Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20155F20321 January 1975Summary of 750116 Meeting W/Util in Bethesda,Md Re Deferred & New Issues Involving Plant Project That Will Require Applicant to Provide Addl Info During post-const Permit Period.Attendance List EnclTurbine Missile
ML20155F22814 February 1975Summary of 750205 Meeting W/Util in Bethesda,Md Re Derivation of Dynamic Loads Considered in Design of Containment Structures & Significance of Loads to Overall Loading on Structures.Attendance List EnclHydrostatic
ML20155F3021 May 1975Summary of 750423 Meeting W/Util in Bethesda,Md Re Util Proposed Response to NRC Requesting Info on Design Basis Loading for Containment Structures Per Mod from Design in PSAR
ML20155F4692 June 1988Summary of 880511 Meeting W/Util to Discuss TVA Response to Generic Ltr 88-01 & Restart Item Identified as Igscc. Attendance List & TVA Summary Slides Encl
ML20155F48510 June 1975Summary of 750603 & 04 Meeting W/Util in Gaithersburg,Md & Bethesda,Md,Respectively Re Design Basis Loading & Design Methods for Plant
ML20155H3932 November 1998Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees EnclCoatings
Temporary Modification
Process Control Program
Fire Protection Program
ML20195B2218 June 1988Summary of Operating Reactors Events Meeting 88-23 on 880607.List of Attendees,Events Discussed & Summary of Reactor Scrams EnclFire Barrier
ML20195D8673 November 1998Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl
ML20195H02725 November 1988Summary of Operating Reactor Events Meeting 88-46 on 881122
ML20195J52521 January 1988Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant
ML20195J6289 June 1988Summary of 880518 Meeting W/Util to Address NRC Questions Re Interim Design Criteria for Seismic Design Program.Related Info Including List of Attendees EnclSafe Shutdown
Operating Basis Earthquake
Temporary Modification
Earthquake
ML20196A92017 June 1988Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl
ML20196B03719 November 1998Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts EnclSafe Shutdown
Met Tower
ML20196B2675 February 1988Summary of 880127 Meeting W/Util Re Use of Dual Role Senior Reactor Operator/Shift Technical Advisor.List of Attendees & Viewgraphs Encl
ML20196B9821 December 1988Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl
ML20196D38410 February 1988Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary EnclUnanalyzed Condition
ML20196E7246 December 1988Summary of 881130 Meeting W/Util in Rockville,Md Re Cable Separation.Attendance Roster & Viewgraphs Encl
ML20196F99524 February 1988Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs
ML20196H32529 June 1976Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl
ML20196H3985 July 1978Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl
ML20196J5434 March 1988Summary of 880229 Meeting W/Tva,S&W & Eqe Re Overall Civil/ Seismic Program at Plant.List of Attendees,Viewgraphs & Addl Info EnclSafe Shutdown
Design basis earthquake
Earthquake
ML20196J78510 March 1988Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl
ML20196L47929 June 1988Summary of 880616 Meeting W/Util Re Pipe & Pipe Supports Seismic Design Methodology.Util Agreed to Reevaluate Piping & Pipe Supports According to SRP & Compare to Original Design Basis to Establish Margin of Difference
ML20196L57628 June 1988Summary of 880602 Meeting W/Tva Re Implementation of ATWS rule,10CFR50.62.List of Attendees & Calculations Encl. Specifics of Standby Liquid Control Sys,Alternate Rod Injection & Recirculation Pump Trip Designs Discussed
ML20197E0727 May 1986Summary of 860408 Meting W/Util Re Hydrogen Control Measures,Standby Shutdown Facility & Nuclear Svc Water Sys Testing.Meeting Agenda,Attendance List & Viewgraphs EnclFuel cladding
ML20197F1698 May 1986Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us ReactorsShutdown Margin
Half scram
Chernobyl
ML20197F7728 May 1986Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments EnclChernobyl
ML20197J27316 January 1985Summary of 850115 Meeting W/Comanche Peak Records Review Group Re Review of Facility Hearing Transcripts
ML20198F56022 January 1974Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program
ML20198F6372 April 1974Summary of 740314 Generic Meeting W/B&W Re Containment Peak Pressure Analysis.List of Meeting Attendees & Viewgraphs Encl
ML20198G55018 December 1998Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop EnclEnforcement Discretion
Temporary Modification
Backfit
ML20198G6933 June 1975Summary of ACRS Subcommittee Meeting on 750516 to Discuss Application.List of Attendees Encl
ML20199G11926 February 1985Summary of 850215 Meeting W/Util Re Util Recovery Team Activities at Plant
ML20199G31815 January 1985Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed
ML20199L64726 June 1986Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs EnclAnchor Darling
ML20202B1812 July 1986Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept
ML20202G1718 July 1986Summary of Operating Reactor Events Meeting 86-22 on 860630 W/Ofc Director,Div Directors & Representatives to Discuss Events Occurring Since 860623.List of Attendees & Viewgraphs Encl
ML20202G49822 May 1986Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts EnclHigh Radiation Area
Hydrostatic
Squib
ML20203A2643 February 1998Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl
ML20203B3005 February 1998Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl
ML20203B57411 February 1998Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl
ML20203C2378 February 1999Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl
ML20203E80518 April 1986Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl
ML20203G49624 July 1986Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis
ML20203G69225 July 1986Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl
ML20203H21814 April 1986Summary of 860205 Meeting W/B&W Owners Group in Bethesda,Md Re B&W Owners Group Ongoing Programs & Activities & 850609 & 1226 Transients at Davis Besse & Rancho Seco,Respectively. Attendance List & Handout Incl
ML20203M94325 April 1986Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl
ML20203P68022 April 1986Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda EnclReactor Vessel Water Level
FLEX
Exemption Request
Control of Heavy Loads
Backfit
Unidentified leakage
ML20204E49519 March 1987Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program EnclInternal Flooding
ML20204E54219 March 1987Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented EnclSafe Shutdown