ML17286A346

From kanterella
Revision as of 00:14, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1990 for WNP-2
ML17286A346
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1990
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A344 List:
References
NUDOCS 9010160287
Download: ML17286A346 (2)


Text

REPCAT PERIOD Au9 19 90 mcnth, year LNIT SfUTDOl<NS

/REDUCTIONS DOCKET NO.UNIT NAME DATE COMPLETED BY TELE'ONE 50-397 WNP-2 9/1/90 LB Hutchison RL DDAD llPl'0IJRb REAsOH MMES IZW1D EP l~V I T E.%HAP8/14/90, S 0 HA PIPBX Reduced load to permit repair of a leaking malay cover on turbine crossunder steam piping.Uc Olg A+O~Qo Ow~<0 000~@co A~NOTE: THIS IS AN ADDENDUM TO THE AUGUST 1990 REPORT WHICH WAS PREVIOUSLY TRANSMITTED.

0 I l.SU>t iARY WNP-2 returned to service frcm refueling outage.Subsequently, a scheduled outage for testing and one peer reduction occurred.T'YPE F-Forced S-Sched REASON A-Equip Failure 0-Maint or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 5-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT Exhibit F&H Instructions for Preparation Gf Data Entry Sheet Licensee Event Report (LER)File (NUREG-0161)

I~~v