MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] |
Text
Entctgy operations. Inc.
Rwer Bend Stahon 54E5 U S Hghaay 61 5~ ENTERGY ; " Fie tx 7077s.
Tel 504 336 0225 Far 504 635 5068 James J. Fisicaro Duector Nuclear Saf tey November 9,1995 U.S. Nuclear Regulatory Commission Document Control Desk Mail Stop Pl-37 Washington, D.C. 20555
Subject:
Response to Request for Additional Infonnation, Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers" (TAC No. M85596)
River Bend Station - Unit 1 License No. NPF-47 Docket No. 50-458 File Nos.: G9.5, G9.33.4 RBG-42159 RBF1-95-0265 ,
i Gentlemen:
The Request for Additional Information (RAI), Generic Ixtter 92-08, "Thermo-Lag 330-1 Fire Barriers" (TAC No. M85596) dated September 25,1995, requested that Entergy Operations, Inc., (EOI) submit ampacity derating evaluations, including any applicable test repons, in order to provide an adequate response to GL 92-08 reponing requirement 2(c).
The summary of the requested infonnation incorrectly indicated that no ampacity information was previously provided by River Bend Station (RBS). The RBS response to GL 92-08 l reponing requirement 2(c) was provided in a letter dated April 14,1993 (RBG-38343). An RAI dated Decen.ber 22,1993, acknowledged the April 14,1993, response. The RBS response to the December 22,1993, RAI was dated February 9,1994 (RBG-40047), and addressed ampacity issues in Section IV.B., "Ampacity Demting." This response was acknowledged in the Follow-up to the RAI dated September 23,1994. Attachment I provides ;
EOI's n:sponse to GL 92-08 reponing requirement 2(c) from the letter dated April 14, 1993.
In addition, EOI was requested to submit the anticipated test procedures or a description of the analytical methodology including typical calculations which will be used to detennine the ampacity derating pammeters, or to infonn your office of the earliest date by which this informatiog will be pmvided for the Thermo-Lag fire barriers installed at RBS. EOI's
.~utLt5 9511170213 951109 PDR ADOCK 05000458 0 %
P. PDR \
Response to Request for Additional Information, Generic I.etter 92-08, "Thermo-12g 330-1 Fire Barriers" (TAC No. M85596) ;
l November 9,1995
! RBG-42159 i RBF1-95-0265 Page 2 of 2 ;
II response is pmvided in Attachment 2. Note that a supplement to this response will be !
provided in accordance with the schedule described in the attachment. !
! Should you have any questions or mquim additional information, please contact Tim Gates of j my staff at (504) 381-4866. ,
t Sincerely, f
& h f
. JJF/kym i
l attachments (2) l enclosure (1) l l
l cc: U.S. Nuclear Regulatory Commission l Region IV l 611 Ryan Plaza Drive, Suite 400 l Arlington, TX 76011 Mr. D. L. Wigginton U.S. Nuclear Regulatory Commission 11555 Rockville Pike M/S OWFN 13-H-3 Rockville, MD 20852 l
l NRC Resident Inspector (w/o enclosure)
P.O. Box 1051 j l St. Francisville, LA 70775 i l
l l
4 9
i
. . . -..~.m_ -. . . . _ _ _ _ . - . . . - . _ -
i i
BEFORE THE l' UNITED STATES NUCLEAR REGULATORY COMMISSION j i :
1 !
l LICENSE NO. NPF-47 :
i l I l
DOCKET NO. 50-458 ;
I '- IN THE MA*lTER OF l 4
GULF STATES UTILITIES COMPANY l l
CAJUN ELECTRIC POWER COOPERATIVE AND I ENTERGY OPERATIONS, NC. {
l AFFIRMATION j I, George A. Zinke, state that I am acting Director of Nucicar Safety of Entergy Operations, Inc., at River Bend ;
Station; that on behalf of Entergy Operations, Inc., I am authorized by Entergy Operations, Inc. to sign and file 1 with the Nuclear Regulatory Commission, this Response to Request for Additional Information, Generic Letter 92- l 08,"Thermo-La 130-1 Fire Barriers" (TAC No. M855%), that I signed this supplement as acting Director- i Nucien Safety a. ',iver Bend Station of Entergy Operations, Inc.; and that the statements made and the matters set !
forth therein are true and correct to the best of my knowledge, information, and belief.
, ?
O George AZihke STATE OF LOUISIANA ,
WEST FELICIANA PARISH I
SUBSCRIBED AND SWORN TO before me, Notary Public, commissioned in the Parish of East Baton Rouge and qualified in and for the Parish and State above named, this 9 4 day of Il6m4a b .1995, bbu 46 ((
U Jane Russell Notary Public My Commission expires with life.
l , . - . . , . , - . . , , . , - . . -_, . -
l l
ATTACHMENT 1 i
Reauest for Additional Information (RAI) of February 9.1994 The Request for Additional Information (RAI), Generic Letter 92-08,"Thermo-Lag 330-1 Fire Barriers" (TAC No. M85596) dated September 25,1995, requested, in part, that Entergy Operations, Inc., (EOI) submit ampacity derating evaluations, including any applicable test reports, in order to provide an adequate response to GL 92-08 reporting requirement 2(c). GL 92-08 reporting requirement 2(c) states:
State (1) whether or not the as-built Thermo-Lag 330-1 barrier configurations are consistent with the barrier configurations used during the ampacity derating tests relied upon by the licensee for the ampacity derating factors used for all raceways protected by Thermo-Lag 330-1 (for fire protection or safe shutdown capability or i
to achieve physical independence electrical systems) and (2) whether or not the ampacity derating test results relied upon by the licensee are correct and applicable to the plant design. j l
l The RBS response to GL 92-08 dated April 14,1993, (RBG-38343) states, in part-The as-built fire barrier configurations at RBS are consistent with fire barrier configurations used in TSI ampacity derating tests. The fire barrier configurations used in the tests were installed in accordance with TSI Technical Note 20684, "Thermo-Lag 330 Fire Barrier System, Installation Procedures Manual." In general, fire baniers at RBS were installed to the same procedure, therefore, for the purposes of ampacity derating, the as-built fire barrier configurations are consistent with those used in the qualifying tests.
The ampacity derating of cables inside Thermo-Lag wrapped raceway is addressed in RBS Calculation E-218, "Ampacity Verification of Cables Within Raceways Wrapped with Appendix R Fire Protection Banier." The basis for the ampacity derating was a letter from TSI to SWEC dated July 5,1985. The test report numbers and ampacity derating values are shown in the following table:
TSI UL DERATING DERATING TEST REPORT DESCRIPTION VALUE VALUE 1.T.L. No. 82-355-F-1 One llour Cable Tray Test 12.5 %
I.T.L. No. 84-3-275A Three llour Cable Tray Test 20.55 %
Technical Note No. 111781 One llour Conduit Test 7.2%
I.T.L. No. 84-10-5 Three llour Conduit Test 9.72 % i UL 86NK23826, File R6802 One 1Iour Cable Tray Test 28.0 %
UL 86NK23826, File R6802 1hree llour Cable Tray Test 31.2 %
UL 86NK23826, File R6802 1hree 11our Conduit Test 9.4%
A letter from Underwriter's Laboratories (UL) to TSI dated January 21,1987, presides the results of a test performed by UL to determine the ampacity derating of Thermo-Lag 330 fire
Attachmsnt 1 RBG-42159 RBF1-95-0265 Page 2 of 2 wrap enclosures. The RBS review of the UL Report concerning ampacity derating of Thermo-Lag 330 fire wrap enclosures noted that the UL test configurations vary from the TSI report and the RBS installed configurations. Calculation E-218 was reviewed using the more conservative ampacity derating factors from the UL test shown in the table above. The review and resulting modifications confirmed that all wrapped cables are adequately sized.
Although GL 92-08 reporting requirement 2(c) contains no specific request to submit ampacity derating evaluations, a copy of Calculation E-218 is enclosed.
- A'ITACHMENT 2 Request For Additional Information of December 28.1994 The RAI dated September 25,1995, requested, in pan, that EOI submit the anticipated test procedums or a description of the analytical methodology including typical calculations which will be used to detennine the ampacity derating parameters, or to inform your office of the earliest date by which this information will be provided for the Thermo-Lag fire baniers installed at RBS. As explained in previous RAI responses (most recently, RBG-42029 dated October 26,1995) RBS is pursuing a comprehensive program to evaluate applications of Thenno-Lag in the plant. The project consists of two sections. The first is a re-analysis of the Safe Shutdown Methodology. This effon is expected to result in a significant reduction in the amount of fire wrap material required. The second will review the Thermo-Lag installations that remain and determine if the Thenno-Lag can be qualified as-is through additional testing, if the Thenno-Lag can be upgraded economically using methods similar to those tested by the Nuclear Energy Institute, or if the Thermo-Lag must be replaced with a diffemnt material.
The Project Instmetion for evaluating ampacity is currently under development. Based upon the current project schedule, ampacity testing and/or model development will occur during the second quaner of 1996. A supplement to this msponse will be provided at that time with the anticipated test procedures or a description of the analytical methodology including typical calculations which will be used to detennine the ampacity derating parameters. A summary of the process which is expected to be used is provided below.
- 1. Identify all required and abandoned Thermo-Lag wrapped raceways and the associated l cables. I 1
- 2. Son cables by function-l 120 VAC or 125 VDC Control and Power Cables Small Power Cables Large Power Cables (480V) i Instrumentation Cables '
4 kV Power Cables 13.8 kV Power Cables
- 3. Evaluate instrumentation cables for generic elimination from the analysis.
- 4. Evaluate 120 VAC and 125 VDC control cables for generic elimination from the analysis.
- 5. For all power cables, detennine the component it supplies and load current.
For AC loads, use electrical transient analysis program (ETAP)
For DC loads, use calculated values for full load current at rated voltage and ,
rated hp/kW i
- 6. Develop ampacity adjustment factor (value greater than one). 1 i
RBG-42159 RBF1-95-0265 Page 2 of 2
- 7. Apply ampacity adjustment factor to determine minimum required ampacity.
Minimum Required Ampacity = FullImad Current X Ampacity Adjustment Factor
- 8. For each cable in a wrapped raceway, identify the cable diameter. Use this value to.
detennine the base ampacity of the cable based upon 40 C in air.
L
- 9. Identify the maximum ambient design temperatum for each mom in which a wralped raceway exists. Use this value to determine the'ampacity derating adjustment for temperature.
- 10. Calculate the depth of cables in each wrapped tray (other than contml cables). Use this value to determine an ampacity derating adjustment for cable depth.
I 1. Identify the wrap detail and determine if it is bounded by a Texas Utilities (TU)
Electric Company test case. If yes, then use TU demting factor. If no, then develop additional analysis.
- 12. Calculate the derated cable ampacity with fire wrap using the TU ampacity derating value.
- 13. Knowing the cable ampacity with firewrap and the minimum required ampacity, calculate the margin. If margin is less than zero, perfonn additional analysis. ,