May 2, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Specification Bases Change Summary NRC 2018-0025 TS 5.5.13 10 CFR 50.71(e)

In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71 (e),

NextEra Energy Point Beach, LLC (NextEra) is submitting a summary of changes made to the Point Beach Nuclear Plant TS Bases without prior NRC approval.

The enclosure contains the TS Bases change summary for the period January 1, 2016, through March, 31 2018. NextEra previously submitted the TS Bases change summary for January 1, 2015, through December 31, 2015, on August 23, 2016 (ML16236A267).

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions or require additional information, please contact me at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC J~~?,b~~

\\1-\\v~-AM ~ _ Sc~rJc 1 Vbi2-Eric Schultz Licensing Manager Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, Wl54241

Affected Section 3.0 3.4.6 3.4.7 3.4.8 3.5.2 3.5.3 3.6.6 3.8.1 3.8.1 3.8.9 3.8.10 3.9.4 3.9.5 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION (TS) BASES CHANGE

SUMMARY

FOR JANUARY 1, 2016-MARCH 31, 2018 Date of Affected ChanQe Page(s)

Summary July 2017 8 3.0-11 thru Clarified applicability to Technical Specification 14 Chapter 5 proqrams.

Clarified that design basis acceptance criteria are September 8 3.4.6-5 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 8 3.4.7-5, 6 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 8 3.4.8-3, 4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

September 8 3.5.2-4, 7 Added clarifying information in regards to 2016 containment spray and operability.

October Removed extraneous verbiage and provided 2017 8 3.5.3-2, 3 clarifying information pertaining to the resolution of concerns raised by NRC IN 2010-011.

September 8 3.6.6-7, 13 Added clarifying information in regards to 2016 containment spray and operability.

April 2016 3.8.1-3, 4 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

June 2016 3.8.1-5, 6 Aligned room temperatures for all emergency diesel Qenerators.

April2016 3.8.9-1 J 5 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

April2016 3.8.1 0-3 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

Clarified that design basis acceptance criteria are September 3.9.4-4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 3.9.5-4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Page 1 of 1

May 2, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Specification Bases Change Summary NRC 2018-0025 TS 5.5.13 10 CFR 50.71(e)

In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71 (e),

NextEra Energy Point Beach, LLC (NextEra) is submitting a summary of changes made to the Point Beach Nuclear Plant TS Bases without prior NRC approval.

The enclosure contains the TS Bases change summary for the period January 1, 2016, through March, 31 2018. NextEra previously submitted the TS Bases change summary for January 1, 2015, through December 31, 2015, on August 23, 2016 (ML16236A267).

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions or require additional information, please contact me at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC J~~?,b~~

\\1-\\v~-AM ~ _ Sc~rJc 1 Vbi2-Eric Schultz Licensing Manager Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, Wl54241

Affected Section 3.0 3.4.6 3.4.7 3.4.8 3.5.2 3.5.3 3.6.6 3.8.1 3.8.1 3.8.9 3.8.10 3.9.4 3.9.5 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION (TS) BASES CHANGE

SUMMARY

FOR JANUARY 1, 2016-MARCH 31, 2018 Date of Affected ChanQe Page(s)

Summary July 2017 8 3.0-11 thru Clarified applicability to Technical Specification 14 Chapter 5 proqrams.

Clarified that design basis acceptance criteria are September 8 3.4.6-5 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 8 3.4.7-5, 6 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 8 3.4.8-3, 4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

September 8 3.5.2-4, 7 Added clarifying information in regards to 2016 containment spray and operability.

October Removed extraneous verbiage and provided 2017 8 3.5.3-2, 3 clarifying information pertaining to the resolution of concerns raised by NRC IN 2010-011.

September 8 3.6.6-7, 13 Added clarifying information in regards to 2016 containment spray and operability.

April 2016 3.8.1-3, 4 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

June 2016 3.8.1-5, 6 Aligned room temperatures for all emergency diesel Qenerators.

April2016 3.8.9-1 J 5 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

April2016 3.8.1 0-3 Changed the verbiage to discuss Unit 1 and Unit 2 separately.

Clarified that design basis acceptance criteria are September 3.9.4-4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.

Clarified that design basis acceptance criteria are September 3.9.5-4 used to assess operability. Clarified when 2016 surveillance is met. Clarified past operability requirement.