ML20154K252

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Section 6,providing Recognition of Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety
ML20154K252
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/12/1998
From:
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20154K249 List:
References
NUDOCS 9810160211
Download: ML20154K252 (6)


Text

. _ . . _ . _ _ _ _ . _ _ . . . . _ . . . . . _ . . . _ _ _ . . . _ _ . _ _ _ . . . .

Joseph M. Farley Nuclear Plant Technical Specification Change Request For Steam Generator Replacement Project - Administrative Controls Changed Pages List

!!aill. Revision 6-13 Replace 1

9810160211 981012 PDR ADOCK 03000348 P PDR

thn Stum Gingrit:r Rsplictm;nt (SGR) Prrjict Minag:r, th) SGR Enginnring MinigIr, th3 SGR instill:tinn Minagir, the SGR Quality ADMINISTRATIVE CONTROLS Manager, the SGR Project Controls Manager, Manager Plant Modifications Manager, the Administrative Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not change the intent of the approved procedures will be approved by two members of the plant staff, at least one of whom holds a Senior Reactor Operator's License. For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b. Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant. Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which designed the modification. Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the General Manager - Nuclear Plant.
c. Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be prepared, reviewed, and approved. Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment. Proposed tests and experiments shall be approved before implementation by the General Manager - Nuclear Plant,
d. Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent i recurrence. Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Chairman of the Nuclear Operations Review Board.
e. Individuals responsible for reviews performed in accordance with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previousiv designated by the General Manager - Nuclear Plant. Each such ceview shall include a determination of whether or not additic..al, cross-

) disciplinary, review is necessary. If deemed necessary, such review shall be performed by the review personnel of the

, appropriate discipline.

. f. Each review will include a determination of whether or not an

. unreviewed safety question is involved. Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question will be obtained prior to General Manager - Nuclear Plant approval j for implementation.

FARLEY-UNIT 1 6-13 AMENDMENT NO. 60, 78 1

1

s

. ADMINISTRATIVE CONTROLS Manager, Plant Modifications Manager, the Administrative Manager, the Steam Generator Replacement (SGR) Project Manager, the SGR Engineering Manager, the SGR Installation Manager, the SGR Quality Manager, the SGR Project Controls Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not change the intent of the approved procedures will be approved by two members of the plant staff, at least one of whom holds a Senior Reactor Operator's License. For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b. Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant. Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which designed {

the modification. Proposed modifications to plant nuclear safety- i related structures, systems and components shall be approved prior i to implementation by the General Manager - Nuclear Plant,

c. Proposed tests and experiments which affect plaat nuclear safety and are not addressed in the Final Safety Analysis Report shall be i prepared, reviewed, and approved. Each such test or experiment shall be reviewed by an individual / group other than the  !

individual / group which prepared the proposed test or experiment.

Proposed tests and experiments shall be approved before implementation by the General Manager - Nuclear Plant.

d. Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence. Such reports shall be ,

approved by the General Manager - Nuclear Plant and forwarded to the l Chairman of the Nuclear Operations Review Board. '

e. Individuals responsible for reviews performed in accordance with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager - Nuclear Plant. Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary. If deemed necessary, such review shall be l' performed by the review personnel of the appropriate discipline.

f

f. Each review will include a determination of whether or not an unreviewed safety question is involved. Pursuant to 10CFR50.59 l'

NRC approval of items involving unreviewed safety question will be obtained prior to General Manager - Nuclear Plant approval for implementation.

FARLEY-UNIT 1 6-13 AMENDMENT NO.

1.

l . .

l 0 t Joseph M. Farley Nuclear Plant Technical Specification Change Request For Steam Generator Replacement Project- Administrative Controls Changed Pages List Unit 2 Revision 6-13 Replace l

l i

ths St21m Giniritar RiplicImint (SGR) Prcjict MKnigir, ths SGR Enginssring MinIgir, tha SGR InstIllitinn Mantgir, th3 SGR QuIlity ADMINISTRATIVE CONTROLS ' '

i l Manager,[ Plant Modifications Manager, the Administrative

. Manager, Tor an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative i procedures, security implementing procedures, emergency plan l- implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not change the intent of the approved procedures will be l approved by two members of the plant staff, at least one of l whom holds a Senior Reactor Operator's License. For changes to procedures which may involve a change in intent of the approved l procedures, the person authorized above to approve the procedure shall approve the change.

b. Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as ,

designated by the General Manager - Nuclear Plant. Each such modification shall be reviewed by an individual / group other l than the individual / group which designed the modification, but who may be from the same organization as the individual / group j which designed the modification. Proposed modifications to 1 plant nuclear safety-related structures, systems and components l shall be approved prior to implementation by the General '

Manager - Nuclear Plant.

c. Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be prepared, reviewed, and approved. Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment. Proposed tests and experiments shall be
approved before implementation by the General Manager - Nuclear Plant.

l

d. Occurrences reportable pursuant to the Technical Specification l 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence. Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Chairman of the Nuclear Operations Review Board.
e. Individuals responsible for reviews performed in accordance with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager - Nuclear Plant. Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary. If deemed necessary, such review shall be performed by the review personnel of the l appropriate discipline. I
f. Each review will include a determination of whether or not an I unreviewed safety question is involved. Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question will

, be obtained prior to General Manager - Nuclear Plant approval l- for implementation. l l FARLEY-UNIT 2 6-13 AMENDMENT NO. 64, 70 i

.. _ _ _ _ _ _ . . .-. __- ~ _ . - . - . _ _ _ _ . .___- _ . . _ _ _ _ ._ _ .__

= ,

ADMINISTRATIVE CONTROLS-Manager, Plant Modifi7;at ions Manager, the Administrative Manager, l

the Steam Generator Replacement (SGR) Project Manager, the SGR Engineering Manager, the SGR Installation Manager, the SGR Quality Manager, the SGR Project Controls Manager or an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not I change the intent of the approved procedures will be approved by two l members of the plant steff, at least one of whom holds a Senior Reactor Operator's License. For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change,

b. Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant. Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which' designed the modification. Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the General Manager - Nuclear Plant.
c. Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be prepared, reviewed, and approved. Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment.

Proposed tests and experiments shall be approved before l

implementation by the General Manager - Nuclear Plant.

d. Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence. Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Chairman of the Nuclear Operations Review Board,
e. Individuals responsible for reviews performed in accordance with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of l

the plant supervisory staff previously designated by the General Manager - Nuclear Plant. Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary. If deemed necessary, such review shall be performed by the review personnel of the appropriate discipline.

f. Each review will include a determination of whether or not an

('

unreviewed safety question is involved. Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question will i be obtained prior to General Manager - Nuclear Plant approval for I implementation.

s EARLEY-UNIT 2 6-13 AMENDMENT NO.

I. ____ ,