Final Deficiency Rept Re Use of Seismically Unqualified GE Type Hfa Relay.Relays Retested & Found Qualified
ML19329B096
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/27/1976
From: Roe L
TOLEDO EDISON CO.
To:
Shared Package
ML19329B081 List:
References
138, NUDOCS 8001300682
Download: ML19329B096 (2)


Text

-

. . .

-

,,

)

.

.

. . ..

-

. , . ,

,*

g,-

- ,

- '

-

. .

..

,

' '

.'~. . . .

'v)

(

-

.

-

.

,

,

.

.

C M. i MFP.fL.r.my 3b:litabMib .

- ' -

. .

LOWELL E. ROE

.- -

,

-

mee ewas

. r=.we. o,.eu.m m October 27, 1976 .

maa rsse: -

- -

.

. ,

. -

serial No.: 138

'

-

Docket No.: 50-346 . <

,

.

,

. c

-

..

,.

Mr. James G. Keppler -

I Regional Director, Region III ,

~

,

.Directorato of Regulatory Operations U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 m

Dear Mr. Koppler:

.

,

This letter is submitted as a final report in accordance tritli 10 'CFR

  • Part 50.55(c) rcgarding the deficiency involving the Ucstinghouse Medium Voltacc, type Dil-P 4,16 KV suitchscar, used on busses C1 and D1, at Davia-Besso Nuclear Power Station Unit No. 1. This was discussed by Mr.

C..R. Domeck, Nuclear Project Engineer, with Mr. T. Vandcl, NRC Region

- '

III Office of Inspection and Enforcement, on September 24, 1976, and was

-

. reported 'as a deficiency. ,

,-

.

Description _ of the Deficiency . .

In response to an iuquiry regarding the scismic capability of the appurte- I nances to the subject suitchgear, a Ucstinghouse sales engineer responded l to our agent, Dccht.cl Company, that the Cencral Electric Type HFA relay )

-

was not scismically qualified Class IE.

.

Corrective Action *

'

A joint meeting with'Ucstinghouse, Dechtcl, and Toledo Edison at Pittsburgh revealed that. Ucstinghouse had scismically tested a prototype switchucar

,

assembly, and made an analysis of the appurtenances to qualify the l Davis -Besse suitchgear and the components to Class IE, per our specifica-l tionc. The scismic qualification reports were submitted as required by 1

( the specification. The basis for the scisinic qualification was an

(,,,/ analysis of the scucric test, which included relays specifically chosen

. .

.- -

- ,

g o o130 0

- a suum e euvier- -

- ... . . - -_. - .

.. -

.

.

! . ;. -

-

F *

. .

,

s. .

,

.

-

2

.

' ~

.

.

to represent the various available types of movements, and were performed

,

at severe seismic icycls well above those for Davis-Hesse. The Type llFA rhlays were not, however, included in the prototype test. Recent infor-

- nation received from the poneral Electric Company has confirmed the seismic qualification of the Type !:FA rela'yc for this application.

'

Safety Implications .

, .

'

.

Since no actual equipment deficiency existed, the health and safety of

, the public were not jeopardized. .

.

Yours very truly,

.

,

  • <

..

l3 ,.#.'g s c:-ebiu

- /

'

-

db c/23-24 cc:

Dr. Ernst Volgenau, Director Office of Inspection & Enforcement N U.S. Nucicar Regulatory Cor:nission *

.