Forwards LER 97-021-01,IAW 10CFR50.73.Rev Describes Two Addl Conditions Identified During on-going TS Surveillance Procedure Review Project
ML18016A218
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/22/1997
From: Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A219 List:
References
HNP-97-197, NUDOCS 9710280197
Download: ML18016A218 (2)


Text

R EGULATOINFORMATION DISTRIBUTION PEM (RIDE).~ACCESSION NBR:9710280197 DOC.DATE: 97/10/22 NOTARIZED:

NO l$I FACZL:50-400 Shearon Harris Nuclear Power Plant, Unit I, Carolina AUTH.NAME AUTHOR AFFILIATION DONAHUP,;".W.

Carolina Power 6 Light Co.RECIP.KAME RECIPIENT, AFFILIATION Document Control Branch (Document Control.Desk)DOCKET I 05000400 A T 05000400 NOTES:Application for permit renewal'filed.

SUBJECT:

Forwards LER 97-.021-01,IAW 10CFR50.73.Rev describes two addi conditions identified during on-going TS surveillance procedure review project.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR J ENCL J SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.RECIPIENT ID CODE/NAME PD2-1 PD'NTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POOREFW NRC PDR COPIES LTTR ENCL 1 1'1 1 1 1 1 l.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROONEYFV OD N FILE CENTE EGB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FILE 01 LITCO BRYCEFJ H NOAC QUEENERFDS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 R D 0 E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 Caralina Power&Ligbt Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 22 1997 U.S.Nuclear Regulatory Commission ATTN: NR'C Document Control Desk Washington, DC 20555 Serial: HNP-97-197 10CFR50.73

'HEARON HARRIS NUCLEAR POWER PLANT UNIT 1.DOCKET NO.50-400 LICENSE NO..NPF-63.;;LICENSEE EVENT REPORT 97-021-01 Sir or Madam: In accordance with Title 10 to the Code of Federal Regulations, the enclosed revision to Licensee Event Report 97-021 is submitted.

This revision describes two additional conditions identified during the on-going Technical Specification Surveillance Procedure Review Project.Sincerely, MV J.W.D nahue Director of Site Operations yt Harris Plant Enclosure c: Mr.J.B.Brady (HNP.-Senior NRC Resident)..

Mr.L.A.Reyes (NRC Regional Administrator,"Region II)'r.V.L.Rooney (NRC-NRR Pr'oject'Manager) 9710280%97 971022 PDR ADQCK 05000400 8 PDR llfffffffffflflfllfflllljlM!!IIIIII State Road 1134 New Hill NC