ML19343A991

From kanterella
Jump to navigation Jump to search
Public Version of Facility Emergency Plan Implementing Procedure, Duties of Shift Supervisor
ML19343A991
Person / Time
Site: Farley  
Issue date: 11/03/1980
From: Harriston W
ALABAMA POWER CO.
To:
Shared Package
ML19343A898 List:
References
FNP--EIP-2-1, FNP-0-EIP-2-01, NUDOCS 8011240394
Download: ML19343A991 (2)


Text

--

O voL. 14 FNP-0-EIP-2 October 6, 1980 Revision 2 FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-IIP-2 S

A F

E T

Y DUTIES OF THE SHIFT SUPERVISOR R

E L

A T

E D

PERSONAL PRI7ACY I.TICF2IATION DELETED IN ACCORDANCE WITH TH3 FF"0M OF INFORMATION ACT Approved:

.0 d. Ch a--

Plant Manager Date Issued:

t i Ye Date of Implementation:

11-17-80 Diskette EIP-1 DOCUMENT CONTROL List of Effective Page CCNTRCtLED COPY Page Rev. #

DO NOT REPRODUCE COPY NO. 6 3 i

_a 1

Rev.

l U

VOL. 14 FNP-0-EIP-2 DUTIES OF THE SHIFT SUPERVISOR 1.0 Purpose This procedure provides guidelines for the Shift Supervisor during emergency situations.

2.0 References 2.1 Joseph M. Farley Nuclear Plant Emergency Plan 2.2 FNP-0-EIP-26, "Offsite Notificaticn" 3.0 Procedure 3.1 The Shift Supervisor shall have the authority and responsibility to immediately and unilaterally declare an emergency and to initiate the following emergency responses during emergency situations:

3.1.1 Evaluation of the condition and determination of the appropriate emergency classification.

3.1.2 Notifications per EIP-26, "Offsite Notification" 3.1.3 Completion of initial actions delineated in applicable EIP's.

3.1.4 Establishment of initial offsite communications.

3.2 The Shift. Supervisor shall become the Emergency Director until the individual on call is contacted and shall also complete timely duties of the Emergency Director, as appropriate, prior to the E.nergency Director taking full responsibility fcr the implementation of the Emergency Plan.

1 Rev. 2