MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
.-. . -_- - . . .
i l
l M
""""= Log # TXX 92306
- 1. : File # 10010 C
~~
C~~
916 (TRH)
Ref. # 10CFR50.36 1UELECTRIC June 30, 1992 l wim.m J. c.hnL Jr.
3 aw.e nn hasthe :
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
C0HANCHE PEAK STEAH ELECTRIC STATION (CPSES)
DOCKET NOS, 50 445 AND 50 446 TRANSHITTAL Of TECHNICAL REQUIREMENTS HANUAL (TRii),
REVISION 8 REF: 1) TV Electric letter logged TXX-92050 f rom Mr. William J. Cahill to the NRC, dated February 4, 1992 Gentlemen:
TV Electric herewith submits Revision 8 (enclosed) of the CPSES Technical Requirements Manual.
Enclosed are the following documents:
Technical Requirements Manual - 1 signed (and sworn) original Revision 8 and 10 copies Attachment (2) contains a page by-page description of the changes. As has been the 10 Electric practice in the past several TRH revisions, all changes described in the attachment have been evaluated for relative sianificance (i.e. , the group number 1, 2, 3 or 4 following each change justification as discussed in TV Electric letter TXX-88467 dated June 1, 1988). In addition, all changes applicable to CPSES Unit I have been reviewed under the TV Electric 10CFR50.59 process and found not to include any 'unreviewed safety questions."
TRH Revision 8 is being issued on June 30, 1992, and will be executed at 12:01 a.m. on July 30, 1992. After execution, compliance to the TRH through Revision 8 is required, Revision 8 may be entered into controlled copies of the TRH prior to execution as long as compliance to Revision 7 is maintained.
.100047 ,')
Lfp I S 9207100200 920630 p PDR ADOCK 05000445 i P PDR 4ao N.ouvi sireet LB.si D nas, Texas 75201 - \.t
TXX 92306 Page 2 of 2 ,
As discussed in reference 1 above. Revision 8 is a dual unit TRM which states that the Unit 2 requirements will become effective upon the issuance of the Unit 2 operating license. The TRM contains specific numbers which .
are yet to be confirmed for Unit 2. Those numbers still requiring design t confirmation, of applicability for Unit 2, have been enclosed within brackets for identification purposes. All numbers with brackets will be confirmed and the brackets removed prior to Unit 2 fuel load. ,
Several TRM changes which are currently being considered are listed in attachment (3). If you should have any questions, please contact Mr. Carl B. Corbin at (214) 812 8859.
Sincerely, AA -
William J.
aMA ahill. Jr.
CBC/vid 1 Attachments Enclosure c- Mr. R. D. Martin. Region IV Resident Inspectors, CPSES (3)
Mr. T. A. Bergman. NRR Mr. B. E. Holian NRR (25)
_... y. -4,v
- - . - . _ . - .- to 'XX 92306 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION (1 the Hatter of )
)
Texas Utilities Electric Company ) Docket Nos. 50-445 and 50-446
)
(Comanche Peak Steam Electric )
Station, Units 1 and 2) )
AFFIDAVIT William J. Cahill, Jr. being duly sworn, hereby deposes and says that he is Group Vice President, Nuclear of TV Electric, the lead Applicant herein: that he is duly authorized to sign and file with the Nuclear Regulatory Conunission this transmittal of Revision 8 of the Technical Requirements Manual for the captioned facility: that he is familiar with the content thereof: and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
4 +^ i tt > A.
William J. (4 hill, Jr. ['
Group Vice President. Nuclear STATE OF TEXAS )
)
COUNTY OF DALLAS )
Subscribed and sworn to before me, on this 29th day of June. , 1992, Lb [ .
Notary 'ublic
CPSES TRH REVISION 8 DETA! LED DESCRIPTION Page 1 TXX 92306 ATTACHMENT 2
{fgE 1p p{,8 (al geended) Graun Description i 3 See Page No(s):through page 4 31 Changes footer from "C0HANCHE PEAK UNIT 1" to
" COMANCHE PEAK - UNITS 1 AND 2" for all TRH pages.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request Number: TR92014.01 Related SER Section: 16 SER/SSER Impact: No 0 02 3 Adds note regarding Unit 2 applicability (Issuance of Dual Unit TRM) to Section 0. Unit 2 requirements are not effective until issuar.ce of Unit 2 operating license. Information requiring validation for Unit 2 is enclosed in brackets.
Update:
This change is needed to support a dual Unit Technical Requirements Hanual applicabic to both Units 1 and 2.
All numbers with brackets will be validated prior to Unit 2 fuel load and the brackets removed.
TRH Change Request Number TR92014.02 Related SER Section: 16 SER/SSER Impact: No 0 11 3 Adds from Technical Specifications the definition of the CORE OPERATlHG LlHITS REPORT (COLR).
Update:
This change provides consistency between the definitions in the Technical Specifications and the Technical Requirements Manual.
TRH Change Request Number: TR 92-005 Related SER Section: 16 SER/SSER Impact: No 0-16 2 (Byron precedence) Adds the dual unit Limiting Condition for Operation (LCO 3.0.5) to provide applicability definition for the Limiting Conditions for Operation. (See related change TR 92008.3 on page 0 21)
Update:
This change is needed to support a dual Unit Technical Requirements Hanual applicable to both Units 1 and 2.
TRH Change Request Number: TR 92008.1 Related SER Sectien: 16.0 SER/SSER Impact: No
CPSES VRH REVISION 8 TXX 92306 DETAILED DESCRIPTION Page 2 ATTACHMENT 2 PAGE 2 Of 8 TRM Page (11 Attadtd) Group DrittiMiaD 0 19 3 See Page No(s):through page 0 22 Adds from Technical Specifications the BASES for Specification 3.0.1 through 3.0.4.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRM Chance Request Number: TR 92008.2 Related SER Section: 16.0 SER/SSER tmpact: No 0 22 2 (Byron precedence)-Adds the associated _ BASES 3.0.5 to support the support the applicability detinition for the Limiting Conditions for Operation (see related change TR-92008.1 on page 0 15). The BASES includes a discussion of valve identification for duti units.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request amber: TR 92008.3 Related SER Section: 16.0 SER/SSER Impact: No 0 23 3 See Page No(s):through page 0-26 Adds from Technical Specifications the BASES for Specifications 4.0.1 through A.0.5.
Update:
This change is needed to support' a dual Unit Technical-Requirements Manual' applicable to both Units 1 and 2.
TRM Change Request Number: TR 92008.4 Related SER Section: 16.0 SER/SSER-Impact: No 1 02 3 Adds note to APPLICABILITY statement indicating Unit 2-requirements are effective upon issuance of the Unit 2 oper& ting license.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRM Change Request Number:-TR92014.03 Related SER Section: If SER/SSER Impact: No 1-06 3 Adds note t'o APPLICABILITY _ statement indicating Unit 2
[ _ _ _ _ _ _ _ _ _ _ _ - - - _ - - - - - - - -
.v CPSES'TRM REVISION 8 TXX-92306 DETAILED DESCRIPTION- Paga 3 ATTACHHiH1 2 PAGE 3 0F 8 TRM Page
( Alt AN10 Aid) Aflug Q11CIlp. tion requirements are effective upon issuance of the Unit 2 operating license.
Updatet This change is needed to support a dual Unit Technical Requirements-Manual applicable to both Units 1 and 2.
TRM Change Request Number: TR92014.04-Related SER Section: 16 SER/SSER Impact: No 1-09 2 See Page No(s):through page 1-13 (Table 1.2.1)
Adds brackets for plant specific numbers which require design confirmation for applicability for unit 2.
Update:
These plant spet ,' - Jonbert wi'l be confirmed and the brackets removed ,9 Lor to unit 2 fuel load. These changes are needed to support the dual unit Technical Requirements Manual applicable to units 1 and 2.-
TRM Change Request Number: TR 92 013 Related SER Section: 7.2 SER/SSER' Impact: No 1-15 3 Adds note to ADDLICABILITY statement indicating Unit 2
\_ requirements are effective upon issuance of the Unit 2
) operating license.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2, TRM Change Request Number: TR92014.05 Related SER-Section: 16 .
SER/SSER Impact: No 1-17 2 Adds " Units 1 and 2" to COMPENSATORY' MEASURES.
See related change TR 92-008 (LCO 3.0.5a, TRM page 0-16)
Update: .
This change are needed to support a dual Unit T*,;hnical Requirements Manual applicable to both Units 1 and 2.
TRM Change Request Number: TR-92009.1-Related SER'Section: 3.7.4 SER/SSER !mpact: No 1-17 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit-2 operating-license.
Update:
This change is needed to support a dual Unit Technical
CPSES TRM REVISION 8 TXX+92306 DETAILED DESCRIP?!ON Page 4 j ATTACHHENT 2 !
PAGE 4 0F 8 l TRM Page 1 (n Antadsd) Et9Mn Dentirttion Requirements Manual applicable to both Units 1 and 2. q TRM Change Request Number:-TR92014.06 Related SER Section: 16 SER/SSER Impact: No 1-18 2 Adds note to Table 1.4.1 stating that Unit 1 and Unit 2 control room alarms are connected to shared seismic -
instruments which are located in Unit I and common structures.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable.to both Units 1 and-2.
TRM Change Request Number: TR-92009.2 Related SER Section: 3.7.4 SER/SSER Impact: No 1-18 2 Update sensor locations in Table.l.4.1 to indicate the Unit 1 structure or the common structure.
Update:
These changes are needed to. support a dual Unit Technical Requirements Manual applicable to both Units i 1 and-2.
TRM Change Request Numbers _TR-92009.3 Related SER Section: 3.7.4 SER/SSER Impact: No 1-19 2 See.LOCR-TR 92009.2 (TRM page 1-18),
Update:
See LDCR-TR-92009.2 (TRM.page 1-18).
TRM Change Request Number: TR-92009.4 Related SER Section: 3.7.4 SER/SSER Impact: No 1-19 2 See LDCR-TR-92009.3 (TRM page:1-18).-
Update:
See LOCR-TR-92009.3 (TRH page 1-18,.
TRM Change Request Numberi TR-92009.5 Related SER Section: 3.7.4 SER/SSER Impact: No
'l-20 2 See LOCR-TR-92009.2 (TRM page 1-18).
Update:
.See LDCR-TR-92009.2 (TRM page 1-18).
TRM hange Request Number:-TR-92009.6 Related SER Section: 3.7.4
n . .
V LCPSES TRM REVISIO'N 8-
'TXX 92306..- DETF LED DESCRIPTION ~ Page'.5
' ATTACHMENT-: 2 :
PAGE 5 0F 8-TRM- .Page
-(11 aggDded) Group Dticription SER/SSER Impact: No ,
1 20 2 See.LDCR TR 92009.3)(TRM pageL1 18).
Update:
See~LDCR-TR-92009.3 (TRM page 1 18).
TRM. Change Request Number:-TR 92009.7 Related SER1Section:.3.7.4 SER/SSER Impacts No 1-22 3 Adds note-to-APPLICABILITY statement indicating-Unit =2 requirements _are' effective upon. issuance _of-the Unit 12 operating l license; Update:-
This' change isLneeded to support a dual Unit Technical Requirements Manual applict.ble-to both Units 1 and 2.
- TM Change Request Number: TR92014.07 ated.SER_Sectiont 16-
' " /SSER Impact: No1 2-02 1s note to APPLICABILITY statement-indicating Unit' 2 1
' .quirements are effective upon issuance of_the Unit 2 operating license.; '
Update:
This change is;needed.+o support.aldual Unit Technical
-Requirements-Manual applicable to both Units:1 and.2.
TRM Change Request-Number: TR92014 ~.08 Related SER Section: 16-SER/SSER Impact: No-
'2 04 -2 See Page No(s):through page:2-13.(Table!2.1.1) . .
Updates.the valve identification numbers':(tag numbers) to: include unit designator'as first character.(e.g.-
- 1CS-8455 -is: unit l'.- 2CS-845511 s" Units 2). - Tag ' numbers without!the unit designator are applicable to both -
4 units.-
Update:
'Theseichanges are needed2to.supportiaidualiUnit-Technical Requirements' Manual-_ applicable-to;both-Units-
'1 and 2.
LTRM Change Request Number: tTR-92010.1, Related:SEP. Section: 6.2-
- SER/SSERl Impact:iNo 12
~
-2 Adds 1 brackets for= plant: specific. numbers which require
-designLeonfirmation for_'applicabi_litylfor-unit 2.
- Update
I'
)
.= _ - _._- = L i a :- L L -- - ---- L ' '
CPSES TRM REVISION 8' TXX 92306 DETAILED DESCRIPTION- Page 6 ATTACHMENT 2-PAGE 6 0F 8 T RM - Page (Al amended) frp.gg Description These plant specific numbers will be confirmed and the brackets removed prior to unit 2 fuel load. These changes are needed to support the dual unit Technical 4
Requirements Manual applicable to units 1 and 2.
TRH Change Request Number: TR 92010.2 Related SER Section: 6.2 SER/SSER Impact:.No 2 13 2 See Page No(s):through page 2-14 Updates Table 2.1.1 by adding the Unit 2 Airlock Hydraulic System Valves.
Update:
These changes are needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
. TRH Change Request Number: TR 92010.3 i
Related SER Saction: 6.2
- SER/SSER Impact
- No 2-14 2 -See Page No(s):through.page-2-25 Updates the valve idantification numbers (tag numbers) to include unit designator as first character (e.g.
a 1C5 8455 is unit 1. 205 8455 is Unit 2), _ Tag numbers without the unit designator are applicable to both units.
, Update:
These changes are needed to support 'a dual Unit-Technical Requirements Manual applicable to both Units 1 1-and 2, 4
_ TRM Change Request Number: TR 92010.4
, Related SER Section: 6.2 SER/SSER Impact: No 2 25 2 Adds brackets for plant specific numbers which' require design confirmation for applicability for unit 2.
1 Update:
These plant specific numbers will be' confirmed and-the-brackets. removed ~ prior to unit 2 fuel load.: These changes are needed-to support-the dual-unit Technical Requirements Manual applicable to units-1 and 2.
TRM Change Request Number: TR-92010.5 Related~ SER Section: 6.2 SER/SSER Impact: No i
3-02 3 Adds note to APPLICABILITY statement, indicating Unit.2 requirements are effective upon-issuance of_the Unit 2 operating license ~.
,. . . . . _ . . . . . - . . . . , . . _ . . , ,. . . . . . . . - . ,- , ~ . . . ,, , , . .
CPSES TRH REV!SION 8 TXX 92306 DETAILED DESCRIPTION Page 7 ATTACHHEHT 2 PAGE 7 0F 8 TRH Page (Al RRRBdid) Droup Description Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request Number: TR92014.09 Related SER Section: 16 SER/SSER Impact: No 3-10 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit 2 operating license.
Update:
This change is needed to support a dual Unit. Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request Number: TR92014.10 Related SER Section: 16
. SER/SSER Impact: No 3 12 4 Changes the instrument identification numbers (tag numbers) to include unit designator as first char 1cter, e.g.1-TI-2152-1 is Unit 1, 2-TI-2152-1 is Unit 2.
Tag numbers without the unit designator are applicable to both units.
Clarification:
These changes are needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request Number: TR-92011.1 Related SER Section: 10.3.3 SER/SSER Impact: No 3-12 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit 2 operating license.
Update:
This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.
TRH Change Request Number: TR92014.11 Related SER Section: 16 SER/SSER Impact: No 3-13 4 Changes the valve identification numbers (tag numbers) to include unit designator as first character, e.g. 1HV-2134 is Unit 1, 2HV-2134 is Unit 2.
Tag numbers without the unit designator are appliceble to both units.
Clarification:
These changes are needed to support a dual Unit
CPSES TRM REVIS10N'8
.TXX-92306 - LDETAILED DESCRIPTION Page 8 ATTACHMENT 2 PAGE 8-0F 8 TRM Page (n magnded) Sr_que Description
~
Technical Requirements Manual 1 applicable _to both Units 1-and 2.
TRM Change Request Numberi-TR-92011,2 Related SER.Section: 10.3.3 SER/SSER Impact: No 4-02 3 -Adds note to APPLICABILITY statement indicating-Unit-2
-requirements are effective upon' issuance of the: Unit-2 operating license.
Update:
This change is neededito support a dual Unit Technical' Requirements Manual applicable to both Units 1 and 2.-
TRM Change Request Number -TR92014,12 Related SER Section: 16 SER/SSER Impact: No i 4-05 2 See Page No(s):through-page 4-17 Updates Table 4.1.1 by separating Unit 1 devices into' Table 4.1,la.
Update:^ __
This change is needed to support a dual Unit Technical Requirements 1 Manual _ applicable-to_both Units _'l and 2, TRM Change Request Number: TR-92012,1 Related SSER Section: SSER22 8.4.1-SER/SSER Impact: No-4-18 2 See Page No(s):through page 4 30- _ _
Updates: Table 4.1.1 by separating Unit 2 devices into Table 4.1.1b, Update:: _ _
This-change-is needed to support a dual Unit Technical-Requirements Manual applicable 1to both Units 1 and 2;
-TRM Change Request Number: TR 92012.2 Related SSER Section: SSER22 8.4.1 SER/SSER Impact: No
__________._-._m__ ------.I- - - - - - - " - - - - - - - - " ' - - - - ^ - ' - - - ' " - ' ' ' ' " ' ' - ' ' - ~ ' ' -
TXX 92306 ATTACHMENT 3 PAGE 1 of 1 Several Technical Requirement Manual (TRM) changes are currently being.
considered for CPSES Units 1 and 2. Many of these changes are not directly attributable to the licensing.of Unit 2 and are not' included.in TRM Revision 8. It is however, desirable that CPSES Unit 2 be licensed incorporating many of these changes. =The TRM changer currently in the TV Electric internal review process are:
A. Revise Table 1.2.1 Technical Requirement 1.2 to reflect changes made
]
to the Technical Specifications regarding DG undervoltage testing.
B. Update Table 2.1.1 of Tcchnical Requirement 2.1 to add bonnet rel' valves to containment sump recirculation isolation valves.
C. Update Technical Requirement 3.3 to clarify which Nondestructive Examinations were used in the fracture analysis to demonstrate the fracture toughness of the feedwater isolation valve.
D. Update Table 4.1.1 of Technical Requirement 4.1 to revise the breaker type from *01L' to '00B".
E. Adds clarification to containment penetration conductor overcurrent protective devices list (Technical Requirement 4.1). The change is f
based upon ti . guidance provided in Generic Letter 91-08, F. Deletes relays from Table 4.1.la of Technical Requirement 4.1 which are not associated with containment penetration protection, d
CPSES/TRH COMANCHE PEAK STEAM ELECTRIC STATION TECHNICAL REQUIREMENTS MANUAL (TRM)-
INSTRUCTION SHEET The following instructional information and check list is being furnished to help insert Revision 8 into the Comanche Peak Steam Electric Station TRM. A description of'this revision is provided in Attachment 2 of TXX-92306, dated June 30, 1992.
Discard the old sheets and insert the new sheets, as listed below. Please refer to TXX-92306 for discussion of.when old sheets should be discarded and new sheets inserted. Keep these instruction sheets in the front of-the 1 Effective Page Listing to serve as a record of changes.
Remove Insert Technical Recuirements Manual Title Page . Title Page Table of Contents i i Administrative Controls Title Page Title Page 0-1 thru 0-17 0-1 thru 0-26 Section 1 1-1 thru l-21 1-1 thru l-22 SE tion 2 2-1 thru 2-26 2-1 thru 2-27 Section 3 3-1 thru 3-13 3-1 thru-3-13 4 (Page 1 of 2)
- v
.. __ - . _ _ . . - - . _ - . -_ - a
[
Remove Insert O
-Section 4 4-1 thru 4-18 4-1 thru 4-31 List of Effective Paaes <
- EPL-1 EPL-1 thru EPL-3 EPL-1 thru EPL-3 O
(Pagel2 of 2)
.