NRC-2014-0059, Technical Specification Bases Change Summary

From kanterella
Jump to navigation Jump to search
Technical Specification Bases Change Summary
ML14233A425
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/21/2014
From: Millen M
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-2014-0059
Download: ML14233A425 (2)


Text

NEXTera EN ERGY ~

POINT BEACH August 21, 2014 NRC 2014-0059 TS 5.5.13 10 CFR 50.71(e)

U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Specification Bases Change Summary In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71 (e) , NextEra Energy Point Beach, LLC (NextEra), is submitting a summary of changes made to the Point Beach Nuclear Plant (PBNP) TS Bases.

The enclosure contains the TS Bases change summary for the period January 1, 2013, through December 31, 2013. NextEra previously submitted the TS Bases change summary for January 1, 2012, through December 31,2012, on August 28,2013 (ML13241A198).

This letter contains no new commitments and no revisions to existing commitments.

If you have questions or require additional information, please contact Michael Millen at 920/755-7845.

Very truly yours, NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers , WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS BASES CHANGE

SUMMARY

FOR 2013 Date of Affected Affected Change Section Page{s} Summary 9/24/13 3.3.2 8 3.3.2-26 Clarified that if the auxiliary feedwater (AFW) low suction pressure instrument channel is inoperable, Action Condition J is met. This allows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to restore the channel. If that is not possible, the AFW pump must be declared inoperable.

7/22/13 3.3.3 8 3.3.3-8, 9 Added steam generator tube rupture to the list of accidents that require AFW. Added the automatic transfer of AFW suction from the condensate storage tanks (CST) to service water (SW).

6/25/13 3.6.1 8 3.6.1 -2 Added line 'e' to the background section . "An evaluation must be performed when a valve or component that has not been leak tested is used to isolate containment.

Subsequent to meeting the Required Action to isolate the affected penetration flow path, an evaluation must be performed to document the ability of the component to meet the license basis requirements associated with containment isolation."

6/25/13 3.6.3 8 3.6.3-1 Added the same language as 3.6.1 to the background section .

9/24/13 3.7.5 8 3.7.5-1 ,4 Added language in the background section regarding the automatic transfer from CSTs to SW . Discussed the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> allowed to restore AFW low suction pressure instrument channel before Action Condition 8 applies.

1/11/13 3.8.1 8 3.8.1 -5 Changed 1/2C157 safeguards rack equipment ID number.

8/26/13 3.8.1 8 3.8 .1-5, 6, Discussion on diesel generator fans was rewritten based 25 on a new calculation.

12/12/13 3.8 .1 83.8.1-9 Removed discussion on fast transfer cabapility of offsite power.

Page 1 of 2