Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20155F203 | 21 January 1975 | Summary of 750116 Meeting W/Util in Bethesda,Md Re Deferred & New Issues Involving Plant Project That Will Require Applicant to Provide Addl Info During post-const Permit Period.Attendance List Encl | Turbine Missile |
ML20155F228 | 14 February 1975 | Summary of 750205 Meeting W/Util in Bethesda,Md Re Derivation of Dynamic Loads Considered in Design of Containment Structures & Significance of Loads to Overall Loading on Structures.Attendance List Encl | Hydrostatic |
ML20155F302 | 1 May 1975 | Summary of 750423 Meeting W/Util in Bethesda,Md Re Util Proposed Response to NRC Requesting Info on Design Basis Loading for Containment Structures Per Mod from Design in PSAR | |
ML20155F469 | 2 June 1988 | Summary of 880511 Meeting W/Util to Discuss TVA Response to Generic Ltr 88-01 & Restart Item Identified as Igscc. Attendance List & TVA Summary Slides Encl | |
ML20155F485 | 10 June 1975 | Summary of 750603 & 04 Meeting W/Util in Gaithersburg,Md & Bethesda,Md,Respectively Re Design Basis Loading & Design Methods for Plant | |
ML20155H393 | 2 November 1998 | Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl | Coatings Temporary Modification Process Control Program Fire Protection Program |
ML20195B221 | 8 June 1988 | Summary of Operating Reactors Events Meeting 88-23 on 880607.List of Attendees,Events Discussed & Summary of Reactor Scrams Encl | Fire Barrier |
ML20195D867 | 3 November 1998 | Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl | |
ML20195H027 | 25 November 1988 | Summary of Operating Reactor Events Meeting 88-46 on 881122 | |
ML20195J525 | 21 January 1988 | Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant | |
ML20195J628 | 9 June 1988 | Summary of 880518 Meeting W/Util to Address NRC Questions Re Interim Design Criteria for Seismic Design Program.Related Info Including List of Attendees Encl | Safe Shutdown Operating Basis Earthquake Temporary Modification Earthquake |
ML20196A920 | 17 June 1988 | Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl | |
ML20196B037 | 19 November 1998 | Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl | Safe Shutdown Met Tower |
ML20196B267 | 5 February 1988 | Summary of 880127 Meeting W/Util Re Use of Dual Role Senior Reactor Operator/Shift Technical Advisor.List of Attendees & Viewgraphs Encl | |
ML20196B982 | 1 December 1988 | Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl | |
ML20196D384 | 10 February 1988 | Summary of Operating Reactors Events Meeting 88-05 on 880202 on Events Since 880126 Meeting.List of Attendees, Events Discussed,Tabulation of long-term Followup Assignments & 10CFR50.72 Rept Tabulation & Summary Encl | Unanalyzed Condition |
ML20196E724 | 6 December 1988 | Summary of 881130 Meeting W/Util in Rockville,Md Re Cable Separation.Attendance Roster & Viewgraphs Encl | |
ML20196F995 | 24 February 1988 | Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs | |
ML20196H325 | 29 June 1976 | Summary of 760525 Meeting W/Util & Westinghouse Re Proposed Approach to Solution of Reactor Vessel Lateral Loading Question.List of Attendees,Agenda & Viewgraphs Encl | |
ML20196H398 | 5 July 1978 | Summary of 780622 Meeting W/Westinghouse Owners Group to Discuss Results of Phase a of three-phase Plan & Current Schedule for Resolution of Asymmetric LOCA Loads Isssue.List of Attendees Encl | |
ML20196J543 | 4 March 1988 | Summary of 880229 Meeting W/Tva,S&W & Eqe Re Overall Civil/ Seismic Program at Plant.List of Attendees,Viewgraphs & Addl Info Encl | Safe Shutdown Design basis earthquake Earthquake |
ML20196J785 | 10 March 1988 | Summary of Operating Reactors Events Meeting 88-10 on 880308.List of Attendees & Significant Elements of Events Discussed Encl | |
ML20196L479 | 29 June 1988 | Summary of 880616 Meeting W/Util Re Pipe & Pipe Supports Seismic Design Methodology.Util Agreed to Reevaluate Piping & Pipe Supports According to SRP & Compare to Original Design Basis to Establish Margin of Difference | |
ML20196L576 | 28 June 1988 | Summary of 880602 Meeting W/Tva Re Implementation of ATWS rule,10CFR50.62.List of Attendees & Calculations Encl. Specifics of Standby Liquid Control Sys,Alternate Rod Injection & Recirculation Pump Trip Designs Discussed | |
ML20197E072 | 7 May 1986 | Summary of 860408 Meting W/Util Re Hydrogen Control Measures,Standby Shutdown Facility & Nuclear Svc Water Sys Testing.Meeting Agenda,Attendance List & Viewgraphs Encl | Fuel cladding |
ML20197F169 | 8 May 1986 | Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors | Shutdown Margin Half scram Chernobyl |
ML20197F772 | 8 May 1986 | Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl | Chernobyl |
ML20197J273 | 16 January 1985 | Summary of 850115 Meeting W/Comanche Peak Records Review Group Re Review of Facility Hearing Transcripts | |
ML20198F560 | 22 January 1974 | Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program | |
ML20198F637 | 2 April 1974 | Summary of 740314 Generic Meeting W/B&W Re Containment Peak Pressure Analysis.List of Meeting Attendees & Viewgraphs Encl | |
ML20198G550 | 18 December 1998 | Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl | Enforcement Discretion Temporary Modification Backfit |
ML20198G693 | 3 June 1975 | Summary of ACRS Subcommittee Meeting on 750516 to Discuss Application.List of Attendees Encl | |
ML20199G119 | 26 February 1985 | Summary of 850215 Meeting W/Util Re Util Recovery Team Activities at Plant | |
ML20199G318 | 15 January 1985 | Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed | |
ML20199L647 | 26 June 1986 | Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl | Anchor Darling |
ML20202B181 | 2 July 1986 | Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept | |
ML20202G171 | 8 July 1986 | Summary of Operating Reactor Events Meeting 86-22 on 860630 W/Ofc Director,Div Directors & Representatives to Discuss Events Occurring Since 860623.List of Attendees & Viewgraphs Encl | |
ML20202G498 | 22 May 1986 | Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts Encl | High Radiation Area Hydrostatic Squib |
ML20203A264 | 3 February 1998 | Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl | |
ML20203B300 | 5 February 1998 | Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl | |
ML20203B574 | 11 February 1998 | Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl | |
ML20203C237 | 8 February 1999 | Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl | |
ML20203E805 | 18 April 1986 | Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl | |
ML20203G496 | 24 July 1986 | Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis | |
ML20203G692 | 25 July 1986 | Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl | |
ML20203H218 | 14 April 1986 | Summary of 860205 Meeting W/B&W Owners Group in Bethesda,Md Re B&W Owners Group Ongoing Programs & Activities & 850609 & 1226 Transients at Davis Besse & Rancho Seco,Respectively. Attendance List & Handout Incl | |
ML20203M943 | 25 April 1986 | Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl | |
ML20203P680 | 22 April 1986 | Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl | Reactor Vessel Water Level FLEX Exemption Request Control of Heavy Loads Backfit Unidentified leakage |
ML20204E495 | 19 March 1987 | Summary of Operating Reactor Events Meeting 87-07 on 870316. List of Attendees,Events Discussed & Significant Elements of Events Presented & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl | Internal Flooding |
ML20204E542 | 19 March 1987 | Summary of Operating Reactors Events Meeting 87-06 on 870309.List of Attendees & Events Discussed & Significant Elements of Events Presented Encl | Safe Shutdown |