Authority Name 1101 Market Street, Chattanooga, TN 37402-2801 Address 2. Plant Sequoyah Nuclear Plant Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Date Sheet 7 of '-7 Unit 4 -o6 --77-4 Address Reoair Oroanization P.O. No.. Job No. etc.3. Work Performed by Sequoyah Nuclear Plant Type Code Symbol Stamp N/A Name P. 0. Box 2000, Soddy-Daisy, TN, 37384-2000 Authorization No N/A Address Expiration Date N/A 4. Identification of system A Vlkrs/ z ,- ,/ -a-5. (a) Applicable Construction Code,.5j ag,,l,7 19 Edition, lo Addenda, MAJA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989.6. Identification of.Components Repaired or Replaced and Replacement Components Repaired, ASME Code Name of Name of Manufacturer National Other Year Replaced, Stamped Component Manufacturer Serial No. Board Identification Built or Replacement (Yes or No)No 7. Description of Work 8. Tests Conducted: Hydrostatic o Pneumatic o Nominal Operating Pressure a-Other o Pressure psi Test Temp OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2/ in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form./0,5 Of izq /FORM NIS-2 (Back)9. Remarks NlA-Apph,,;d~e ,1-nuidCmuterb IJdLi keNr o to L); F n;7 CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this 'F67Ca 4 7 M-- conforms to repair or replacembrnt the rules of the ASME Code, Section XI.Type Code Symbol Stamp NA Certifica e/A thor tion No. NA Expiration Date Signed .h, f--' &1 )P _ Date Ow or wner' Designee, Title NA"ZZ 7 1A-- 2006 I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Tennessee and employed by HSB CT of Hartford, Connecticut have inspected the components described in this Owner's Report during the period Elo0 / 06 to __ ,/_ z/_ _ _ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Inspector'i(Signature Date %ThA)-J e2-Commissions 7-TJ 3 2006 National Board, State, Province, and Endorsements 4/o 0 6- 774 017-00 1o o-F' 12 1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED APPENDIX C PRESSURE TEST REPORT The inspection plan work required for the third outage of the third period of the second interval for Code Category B-E, Code Category B-P, Code Category C-H, Code Category D-A, Item Number D1.10; Code Category D-B, Item Number D2.10; Code Category D-C, Item Number D3.10 and RI-ISI Code Category R-A (Item Numbers R1.11 and R1.12) is on schedule.PREPARED B I/0 7 n-c 125 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED System Pressure Tests Unit I Cycle 14 Third Period of the Second Interval The Unit 1 tests scheduled for the third period which were required to be performed during the U1C14 refueling outage are complete. This completes the Second Interval testing.System Test Results Blowdown RI-ISI No leakage found Chemical Volume and Control(CVCS) RI-ISI No leakage found Containment Spray RI-ISI No leakage found Feedwater RI-ISI No leakage found Reactor Coolant RI-ISI No leakage found Safety Injection RI-ISI No leakage found Residual Heat Removal RI-ISI No leakage found Reactor Coolant System No leakage found Sampling System No leakage found Relief Valve Discharge Header to the PRT No leakage found Drain Lines from Accumulator Rooms 3 & 4 Unimpaired flow verified Spent Fuel Pool Cooling No leakage found ERCW Outside Containment Three separate leaks were identified and corrected. /o6' ~4 /2z, OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED APPENDIX D IWE METAL CONTAINMENT EVALUATIONS The following evaluations were performed for containment examinations performed during ULC14 for inaccessible areas and additional examinations in accordance with IOCFR 50.55a(b)(2)(ix) for Class MC components. 0"14-1ýPREPARED BY 41 I I/0 ?C>+- /2,q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA. TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED

SUMMARY

OF IWE METAL CONTAINMENT EVALUATIONS The Unit 1 Cycle 14 Inservice Inspection of Class MC components included eight Notification of Indications (NOls) for IWE Metal Containment evaluation. These evaluations require reporting per 1OCFR 50.55a(b)(2)(ix). NOI NUMBER COMPONENT IDENTIFIER 1-SQ-464I MB-3 DISPOSITION: Debonded areas of the moisture barrier at the top edge at various locations at the SCV interface were removed to sound moisture barrier material.The removed areas were filled in with RTV material.1-SQ-465 I MB-3 (SCV surface above the floor)DISPOSITION: Cleaned and repcoated areas.1-SQ-466 MB-3 (SCV surface behind the moisture barrier at the top edge were the debonded moisture material was removed)DISPOSITION: Cleaned and recoated areas.1-SQ-467 I MB-1 DISPOSITION: Debonded areas of the moisture barrier at the top edge at various locations at the SCV interface were removed to sound moisture barrier material.The removed areas were filled in with RTV material.1-SQ-468 I MB-1 (SCV surface above the floor)DISPOSITION: Cleaned and recoated areas.1-SQ-471 I Penetration X-64, X-65, X-66 and X-67 DISPOSITION: Cleaned and repainted areas.1 -SQ-473 MB-1 (SCV surface behind the moisture barrier at the top edge were the debonded moisture material was removed)DISPOSITION: Cleaned and repainted areas.1-SQ-474 I SCV-1, 2, 3 and 4 (elevation 680 to 760) annulus DISPOSITION: The areas were light corrosion and missing coating these areas will be recoated later under work order 06-773916-000. The other areas were documented under PER 101958 and were acceptable as is.//1D 0-F /2 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-464 Component Identifier: MB-3 Examination Report Number: SCV-0203 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examination of the moisture barrier (MB-3)(azimuth 303-360 and 0-60) at SCV interface at the raceway floor. The examination on the moisture barrier identified minor debonding of the top edge of the moisture barrier from the SCV in 22 locations with a total length of approximately 75 inches.One location had an approximate maximum depth of 1 3/4 inches. The total depth of the moisture barrier is approximately 6 inches. These indications on the moisture barrier indicated a lack of adhesion of the moisture barrier material at the top edge to SCV interface due to surface preparation at these areas when the moisture barrier was replaced in UlClO.The moisture barrier material at the top edge to SCV interface was removed down to sound adhesion between the SCV and the moisture barrier material. These debonding areas were determined to be minor due to the depth of the moisture barrier being approximately 6 inches. The SCV at these areas were VT-3 examined and there were no visible signs of active corrosion, any significant wall loss or gross degradation. The exposed SCV areas requiring recoating were recoated and VT-3 examined. The removed moisture barrier material was filled in with RTV and VT-3 examined.This minor debonding has not affected the integrity of the moisture barrier. These areas are normally inaccessible due to the stainless steel flashing and insulation (refer to drawing CISI-1000-C-59). Based on the information above, the moisture barrier areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. The moisture barrier areas are acceptable for continued service, and no further corrective action is required. Based on this information, there is no indication that an adverse condition exists in the areas examined or that an adverse condition would be present in inaccessible areas. OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-464 -continued Evaluation of additional examinations required per 1OCFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. The examination identified indications Consisting of minor debonding of the top edge of the moisture barrier at the SCV interface at 22 locations with a total length of approximately 75 inches. The debonding at these locations appeared to be lack of adhesion of the top edge of the moisture barrier to the SCV and minor shrinkage. There were do visible signs of active corrosion on the SCV. The SCV at the moisture barrier areas examined did not show any significant wall loss or gross degradation. However upon further review the moisture barrier had sound adhesion and the SCV areas were deemed to have minor rusting. The top edge of the moisture barrier at the SCV interface was removed at the debonded areas to sound material where the moisture barrier adheres to the SCV. The SCV surface at the removed moisture barrier material was VT-3 examined and did not show any signs of detrimental flaws of significant degradation of the SCV liner. The areas requiring recoating were recoated and VT-3 examined. RTV was used to fill in at the removed moisture barrier material areas and VT-3 examined. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. The component is acceptable for continued service, and no further corrective action is required. An additional section MB-1 of the moisture barrier was examined and debonding of the moisture barrier was identified. The moisture barrier was replaced in U1C10 and moisture barrier section MB-2 was examined in the last outage U1 C1 3 and no debonding of the moisture barrier was identified. Examination of section MB-1 and MB-3 complete the examination of the entire replaced moisture barrier since it was replaced in U1C1O. Therefore, additional examinations are not warranted on the remaining section MB-2.7//2 o, IZ121 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-465 Component Identifier: MB-3 (SCV surface above floor)Examination Report Number: SCV-0202 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examinations of the SCV interior surface in the vicinity of the moisture barrier at the interface of the SCV, and raceway floor (approximately 12 inches above the floor interface). The area examined was identified for coating repair, and this VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). The examination identified indications consisting of light corrosion with no visible signs of active corrosion. The area examined did not show any wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities. This area is not considered suspect and does not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These areas were cleaned/prepared and recoated in accordance with site procedures. Based on this information, there is no indication that an adverse condition exists in the area examined or that an adverse condition would be present in inaccessible areas.Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These indications were noted during the VT-3 visual examinations of the SCV interior surface in the vicinity of the moisture barrier at the interface of the SCV and raceway floor (approximately 12 inches above the floor interface). The area examined was identified for coating repair, and this VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). The examination identified indications consisting of light corrosion, with no visible signs of active corrosion. The areas examined did not show any significant wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities. This area is not considered suspect and does not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These areas were cleaned/prepared and recoated in accordance with site procedures. A VT-3 preservice examination was performed on this area following reapplication of the coatings to satisfy the requirements of IWE-2200(g). The component is acceptable for continued service, and no further corrective action is required. Based upon the conditions found, no additional examinations are warranted. 113 o-F 12-1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-466 Component Identifier: MB-3 (SCV surface behind the moisture barrier at the top edge were the debonded moisture barrier material was removed)Examination Report Number: SCV-0206 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by IOCFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examinations of the SCV interior surface at 22 areas behind the top edge of the moisture barrier at the interface of the SCV and raceway floor. These areas were exposed following the removal of the moisture barrier at these locations. A VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Only three areas required surface preparation. The examination identified indications consisting of light corrosion with no visiable signs of active corrosion. The area examined did not show any wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities that affected the moisture barrier bonding to the SCV at these locations. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These three areas were cleaned/prepared and recoated in accordance with site procedures. Based on this information, there is no indication that an adverse condition exists in the area examined or that an adverse condition would be present in inaccessible areas.Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These indications were noted during the VT-3 visual examinations of the SCV interior surface at 22 areas behind the top edge of the moisture barrier at the interface of the SCV and raceway floor. These areas were exposed following the removal of the moisture barrier at these locations. A VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Only three areas required surface preparation. The examination identified indications consisting of light corrosion, with no visible signs of active corrosion. The areas examined did not show any significant wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities that affected the moisture barrier&- /21 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-466 -continued bonding to the SCV at these areas. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These three areas were cleaned/prepared and recoated in accordance with site procedures. A VT-3 preservice examination was performed on this area following reapplication of the coatings to satisfy the requirements of IWE-2200(g). The component is acceptable for continued service, and no further corrective action is required. Based upon the conditions found, no additional examinations are warranted. c9- I z'q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-467 Component Identifier: MB-1 Examination Report Number: SCV-0209 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examination of the moisture barrier (MB-1)(azimuth 60-175) at SCV interface at the raceway floor. The examination on the moisture barrier identified minor debonding of the top edge of the moisture barrier from the SCV in 21 locations with a total length of approximately 100 inches. Also identified was a cut in the moisture barrier about 6 inched long and 5/8 inch deep.One location had an approximate maximum depth of 3 inches. The total depth of the moisture barrier is approximately 6 inches. These.indications on the moisture barrier indicated a lack of adhesion of the moisture barrier material at the top edge to SCV interface due to surface preparation at these areas when the moisture barrier was replaced in Ul Cl 0. The moisture barrier material at the top edge to SCV interface was removed down to sound adhesion between the SCV and the moisture barrier material. These debonding areas and cut were determined to be minor due to the depth of the moisture barrier being approximately 6 inches. The SCV at these areas were VT-3 examined and there were no visible signs of active corrosion, any significant wall loss or gross degradation. The exposed SCV areas requiring recoating were recoated and VT-3 examined. The removed moisture barrier material and cut were filled in with RTV and VT-3 examined. This minor debonding has not affected the integrity of the moisture barrier. These areas are normally inaccessible due to the stainless steel flashing and insulation (refer to drawing C15-1 000-C-59). Based on the information above, the moisture barrier areas and cut are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. The moisture barrier areas are acceptable for continued service, and no further corrective action is required. Based on this information, there is no indication that an adverse condition exists in the areas examined or that an adverse condition would be present in inaccessible areas.1/6 0-ýi12t OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-467 -continued Evaluation of additional examinations required per IOCFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. The examination identified indications consisting of minor debonding of the top edge of the moisture barrier (MB-1) at the SCV interface at 21 locations with a total length of approximately 100 inches. Also identified was a cut in the moisture barrier about 6 inches long and 5/8 inch deep. The debonding at these locations appeared to be lack of adhesion of the top edge of the moisture barrier to the SCV and minor.shrinkage. The cut appeared to be from activities in the removal of the steel flashing for access to the moisture barrier.There were no visible signs of active corrosion on the SCV. The SCV at the moisture barrier areas examined did not show any significant wall loss or gross degradation. However upon further review the moisture barrier had sound adhesion and the SCV areas were deemed to have minor rusting. The top edge of the moisture barrier at the SCV interface was removed at the debonded areas to sound material where the moisture barrier adheres to the SCV. The SCV surface at the removed moisture barrier material was VT-3 examined and did not show any signs of detrimental flaws of significant degradation of the SCV liner. The areas requiring recoating were recoated and VT-3 examined. RTV was used to fill in at the removed moisture barrier material areas and cut and these areas were VT-3 examined. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. The component is acceptable for continued service, and no further corrective action is required. The moisture barrier was replaced in U1C10 and moisture barrier section MB-2 was examined in the last outage U1C13 and no debonding of the moisture barrier was identified. Examination of section MB-1 and MB-3 complete the examination of the entire replaced moisture barrier since it was replaced in UlCl0. Therefore, additional examinations are not warranted on the remaining section MB-2.o_4 1291 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402.2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-468 Component Identifier: MB-1 (SCV surface above floor)Examination Report Number: SCV-0210 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examinations of the SCV interior surface in the vicinity of the moisture barrier at the interface of the SCV and raceway floor (approximately 12 inches above the floor interface). The area examined was identified for coating repair, and this VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). The examination identified indications consisting of light corrosion with no visible signs of active corrosion. The area examined did not show any wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities. This area is not considered suspect and does not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These areas were cleaned/prepared and recoated in accordance with site procedures. Based on this information, there is no indication that an adverse condition exists in the area examined or that an adverse condition would be present in inaccessible areas.Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These indications were noted during the VT-3 visual examinations of the SCV interior surface in the vicinity of the moisture barrier at the interface of the SCV and raceway floor (approximately 12 inches above the floor interface). The area examined was identified for coating repair, and this VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). The examination identified indications consisting of light corrosion, with no visible signs of active corrosion. The areas examined did 'not show any significant wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities. This area is not considered suspect and does not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These areas were cleaned/prepared and recoated in accordance with site procedures. A VT-3 preservice examination was performed on this area following reapplication'of the coatings to satisfy the requirements of IWE-2200(g). The component is acceptable for continued service, and no further corrective action is required. Based upon the conditions found, no additional examinations are warranted. // 6o- 12 q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-471 Component Identifier: Penetrations X-64, X-65, X-66 and X-67 Examination Report Number: SCV-0215, SCV-0216, SCV-0217 and SCV-0218 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examination of the SCV exterior surface areas at chill water penetration X-64, X-65, X-66 and X-67 that were identified during preparation for the ultrasonic thickness examination on these penetrations. This examination identified flaking and light corrosion on the penetrations and SCV. This condition was due to the removal of the foam insulation and the sweating of the chill water lines. These areas examined were identified for coating repairs during cleaning for the ultrasonic examination, and this visual examination (VT-3) was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Flaking paint and light corrosion were removed to allow for the ultrasonic examination. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. Therefore, there is no indication that an adverse condition exists which may be present in inaccessible areas. These penetration and SCV areas were cleaned, examined and re-coated. Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These Indications were noted during the VT-3 visual examination of the SCV exterior surface areas at chill water penetration X-64, X-65, X-66 and X-67 that were identified during preparation for the ultrasonic thickness examination on these penetrations. This visual examination identified flaking and light corrosion on and at the penetrations. These areas examined were identified for coating repairs during cleaning for the ultrasonic examination, and this visual examination (VT-3) was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Flaking paint and light corrosion were removed to allow for the ultrasonic examination. A VT-3 preservice examination will be performed on these areas following re-application of the coatings to satisfy the requirements of IWE-2200(g). These conditions were due to the removal of the foam insulation and the sweating of the chill water piping. These penetrations and SCV were cleaned, examined and re-coated. //ý0-ýI z OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-473 Component Identifier:* MB-1 (SCV surface behind the moisture barrier at the top edge were the debonded moisture barrier material was removed)Examination Report Number: SCV-0219 Disposition: Cleaned and repainted areas Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation;.and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examinations of the SCV interior surface at 21 areas behind the top edge of the moisture barrier at the interface of the SCV and raceway floor. These areas were exposed following the removal of the moisture barrier at these locations. A VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Only three areas required surface preparation. The examination identified indications consisting of light corrosion with no visiable signs of active corrosion. The area examined did not show any wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities that affected the moisture barrier bonding to the SCV at these locations. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These three areas were cleaned/prepared and recoated in accordance with site procedures. Based on this information, there is no indication that an adverse condition exists in the area examined or that an adverse condition would be present in inaccessible areas.Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does.not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These indications were noted during the VT-3 visual examinations of the SCV interior surface at 21 areas behind the top edge of the moisture barrier at the -interface of the SCV and raceway floor. These areas were exposed following the removal of the moisture barrier at these locations. A VT-3 visual examination was performed prior to surface preparation to satisfy the requirements of IWE-2500(b). Only three areas required surface preparation. The examination identified indications consisting of light corrosion, with no visible signs of active corrosion. The areas examined did not show any significant wall loss or gross degradation. These indications appeared to be the result of previous maintenance activities that affected the moisture barrier 120 o4: 12-1 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-473 -continued bonding to the SCV at these areas. These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. These three areas were cleaned/prepared and recoated in accordance with site procedures. A VT-3 preservice examination was performed on this area following reapplication of the coatings to satisfy the requirements of IWE-2200(g). The component is acceptable for continued service, and no further corrective action is required. Based upon the conditions found, no additional examinations are warranted. /2/ 0-F /2-OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384.2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-474 Component Identifier: SCV-1, 2, 3, 4 and SCV-Dome; (horizontal stiffeners O-R and vertical stiffeners 0-37 and 74-90; horizontal stiffeners R-S and vertical stiffeners 0-90, and elevation 821 to top of dome)Examination Report Number: SCV-0220, SCV-0221, SCV-0222, and SCV-0223 Disposition: Cleaned, repainted areas and repaired stiffeners Evaluation of inaccessible areas as required by 10CFR50.55a(b)(2)(ix)(A)(Include (1) A description of the type and estimated extent of degradation, and the conditions that led to the degradation; (2) An evaluation of each area, and the result of the evaluation; and (3) A description of necessary corrective actions).These indications were noted during the VT-3 visual examination of the SCV outboard exterior surface areas (horizontal stiffeners B-J and vertical stiffeners 0-90). The examination identified indications consisting of:* Light corrosion in the drip channels, several areas with light corrosion on the stiffeners and steel containment vessel, and several areas where the coating was missing.These areas appear to have occurred as a result of condensation on the SCV or maintenance activities." Four bent vertical stiffeners, one stiffener with a gouge, two stiffeners with a weld on one side to the horizontal stiffener not complete and one area on the outside edge of the plate to the horizontal stiffener with metal damage. These areas are documented on PER 101958.These indications appeared to be from fabrication/installation or previous maintenance activities. The indications identified as light corrosion areas were deemed to be minor surface rust in nature. There were no visible signs of active corrosion in the light corrosion areas or the areas with missing coating. The areas examined did not show any wall loss or gross degradation. The four bent vertical stiffeners

  1. 53, and #54 between elevation 680 and 691, and #66 and #67 between elevation 740 and 750 are considered negligible and do not affect the structural integrity of the SCV. The stiffeners weld on vertical stiffener
  2. 17 at elevation 691 and vertical stiffener
  3. 8 at elevation 730 each had a complete weld on the other side and are acceptable by providing significant load path through the connection.

The metal damage on the outside plate to the horizontal stiffener B and between vertical stiffeners

  1. 12 and #13 at elevation 680 does not affect the structural integrity of the horizontal stiffener because the analysis does not take any credit for this outside plate. The gouge (approximately one inch long and '/ the thickness of the stiffener) on vertical stiffener
  2. 9 at elevation 749 does not affect the stiffener or the horizontal stiffener because the resulting reduction in the stiffness and structural capacity in not significant.

This information is documented under PER 101958.1? 21 OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1, 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-474 continued These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. Based on this information, there is no indication that an adverse condition exists in the areas examined or that an adverse condition would be present in inaccessible areas.No corrective actions are required to be performed during this outage. The light corrosion areas and the areas with missing coating will be cleaned and re-coated in the next outage (work order 06-773916-000). The bent stiffeners, incomplete welds, the stiffener with a gouge and the area with metal damage are documented under PER 101958 and no corrective actions required. The SCV is acceptable for continued service, and no further corrective action is required.Evaluation of additional examinations required per 10CFR50.55a(b)(2)(ix)(D). (1)A description of each flaw or area, including the extent of degradation, and the conditions that led to the degradation; (2) The acceptability of each flaw or area, and the need for additional examinations to verity that similar degradation does not exist in similar components; (3) A description of the necessary corrective actions; and (4) The number and type of additional examinations to ensure detection of similar degradation in similar components. These indications were noted during the VT-3 visual examination of the SCV on the outboard exterior surfaced areas (horizontal stiffeners B-J and vertical stiffeners 0-90). The examination identified indications consisting of:* Light corrosion in the drip channels, several areas with light corrosion on the stiffeners and steel containment vessel, and several areas where the coating was missing.These areas appear to have occurred as a result of condensation on the SCV or maintenance activities.

  • Four bent vertical stiffeners, one stiffener with a gouge, two stiffeners with a weld on one side to the horizontal stiffener not complete and one area on the outside edge of the plate to the horizontal stiffener with metal damage. These areas are documented on PER 101958.These indications appeared to be from fabrication/installation or previous maintenance activities.

The indications identified as light corrosion areas were deemed to be minor surface rust in nature. There were no visible signs of active corrosion in the light corrosion areas or the areas with missing coating. The areas examined did not show any wall loss or gross degradation. /2-3 c 2,q OWNER: TENNESSEE VALLEY AUTHORITY PLANT: SEQUOYAH NUCLEAR PLANT 1101 MARKET STREET P.O. BOX 2000 CHATTANOOGA, TENNESSEE 37402-2801 SODDY DAISY, TENNESSEE 37384-2000 UNIT: ONE CERTIFICATE OF AUTHORIZATION: NOT REQUIRED COMMERCIAL SERVICE DATE: JULY 1. 1981 NATIONAL BOARD NUMBER FOR UNIT: NOT REQUIRED IWE METAL CONTAINMENT EVALUATION NOI Number: 1-SQ-474 continued The four bent vertical stiffeners

  1. 53, and #54 between elevation 680 and 691, and #66 and #67 between elevation 740 and 750 are considered negligible and do not affect the structural integrity of the SCV. The stiffeners weld on vertical stiffener
  2. 17 at elevation 691 and vertical stiffener#8 at elevation 730 each had a complete weld on the other side and are acceptable by providing significant load path through the connection.

The metal damage on the outside plate to the horizontal stiffener B and between vertical stiffeners

  1. 12 and #13 at elevation 680 does not affect the structural integrity of the horizontal stiffener because the analysis does not take any credit for this outside plate. The gouge (approximately one inch long and 1/2 the thickness of the stiffener) on vertical stiffener
  2. 9 at elevation 749 does not affect the stiffener or the horizontal stiffener because the resulting reduction in the stiffness and structural capacity in not significant.

This information is documented under PER 101958.These areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. Based on this information, there is no indication that an adverse condition exists in the areas examined or that an adverse condition would be present in inaccessible areas or other areas on the SCV.The component is acceptable for continued service, and no further corrective action is required.Therefore, additional examinations are not warranted. No corrective actions are required to be performed during this outage. The light corrosion areas and the areas with missing coating will be cleaned and re-coated in the next outage (work order 06-773916-000). The bent stiffeners, incomplete welds, the stiffener with a gouge and the area with metal damage are documented under PER 101958, and no corrective actions are required.These SCV areas are not considered suspect and do not impact the structural integrity or leak tightness of the SCV. No detrimental flaws were observed. The component is acceptable for continued service, and no further corrective action is required this outage. Based upon the conditions found, no additional examinations are not warranted this outage.The remaining SCV surface area on the outboard exterior side is scheduled for examination in the next outage, ULC15. The areas with light surface corrosion and areas with missing coating are to be cleaned and re-coated next outage (work order 06-773916-000).; Based on the engineering evaluation documented in PER 10958, the four bent stiffeners, the incomplete weld areas on two vertical stiffeners and the gouge damage on one vertical stiffener are being scheduled for successive examinations in the next three inspection periods. Examinations being performed this outage, ULC14, and the next outage, ULC15, will result in 100% of the accessible areas on the SCV outboard side being examined this period./249~ 2}}