NRC 2013-0082, Technical Specification Bases Change Summary
ML13241A198 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 08/28/2013 |
From: | Millen M Point Beach |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
NRC 2013-0082 | |
Download: ML13241A198 (3) | |
Similar Documents at Point Beach | |
---|---|
Category:Letter type:NRC
MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024
[Table view]Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18 Category:Technical Specification MONTHYEARL-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023
[Table view]License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML22140A1342022-05-20020 May 2022 Attachment 2 - Proposed Technical Specification Changes (Mark-Up) ML22140A1372022-05-20020 May 2022 Attachment 3 - Proposed Technical Specification Bases Changes (Mark-Up) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2018-0028, NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2018-07-30030 July 2018 NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NRC 2018-0025, Technical Specification Bases Change Summary2018-05-0202 May 2018 Technical Specification Bases Change Summary ML16349A0802017-01-30030 January 2017 Issuance of Amendments for Elimination of Technical Specifications 3.7.14, Primary Auxiliary Building Ventilation NRC 2016-0038, Technical Specifications Bases Change Summary for 20152016-08-23023 August 2016 Technical Specifications Bases Change Summary for 2015 NRC 2016-0030, License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region2016-07-29029 July 2016 License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region NRC 2015-0044, Submits Technical Specification Bases Change Summary2015-08-11011 August 2015 Submits Technical Specification Bases Change Summary NRC 2015-0004, LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2015-03-27027 March 2015 LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process NRC-2014-0060, Submittal of Technical Requirements Manual Change Summary2014-08-21021 August 2014 Submittal of Technical Requirements Manual Change Summary NRC-2014-0059, Technical Specification Bases Change Summary2014-08-21021 August 2014 Technical Specification Bases Change Summary NRC 2013-0082, Technical Specification Bases Change Summary2013-08-28028 August 2013 Technical Specification Bases Change Summary NRC 2012-0045, Technical Specification Bases Change Summary2012-06-12012 June 2012 Technical Specification Bases Change Summary NRC 2012-0033, License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 22012-04-30030 April 2012 License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 2 NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) NRC 2009-0042, Supplement to License Amendment Request 258, Incorporate Best Estimate Large Break Loss of Coolant Accident (LBLOCA) Analyses Using Astrum2009-04-0808 April 2009 Supplement to License Amendment Request 258, Incorporate Best Estimate Large Break Loss of Coolant Accident (LBLOCA) Analyses Using Astrum NRC 2008-0044, Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control2008-07-24024 July 2008 Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control NRC 2008-0044, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control2008-07-24024 July 2008 License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control NRC 2008-0048, Technical Specification Bases Change Summary from January 1, 2007 Through June 30, 20082008-06-27027 June 2008 Technical Specification Bases Change Summary from January 1, 2007 Through June 30, 2008 NRC 2007-0034, License Amendment Request 249, Technical Specification 3.6.3, Containment Isolation Valves2007-07-12012 July 2007 License Amendment Request 249, Technical Specification 3.6.3, Containment Isolation Valves NRC 2007-0052, Technical Specification Bases Change Summary2007-06-29029 June 2007 Technical Specification Bases Change Summary NRC 2006-0090, License Amendment Request 251; Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report2006-12-14014 December 2006 License Amendment Request 251; Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report ML0514003852004-10-0808 October 2004 Enclosure IV Attachments 1 & 2 Point Beach Revised EAL Submittal. Attachment 1: Red Line of the Technical Basis Document. Attachment 2: Clean Copy of the Technical Basis Document NRC 2004-0062, Technical Specifications Bases Revisions2004-06-10010 June 2004 Technical Specifications Bases Revisions NRC 2004-0034, License Amendment Request 239 Technical Specification Surveillance Requirements SR 3.8.4.6 and SR 3.8.4.7, DC Sources - Operating2004-04-0808 April 2004 License Amendment Request 239 Technical Specification Surveillance Requirements SR 3.8.4.6 and SR 3.8.4.7, DC Sources - Operating ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process NRC 2003-0033, Technical Specification Bases Revisions2003-04-0909 April 2003 Technical Specification Bases Revisions ML0233704602002-11-29029 November 2002 Technical Specifications for Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level NRC 2002-0108, Technical Specification Bases Revisions2002-11-10010 November 2002 Technical Specification Bases Revisions NRC 2002-0081, License Amendment Request 229 Technical Specifications LCO 3.5.2, ECCS - Operating, & LCO 3.5.3, ECCS - Shutdown2002-09-12012 September 2002 License Amendment Request 229 Technical Specifications LCO 3.5.2, ECCS - Operating, & LCO 3.5.3, ECCS - Shutdown NRC 2002-0040, Technical Specification Bases Revisions2002-05-13013 May 2002 Technical Specification Bases Revisions ML0209105352002-03-29029 March 2002 Technical Specification Pages, Point. Beach, Units 1 and 2 - Amendment 203 and 208 NRC 2002-0010, Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 22002-01-17017 January 2002 Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 2 2023-09-19 Category:Bases Change MONTHYEARL-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023
[Table view]License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML22140A1372022-05-20020 May 2022 Attachment 3 - Proposed Technical Specification Bases Changes (Mark-Up) NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2018-0025, Technical Specification Bases Change Summary2018-05-0202 May 2018 Technical Specification Bases Change Summary NRC 2016-0038, Technical Specifications Bases Change Summary for 20152016-08-23023 August 2016 Technical Specifications Bases Change Summary for 2015 NRC 2015-0044, Submits Technical Specification Bases Change Summary2015-08-11011 August 2015 Submits Technical Specification Bases Change Summary NRC-2014-0059, Technical Specification Bases Change Summary2014-08-21021 August 2014 Technical Specification Bases Change Summary NRC-2014-0060, Submittal of Technical Requirements Manual Change Summary2014-08-21021 August 2014 Submittal of Technical Requirements Manual Change Summary NRC 2013-0082, Technical Specification Bases Change Summary2013-08-28028 August 2013 Technical Specification Bases Change Summary NRC 2012-0045, Technical Specification Bases Change Summary2012-06-12012 June 2012 Technical Specification Bases Change Summary NRC 2012-0033, License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 22012-04-30030 April 2012 License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 2 NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) NRC 2008-0048, Technical Specification Bases Change Summary from January 1, 2007 Through June 30, 20082008-06-27027 June 2008 Technical Specification Bases Change Summary from January 1, 2007 Through June 30, 2008 NRC 2007-0052, Technical Specification Bases Change Summary2007-06-29029 June 2007 Technical Specification Bases Change Summary ML0514003852004-10-0808 October 2004 Enclosure IV Attachments 1 & 2 Point Beach Revised EAL Submittal. Attachment 1: Red Line of the Technical Basis Document. Attachment 2: Clean Copy of the Technical Basis Document NRC 2004-0062, Technical Specifications Bases Revisions2004-06-10010 June 2004 Technical Specifications Bases Revisions NRC 2003-0033, Technical Specification Bases Revisions2003-04-0909 April 2003 Technical Specification Bases Revisions NRC 2002-0108, Technical Specification Bases Revisions2002-11-10010 November 2002 Technical Specification Bases Revisions NRC 2002-0040, Technical Specification Bases Revisions2002-05-13013 May 2002 Technical Specification Bases Revisions NRC 2002-0010, Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 22002-01-17017 January 2002 Technical Specification Bases B3.3.1 Revision for Point Beach Nuclear Plant, Units 1 and 2 2023-09-19 |
Text
August28, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Specification Bases Change Summary NEXT era ENERGY. POINT BEACH NRC 2013-0082 TS 5.5.13 10 CFR 50.71(e) In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71(e), NextEra Energy Point Beach, LLC (NextEra), is submitting a summary of changes made to the Point Beach Nuclear Plant (PBNP) TS Bases. The enclosure contains the TS Bases change summary for the period January 1, 2012, through December 31, 2012. NextEra previously submitted the TS Bases change summary for January 1, 2011, through December 31,2011 , on June 12,2012 (ML12165A251).
This letter contains no new commitments and no revisions to existing commitments. If you have questions or require additional information, please contact Michael Millen at 920/755-7845.
Very truly yours, NextEra Energy Point Beach , LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Date of Change 5/21/12 6/4/12 6/28/12 3/26/12 3/26/12 3/26/12 10/10/12 3/26/12 8/27/12 3/26/12 3/26/12 6/28/12 3/26/12 8/27/12 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS BASES CHANGE
SUMMARY
FOR 2012 Affected Affected Section Page(s) Summary 3.3.1 B 3.3.1-27 Added information regarding the P-9 interlock and its relationship to the condenser steam dumps. 3.3.1 B 3.3.1-27, 28 Moved the P-9 interlock/condenser steam dumps information to the P-9 section. 3.3.2 B 3.3.2-14 Spray pump suction is shifted at a predetermined RWST level to the containment sump vice the low-low level setpoint.
3.4.5 B 3.4.5-2, 4 The steam generator (SG) level for meeting SR 3.4.5.2 changed from 30% to 35%. 3.4.6 B 3.4.6-4 The SG level for meeting SR 3.4.6.2 changed from 30% to 35%. 3.4.7 All References to SG level of 30% changed to 35%. 3.5.1 B 3.5.1-6 Removed the words "do not" from in front of "include instrument uncertainty".
3.5.4 B 3.5.4-3, 5 Revisions from the parametric values amendment.
3.6.2 B 3.6.2-2, 7 Changed reference 1 from 10 CFR 50, App J, Option B to Technical Specification 1.1. Changed La from 0.4% to 0.2% 3.6.4 B 3.6.4-2, 3 Revisions from the parametric values amendment.
3.6.5 B 3.6.5-2, 3 Revisions from the parametric values amendment.
3.6.6 B 3.6.6-1 I 3-5, Added information from the FSAR and the alternate 7, 13 source term NRC safety evaluation.
3.6.7 B 3.6.7-2, 4 Revisions from the parametric values amendment.
3.7.3 B 3.7.3 Descriptions changed to match the FSAR. Page 1 of 2 Date of Change 7/16/12 Affected Section 3.7.6 Affected Page(s) B 3.7.6-1, 2, 4 Summary The NRC safety evaluation for the auxiliary feedwater system modifications dated March 25, 2011 replaced the 1990 NRC safety evaluation of the Point Beach response to station blackout rule as a reference.
Page 2 of 2