Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000369/1988026 | 12 October 1988 | Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings | Safe Shutdown Fire Barrier Fire Watch Hourly Fire Watch |
IR 05000369/1988027 | 28 October 1988 | Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise | Fire Watch |
IR 05000369/1988028 | 14 October 1988 | Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies | |
IR 05000369/1988029 | 23 September 1988 | Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing | Time of Discovery Shutdown Margin Past operability |
IR 05000369/1988030 | 4 November 1988 | Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings | |
IR 05000369/1989001 | 29 March 1989 | Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures | Fire Barrier Past operability Temporary Modification Loctite Overspeed trip |
IR 05000369/1989002 | 25 April 1989 | Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures | |
IR 05000369/1989003 | 30 March 1989 | Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) | Safe Shutdown Fire Barrier Temporary Modification Emergency Lighting Fire Protection Program Fire Watch Manual Operator Action |
IR 05000369/1989006 | 10 April 1989 | Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ | |
IR 05000369/1989007 | 17 April 1989 | Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing | Nondestructive Examination Eddy Current Testing |
IR 05000369/1989008 | 6 April 1989 | Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube | Nondestructive Examination Eddy Current Testing |
IR 05000369/1989009 | 30 March 1989 | Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures | |
IR 05000369/1989013 | 1 June 1989 | Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting | |
IR 05000369/1989015 | 7 September 1989 | Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation | Packing leak Stroke time Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Commercial Grade Scaffolding Grace period |
IR 05000369/1989016 | 8 August 1989 | Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings | |
IR 05000369/1989017 | 10 July 1989 | Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers | |
IR 05000369/1989018 | 9 August 1989 | Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings | Past operability Moisture barrier Coast down |
IR 05000369/1989019 | 19 July 1989 | Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr | |
IR 05000369/1989020 | 16 August 1989 | Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity | Local Leak Rate Testing |
IR 05000369/1989021 | 16 August 1989 | Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments | |
IR 05000369/1989022 | 17 August 1989 | Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item | |
IR 05000369/1989023 | 3 August 1989 | Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs | |
IR 05000369/1989026 | 30 August 1989 | Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys | Stress corrosion cracking Eddy Current Testing |
IR 05000369/1989029 | 31 August 1989 | Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications | Nondestructive Examination Liquid penetrant |
IR 05000369/1989030 | 20 September 1989 | Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000369/1990015 | 10 September 1990 | Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise | Unidentified leakage |
IR 05000369/1990017 | 11 September 1990 | Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods | Fitness for Duty Packing leak Temporary Modification Unidentified leakage |
IR 05000369/1990019 | 4 October 1990 | Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan | |
IR 05000369/1990020 | 7 November 1990 | Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities | Stroke time |
ML20055H484 | 13 July 1990 | Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 | |
ML20056A586 | 24 July 1990 | Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts | Earthquake Commercial Grade Scaffolding Overspeed trip |
ML20127E623 | 15 April 1985 | Insp Repts 50-369/84-20 & 50-370/84-17 on 840904-06. Violation Noted:Failure to Perform Periodic Tests of Standby Shutdown Sys | |
ML20127K190 | 9 April 1985 | Insp Repts 50-369/85-09 & 50-370/85-10 on 850304-08. Violation Noted:Failure to Specify post-mod Testing Requirements & Acceptance Criteria | Temporary Modification |
ML20127K917 | 3 May 1985 | Insp Repts 50-369/85-03 & 50-370/85-03 on 841220-850120. Violations Noted:Failure to Follow Operations Procedures, Failure to Perform Surveillance & Failure to Implement Requirements of Tech Spec Section 3.0.3 | Temporary Modification Missed surveillance |
ML20132A977 | 26 February 1985 | Insp Repts 50-369/84-40 & 50-370/84-35 on 841127-1211. Violations Noted:Operation W/Degraded Safety Circuit,Failure to Adequately Install & Test safety-related Equipment & Failure to Perform Adequate post-trip Review | |
ML20132G668 | 20 June 1985 | Insp Repts 50-369/85-20 & 50-370/85-21 on 850521-24 & 0603-07.Violation Noted:Failure to Follow Procedure for Reactivity Balance Calculations & Reactor Startup | Shutdown Margin |
ML20133E036 | 28 November 1984 | Insp Repts 50-369/84-28 & 50-370/84-25 on 840924-28. Violations/Deviations Noted:Failure to Provide Fixed Suppression Sys in Accordance w/10CFR50,App R,Section III.G.3 for Rooms,Area & Zones Under Const | Safe Shutdown Boric Acid Fire Barrier Emergency Lighting Fire Protection Program Hourly Fire Watch |
ML20133P695 | 29 July 1985 | Insp Repts 50-369/85-21 & 50-370/85-22 on 850521-0620. Violations Noted:Failure to Follow Procedures & Inadequate Procedure Resulting in Valve Misidentification & Failure to Perform Surveillance on Unlocked/Open Fire Doors | Missed surveillance |
ML20133P713 | 18 July 1985 | Insp Repts 50-369/85-16 & 50-370/85-17 on 850421-0520. Violations Noted:Inadequate Measures,Procedures or Instructions Provided to Assume That Valve/Motor Installation Requirements Implemented | |
ML20133Q284 | 2 August 1985 | Insp Repts 50-369/85-22 & 50-370/85-23 on 850610-14. Violations Noted:Failure to Post Radiation Area & Skin Exposure in Excess of 10CFR20.101(a) Limits | Overexposure |
ML20137E165 | 14 November 1985 | Insp Repts 50-369/85-32 & 50-370/85-29 on 850923-27. Violations Noted:Failure to Follow Procedure When Replacing Tubing Test Tee on Cold Leg Accumulator Level Transmitter | Temporary Modification |
ML20137W225 | 2 December 1985 | Insp Repts 50-369/85-39 & 50-370/85-40 on 851015-1108. Deviation Noted:Failure to Complete Preoperational Testing of Control Room Ventilation Sys Per FSAR Commitments | |
ML20138A401 | 4 March 1986 | Insp Repts 50-369/86-05 & 50-370/86-05 on 860203-07. Violation Noted:Asme Section XI Position Indicator Verification Inservice Testing for RHR Sys Valves Not Performed within Required Interval | |
ML20138C587 | 20 March 1986 | Insp Repts 50-369/85-45 & 50-370/85-46 on 851221-860127. Violation Noted:Inadequate post-trip Review of Unit 1 Reactor Trip & Safety Injection on 851102 | Unidentified leak |
ML20138M740 | 18 October 1985 | Insp Repts 50-369/85-30 & 50-370/85-32 on 850821-0920. Violations Noted:Two Trains of Pressurizer Heaters W/Backup Emergency Power Inoperable for Period Longer than Allowed by Tech Specs & Failure to Follow Procedures | |
ML20138Q402 | 13 December 1985 | Insp Repts 50-369/85-40 & 50-370/85-41 on 851029-1120. Violation Noted:Surveillance to Verify Operability of Refueling Canal Drains & PORV Block Valves Not Performed within Applicable Surveillance Intervals | Missed surveillance Through Wall Leak |
ML20138R561 | 16 December 1985 | Special Insp Repts 50-369/85-29 & 50-370/85-28 on 850903-11. No Violations or Deviations Noted.Major Areas Inspected: Emergency Response Facilities.Weaknesses Noted: Meteorological Measurements & Control Room Assessment Areas | Emergency Lighting |
ML20148H178 | 8 March 1988 | Insp Repts 50-369/88-04 & 50-370/88-04 on 880121-0226. Violation Noted.Major Areas Inspected:Operations,Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings | |
ML20149E209 | 14 January 1988 | Insp Repts 50-369/87-42 & 50-370/87-42 on 871215-18. Violations Noted.Major Areas Inspected:Thermal Power Monitoring & Nuclear Instrument Calibr & Operability.Heat Balance Data Sheets Encl | |
ML20149M126 | 18 February 1988 | Insp Repts 50-369/87-43 & 50-370/87-43 on 871121-880120. Violations Noted.Major Areas Inspected:Operations,Safety Verification,Surveillance Testing,Maint Activities & Review of Licensee Actions Re Generic Ltr 81-21 |