VOLUME 14 FNP-0-EIP-4 October 6, 1980 9
Revision 5 I
FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-EIP-4 S
A E
E T
Y CHEMISTRY AND HEALTH PHYSICS SUPPORT TO THE EMERGENCY PLAN R
E L
A T
E D
PERSCIAL FRI7ACY ITiOR'nTION Approved:
DCI~ID 13 AccoRcAscs WInt THE FFIEC2 0F INFOR2MIION ACT Ld l, L' hv Plant Manag^r Date Issued:
tt rv~
Date of Implementation:
11-17-80 Diskette EIP-1 List-o f-Effective-Page Page Rev. 4 1
Rev. 4 DOCUn':NT CONTROL 2-7 Rev. 5 CONTROttED COPY Fig. 1,2 Rev. 5 DO NOT REPRODUCE COPY NO.
039 p
FOllMO8f56
i l
VOL. 14 FNP-0-EIP-4 l
l l
CHEMISTRY AND HEALTH PEYSICS l
SUPPORT TO THE EMERGENC'l PLAli 1.0 Purpose i
This procedure delineates the responsibilities of the Chemistry and Health Physics group during emergency conditions.
2.0 References 2.1
' Joseph M. Farley Nuclear Plant Emergency Plan.
2.2 FNP-0-EIP-10, Evacuation and Personnel Accounta-bility.
2.3 FNP-0-EIP-11,-Handling of Injured Personnel.
2.4 FNP-0-EIP-13, Fire Emergencies.
2.5 FNP-0-EIP-14, Re-entry Procedures.
2.6 FNP-0-RCP-25, Chemistry and Health Physics Activities During a Radiological Accident (short l
Term).
3.0 General 3.1 Chemistry and Health Physics support during i
emergencies shall consist of but is not limited to the following actions:
1 3.1.1 Provide personnel for Radiation Monitoring Teams for monitoring in the plant, in the environment (onsite and offsite) and at the Southeast Alabama Medical Center (SAMC).
3.1.2 If necessary, perform sampling, monitoring, chemical analysis and isotopic analysis activities delineated in RCP-25.
3.1.3 Provide environ.xntal monitoring data to the Emergency Director.
3.1.4 Assist in planning're-entry and recovery activities to aid in minimizing personnel
- exposures.
)
3.2 All C & EP shift personnel will report to the Southeast corner of the Control Room if the i
plant emergency alarm is sounded.
Rev. 4 1
y,__
,,,_,. _,. 7
,,_._,m_
,7 j
=_
VOL. 14 FNP-0-EIP-4 3.3 All C & EP Group administrative personnel shall report to the Service Building auditorium in accordance with EIP-10 in the event of a general evacuation.
4.0 Procedure 4.1 The Health Physics Manager shall:
4.1.1 Ensure C & EP Group accountability per EIP-10.
4.1.2 Dispatch personnel to provide radiological monitoring of personnel at other assembly areas.
4.1.3 Implement RCP-25, if appropriate.
4.1.4 Provide EP coverage when searching for missing personnel at the direction of the Emergency Director.
4.1.5 Initiate recall of off-duty C & EP personnel as necessary.
4.1.6 Provide the Emergency Director with information concerning plant status and environmental monitoring data and concerning any radiological incident.
4.1.7 Assign available personnel to specific Radiation Monitoring Teams (RMT).
Maintain communications with environmental RMT's via the radio located in the Control Alarm Station (CAS).
4.1.8 Assist the Emergency Director by planning the activities of and giving instructions to members of the Radiation Monitoring Team (s).
4.1.9 Assist the Emergency Director and other groups in planning re-entry and recovery activities to minimize personnel exposures.
4.1.10 Evaluate the relocation of access control as necessary for re-entry.
4.1.11 Provide supervision for personnel, area.
l and equipment decontamination during an accident to prevent / limit the spread of contamination.
Rev. 5 2
= -
VOL. 14 FNP-0-EIP-4 i
Decontamination will be initiated if practicable:
a.
Inside the Radiation Controlled Area (RCA) when radioactive contamination for personnel and equipment reach 1000 and 3
5000 dpm/100cm, respectively.
b.
Outside the RCA when radioactive contamination for personnel and equipment reach 200 and 3
500 dpm/100cm, respectively.
4.1.12 Provide for offsite analysis of radiological samples as appropriate.
e 4.1.13 If conditions warrant, provide for sampling and analysis of site drinking i
water for radioactive contamination.
4.2 A Radiation Monitoring Team assigned to monitor in the plant or at assembly areas shall:
4.2.1 Comply with EIP-10 in providing support during evacuations.
4.2.2 Comply with EIP-11 in providing support to in]ured personnel.
4.2.3 Comply with EIP-13 if supporting the fire brigade.
1 4.2.4 Comply with EIP-14 if a member of a re-entry team.
i 4.2.5 Don necessary, protective clothing and emergency equipment and perform radio-logical surveys as directed.
4.2.6 Document all survey data.
4.2.7 Post and establish controlled access i
areas as appropriatr.
4.2.8-Report findings to the Technical Support Center (TSC).
4.3 A Radiation Monitoring Team assigned to monitor in the environment (onsite and offsite) shall:
Rev. 5 l
3
VOL. 14 FNP-0-EfP-4 4.3.1 Obtain the RMT kit from the CSC building.
Check operability of all equipment.
Don necessary protective clothing and emergency equipment (rain suits are available in the storeroom).
4.3.2 Pick up a transceiver, if necessary, located in the Primary Access Point j
(PAP) Building and proceed to the Environmental Vehicle or other available plant vehicle.
4.3.3 Perform a direct radiation, air particulate, and radiciodine surveys in areas designated by the Emergency Director or Health Physics Manager.
Refer to Figures 1 & 2 for predesignated monitoring points.
i 4.3.4 Replace any TLD located in the area and post additional TLD's as directed.
4.3.5 Document survey data.
4.3.6 Relay data to the TSC via radio.
Report locations per the instructions on Figure 2.
4.4 A Radiation Monitoring Team assigned to monitor at the Southeast Alabama Medical Center shall:
4.4.1 Maintain a log of all personnel who enter the Radiation Casualty Receiving Area or who are in the vicinity of the casualty.
4.4.2 Ensure that the ventilation system registers in the Radiation casualty / Decontamination Area are closed if high levels of contamination are involved.
4.4.3 Keep the doctor informed of radiation and contamination levels.
4.4.4 Monitor the patient when directed by the doctor.
4.4.5 Ensure all body excreta and excised tissue from patient are placed in appropriately labeled and sealed containers.
4 4.6 Previde decontamination information to doctor as requested.
Rev. 5 4
1
VOL. 14 FNP-0-EIP-4 4.4.7 If patient must be transferred so ' surgery or elsewhere in the hospital, advise doctor as to the radiological precautions necessary during.and after transfer.
4.4.8 After the patient has left the Radiation Casualty / Decontamination Area, survey personnel, equipment and the Radiation Casualty / Decontamination Area.
Direct decontamination efforts to return the area to normal use.
4.4.9 survey ambulance personnel, ambulance, equipment, receiving area and path of the casualty and direct decontamination efforts, if necessary.
4.4.10 Collect and prepare all bioassay samples, smears and waste containers for transportation to the plant.
Post and label containers and area as appropriate.
i 4.4.11 Sample the run-off in the holdup tank i
for analysis at the plant.
Based on the j
analysis the C & HP supervisor shall inform SAMC to hold the contents for i
drumming or to release the centents to the sanitary sewer system.
4.4.12 Obtain personnel monitoring devices and appropriate information from hospital personnel.
4.4.13 Document all survey data and record all actions in the logbook.
4.4.14 Maintain communications with Emergency Director or Health Physics Manager.
l Rev. 5 L
'S i
VOL. 14 FNP-0-EIP-4 RADIATION MONITORING TEAM CHECKLIST:
ENVIRONMENTAL The senior Chemistry & Health Physics Technician on the team shall be responsible for completing the checklist and returning '
it to the Health Physics Manager.
Refer to Figure 1 for predesigned monitoring points.
The Environmental Radiation Monitoring Team (onsite and offsite) shall:
Initials J
A.
Obtain RMT kit from CSC.
Don necessary protective clothing and emergency equipment B.
Pick up monitoring equipment (i.e. G.M.
Instrumenc, Exposure Rate Instrument, and Air Sampler) necessary for environmental survey.
Check operability of equipment.
l C.
Verify operation of vehicle two-way radio prior to exit from site.
D.
If the two-way radio is non-operational or if the vehicle is not equipped with a radio, pick up a transceiver from PAP.
Check operability.
E.
Perform surveys and document survey data in log book.
Report locat:'sns per instructions on Figure 2.
F.
Label all samples with sample time, flow rates, location, date, etc.
G.
Relay pertinent data to TSC.
H.
Maintain two-way radio in the CN position and report data to TSC.
I.
If requested to replace filters at environ-mental air sampling station, record totalizer reading and insure flow rate is 1 cubic feet / minute.
K.
If replacing environmental TLD's, record TLD serial number, sector, date and time TLD placed or removed.
~
Rev. 5
=6
VOL. 14 FNP-0-EIP-4 RADIATICN MONITORING TEAM CHECKLIST:
HOSPITAL The senior Chemistry & Health Physics Technician on the team shall be responsible for completing the checklist and returning it to the Health Physics Manager.
1 The Radiation Monitoring Team at the Hospital shall:
Initials A.
Detain ambulance personnel and vehicles
}
ur_tll surveying is comp!sted.
B.
Close the ventilation system in the Radiation Casualty / Decontamination area, if high levels of contamination crevre the potential for airborne activity.
C.
Insure that drain systems are aligned to a holding tank and isolated from the Dothan Sewer System.
D.
Maintain a log of personnel who enter the affected area.
E.
Ensure that Personnel Monitoring Dosimeters (PMD's) are distributed as necessary.
(Insure dosimeters are cerced or record issue readings.)
F.
Insure excreta and/or excised tissue are placed in appropriately labeled and sealed containers.
G.
Provide the doctor with monitoring and decontamination data.
Monitor patient when directed by doctor.
H.
Survey all personnel, equipment and affected areas prior to release.
I.
Direct all decontamination efforts.
J.
Collect all PMD's, log readings from dosimeters and insure the names are on TLD's.
K.
Sample holding tank for analysis at plant.
L.
Maintain communication with Emergency Director or Health Physics Manager.
Rev. 5 7
i N
/AibI NNW NNE x
s
[
4 l _,
-g 4
o(
+
c
,c a,_:;
A 4
c' NE\\g 5
p r-t j
a Nw
+ Ytr g
g i
e i
i
\\+
fI f
/l*
_lhENE i
H b
i
>&\\
u
,n A
,,kl WNy
- qN
(
4 5
e9 N\\in'/
T f
[
h a
+
1 4
1 o ran a v ep p
w s~
Tr b,
I h ~. ~* =$ j yg,,7_
cas t i
Or i
f f
w II '
.w.ed
(
,n WSW 7,
/'
ik lk ESE i
t
~_\\ z1 N{ *+P,p
/
cm___
=
\\
x v
a SE -
~
\\
A.//
f+
~
= = =2. =. = =.
\\
== =:
S
~ z g./
.. ~..
ma
\\
PREDESIGNATED MONITORING POINTS Point location Description Point Locteten Desertatten fotne Loc at io.i Desertation
'5W-1 Bend of road A
- +4 Met tower J
ESE-1 Intaae Structure T
=
5 N18 Eel Road intersection K
SE-g Disenarge Stracture U
WSW-1 Cate at AL15 C
NE-1 TLD station L
SE+o scream crossing V
WSW+%
Gate et AL15 D
4E+%
Road intersection M
%AE+S Road intersection
'd i.5W-0 Bend of road E
ENE-4 End of road M
$&i Pond d4e X
WNW-4 Cate at All)
F ENf64 Road intersection P
5+1 End of field read Y
'tw+ L
% orth site at AL15 C
E+N Road latersection R
55W+5 Serv. water teruct.
NW+0 Rend of road it E+5 Sarte slip 5
$W-L toad intersection AA N!iW-i Coenlex Three i
- 1 Figure 1 Rev. 3
. r--g - f:- ;. ;
n i
,j n
48
=
s lp s.
- -e
^.
'. [
- ~
- (.,.,,..
....., g p...% y. -.,,,
./~~' w-N M.. < -
..-?
b.
~-.--%.,
N.
~'
.d
'.,, /.
,.., 3 1
-3
,o.
1 4
N l
.' ' NNE.C,..
.r-
.NNW WS
' 4
\\
-e-
\\
-g
.. _..., c y ;,,-..
+
1 v(F*>.w.
-r c
,te.,
,4
,,8 )(
'.s._-
h
,,f -
,N~~~. N.;...,. h _ [-- ~'-
['.
M.~;* ',
~ *[
2
' ~,. -
e c~m
'... '-?. ;.-~ ~ 8 ~~-- ?-9. +
';. m. ;. '. -
.- y
~
4 4.y; -
- r..
r p
.,,r g
.y g.._.
2 s.
.s
.u
.,.s-*
NW.,
y.
s - '-%
pI g.,
K. ;,'.,, - A _,
l
.g
,s
/- =-
. N.--
-.N
- p.~ e - : : g..
f
. r-
~.
y
. M c.
i ' ~, ; ' ~ ~.' ' -
1.
N :
% ~(:
^ 6..-
.y' #y, \\.
. ---n. : _.e.=
.=5gs.-*-
, - * - =.
T*
.j.'f,7.
,;. -~ w i-
' r 'y.,-
.?va-A
- 1 hf.. ~.,-- - ;. 3. >_ 5 %,;.y...~
w.
.,,-.y e
. s
?
.i ns.: r.
7 l
g- / w :.,Q.Q H
.K p;.y Nm, s... p..-.t.m..
y
~
.?
~
'N n
a:
8 p
' Y..:.- -,
s s
s
_. f,.,f' ?
b ur.M
& f.
l,
?
~
+
.T 4 %.
..<..:_. c,.-WNW ~'. "
..,.s r~%,
.;,,.. - +.,
- gNg.,_._.
Y x.*,-..
%. <. i-.A, :
Am-
".e. #
- w ;. ~. 'c., f,N-=
t.-'
,a i
,r***.t f,
..s" m v,..
-g m.'.%,
.,y.,.e*
T.
p.
..t
.b 4.l j.mN
..=
>=
,e y/
see-.-,.- 4,_
f -% h : #.7, t(s.
.d
~.
,.,3. s a%
, u j,*9 g
..m
.1,.
.at g, 3- * (y-
,Ny,,,
-,.,- /.
2 c-
... = *-,*
se anon; s 3
-~:--=
a-h
%'.t p
n
_ w.,4..,,.,,4 g
_ % u.4,/.
. Q, s=
p,?
.m
.s 3
2 y.. /-
s-
- .,. \\,. s.,.. '- = /,
- 3..-.
A 4" J*".-
- g; f. ( ' >h,,a "T'-'
M'. *-* ?*~ ~ ~ ~
~ ~
- f. c.c t
- a.-
~
k
.~
V' n
,w'* /.,s,.N.,).
,,, ', ', '.e.'(-.
,.,,,a#
e
- g '. -
.a
...'-n.,.__-.. ~1,. y,n ".* ~
.-l
!..i,' R
- m., n..* ls,.s.e
..,,... e 1 &.'.
(.
.. -..e
.. a.s.
r
,,-r -=.is.s..
, s e.
r
..c s -.s + -
- -=. =. M. m. --i.,.,.,. i 3 -
...+&.
~.
9 6 4 -- S -- y,W.._- ',. '- : '...~ < @% v o r_.::trWS f,
\\T v ; !.'..~
... s 1
9t
- j - ;,";,:, -
Ty.
. - -8
!, - 9 ; - 10 Ej
-4. !3 = 2
, ^
_1 -- 3 m. 4 r. 3
. 6 T,
--'.h
,,. W 5.106,,. 9 %. : 8 M. -.."I...-:
7 Ma%, *,, g.
- /-
di 3
- d. ~ t..--1-- <'.
w n
/
t
~
. 4' ** } l' e
"'..., k.,
, D:v :-L.,.f.
- ..s,.. 3-+
- . y s'
- --T s ::ll"-' e N**
iw.s * % t'.:.-l
- .'t -
- % N,N J' '. !
l i,.
w
>.1.r"M.,
e
,r..,L,.
.:1
- y -y., A 1J ;(
4 ---
.; ;. = -.
..y.
,[}$ -
- S=
- .
/ _'
c.
~
. b T* r 5
f.'.'
- '..,N /.,
\\
A,,.si M*
- -~7..a=.;,p ---:-#"?
-S,..V.
- -lr *. 7 7.I.
f /,., T
- i
-r,1j
- -- ;,--e
"~~.g,*s:;,'ji
(_p7,
' '- ;w C.:
T.
er
. i.
x.y
, b :..,
- A n -
p' e
3rg
. '.,, 'Q s
'.'~r, s
q t ; f ; +/. ; "! [
f g
x y
~.--..:
c
~r..
o'
. '* j! >g.,j Y. Q
- u.
%-h a (@ ki n
W y Ew=.= .l/.f, u, 3.
.-d.'w4-. ' W :.-=' '.ic.
r.
b ^
I
' %?
~^
l V
- ' %.--w<,
~'g5gt
~'-'
ly
..:.e
- s ' '
~ ~...
a 4 -- =*4
,a,..
- w eg e -
- ~A. *.
T.'*.
)-m N"
,....,... -*w s
- w.m.,.,..c :;,,,
,.y.
t m:~.* -n. '.S..-
n.
%., v. -
+*..%.
%u e
r A -. ';
p s.
.S.'. 2 -%m g s
. ~ :=.,
' N.; -v
-l. =-O. r /., 4 r '.1 ; f. 3
--Y l/ %.
/i.
^ :::-
4w,2,-:- N.@..e-;.
s :4..(,.c :.; ;
W
'. t, %. ;' N N.*.*-w,...'.1..
.* 3.
'~%.
.=.-v
+
s
~
M'M;.
J,.,..,f,, +.,.
t,, n,,e % -.; A.7.,., =..
s.s p-f
- N E
-.y
- s,..,
y- \\4 1.< x,.,. p.., <, ~.
w*. y :.
y
- p. c, y ~"q... p
.:%.,, J.m.
?,
~~
. _e :..,.r.- r..
. y
+ - -,
..w+--.-
.i..
.,,..m- "_'v&,.b p/.
A..,-,.. _/
1.,,
- .4
,~e i -
- 1
' - J : ::
g,.
L %-a:EL;,,.;
.?"
,._-e. b-.Vc '.,;, :.-M.,r. ' !
n v - ;*-
~
v.
- 4. f m.,,,
- m'. -dI'~c% 9..y a
P-.-
--. ~
, :.L.
W.~: e
"-',. T J
Q de,T-2,%, l~%~' ' ' H+-- -'%
- ,,~ -
e SE
'~i W-66. ** / i
"~
.7 *';
i T,We %:.i ! -
J-
'yl y- = ".
l:.W.9.;.
N-4f T.s, j., g
/i Y d- & p:D. ~~- M i.~'-h'b
%:,'?
'T-Q j ", $g ? W N,@ ! N y.l (,." l_
~'1yV &' NQ. w
~-
~
i.4.'#. ?.
.i f4.-.-f H
M.. ~
' l, r W.%, ;.
w-
+
lT': ;jg,s.9' : "\\.;[. R' a
..q. 7 zf' ~ ;33g j' G,..iSSW '. _,;.,.,g,4=,.h _*j,. _ to. n.,
i' j
.o.
. _., m A :
-,s
- e. star sa. taea *e= eg *** to La.isass assaa
~. c
- 1...,
_'. y a 42v d :.,._e. =:,, g.
\\.-.x
,g SgN; s.a
. e.
i
.s.,
.i m.,a u
m.u. -,e a..
.,n
, %.g %
z+.
i,
w2
- a. u u. u u.
3...
= 2-.
.m
=.e ua.-
.- w u.--
m N
4, 7
-<, ~ -
. s.
mumtm,, er m=.u==n. u..ni s
er e
i o
.. c..
. -l;
. / r y.
t ms=
x v
v'.
.~
a
~
~'
_a PREDESIt".,NATED. MONITORING POIES
?'m 3:2:.:n ?ns:- - m h --,
- 1-n
-n e -- n 5<=.7 2...
. :32 4.1 A042.~.:arst::.:n lI-:
3ru;e
. T.%
C (a:a 4:.4 / 5 N
h44 narse;.:n R
Wh bn.-: arse;.:n a: Z7 '
C
.' *.M bu s:a se::ua.
SE s nerse
.2-
*h i h as
- arsec:u.
M *: i a:M a:.C ?
- P Oras: in:.a r-t
- 'E ie.s.
sai s
3'
" '
- 1 r.nr at Cl3
'N'.- h 3aa:.a: arse::.:9 i-04:ar : eet at.G ) $
a: 4.15 9
i r.- W
. bas.2: arse::Ra a
M mer.s :.s j
ac.475 i
9 Figure 2 Rev. i