Monthly Operating Repts for May 1980
ML19310A329
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/03/1980
From: Willis E
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML19310A327 List:
References
NUDOCS 8006110095
Download: ML19310A329 (9)


Text

-- .- .~. .- ~ _ _ . .._ - -.. . - -- ... . . . - . . .

-

,[ 1.

APPENDIX B

. AVERAGE DAILY POWER' LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT-1 i .DATE 06/03/80 I COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 MAY SG

. DAY -AVG. DAILY POWER LEVEL DAY AVG. DAILY. POWER LEVEL-l(MWE-NET) (MWE-NET).

i-1 656. '17 376.

4 2 673. 18 385.

, 3 665. 19 393; i

'- 4 663. 20 377.

J 5 686. 21 270.

~6 693. 22 287.

7 688. 23 285.

4 -

A 8 598. 24 283.

9 536. 25 273.

10 540. 26 170.

4'

.

1 11 641. 27 0.

i 12 625. 28 6.

i

13 619. 29 0.

i i

j 14 546. .30 0. ,

i i -15 1441.. 31 .- 0 . -

i 16 -331..

f 1

l -

j.

1 1

f i
-1.'16'- 8 t ,

g .x sooohoog

. . - .. -- .. -. - - .-- = .. . .. -. .

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 06/03/80 COMPLETED BY EULIS WILLIS TELEFHONE 919-457-9521 OPERATING-STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. REPORTING PERIOD: MAY 80 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I 4 NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDASLE CAPACITY (NET MWE): 790.0 -------------------------------

S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0' 3647.0 28104.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 615.3 3270.4 20660.0 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1 14 HOURS GENERATOR ON LINE 615.3 3148.3 19481.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 945202.1 6237934.0 40067431.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 316244.0 2087474.0 13326293.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 303678.0 1011410.0 12819220.0
19. UNIT SERVICE FACTOR 82.7 86.3 69.3
20. UNIT AVAILABILITY FACTOR 82.7 86.3 69.3
21. UNIT CAPACITY FACTOR (USING MDC NET) 51.7 69.8 57.7
22. UNIT CAPACITY FACTOR (USING DER NET) 49.7 67.2 55.6
23. UNIT FORCED OUTAGE RATE 1.4 10.7 19.9'
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT_END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 7/ 3/80
26. UNITS IN TEST STATUS'(PRIOR-TO COMMERICIAL OPERATION): FORCAST ACHEIVED:

INITIAL CRITICALITY. -------- --------

INITIAL ELECTRICITY. -----~~- ---------

COMMERICIAL OPERATION -------- --------

1.16 -

9 1

3

IXX'KET NO. 050-0325 UNITSHU1 DOWNS AND F3WER REDUCilO.1S UNIT N AME Brunswick No. 1 DATE June 1980 COMPLETED BY Eulis A. Willis-REPORT MONTil May 1980 TELEPHONE (919) 457-9521 e.

< -_ E c

-, jg 3ij j E5 Licensee 5 r, gn, Cause & Corrective No. Daie g g 2s& Event 3,7 gU3 Action to W y 5 ~ ;5 g Repori # mV g Prevent Recurrence d5 016 800508 F 5.5 A 1 N/A IIC IITEXCil Power was reduced to perform work on the condenser water boxes.

lA north condenser was removed from service due to plugging. This water box was cleaned and returned to satisfactory service.

9 ' .. .

I 2 3 4 F: Forced . Reason: Method: Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File INUREG-D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License Examination

, F Administrative 5 G-Operational Error (Explain) Es hibit I- Same Source es/77) Il-Other (Explain)

^ .

^ "

050-0325 DOCKET NO.

UNIT SifUTDOWNS AND POWER REDUCTIONS ,

UNIT N AME DATE June 1980 11ay 1980 COMPLETED BY Eulis A. Willis REPORT MONTII TELEP!!ONE (919) 457-9521, e.

- E E

, .! ? 3 $ .E' } Licensee ,E r, j9, Cause & Corteetive .

No. Date i 58 $ .5 s e Event gy mo c.3 gu Action to H

f5 5 e 5 I:g Report #

u Prevent Recurrence o

017 800509 F 13.95 A 1 N/A IIC llTEXCll Power was reduced to perform. work on the condenser water boxes.,

lA south condenser was removed from service due to plugging. The water box was cleaned and returned to .

satisfactory service.

I 2 3 4 F: Forced Reason: Method: Exinbit G . Instructions

. S: Scheduled A Equipment Failure (Explain) I-Manual for Preparanon of Daia B. Maintenance of Tes. .

2-Manual Scram. Entr> Sheets for Licensee

. C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D.Regularory Restrictiun . 4-Other (Explain) 0161)

E Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Estubit I Same Source (9/77) Il Other (Explain)

$ 4 IXXTEI NO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCHONS UNIT N AME Brunswick No. 1 June N DATE fiay 1980 COMPLETED BY Eulis A. Willis REPORT MONTil TELEPilONE (919) 457-9521 n.

- E c

-, ,$ g 3 j E3 Licensee ,E% ., Cause & Correetive No. Daie & 5g 5 2s& Event g? $*3 gU Action to 6-- yE 5 j;gg Report # mV g Prevent Recurrence 6

018 800514 F 281.1 A 1 N/A IIC llTEXCil Power was reduced because of conduc-tivity associated with condenser water box problems.

1B north condenser was removed from service due to tube leakage. All attempts to find leaking tubes failed and Unit No. 1 entered the refueling outage with Icaks still present.

After changing out plugs from pre-vious leaks and cleaning condenser

  • tubes, further attempts will be made

" locate leaks upon start up.

I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions i S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entay Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Exhibit I Same Source cr/77) Il-Other (Explain)

APPENDIX DOCKET NO: 050-0325 UNIT: Brunswick No. 1 DATE: June 1980 COMPLETED BY: Eulis A. Willis OPERATIONS

SUMMARY

BRUNSWICK NO. 1 Brunswie's Unit No.1 operated at a 82.7% availability factor for the month of May with a 51.7% capacity factor. There were three major power reductions for the month, all of which can be attributed to condenser water box work. The unit was shut down May 26 to begin a scheduled 38-day refueling outage. Unit No.1 is expected back on-line July 3,1980. A more detailed description of the refueling outage will be provided in this report the month the unit re-turns to service.

S 0

a:. . _ ,

1 APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 06/03/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 MA( 80 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0. 17 0.

2 0. 18 9.

3 9. 19 9.

4 0. 20 0, 5 9. 21 0 6 0. 22 0.

/ 0. 23 0.

8 0. 24 6.

9 9. 25 O.

10 0. 26 9.

11 9. 27 9.

12 0. 28 0.

13 9. 29 0.

14 6. 30 9.

15 0. 31 9.

16 9.

1.16 - 8 e a

OPERATING DATA REPORT' DOCKET NO. 050-0324 DATE 06/03/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: MAY 80 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I 4 NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET M4E) : 821.0 I I
c. MAX DEPENDABLE CAPACITY (GROSS MWE.): 815.0 I I 7 MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTS GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION I .: ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0' 3647.0 40128.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1365.7 26689.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 0.0 1228.1 25102.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 2604959.4 -46339422.~6
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 872613.0 15487687.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 0.0 842126.0 14882598.0
19. UNIT SERVICE FACTOR 0.0 33.7 62.6
20. UNIT AVAILABILITY FACTOR 0.0 33.7 62.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 29.2 46,9
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 .28.1 d5.2
23. UNIT FORCED OUTAGE RATE .

0.0 8.1- 12.7

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, EoTIMATED DATE OF START UP: 6/20/80
26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL. CRITICALITY -------- --------

' INITIAL ELECTRICITY -------- --------

COMMERICIAL' OPERATION -------- --------

i .

1.16 .9 o

.o, .- .

APPENDIX

' DOCKET NO: 050-0325 UNIT: Brunswick No. 2 DATE: June 1980 COMPLETED BY: Eulis A. Willis OPERATIONS

SUMMARY

BRUNSWICK NO. 2 Brunswick Unit No. 2 was shut down for the entire month of May for refueling.

The unit is expected back on-line May 20, 1980. A more detailed description of the refueling outage will be provided in the Monthly Operating Report for the month the unit returns co service.