ML19343B029

From kanterella
Revision as of 00:32, 4 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Public Version of Facility Emergency Implementation Procedure, Notification of Unusual Event.
ML19343B029
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/06/1980
From: Harriston W
ALABAMA POWER CO.
To:
Shared Package
ML19343A898 List:
References
FNP--EIP-17-1, FNP-0-EIP-17-01, NUDOCS 8011240497
Download: ML19343B029 (7)


Text

,.4

.

.

VOLUME 14 FNP-0-EIP-17 October 31, 1980 Revision 3 FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-EIP-17 S

A F

E T

Y NOTIFICATION OF UNUSUAL EVENT R

E L

A msonAL HI7ACT I:iFcEMATION DELZID IN ACC0rAN05if1TH TH3 g rszcc:a or INFCEMATION ACT D Approved:

H . d. 14 &w Plant Manager Date Issued: /l-4-FD Date of Implementation: 11-17-80 Diskette #EIP-1 List of Effective Pages DOCUMENT CONTROL Page Rev- CONTROLLED COPY 1-4 3 DO NOT REPRODUCE l Checklist pg. 1 3 Fig. 1 3 COPY NO. D39 i l

l 80ll ayo yq 7

s

.

VOLUME 14 FNP-0-EIP-17 NOTIFICATION OF UNUSUAL EVENT

!

1.0 Purpose This procedure defines the criteria for classifying an emergency as a Notification of Unusual Event, delineates l personnel and organizations who may be notified and lists actions which may be taken to mitigate the effects of the emergency.

'2. 0 References 2.1 Joseph M. Farley Nuclear Plant Emergency Plan.

2.2 FNP-0-EIP-8, Notification Roster 2.3 FNP-0-EIP-13, Fire Emergencies 2.4 FNP-0-EIP-11, Handling of Injured Personnel 2.5 FNP-0-EIP-26, Offsite Notification 3.0 General 3.1 Description The classification of Notification of Unusual Event applies to situations in which events are in process or have occurred which could indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occur.

3.2 Criteria A NOTIFICATION OF UNUSUAL EVENT would be required for any plant condition that warrants increased awareness on the part of state and/or local offsite authorities or involve other-than-normal plant shutdown or any of the following items:

3.2.1 Initiation of safety injection either automatically or manually as a result of plant parameters approaching or reaching their setpoint.

3.2.2 Radiological effluent technical specification limits being exceeded.

3.2.3 Any of the following technical specification limited conditions for operation are exceeded:

'

Rev. 3 1

_ _ _ _ _ _ _ _ _

.

.

. VOLUME 14 FNP-0-EIP-17 3.2.3 Any of the following technical specification limited conditions for operation are exceeded:

(a) Reactor coolant activity, (b) Containment integrity requiring shutdown to HOT SEUTDOWN.

3.2.4 Indicated subcooling (margin to saturation) decreased below 100F.

3.2.5 Failure of any of the following valves to c1cse:

(a) Pressurizer safety valve, (b) Pressurizer power operated relief valve and its remote motor operated isolation valve.

J (c) A steam generator safety valve, (d) A steam generator power operated relief valve.

3.2.6 Loss of both trains of offsite power OR--

loss of all onsite emergency, power (diesel generators and auxillaries).

3.2.7 Attempted unauthorized entry into a vital area or attempted sabotage of vital equipment.

3.2.8 Loss of control room indication or annunciation to an extent requiring shutdown.

3.2.9 Natural phenomena being~ experienced or projected to affect the plant site as follows:

(a) Any earthquake, (b) Unusual river water level caused by flood, low water or hurricane surge, (c) Any tornado onsite, (d) Any threatening hurricane.

1 Rev. 3 l l

2

.

i

.

VOLUME 14 FNP-0-EIP-17 3.2.10 Hazards experienced onsite or within one mile of the site boundary which could affect plant operations, such as:

(a) Aircraft crash, (b) Explosion or fire, (c) Release of toxic gas, (d) Release of flammable gas.

3.2.11 Transportation of contaminated injured individual to an offsite facility.

3.2.12 Loss of secondary coolant outside containment concurrent with ECCS activation.

3.2.13 Complete loss of forced RCS flow as indicated by RCS flow indicators on all three RCS loops. I 3.2.14 Inadvertent loading of a fuel assembly into an improper position which causes ,

Fq to be greater than the technical specification limit.

4.0 Procedure 4.1 A plant operator shall notify the Emergency Director of any emergency if the Shift Supervisor is indisposed.

4.2 The Shif t Supervisor will perform the following:

4.2.1 Announce the condition over the plant public address system and evacuate affected areas of the plant as applicable.

4.2.2 Notify the individuals or authorities as delineated in EIP-26 (Figure 1).

4.2.3 The Shift Supervisor shall perform the duties of the Emergency Director until his arrival or as otherwise instructed by the Emergency Director.

-

4.3 The Emergency Director will perform the following:

4.3.1 Notify the offsite authorities delineated

in EIP-26. (Figure 1)

Rev. 3 i

3 i

,

__

.

4 VOLUME 14 FNP-0-EIP-17 4.3.2 Activate that portion of the plant emergency organization necessary to respond to the incident by,providing instructions for the Administrative Aide (refer to EIP-8) and natify the Emergency Coordinator.

4.3.3 Ensure personnel accountability if an evacuation was initiated (EIP-10).

4.3.4 Plan and initiate re-entries (EIP-14) .

4.3.5 Continually reassess the emergency condition to ensure a higher classification does not exist.

4.3.6 Close out with verbal notification to notified agencies followed by a written report as required by technical specifications or escalate to a more severe class.

't

,

Rev. 3 4

-

.. -- -- ,

_ _ _ __ _ _ _ _ _

,

%

FNP-0-EIP-17A NOTIFICATION OF UNUSUAL EVENT CHECKLIST Initials I. Shift Supervisor A. Announce condition and initiate evacuation if required.

B. Notify individuals / agencies per EIP -26 II. Emergency Director A. Provide instructions for the -

Administrative Aide to notify essential members of the plant staff and the Emergency Coordinator.

B. Notify offsite authorities per EIP-26 C. Activate plant emergency organization D. Ensure personnel accountability

,

(EIP-10)

E. Plan and initiate re-entry (EIP-14)

F. Reassess conditions for possible upgrade to a higher emergency classification G. Close out or escalate to a more severe class 1 Rev. 3 J

'

.

_.

/

/ '.

.,

.

.

I-~~~~~*I State of I Alabama I

i l

I l Plant Emergency l

Personnel i ', Ccordinator I l l ,

f .

,, Plant Shift Emergency '

lIndivi dua l ,

. i :

Supervisor Director >

-' Call-List

'

). N 4 N c N M '

m '

llealth NRC t Physics Region II Support N ANI

~

.

s

.

  • e M

E e

Notification Order - Notification of IJnusual Event C

.

s u

_ _ _ _