August 11, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Specification Bases Change Summary NRC 2015-0044 TS5.5.13 10 CFR 50.71(e)

In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71(e), NextEra Energy Point Beach, LLC (NextEra), is submitting a summary of changes made to the Point Beach Nuclear Plant (PBNP) TS Bases.

The enclosure contains the TS Bases change summary for the period January 1, 2014, through December 31, 2014. NextEra previously submitted the TS Bases change summary for January 1, 2013, through December 31, 2013, on August 21, 2014 (ML14233A425).

This letter contains no new commitments and no revisions to existing commitments.

If you have questions or require additional information, please contact me at (920) 755-7599.

Very truly yours, NextEra Energy Point Beach, LLC

!
?2~~ /'b..--

h/C//--?6:--t:- /'7 /Ut£.-1 Bryan Woyak Licensing Manager Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS (TS) BASES CHANGE

SUMMARY

FOR 2014 Affected Date of Affected Section Change Page(s)

Summary 3.1.7 5/21/14 B 3.1.7-4 Added monitoring the continued energization of the stationary gripper coil as a means of control rod position verification.

3.3.3 1/27/14 B 3.3.3-3, 9 Clarified the TS Core Exit Thermocouple (CET) channel check requirement as two GETs/core quadrant, where one CET is supplied from the White instrument bus and one CET is supplied from the Yellow instrument bus.

3.5.3 5/21/14 B 3.5.3-2 Added discussion regarding the need to maintain one train of ECCS operable and aligned for injection in Mode 4 to prevent the potential for steam voiding.

3.8.1 11/6/14 B 3.8.1-5, 6, Changed the required number of gravity-operated 25 louvers and the louver configuration for Emergency Diesel Generator G01 and G02 operability as a result of a station modification.

3.8.4 9/25/14 B 3.8.4-2 Revised the 125 VDC battery charger minimum voltage limit to reflect batteries 005 and 006 as containing 60 cells instead of 59 cells.

3.8.9 1/27/14 B 3.8.9-4, 5 Removed discussion of Auxiliary Feedwater System as a shared system.

3.8.10 1/27/14 B 3.8.10-2 Removed discussion of Auxiliary Feedwater System as a shared system.