t

~49 i 1

FNP-0-STP-611.O  !

March 28, 1991 i

=l Revision 4 r

FARLEY NUCLEAR PLANT SURVEILLANCE TEST PROCEDURE' i FNP-0-STP-611.0 l S ,

A  ;

F .;

E i T '

Y SPILLWAY CHANNEL INSPECTION.  ;

R  !'

E L .

A  !

.T .!

E  !

D i

i l

Approved: ,

-i Maintddance Kanager Date Issued: thj [# fan,

{

Dec Diskette STP06 Job 5 UNCONTROLLED COPY CAUllON: This Copy is not mamtained current Do Not use in Satety Related Activity 9400110113b i40/29 PDR ADDCK 05000348 -

1 F PDR )

e.

Rev. 3 FNP-0-STP-611.0 FARLEY EUCLEAR PLANT c c SURVEILLANCE TEST REVIES SHEET j SURVEILLANCE TEST NO. TECHNICAL SPECIFICATION REFERENCE FNP-0-STP-611.0 4.7.6.2.2 TITLE MODE (S) REQUIRING TEST:

SPILLWAY CHANNEL INSPECTION .

1,2,3,4 TEST RESULTS (To be completed by test performer)

PERFORMED BY DATE/ TIME COMPONENT OR TRAIN TESTED (if applicable)

O ENTIRE STP rERr0RMED PARTIAL STP PERFORMED For Surveillance Credit )

l Not for Surveillance Credit REASON FOR PARTIAL:

TEST COMPLETED: . Satisfactory Unsatisfactory The following deficiencies occurred:

l Corrective action taken or initiated:

i i

PERFORMING GROUP REVIEV REVIEVED BY DATE Procedure properly completed and satisfactory Comments:

1

-, 1 i

SYSTEMS PERFORMANCE SCREENED BY DATE GROUP REVIEV REVIEVED BY DATE  ;

Satisfactory and Approved Comments:

l FIGURE 3 Rev. 7

. s e

~ ._ . -- - . . _ . . . - . . . -. .. .

i FNP-0-STP-611.0 i i

i LIST OF EFFECTIVE PAGES 1

l i

REVISION NO. J PAGE NO. 0 1 2 3 4 5 6 7 8 9 10- j 1 X X X X 2 X X X X X 3 X X Y

EATA SHEET 1 X l

I l

l l

l l

s l

l l

l l

)

l Page 1 of 1 1

l

, .. ~ .-

m FNP-0-STP-611.0  !

~

FARLEY NUCLEAR PLANT UNITS 1& 2 l' SURVEILLANCE TEST PROCEDURE STP-611.0 SPILLWAY CHANNEL INSPECTION I

1.0 Purpose l

1.1 To verify the spillway channel and adjacent areas are )

intact. 1 2.0 Acceptance Criteria 2.1 There is no evidence of water erosion damaged to the spill channel or adjacent areas.

3.0 References t

3.1 FSAR, Chapter 2.0 '

3.2 Unit 1 and Unit 2 Technical Specification 4.7.6.2.2 '

3.3 FNP-0-AP-5, surveillance Program Administrative '

Control 3.4 FNP-0-AP-31, Quality Control Measures A-171501, Outdoor concrete spillway Structure -

3.5 General Arrangement 3.6 D-170538, Facility Description - Storage Pond 3.7 FNP-0-GMP-0.0, Mechanical Maintenance Precautions and l Limitations 4.0 Test Equipment, Special Tools and Materials '

4.1 Test Equipment None 4.2 Special Tools None 4.3 Materials None M 5.0 Precautions and Limitations 5.1 Wear appropriate safety equipment as required by task performance.

1 Rev. 4 A

FNP-0-STP-611.0 s 5.2 Mechanical Foreman shall be notified if discrepancies are encountered that cannot be resolved within the scope of this procedure. ,

1 5.3 shift Supervisor shall be notified if acceptance criteria are NOT met.

5.4 Maintenance Group is responsible for performance,  ;

documentation and initial review of maintenance '

surveillance tests in accordance with FNP-0-AP-5.

5.5 A Maintenance Work nequest (MWR) shall be issued l prior to performing any corrective maintenance identified during performance of this STP.

5.6 Observe all precautions and limitations listed in FNP-0-GMP-0.0, Mechanical Maintenance Precautions and Limitations.

M 6.0 Prerequisites and Initial Conditions 6.1 shift Supervisor has authorized performance of this procedure.

6.2 Personnel performing the test procedure have been briefed in proper procedure performance and meet qualification requirements as specified in FNP-0-AP-31.

6.3 This inspection may be performed during any mode of plant operation.

7.0 Maintenance Instructions M 7.1 Inspect the east and west banks of the spillway channel between the spillway structure and the storage pond for any signs of land slippage or erosion damage caused by the water runoff from the storge pond.

M 7.2 Inspect the upstream side of the spillway structure '

for any signs of water erosion and especially behind the sheet piling on the wast and west sides of the spillway structure.

M 7.3 Inspect the spillway drop and verify there has been

,_,no erosion damage to the impact blocks or to the concrete floor of the drop.

M 7.4 Inspect the sheet pile cut-off wall at the down stream end of teh spillway drop and verify that there is no under-cutting under the drop structure.

2 Rev. 4 y

FNP-0-STP-611.0

<: M 7.5 ' Inspect both. banks of the.out flow canal downstream  :

of the spillway, verify there is not land slippage or. erosion damage of the banks caused by the runoff from the storage pool.

t S 7.6 If any of the inspections fail to pass the' acceptance '

criteria, notify the Shift Supervisor immediatley.

Obtain verification signature on Data Sheet 1.  ;

M 7.7 Notify Shift Supervisor that task is complete.  ;

i

-i i

e b

l P

k I

m t

t 8

--r-1 3 Rev. 4

DMA SHEET 1 SPILD@0f CIWNEL ZNSP!rI'IG3 I

i TPNS 10: ImIE:

l STEP DESOtIPTIO4 SIGATURE4WIE l 5.0 Precautions and Limitation.s have been (M) /

read and understood. i 6.0 Prerequisites and Initial Conditions (M) /

have been satisfied.

7.1 Inspected east and west banks. (M) /  :

Condition:

7.2 Inspected upstream side of spillway structure. (M) /

Condition:

7.3 Inspected spillway drop. (M) /

Condition:

7.4 Inspected sheet pile' cut-off wall. (M) /

Condition:

7.5 Inspected both banks of out flow canal. (M) /

. 1 Condition:

7.6 Shift Supervisor signature for Unsat (S) / .

Acceptance Criteria.

7.7 Notified Shift Supervisor task conpleted. (M) / l PH %RKS:

REVIENED BY: DATE: .

Foreman Signature  !

ACCEPIANCE CRITERIA: There is no evidence of water erosion damage to the spillway channel oradjacentareas. '

-w r

3 Gen. Bev. 3

-.4 - *