Letter Sequence Meeting |
---|
|
|
MONTHYEARML20199H2771999-01-20020 January 1999 Proposed Tech Specs Changing Table 3.3.8.1-1 to Revise Allowable Values for Degraded Voltage Relay Reset & Dropout Setpoints as Specified Per Items 1.c,1.d,2.c & 2.d Project stage: Request ML20202J8541999-02-0505 February 1999 Forwards Notice of Proposed No Significant Hazards Consideration & Opportunity for Hearing Project stage: Other ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl Project stage: Meeting 1999-02-05
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] |
Text
,
, February 8, 1999 LICENSEE: lilinois Power Company FACILITY: Clinton Power Station
SUBJECT:
SUMMARY
OF JANUARY 21,1999, DEGRADED VOLTAGE RELAY SETPOINTS MEETING (TAC NO. MA4524)
On January 21,1999, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company (the licensee). The purpose of the meeting was to discuss proposed changes to degraded voltage relay setpoints as described in the license amendment submittal dated January 20,1999. A list of the meeting participants is included as Attachment 1. Copies of the meeting handouts are provided as Attachment 2 and
. Attachment 3. A copy of information sent by facsimile from the licensee to the NRC on January 12,1999 is included as Attachment 4.
The licensee proposes increasing voltage onsite by 5 percent to reduce the number of 480/120 voit regulating transformers that need to be installed and reduce the number of circuit modifications that need to be made to guard against undervoltage in the 120 voit circuits. The voltage increase necessitates changes to the Technical Specification undervoltage relay setpoints as described in the proposed license amendment. The licensee stated that it would like the amendment to be issued following field tests confirming the calculations and 2 weeks before their projected startup date of mid-March. The NRC staff is coordinating its amendment review and onsite inspection activities to provide for an efficient, effective review of the proposal.
Original signed by:
Jon B. Hopkins, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
- 2. Meeting Handout
- 3. Meeting Handout
- 4. Facsimile
\
cc w/atts: See next page i pQ\ \
DOCUMENT NAME: G:\PD3-3\CLINTON\0121MTS.WPD OFFICE PD3-2:PM 1, E PD3-2:LA E PD3-2:D E ,
NAME JHopkins /jV EBamhill & SRichards #
DATE h/5/99 'I A/f799 9-/ 8 /99 -
OFFICIAL RECORD COPY 110045 9902110290 990208 goa Apocaosoogg+t f.,gpfg:v.
.o, g $'7' h9'
. ~ _ . _ , ~ . - . .~ - ~ - - - - - - - - - ~ ~ ~ - - - - - - -- - --- -----
l .
UNITED STATES g j NUCLEAR REGULATORY COMMISSION WAsMINGToN, D.C. 30ee6 c001 I
February 8, 1999 LICENSEE lilinois Power Company FACILITY: Clinton Power Station l
SUBJECT:
SUMMARY
OF JANUARY 21,1999, DEGRADED VOLTAGE RELAY SETPOINTS MEETING (TAC NO. MA4524) i On January 21,1999, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company (the licensee). The purpose of the meeting was to discuss proposed changes to degraded voltage relay setpoints as described in the license amendment submittal dated January 20,1999. A list of the meeting participants is included as Attachment 1. Copies of the meeting handouts are provided as Attachment 2 and i Attachment 3. A copy of information sent by facsimile from the licensee to the NRC on January 12,1999 is included as Attachment 4.
The licensee proposes increasing voltage onsite by 5 percent to reduce the number of 480/120 j voit regulating transformers that need to be installed and reduce the number of circuit modifications that need to be made to guard against undervoltage in the 120 volt circuits. The voltage increase necessitates changes to the Technical Specification undervoltage relay '
setpoints as described in the proposed license amendment. The licensee stated that it would ;
l!ke the amendment to be issued following field tests confirming the calculations and 2 weeks ;
before their projected startup date of mid-March. The NRC staff is coordinating its amendment review and onsite inspection activities to provide for an efficient, effective review of the proposal.
l
/
s -- J Jon B. Hopkins, Senior roject Manager Project Directorate lll-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-461
-Attachments: 1. List of Meeting Participants
- 2. Meeting Handout
- 3. Meeting Handout
- 4. Facsimile cc w/atts: See next page
= - ----u- - - - - -- e -- - ,.r- =,- -,
Clinton Power Station, Unit 1 lilinois Power Company -
cc: '
1 John P. McElwain . Illinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station ATTN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Spiingfield,IL 62704 Wayne Romberg Josepn V. Sipek Manager Nuclear Station Director- Licensing Engineering Department Clinton Power Station Clinton Power Station P.O. Box 678 P.O. Box 678 Mail Code V020
.Clinton,IL 61727 Clinton,IL 61727 Resident inspector Leah Manning Stetzner )
U.S. Nuclear Regulatory Commission VP, General Counsel & Corp. Secretary RR#3, Box 229 A 500 South 27th Street Clinton,IL 61727 Decatur,IL 62525 i
R. T. Hill Licensing Services Manager l General Electric Company 175 Curtner Avenue, M/C 481
]
San Jose, CA 95125 '
Regional Administrator, Region lli !
U.S. Nuclear Regulatory Commission
]
801 Warrenville Road Lisle, IL 60532-4351 i
' Chairman of DeWitt County l c/o County Clerk's Office
. DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager >
,- Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603 i
~' ~ l DISTRIBUTION FOR
SUMMARY
OF JANUARY 21,1999, MEETING WITH ILLINOIS POWER COMPANY Hard Coov w/atts Docket File PD lll-2 Reading j l- PUBLIC '
GGrant, Rlil
'JHopkins Hard Coov w/Att 1 OGC ACRS E-mail w/Att 1 SCollins (SJC1)
RZimmerman THiltz BBoger EAdensam (EGA1) i SRichards Meeting Participants e
s
- . . - . . . . - - __. _ - -- - - . . - . _ . . - - - . .-_. . .- . ~ .
MEETING ATTENDEES
' NRC AND ILLINOIS POWER COMPANY DEGRADED VOLTAGE RELAY SETPOINTS MEETING JANUARY 21,1999 HRQ J. Hopkins J. Lazevnick S. Richards D. Butler D. Thatcher F. Burrows N. Trehan Illinois Power Comoany J. Sipek R. Phares J. Ray W. Romberg A. Haumann J. Kaczmarek PECO Enerav J.Yacyshyn S. Hutchins t-Attachment 1 c
b
Reassessment of Regulating Transformer Modifications at Clinton Power Station January 21,1999 l
1 i.
IP Reoresentatives:
W. D. Romberg Manager-Degraded Voltage R. F. Phares Manager-Nuclear Safety and Performance Improvement J. V. Sipek Director-Ucensing J. F. Kaczmarek Ucensing Engineer J.L. Ray TechnicalLead-Degraded Voltage A.B.Haumann Technical Manager-Degraded Voltage
[
i.
f i
1 ILLIN915 P4sWER Attachment 2
l Aaenda j l
Introduction J. V. Sipek ,
1 Reassessment of Regulating W.D.Rombeg Transformer Modifications
- Plant Configuration Changes Technical Specification Changes J. F. Kaczmarek
- Supporting Calculations Evaluation of Potential for W.D.Rombeg Overvoltage Conclusion R. F. Phares I
1.
l ILLIN9ES P47WER
Introduction l -
Licensee Event Report 94-005 i - Recognized Weakness in Circuit Modeling Below 480-Volt Level Interim Actions Established
- New Degraded Voltage Relays Purchased
- New Relays Installed / License Amendment 110 issued in Early 1997 Full Scope of Modifications Determined
- Static VAR Compensators for RAT and ERAT ERAT Replaced with Load Tap Changer (RAT to be Replaced in the Future)
- Regulating Transformers to be Installed for Susceptible 120-Volt Circuits Progress / Current Status
- SVCs Installed ERAT LTC installed -
- Regulating Transformer Modifications Underway but Reassessed l
1 ILLIN9fS P(sWER
Reassessment of Regulatina Transformer Modifications Challenges Encountered During Design and Installation of Regulating Transformers Revised Approach Adopted
- Circuits Modified (Cable Rerouted, Parallel Cable l installed, etc.) l
- Raise Tap Setting on RAT
- Fewer Regulating Transformers Required
- Regulating Effect of SVC Accommodates Expected Offsite Voltage Range (Figure 1)
- Revised Degraded Voltage Relay Setpoints Requires Revision of CPS Technical Specifications
- Evaluation of Potential for Overvoltage I '
ILLIN915 PbWER
Technical Specification Channes Technical Specification Changes Required
-- Changes to Allowable Values Specified for Degraded Voltage Relay Setpoints
- Changes to Minimum Required Steady-State Bus Voltage Specified in Surveillance Requirements for Standby Emergency Diesel Generators Setpoint Changes Based on Calculational Methodology Previously Reviewed by NRC (for Amendment 110)
Status of Calculations Timeframe for NRC Review and Approval e
ILLIN915 P4rWER
- I.-..- - -.
!l i[ Overvoltaae Evaluation l
l
- Potential for Overvoltage at Higher RAT Tap Setting l - Not a Concern for ERAT I
, - Potential for Overvoltage Dependent on all of the 1 Following:
i !.
- Offsite Source (Grid) Voltage (Plant Running or
!( Not Running) High
- insufficient Balance of Plant Loading on RAT i,
i
{
Potential Minimized via Procedural Controls
- Transfer Division 1 or 2,4.16 kV Bus to ERAT
- Monitor RAT Loading ILLINSIS P(WWER
4,. .
. .g. . , ,,
_I . . o . \, .
-+ 1 e
g l .
. . _ a ..z .
- . z =*-
ca I :f
< 3 *
' I4 U$c -*a 255 , _ _ _ _ .
15:$ ,. r c.o+m2
, . _ma _ _ _. _ _ _ k oc}a . 3 s ,
C i
> 1 I )}( - t ,-
-c , - 1 h >- A !
g I ,% e a i i
Y /
- (
, , G.
1 . W I xo O mo C to kO$
r- 2 , {6 p $.I a
1
.s a
g y a
' 88 .
5 ,S ib,u
4 y f L g3; I>
ln E
%^.-@h ii; 8 : -
U Ps- 1. - 1-o ~. 3. 8 !
E E
! 9 8 k"I.
8' l 4 2, 8
g 8 :
~
, a ,
3 -
3 2 ' 2 i i
- 4. v.
u ,.
- i. n
=
-gt.;, 5 i
i
.- c .
553 ' 8 a g,e a. .
g,- . -
=
.- r e,,
h > A
~
l.2 a
a.
a Hl.
s -
=l c i 4 n 5 3F- : 5
,a =.
.i m: . ..
y y v -- .,
g I Nd i o
4 Ig :
m E
i x-i
.,: .5 . 3 g e, . I g I y=. .
es l
, =
i
^ -
. $. = >.
t .
i I 1 ss<* :P , , i r.: , , . - i :
at . . a a 5 . ;
v u..i :
. ,e li, i
- n. -
stl, .
rz:! c-c- i : +
- .-Q) ! ,
>@ (> ,
1 n 2 -
i ej-_: llc i ud, a
el
,-ca ,
i g ,
(o_r.s 3t- ,, t.______________. g o5 )
k4 $
!I a#'
s . -
v:5 ("I_d n ,
(o" #
! - c
., .=.r i -- u. ._
s3
.- . U -O,' -
- l1 i
, . 4, t
h,, -
l
. 9. . 4. q +. .
i Figure 1 Attachment 3 i
- 1. "
._._.____.g._____._._.-O-- - O- -- - - -- O -- - - -- --S
- 11. 0.4 --
. ,. . ._- - - 3::=4 -9====r:Ti
. -r i
~
- 1. 02 - -
- 1. 00 - ~
\
- 0. 98 -
h M0. 96 - ~~
i e to o e r
- M0. 94 - g
- 0. 92 - a Predicted High Voltage O. 90 - O Actual High Voltage .
i
- 0. 88 - Predict-d Low Voltage t o Actual L'ow Voltage
- 0. 86 - '
1996 1997 1998 1999 2000 2001 - 2002 - 2003 YEAR-a
_ . _ _ - . . . . . . - - _- ..._-...._.w.m..e, ,%. _ _ . , _ __,_____.m___,-. , -_ . . ,mm......-. mm.,#,-.m...~..
~
- 1. 06 - .
4 1. 04 -
a a = = a 1 02 - - ~ ~ - -
--- 0 -- ---
G- -E)
- 1. 00 -
- 0. 98 - o Predicted High Voltage M0. 96 - O Actual High Voltage ao 0 0.94_ '
O Predictd Low Voltagel o Actual Low Voltage
- 0. 92 -
- 0. 90 -
- 0. 88 -
g
- 0. 86 -
1996 1997 1998 1999 2000 2001 2002 2003 YEAR
_ _ _ _ _ _ _ . _ . _ _____m---m__.____ - _ . - _ _ _ - _m._______m.__._.-__.m_____ _______ -_ _ _ _ _ _ . _ - _ _ - _ . _ . . - _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ - . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . . . . . _ _ _ _ _ . _ _ _ .
graph Chart 1 .
Maximum and Minimum Grid Voltage (6/97 - 9/98) .
?
6 t
I 360.M . 1
^ ^
. . w .
9 ...u( . 3 ,, - n ^
355.00 -
> 11' $. ,
.a....,.. ,e-
> . u.
.'-. 4 ., I 3 w &..
.g>
.n
.A%'. ,u- .-e.. m..AI'..-
m,' [9- _ ,. 'p h. i .
y:. e s , . .- ., ... . -..#.y --t... g. -
- m. .
t, ,. , , .,_
. , .5
,-..1.
y 3. .. g. ,.d. _.. A
_c:
y ,
.w,.. -
.g
. . , . _a - . ~<.., n..
s
~
, . = .._.
4
-.J, e ' r...
- r. 4 .. ,
350.00 - W @/p%aro. M. W~ 5EM ..t_
&.> t%w .- .a. . . 2.w ; - 1 , 'S. . -
- 4e
. . . , t
.:s u . 4 . . . : ~ 1 5
- fi. .w m r
, . y -? - N, " , "p- 4. , ,~r a. - t c- t- ' ys..' l Ngf.pi.nq@D: <- .
'g4 *,Je. m.J c.
- c. .::.:e,-
YAM.x.-u-@.m$a . i*- id~M. . . ~ . - s.4.._ . .
~ *
?.. pc:- ' < .ws' .m, . :r ~
- n. c
.r_. .. ...a. - , .. ,w .1. x. , , .. ,- ..
g .' r; q#jpg.].. ,I,pa . .s.m . ,j E_ J ',. % , ,<<
- s. ', , ,,
^
j' y
.' -p, t
. -c, ,. . -. ., + -
..zu.,.,, -.w m
.=
- . . . ... yw._. p.. ,p. , , .e x. . ..n..:r.u.,, .
> . ,, > .y . . , . ..~s.
~-,,
-. - cj. .:, n.. a ,,:* ? ') L h f.*
- w. ., 4} .' -G '* ' . ' 'T pba /, ,. '%n
{ is f3** ?~',,_.. . . ;, 3 '4,,s j* . s s k
-k. . I 5- 7
= =* ' I -. ,i E M.@ .. c $^? 4+',,- g.i_:.Oc ',f; . , .,N , -. .. o x.
4 -
~
- q., . '
c .
-e-nan (kV)
> < -m,- ~a z. - A:. v. ..
.~w- +:. ' w ,. un. ;
- 1. . 4 +o~ g . x ..e--J u ' . . 6 ,
- . ,z' y 4 t- _.
r y; w; ,.r-
~.
- ~ '
~ - ,
yn 1.y,- -t Q 35 -
n^ . 3m : ,
. .v. s o
s ,.w - ,
. u. . . .,._ .t, t
-1..~ -
s . .
p
-l .. ?_ 'i n..,p,. 1
..-1= . ..n .
4
- . _ x , . i r
2 340.00 - ;- -
.a <a.' o
- g. >
A s
s +. ', n.4.; b :; y -
m;y
. . d. O ;
, p . -
. ' * ,. 1 g,.
- g. .
4
- 6 -
- ye. ,
T .. .n. . .; . - .%v.x ~
. .. ~
s ,i& . aM-4 - N< . .. . . . -
~
4 s
U V v., 1 ,.
w: . C ,y % s :
.,;f o r% g. p %%,@kW. 7 , ,g. [ *. .
. O 1.91.
g n.
^yr.Uni ,,. n :
l': g , @l,t H =': . .
g..,@o_ ... z
,u. . ,
s-_ +
. % .n ,- - -
. 1. A- . r 330.00 Apr-97 Jun-97 Aug-97 Sep.97 Nov-97 Jan-96 Feb-98 Apr-96 Jun-96 Jul-96 Sep-98 r Month ,
L
. Page 1
+
T h
. .?
Minimum E xpec t ed O f f-Sit e Vof ta ge Minimum 0. 75% Margin Maximum Analyical Pickup 4118 --
Maximum Pickup 4111 --
Pickup setpoint 4101
- 4092 Maximum Drop-out Minimum. Pickup 4090 -.
Minimum Analyical Pickup 4084 --
4072 Drop-out setpoint
- 4051 Minimum Drop-out
- 4035 Minimum Analyical Drop-out I
~
.{efdps9 ' ~ "eeis/T "CUNTON' POWER'STATICriUCEN5iNdiiOC Pit 0 JECT nGR" ~~'~ ~t de29~ ~~Pel~~ ~]
i . .
j e Degraded Voltage Modifications (Original / Planned Scope)
SVCs '
! - . ERAT LTC l, - Regulating Transformers (480 V to 120-V)
, . Numberin Division 1 = 5
! = Numberin Division 2 = 5 .
. Numberin Division 3 = 1 -
! e Approximately 70 circuits afected '
. Design, Scheduling, Tedinical issues Encountered That Were Not i Previously Anticipated and Escalated Construction Costs l .
j- . Partial implementation of Scope and Regulating Transformer Installation i'
2 Number in Divisio.n 1 = 2 Number in Division 2 = 1
- Numberin Division 3 = 1
- Interim Configuration (Intend to Complete in RF-7)
- Approximately 27 Circuits Addressed
. Regulating Transformer .
i
. Reduced Voltage Drop e Raise RAT Tap by 5% (One Position)
- Allows SVC to Operate in Intended Range e Raise Second Level Undervoltage Relay Setpoints and Allowable Values
- 5% Boost
- No Significant Change in Probability of Transfer to Diesel Generators
- ENect of RAT SVC Trip
. Some increase in Potential for Overvoltage to Some Circuits in the Event of an SVC Trip at Maximum Expected OWsite Voltage
. Compensatory Measures / Contingencies
- Maintain BOP Loads / Busses on RAT
- Consider Transferring Div.1 or 2 to ERAT on Loss or Redudion of BOP Loads / Busses from RAT.-
Post it" brand fax transmittai memo 7671 aet psons e 1
- Jor4 Horgids- *ies Etwoop US N RC oWFN MtNots Powet
"*
Attachment 4 rn. M s-tS C6
l
. . Degraded Voltage Modifications (Original / Planned Scope)
SVCs .;
- ERAT LTC'
- Regulating Transformers (480 V to 120-V)
. Numberin Division 1 = 5
. Numberin Division 2 = 5
< . Numberin Division 3 = 1
. e Approximately 70 circuits affected
. Design, Scheduling, Technical lasues Encountered That Were Not Previously Anticipated and Escalated Construction Costs 2
Y - .
l . Partial implementation of Scope and Regulating Transformer Installation Number in Divisio.n 1 = 2.
Number in Division 2 = 1 Numberin Division 3 = 1
- Interim Configuration (Intend to Complete in RF-7)
- Approximately 27 Circuits Addressed
. Regulating Transformer
. Reduced Voltage Drop
. Raise RAT Tap by 5% (One Position)
- Allows SVC to Operate in Intended Range
. Raise Second Level Undervoltage Relay Satpoints and Allowable Values
- 5% Boost .
- No Significant Change in Probability of Transfer to Diesel Generators
- Effect of RAT SVC Trip i
. Some increase in Potential for Overvoltage to Some Circuits in the Event of an SVC Trip at Maximum Expected Offsite Voltage
. Compensatory Measures / Contingencies Maintain BOP Loads / Busses on RAT 4
- Consider Transferring Div.1 or 2 to ERAT on Loss or Reduction of l i
BOP Loads / Busses from RAT.-
~
Post-it' brand tax transmittal memn 7671 * * >=eas
- Jota Herms "'T e x E t. w ee p ;
USNRC OWFN T u.tw ois Po wt K
- N3scTs *ENess-stal n4*e Attachment 4 wa s '=; ,,gg g
l '*; .
~ ,
' ~
February 8, 1999 LICENSEE: Illinois Power Company
. FACILITY: Clinton Power Station
SUBJECT:
SUMMARY
OF JANUARY 21,1999, DEGRADED VOLTAGE RELAY SETPOINTS MEETING (TAC NO. MA4524) t On January 21,1999, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company (the licensee). The purpose of the meeting was to :'
- discuss proposed changes to degraded voltage relay setpoints as described in the license amendment submittal dated January 20,1999. A list of the meeting participants is included as Attachment 1. Copies of the meeting handouts are provided as Attachment 2 and Attachment 3. A copy of information sent by facsimile from the licensee to the NRC on January ;
12,1999 is included as Attachment 4.
The licensee proposes increasing voltage onsite by 5 percent to reduce the number of 480/120 volt regulating transformers that need to be installed and reduce the number of circuit 1 modifications that need to be made to guard against undervoltage in the 120 volt circuits. The voltage increase necessitates changes to the Technical Specification undervoltage relay setpoints as described in the proposed license amendment. The licensee stated that it would like the amendment to be issued following field tests confirming the calculations and 2 weeks before their projected startup date 'of mid-March. The NRC staff is coordinating its amendment review and onsite inspection activities to provide for an efficient, effective review of the proposal.
Original signed by:
Jon B. Hopkins, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
- 2. Meeting Handout
- 3. Meeting Handout
- 4. Facsimile cc w/atts: See next page DOCUMENT NAME: G:\PD3-3\CLINTON\0121MTS.WPD OFFICE PD3-2:PM ,, E PD3-2:LA E PD3-2:D E ,
NAME JHopkins /F EBamnill W SRichards #
DATE b / 5/99 '"ll A/f/99 9-/ B /99 OFFICIAL RECORD COPY i
o
. -