ML16118A408

From kanterella
Revision as of 10:31, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Waterford Steam Electric Station, Unit 3, License Renewal Application Online Reference Portal
ML16118A408
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/18/2016
From: Yoira Diaz-Sanabria
NRC/NRR/DLR/RAPB
To: Chisum M R
Entergy Operations
Clark P, NRR/DLR, 415-6447
References
DLR-16-0095
Download: ML16118A408 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

May 18, 2016

Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.

Waterford 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL

Dear Mr. Chisum:

By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants."

In order to improve the efficiency of the NRC staff's environmental and sa fety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would

allow the NRC staff to audit basis documents to determine whether the information contained in

the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket.

The use of the online reference portal will be in accordance with the following restrictions:

  • The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis.
  • The online reference portal will not support any printing, saving, or downloading functions.
  • NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers.
  • The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process.
  • Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. Should you have any questions, please contact Ms.

Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov

. Sincerely,

/RA/

Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-382 cc: Listserv

ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16 Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL

DISTRIBUTION

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource

RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource

RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov


P. Clark

E. Keegan

D. Drucker

J. Danna E. Gettys E. Sayoc

E. Stahl

A. Pulvirenti

Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV

M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV

L. Murray, RIV

G. Young, RIV D. Lach, RIV A. Taylor, RIV UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

May 18, 2016

Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.

Waterford 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL

Dear Mr. Chisum:

By letter dated March 23, 2016, Entergy Operations, Inc (Entergy), submitted an application for renewal of facility operating license no. NPF-38 for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing this license renewal application (LRA) in accordance with the guidance in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants."

In order to improve the efficiency of the NRC staff's environmental and sa fety reviews of the LRA, Entergy and the NRC staff have discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited, read-only access to the basis documents and other reference materials cited in the LRA. The online reference portal would

allow the NRC staff to audit basis documents to determine whether the information contained in

the documents supports the LRA. In cases where the NRC staff identifies documents as necessary for its analysis of the LRA to document its determination in the safety evaluation report, or its development of the Environmental Impact Statement, the NRC staff will formally request those documents to be submitted on the docket.

The use of the online reference portal will be in accordance with the following restrictions:

  • The online reference portal will be password-protected, and passwords will be distributed to NRC staff members and contractors directly involved in the Waterford Steam Electric Station, Unit 3, LRA review on a need-to-know basis.
  • The online reference portal will not support any printing, saving, or downloading functions.
  • NRC staff members and contractors given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers.
  • The conditions associated with the online reference portal will be maintained throughout its use during the Waterford Steam Electric Station, Unit 3, LRA review process.
  • Documents posted to the online reference portal will be limited to basis and other reference material cited in the LRA, unless otherwise agreed upon by Entergy and NRC management. Should you have any questions, please contact Ms.

Phyllis Clark, Project Manager for the safety review of the Waterford Steam Electric Station, Unit 3, LRA at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov

. Sincerely,

/RA/

Yoira K. Diaz-Sanabria, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-382 cc: Listserv

ML16118A408 Concurred via email OFFICE LA:DLR PM:RPB1:DLR PM:RPB1:DLR OGC - NLO NAME IBetts PClark JMitchell JLindell DATE 5/ 2 /16 5/ 3 /16 5/ 4 /16 5/10/16 OFFICE BC:RASB:DLR BC:RARB:DLR BC:RERP:DLR BC:RPB1:DLR NAME BWittick DMorey JDanna YDiazSanabria DATE 5/11/16 5/11/16 5/11/16 5/18/16 Letter to Michael Chisum from Yoira K. Diaz-Sanabria dated May 18, 2016

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL

DISTRIBUTION

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource

RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource

RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov


P. Clark

E. Keegan

D. Drucker

J. Danna E. Gettys E. Sayoc

E. Stahl

A. Pulvirenti

Y. Lindell, OGC D. McIntyre, OPA S. Burnell, OPA A. Moreno, OCA F. Ramirez, RIV C. Speer, RIV

M. Dapas, RIV J. Jarrell, RIV A. Thomas, RIV J. Rodriguez, RIV

L. Murray, RIV

G. Young, RIV D. Lach, RIV A. Taylor, RIV