ML17286A346
| ML17286A346 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/31/1990 |
| From: | Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| Shared Package | |
| ML17286A344 | List: |
| References | |
| NUDOCS 9010160287 | |
| Download: ML17286A346 (2) | |
Text
REPCAT PERIOD Au9 19 90
- mcnth, year LNIT SfUTDOl<NS / REDUCTIONS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELE'ONE 50-397 WNP-2 9/1/90 LB Hutchison RL DDAD llPl'0IJRb REAsOH MMES IZW1D EP l~V I
T E
.%HAP8/14/90, S
0 HA PIPBX Reduced load to permit repair of a leaking malay cover on turbine crossunder steam piping.
Uc Olg A+
O~
Qo Ow
~<0 000
~@co A~
NOTE:
THIS IS AN ADDENDUM TO THE AUGUST 1990 REPORT WHICH WAS PREVIOUSLY TRANSMITTED.
0 I
l.
SU>t iARY WNP-2 returned to service frcm refueling outage.
Subsequently, a scheduled outage for testing and one peer reduction occurred.
T'YPE F-Forced S-Sched REASON A-Equip Failure 0-Maint or Test C-Refueling D-Regulatory Restriction E-Operator Training
& License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 5-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM & COMPONENT Exhibit F & H Instructions for Preparation Gf Data Entry Sheet Licensee Event Report (LER) File (NUREG-0161)
I
~
~
v