VOL. 14 FNP-0-EIP-3 October 6, 1990 Revision 3 FARLEY NUCLEAR PLMT l

EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-0-EIP-3 S

A F

E T

Y DUTIES OF THE EMERGENCY DIRECTOR R

E L

A T

E D

FERS03AI, FRI7ACY I r10FMIION i

DEI.ZTID IN A000ROANCS ?iInl THZ FCOM OF INF0TWATION ACT W /. b k h Plant Manager Date Issued:

is-7-Tc 4

Date of Implementation:

11-17-80 Diskette EIP-1 List-of-Effective-Page Page Rev. 4 DOCUMENT CONTROL CONTROLLED COPY l-2 Rev. 3.

DO NOT REPRODUCE i

COPY NO. 039 j

$0(1 M0df77-

VOL. 14 FNP-0-EIP-3 DUTIES OF THE EMERGENCY DIRECTOR 1.0 Purpose This procedure provides guidelines for the Emergency Director during emergency situations.

2.0 References 2.1 Joseph M. Farley Nuclear Plant Emergency Plan 2.2 FNP-0-EIP-0, Emergency Organization and Control Room Access i

2.3 FNP-0-EIP-7, Security Suppcrt to the Emergency Plan 2.4 FNP-0-EIP-8, Notification Roster 2.5 FNP-0-EIP-9, Radiation Exposure Estimation and Classification of Emergencies 2.6 FNP-0-EIP-10, Evacuation and Personel Accountability 2.7 FNP-0-EIP-14, Re-entry Procedures 2.8 FNP-0-EIP-26, Offsite Notification 2.9 FNP-0-EIP-27, Activation of the Emergency Operations Facility 3.0 General A copy of FNP-0-EIP-8, Notification Roster, FNP-0-EIP-9, Radiation Exposure Estimation and Classification of Emergencies FNP-0-EIP-26, Offsite Notification, and this procedure shall be maintained with the Emergency Director on call.

4.0 Procedure The Emergency Director shall have responsibility for the overall directicn of plant emergency activities and with interfacing with off-site groups.

He shall be guided bv the following in addition to specific actions delineated in applicable EIP's:

4.1 Evaluate conditions and if these conditions so warrant, declare tne existence of an emergency.

If an emergency has been declared, reevaluate the conditions.

Downgrading an emergency level will not be delegated to other elements of the emergency organization.

1 Rev. 3

l t

VOL. 14 FNP-0-EIP-3 4.2 Verify correct control room response to the emergency condition.

4.3 Determine radiolacical status and initiate notifications and/or evacuations as necessary per EIP-9 and EIP-26.

When state authorities cannot be contacted for immediate evacuation, recommendations to local agencies may be made only by the Emergency Director.

4.4 Initiate rescue and emercency repair operations per EIP-14 If appropriate measures are not underway.

4.5 Maintain plant security.

4.6 Establish communications with and provide infor-mation to the Recovery Manager in the EOF per EIP-27.

4.7 Perform personnel accountability per EIP-10.

4.8 Coordinate and maintain communications with offsite authorities per EIP-26.

4.9 Provide staffing of the Technical Support Center (TSC) and Operations Support Centers (OSC ) per EIP-0 within two hours of the declaration of the emergency by notifying the Technical Manager.

4.9.1 Within eight (8) hours of the declaration l

of an emergency, provide a full complement to be available to relieve TSC and OSC personnel.

4.9.2 Within sixteen (16) hours of the declaration of an emergency, provide sufficient personnel such that the TSC and OSC's can be staffed on a 24 hour-a-day basis for at least one week.

4.10 Ast:qn an individual to keep a record of all communications with the general office and offsite authorities.

I 2

Rev. 3