ML20199G119
| ML20199G119 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak, 05000000 |
| Issue date: | 02/26/1985 |
| From: | Livermore H NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| To: | Noonan V NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM) |
| Shared Package | |
| ML20197J178 | List:
|
| References | |
| FOIA-85-59 NUDOCS 8606250084 | |
| Download: ML20199G119 (2) | |
Text
,
r y
- *'4 as kr o,
s 9'o,j 4 e._,
UNITED STATES i
NUCLEAR REGULATORY COMMISSION 3
E WASHINGTON, D. C. 20555
/
9 *. * * *,d 4
MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Project FROM:.
Herbert Livermore, QA/QC Group Leader Comanche Peak Technical Review Team
SUBJECT:
MEETING WITH JOHN HANSEL, TUEC RECOVERY TEAM LEADER On February 15, 1985, at his request, Mr. John Hansel gave me a short presentation of his group's activities at Comanche Peak. The handout he i
provided and the presentation were the same as he had provided the Contention 5 Panel while on-site the previous week.
5 In my estimation the presentation contained nothing new, in fact, I considered it as having only generalities and lacking specific detail.
I informed i
i Mr. Hansel that I neither approved nor disapproved of anything in his presentation and that it was nothing other than general information.
I I wish to note that during some aside discussions, it was learned that another
[
Corporation (PAC) is on-site, working for TUEC, actively revising procedures i
and changing QC cualification tests and methods. A general impression was l
gained indicating that there is a great amount of active recovery effort being performed on-site.
l f i'
%4 ZA4# %
=
J.
Herbert H. Livermore, QA/QC Group Leader i
r Comanche Peak Technical Review Team I
i FCJA-85-59 V 90 8606250084 860611 PDR FOIA GARDE 85-59 PDR b
[S '
,,m-~
,2_
2'
=-
^
~ ~ ~
_..__.,_....T
..a
/
5
~,
1
/
l p
b i
L MEMORANDUM FOR:
Vincent S. Noonan, Ofrector j
Comanche Peak Project W
FRON:
Herbert I.ivermore, QA/QC Group leader Comanche Peak Tech.nical Review Team
SUBJECT:
MEETING tilth JOHN HANSEL, TUEC
[
RECOVERY TEAM LEADER On February 15, 1985, at his request, Mr. John Hansel gave me a short presentation of his group's activities at Comanche Peak. The handout he l
provided and the presentation were the same as he h&d provided the Contention 5 Panel while on-site the previous week.
4' In my estimation the presentation contained nothlng new, in fact, I considered it as having only generalities and lacking specific detail.
I inforraed Mr. Hansel that I neither approved nor disapproved of anything in his presentation and that it was nothing other than general information.
I wish to note that during some aside discussions, it was learned that another Corporation (PAC) is on-site, working for TUEC, actively revising procedures and changing QC qualification tests and methods. A general impression was gained indicating that there is a great amount of active recovery effort being performed on-site.
t i
WOW r
erbert H. Li ermore, QA/QC Group Leader l_