Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 April 3, 2017 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-77 NRC Docket No. 50-327 10 CFR 50.4 10 CFR 50.55a
Subject:
Unit 1 Refueling Outage 21 Day lnservice Inspection Summary Report In accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Article IWA-6240 and Code Case N-532-5, the Tennessee Valley Authority is providing the Sequoyah Nuclear Plant (SQN), Unit 1, lnservice Inspection (ISi)
Summary Report within 90 days from completion of the Unit 1 Refueling Outage 21 (U1 R21 ).
The U1 R21 refueling outage ended on January 4, 2017. Accordingly, this report is required to be submitted by April 4, 2017.
The Enclosure to this letter contains the Owner's Activity Report, a list of items with flaws or relevant conditions that required evaluation for continued service (Table 1 ), an abstract of repair and replacement activities required for continued service due to a flaw or relevant condition (Table 2), and the evaluation of acceptability of inaccessible areas of the steel containment vessel in accordance with 1 O CFR 50.55a(b)(2)(ix)(A).
There are no regulatory commitments associated with this submittal. Should you have any questions, please contact Mr. Michael McBrearty, Site Licensing Manager at (423) 843-7170.
Anthony L. Williams Site Vice President Sequoyah Nuclear Plant
U.S. Nuclear Regulatory Commission Page2 April3,2017
Enclosure:
ASME Section XI lnservice Inspection Summary Report, Unit 1 Refueling Outage 21 cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNIT 1 ASME SECTION XI INSERVICE INSPECTION
SUMMARY
REPORT UNIT 1 REFUELING OUTAGE 21
E-1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number U1R21 Plant SEQUOYAH NUCLEAR PLANT, P 0. Box 2000, Soddy-Daisy, TN 37384-2000 Unit No.
Commercial service date July 1, 1981 Refueling outage no.
21 (if applicable)
Current inspection interval Third and Fourth lnsrection Intervals (1", 2'". 3'", 4', other)
Current inspection period Third Inspection period of the Third Interval, First Inspection Period of the Fourth Interval Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition, 2003 Addenda 2007 Edition, 2008 Addenda Date and revision of inspection plans November 23, 2015 - O-Sl-DXl-000-114.3, Revision 28 May 5, 2016 - O-Sl-DXl-000-114.4, Revision 0 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Not Applicable Code Cases used:
N-460, N-513-3, N-532-4, N-532-5, N-566-2, N-586-1, N-686-1, N-706-1, N-716-1, N-722-1, N-729-1,
N-751, N-770-1 (if applicable, including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan required by the ASME Code XI and (c) the repair/replacement activities and evaluations supporting the completion of U1R21 conform to the requirements of Section XI.
(refueling outage number)
Signed
~ifJ-__
ISi Program Owner Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, Ct have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in manner for personal inj ry or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NB 10822 A,N,I (National Board and Endorsement)
E-2 ASME SECTION XI INSERVICE INSPECTION
SUMMARY
REPORT SEQUOYAH NUCLEAR PLANT UNIT 1 REFUELING OUTAGE 21 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description F-A, F1.10B Component ID 1-RCH-027, Rigid Support, loose nuts on pipe clamp (NOI 1-SQ-522)
Due to the orientation of the clamp, the support was found to remain functional. The loose nuts were corrected by WO# 118367516.
F-A, F1.10B Component ID 1-CVCH-343, Rigid Support, deformation of the lower I-beam (NOI 1-SQ-521)
Deformation is in a low stress area of the support and was evaluated to remain functional and no further action is required.
F-A, F1.10D Component ID 1-CVCH-091, Mechanical Snubber, support misaligned and a loose nut that is tight against the jam nut (NOI 1-SQ-520)
Previously evaluated by NOI-1-SQ-476 from U1C15 and found to be unchanged, remains functional, and no further action is required.
E-3 ASME SECTION XI INSERVICE INSPECTION
SUMMARY
REPORT SEQUOYAH NUCLEAR PLANT UNIT 1 REFUELING OUTAGE 21 TABLE 2 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number 3
Component Cooling Support Snubber (1-SNUB-070-CCH444)
Replaced snubber that was found to have failed the as-found visual exam 12/11/2016 116974304 3
Essential Raw Cooling Water Piping at (1-VLV-067-1600B)
Replaced piping section and weld to repair thru-wall leak.
12/21/2016 118367708 3
Essential Raw Cooling Water Piping at (1-VLV-067-677)
Replaced 3/4 piping section and weld to repair thru-wall leak.
7/2/2016 117812685 REPORTING REQUIRED BY 10 CFR 50.55a(b)(2)(ix)(A)
ASME Section XI, Subsection IWE Steel Containment Vessel Inspection Program 10 CFR 50.55a(b)(2)(ix)(A) requires reporting of the degradation assessment for inaccessible areas when conditions are identified in accessible areas during the performance of the ASME Section XI, Subsection IWE Steel Containment Vessel (SCV) Inspection Program that could indicate the presence of or result in degradation to such inaccessible areas.
The conditions identified during the Unit 1 Cycle 21 refueling outage on the SCV in an accessible area were determined to be acceptable and do not affect the degradation assessment for inaccessible areas. The conditions were documented in NOI 1-SQ-524. Only general surface corrosion was found and conservative assumptions were made to evaluate a wall loss rate that determined an acceptable thickness remained on the SCV bottom plate.