ML19324C175 | 8 November 1989 | LER 89-012-01:on 890309,diaphragm Leak Found in Pressure Differential Switch 1E31-N013BB.Caused by Tear Found in Diaphragm.Replacement Switch Installed,Calibr & Functionally Tested satisfactorily.W/891108 Ltr | |
ML19325F341 | 13 November 1989 | LER 89-024-00:on 891013 & 30,unsealed Openings in Main Control Room Floor & Main Control Room West Wall Discovered. Caused by Wide Gap Between Structural Beam & Cable Tray. Openings Sealed & Fire Watch established.W/891113 Ltr | Fire Barrier Fire Watch Hourly Fire Watch |
ML19327C260 | 17 November 1989 | LER 89-014-00:on 891020,primary Containment Isolation Sys Group 4 Isolation Occurred Causing Isolation Dampers to Close.Caused by Opening of Div 2 125-volt Dc Breaker.Power Supply replaced.W/891117 Ltr | Emergency Lighting |
ML19332D518 | 22 November 1989 | LER 89-018-01:on 890515,RCIC Received Div I & Div II Isolation on RCIC High Steam Line Flow.Caused by Spurious High Steam Flow Signal When Steam Added to RCIC Steam Line. Special Test Initiated.Isolation Logic reset.W/891122 Ltr | |
ML19332E658 | 29 November 1989 | LER 89-015-00:on 891030,shift Control Room Engineer Noted That Quarterly Standby Liquid Control Operating Surveillance LOS-SC-Q1 Was Past Critical Date.Caused by Clerical Data Entry Error.Missed Surveillance performed.W/891129 Ltr | Missed surveillance |
ML19332F008 | 8 December 1989 | LER 89-016-00:on 891109,RWCU Isolation Occurred While Instrument Surveillance on Ventilation Differential Temp Isolation Functional Test in Progress.Caused by Faulty Thermocouple.Thermocouple repaired.W/891208 Ltr | |
ML19332F243 | 1 December 1989 | LER 89-025-00:on 891101,sys Auxiliary Transformer Feed to Bus 142Y Tripped Open When Equipment Operator Closed Door Containing Relays.Caused by Misalignment of Door.Isolations Reset,Bus Energized & Circuit Logic tested.W/891201 Ltr | |
ML19351A630 | 15 December 1989 | LER 89-006-01:on 890214,reactor Vessel Low Water Level 3 Switch Setpoint Found Out of Tolerance.Caused by Setpoint Drift.Level Switch to Be Replaced by Analog Trip Sys During First Quarter 1990.W/891215 Ltr | Reactor Vessel Water Level |
ML19351A675 | 12 December 1989 | LER 89-027-00:on 891113,primary Containment Isolation Sys Group I Isolation Occurred While Performing Instrument Surveillance.Caused by Loss of Power to Leak Detection Sys Logic.Isolation reset.W/891213 Ltr | Reactor Vessel Water Level |
ML19354D836 | 15 January 1990 | LER 89-018-00:on 891216,plant 250-volt Battery & RCIC Sys Declared Inoperable Due to Low Battery Electrolyte Temps. Caused by Failure of Div I Switchgear Heat Removal Sys Damper Actuators.Air Intake Dampers closed.W/900115 Ltr | |
ML20005D662 | 6 December 1989 | LER 89-026-00:on 891106,inadvertent Primary Containment Isolation Actuation Occurred While Clearing out-of-svc. Caused by Inadequate Logic Setup During Mod Installation. Trip Status & Output Switches repositioned.W/891206 Ltr | |
ML20005E274 | 22 December 1989 | LER 89-028-00:on 891204,RHR Shutdown Cooling Suction Header Outboard Isolation Valve Automatically Isolated.Caused by Miscommunication Between Technician & Station Operator.Task Force Developed to Review event.W/891222 Ltr | High Radiation Area Missed surveillance |
ML20006E395 | 14 February 1990 | LER 89-010-01:on 890303,automatic Depressurization Sys Permissive Switch Found W/Setpoint in Excess of Reject Limit.Caused by Setpoint Drift.All Static-O-Ring Reactor Vessel Level Switches Will Be replaced.W/900214 Ltr | |
ML20006E398 | 14 February 1990 | LER 89-008-01:on 890228,reactor Vessel Low Water Level 2 Switch Found W/Setpoint in Excess of Reject Limit.Caused by Setpoint Drift.Channel Placed in Tripped Condition & All Static-O-Ring Pressure Switches to Be replaced.W/900214 Ltr | |
ML20006E445 | 14 February 1990 | LER 89-009-01:on 890619,diaphragm Leak Discovered in RCIC Steam Line High Flow Isolation Switch.Caused by 1 & 1/2-inch Tear in Diaphragm.Pressure Differential Switch Replaced & Calibr.Reported Per NRC Bulletin 86-002.W/900214 Ltr | |
ML20006E450 | 15 February 1990 | LER 89-010-01:on 890715 & 17,voltage Oscillations Noted on Div II Battery Charger,Resulting in Inoperability of HPCS Sys.Caused by Failure of Charger in High Voltage Shutdown Relay.Charger Energized & Relay replaced.W/900215 Ltr | |
ML20006F595 | 21 February 1990 | LER 90-001-00:on 900122,RWCU Sys Received Div 1 Leakage Detection Ambient Temp High Isolation Signal,Causing Trips of RWCU Pumps a & C.Caused by Broken Thermocouple Input Lead.Lead Wire Reconnected & Isolation reset.W/900221 Ltr | |
ML20011D134 | 14 December 1989 | LER 89-017-00:on 891117,flow Switch FS-2E22-N006 Found W/ Setpoint Out of Tolerance Above Reject Limit.Caused by Setpoint Drift.Work Request Written to Replace Flow Switch. W/891214 Ltr | |
ML20011F492 | 16 February 1990 | LER 89-013-01:on 890907,Group I Isolation Received During Performance of Instrument Surveillance LIS-MS-401.Caused by Depressurization of Main Steam Line Low Pressure Switch. Surveillance Revised to Split Into Two parts.W/900216 Ltr | |
ML20011F555 | 28 February 1990 | LER 90-002-00:on 900129,after Filling Diesel Generator 1A Governor W/Oil,Generator Started & Declared Inoperable. Caused by Slow Leak Coming from Compensation Needle Valve Plug.Oil Added & Plug Washer replaced.W/900228 Ltr | |
ML20011F825 | 2 March 1990 | LER 90-003-00:on 900201,RCIC Received Div 2 Isolation on RCIC High Steam Line Flow.Caused by Spurious High Steam Flow Signal Generated When Steam/Water Mixture Admitted to RCIC Steam Line.Isolation Logic reset.W/900302 Ltr | |
ML20012B552 | 8 March 1990 | LER 90-001-00:on 900206,full Reactor Scram Occurred During Instrument Surveillance Testing.Caused by Actuation of APRM E Trip Circuitry.Shutdown Margin Revised & Caution Card Placed on Control Room Bench board.W/900308 Ltr | Shutdown Margin Half scram |
ML20012B650 | 9 March 1990 | LER 90-002-00:on 900209,Operating Surveillance LOS-TG-W1 Determined to Have Exceeded Required Testing Interval,Per Tech Spec 3/4.7.10.Caused by Personnel Error.Personnel Counseled & Ref Procedures Will Be revised.W/900309 Ltr | Safe Shutdown Missed surveillance Grace period |
ML20012C493 | 15 March 1990 | LER 90-004-00:on 900213,control Room B HVAC Intake Radiation Monitor Lost Power Causing auto-start of Emergency make-up Train B.Caused by Blown Fuses.Fuses Replaced.Logic Revs for Radiation Monitors Will Be installed.W/900315 Ltr | |
ML20012D534 | 16 March 1990 | LER 90-003-01:on 900201,RCIC Isolation Signal Occurred During Warmup.Caused by Spurious High Steam Flow Signal.Rcic Sys Piping Integrity Verified & Isolation Logic Reset.W/ 900316 Ltr | |
ML20012D537 | 16 March 1990 | LER 90-002-01:on 900129,oil in Diesel Generator Governor 1A Found to Be Low & Could Not Be Seen in Sight Glass.Caused by Slow Leak from Compensation Needle Valve Plug.Proper Amount of Oil Added & Operability Test performed.W/900316 Ltr | |
ML20023A754 | 8 October 1982 | LER 82-109/03L-0:on 820925,pressure Switches 1E31-N022C & 1E31-N022D Found Out of Tolerance in Nonconservative Direction During Reactor Low Pressure RCIC Isolation Calibr & Functional Test.Caused by Setpoint Drift | |
ML20023B211 | 13 December 1982 | LER 82-152/03L-0:on 821115,during Performance of LIS-RI-01, Differential Pressure Indicating Switch 1E31-N007A Setpoint Found Out of Tolerance in Nonconservative Direction Per Tech Spec 3.3.2.Cause Unknown.Switch Recalibr | |
ML20023B265 | 15 December 1982 | LER 82-151/03L-0:on 821117,emergency Makeup Control Room Ventilation Fan B Failed to Start.Caused by Bent Outlet Damper Shaft to B Train & Broken Bearing Housing Cap. Linkage Misaligned When Installed Initially.Damper Repaired | |
ML20023B805 | 28 April 1983 | LER 83-033/03L-0:on 830402,during Hot Shutdown,Radwaste Effluent Monitor Declared Inoperable.Caused by High Fixed Level of Background Radiation.Liquid Radwaste PRM Inner Chamber Coated W/Acrylic Resin to Prevent Radiation Buildup | |
ML20023C493 | 3 May 1983 | LER 83-034/03L-0:on 830408,during LIS-HP-10,level Indicating Switch 1B21-N100A as-found Setpoint Exceeded Tech Spec Value.Caused by Setpoint Drift.Switch Setpoint Recalibr | Reactor Vessel Water Level |
ML20023C506 | 4 May 1983 | LER 83-035/03L-0:on 830406,offgas Hydrogen Analyzer 1A Not Maintaining Proper Vacuum & Analyzer 1B Not Wired Properly. Caused by Dirty Flame Arrestor on Analyzer A.Flame Arrestor Cleaned.Analyzer B Rewired | Grab sample |
ML20023D965 | 26 May 1983 | LER 83-043/03L-0:on 830427,while Performing Charger Capacity Test,Div 1 Charger SCR Output Fuse F-1 Blew & Charger Feed Breaker Tripped Shutting Down Charger.Caused by Problem W/ Battery Capacity Tester.Fuse replaced.W/830526 Ltr | |
ML20024A654 | 9 June 1983 | LER 83-050/03L-0:on 830518,administrative/clerical Errors Found in Table 3.7.9-2.Caused by Personnel Inability to Transpose Design Info Into Tech Spec Table.Discrepancies corrected.W/830609 Ltr | |
ML20024A696 | 14 June 1983 | LER 83-051/03L-0:on 830516,reactor Protection Sys Trip Channel H2 Limit Switch Failed to Operate Properly.Cause Unknown.Limit Switch readjusted.W/830614 Ltr | |
ML20024B072 | 16 June 1983 | Updated LER 83-012/03X-1:on 830210,w/reactor in Cold Shutdown,Setpoints for Switches 1E31-N612A/B Found Above Tech Spec Limits.Cause Unknown.Switches calibr.W/830616 Ltr | |
ML20024B838 | 5 July 1983 | LER 83-060/03L-0:on 830606,following Turbine Trip & Scram Due to High Vibration on Main Turbine,Reactor Recirculation Breaker 4B Closed.Cause Undetermined.Auxiliary Contacts cleaned.W/830705 Ltr | |
ML20024E912 | 26 August 1983 | LER 83-093/03L-0:on 830801,discovered full-in Indication on Core Display for Control Rod 34-47 Inoperable.Caused by Failed Switching Transistor on Data Memory Board 19.Data Memory Board replaced.W/830826 Ltr | |
ML20024G977 | 10 May 1991 | LER 91-005-00:on 910410,determined That Tech Spec Required Surveillance of Suppression Chamber Oxygen Sampling Missed. Caused by Inadequate Review of Tech Spec Change.Drywell & Suppression Chamber Checked for oxygen.W/910510 Ltr | Missed surveillance |
ML20027A991 | 3 September 1982 | LER 82-090/03L-0:on 820820,mechanical Snubber M514-1056S Found Damaged.Caused by Application of Excessive Forces in Lateral Direction Causing Snubber to Bend &/Or Twist.Snubber Replaced | |
ML20027B192 | 5 August 1982 | LER 82-065/01T-0:on 820722,util Notified Region 3 & NRR of Potential 10CFR50.55e Assessment Involving post-LOCA Chugging Phenomena W/Suppression Chamber to Drywell Vacuum Breakers.Written Response Will Be Issued | |
ML20027B273 | 13 September 1982 | LER 82-089/03L-0:on 820815,reactor Core Isolation Cooling Turbine Tripped on Overspeed During STP 14,Step 10.2.F Vessel Injection Cold Quick Start Test.Caused by Turbine Governor Valve Binding Due to Problem in Mechanical Section | |
ML20028A092 | 8 November 1982 | LER 82-119/03L-0:on 821010,while in Mode 2,OB Vaporizer Concentrate Train Could Not Maintain Required 0.125-inch Water Positive Pressure Relative to Adjacent Areas.Caused by Loose Louver Blade Blocking Ductwork.Blade Repaired | |
ML20028A857 | 19 November 1982 | LER 82-135/03L-0:on 821021,div 1 ID18-N009B Reactor Bldg Ventilation Process Radiation Monitor Drifted High.Caused by Failed Geiger-Muller Tube Mfg by Lnd.Tube Replaced | |
ML20028B075 | 19 October 1982 | LER 82-136/03L-0:on 821022,during Performance of LTS-100-15, Primary Containment Personnel Access Hatch Leak Rate Test, Both Doors Inadvertently Opened.Caused by Door Rebounding Past Hatch.Interior Door Closed Restoring Integrity | |
ML20028B159 | 15 November 1982 | LER 82-129/03L-0:on 821018,condensate Leak Discovered in Heater Bay Between Heaters 13c & 14c.Caused by Crack in Socket Weld of High Vent 1CB027C.Valve Cut Out & Replaced | |
ML20028B292 | 15 November 1982 | LER 82-130/03L-0:on 821019,leak Discovered in Socket Weld of Mechanical Seal Injection Line Valve for Condensate/ Condensate Booster Pump 1A.Caused by Cracked Weld Due to Vibrational Stress.Injection Line Replaced | |
ML20028C137 | 21 December 1982 | LER 82-166/03L-0:on 821126,drywell CAM Sample Pumps 1PL15J & 1PL75J Continuously Tripped Off.Caused by Combination of Leaking cross-tie Valve & Internal Electronic Interference. Valve Will Be Replaced & Procedures Revised | |
ML20028C154 | 30 December 1982 | LER 82-169/03L-0:on 821201,suppression Pool Narrow Range Sightglass Isolation Valves 1CM039-1CM045 Found Locked Open. Caused by Communication Breakdown Between Unit Nso & Equipment Attendant.Valves Realigned | |
ML20028C181 | 30 December 1982 | LER 82-167/03L-0:on 821201,drywell Oxygen Monitoring Sys Failure Alarm Sounded in Control Room.Caused by Low Calibr Gas Bottle Pressure,Faulty Analyzing Cell & Defective Flow Regulator.Calibr Gas Bottle & Faulty Parts Replaced |