7_

t FNP-0-ETP-1035 January 29, 1993 Revision 0 FARLEY NUCLEAR PLANT ENGINEERING TECHNICAL PROCEDURE FNP-0-ETP-1035 SERVICE WATER DAM AND STRUCTURE MONTHLY INSPECTION PROCEDURE USAGE REQUIREMENTS SECTIONS CONTINUOUS USE - Each step of the procedure is to be read prior to performing that step.

ALL Each step is to be performed in the sequence S

given.

Where required, each step is to be A

signed off as complete before proceeding to F

the next step.

E T

REFERENCE USE - The procedure is to be Y

referred to periodically to confirm that all required parts of a work activity have been R

performed.

Where required, steps are to be E

signed off to show that procedure L

requirements have been met.

A T

INFORMATION USE - An activity may be E

performed from memory, but the procedure D

should be available for use as naeded and for training.

Approved:

(0.

Manager - Operations Date Issued:

)dd') _$~}

- r.

List of Effective Pages l

8 Rev.

Test Results Report 0 OPS /ETP-ll DOC. 14 UNCONTROuED COPY CAUTION Trus Copy is not maintamed current On Not use in Safety Aelated Activity 9408110177 940729 PDR ADOCK 05000348 F

PDR j

.i

FNP-0-F P-1035 T

TEST RESULTS REPORT Section I Test Description

Title:

Service Water Dam and Structure Monthly Inspection Procedure Number:

FNP-0-ETP-1035 Revision Nutrber:

_ 0 Start Date:

Completion Date:

Section II Test Results, Evaluation and Reconenendationc

[ ]

Test satisfactory (test results reconunended for approval)

[]

Test unsatisfactory (explain below, as needed)

[ ]

All data sheets and other test data are attached.

[ ]

'All test data steps and data sheets have been completed and signed off.

[ ]

Other disposition as recommended below.

Remarks:

PJrformed By:

Date:

Szetion III Responsible Supervisor's Review n,

~

Conuments:

1 Approved:

Date:

Rev. 0 11

F f

FNP-0-ETP-1035 i

FARLEY NUCLEAR PLANT SHARED ENGINEERING TECHNICAL PROCEDURE ETP-1035 SERVICE WATER DAM AND STRUCTURE MONTHLY INSPECTION 1.0 The following are guidelines for use in the inspection of the Service Water pond dam and surrounding areas.

Signature indicates no discrepancies or discrepancies have been documented in step 2.0.

1.1 Inspect the embankment for signs of erosion and a uniform grass cover.

/

Signature Date 1.2 Inspect the outlet drain collection system spillway for heavy vegetation growth.

/

Signature Date 1.3 Inspect the outlet drain collection system for an excessive flow of water.

/

Signature Date 1.4 Inspect the dam rip-rap area for heavy vegetation growth.

/

Signature Date 1.5 Inspect the dam rip-rap area for noticeable movement of the rock covering.

/

Signature Date 1.6 Inspect the Service Water recire. structure for evidence of cracked concrete.

/

Signature Date 1.7~~~~ Inspect the River Water discharge structure for evidence of crncked concrete.

/

Signature Date Rev. 0 1

R

r s :,

TNP-0-ETP-1035 i

1.8

)

Inspoct Sorvico Wctor structuro for clocnlinoso.

Outside of structure should be free from trash, oil drums, clutter.

Inside should be clean, any water leaks identified, all equipment operating per design or MWR submitted.

/

Signature Date 2.0 After inspection of the above areas document any findings below and report the same to the appropriate management level.

/

Signature Date r

3.0 Any corrections or repairs to the Service Water pond dam and surrounding areas should be documented in accordance with existing plant procedures.

/

Signature Date j

. m e-Rev. 0 2

i