Letter Sequence Other |
---|
|
Results
Other: ML17153A285, ML17153A286, ML17156A093, ML17157B367, ML17180A077, ML17187A035, ML17240A332, ML17262A200, ML17269A051, ML17278A775, ML17279A874, ML17284A100, ML17298B174, ML17348B167, ML18002A369
|
MONTHYEARML17153A2852017-05-25025 May 2017 License Renewal Application Project stage: Other ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application Project stage: Other ML17156A0932017-06-20020 June 2017 Receipt and Availability of the License Renewal Application for River Bend Station, Unit 1 Project stage: Other ML17186A1592017-07-10010 July 2017 License Renewal Application - Supplemental Information Needed for Acceptance of Requested Licensing Action, Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 Project stage: Acceptance Review ML17180A0772017-07-27027 July 2017 Correction Letter for the Receipt and Availability of the License Renewal Application for the River Bend Station, Unit 1 Project stage: Other ML17157B3672017-07-31031 July 2017 License Renewal Application Online Reference Portal Project stage: Other ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 Project stage: Meeting ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 Project stage: Meeting ML17187A0352017-08-0707 August 2017 Determination of Acceptability and Sufficiency for Docketing and Proposed Review Schedule Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 (CAC No. MF9747 and MF9778 Project stage: Other ML17180A1362017-08-0909 August 2017 05/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17187A0372017-08-0909 August 2017 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application Project stage: Meeting ML17173A1332017-08-0909 August 2017 FRN River Bend Acceptability for Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene Project stage: Request ML17240A3322017-09-0707 September 2017 License Renewal Application Review Status Letter (CAC No. MF9747 and MF9778) Project stage: Other ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 Project stage: Meeting ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review Project stage: Other ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 Project stage: Other ML17293A6152017-10-19019 October 2017 09/19/2017 Summary of Meting to Describe License Renewal and Allow Members of the Public the Opportunity to Provide Comments Environmental Issues with Us NRC Should Consider During Environmental Review of River Bend Statin License Renewal A Project stage: Approval ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML17348B1672018-01-0404 January 2018 Status Letter - December Project stage: Other ML18002A3692018-01-0808 January 2018 Extension Letter Request Response Project stage: Other ML18233A1822018-08-23023 August 2018 License Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778) Project stage: Acceptance Review 2017-07-27
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML17298B1742017-10-31031 October 2017 Audit Plan for the Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1 License Renewal Application Review ML17284A1002017-10-13013 October 2017 License Renewal Severe Accident Management Alternatives Audit Regarding River Bend Station, Unit 1 ML17278A7752017-10-13013 October 2017 License Renewal Environmental Site Audit Regarding River Bend Station, Unit 1 ML17279A8742017-10-11011 October 2017 Plan for the Scoping and Screening Methodology Regulatory Audit Regarding the License Renewal Application Review ML17269A0512017-10-10010 October 2017 Plan for the Aging Management Program Regulatory Audit Regarding the River Bend Station, Unit 1 License Renewal Application Review ML17262A2002017-09-25025 September 2017 Plan for the Operating Experience Review Regarding the River Bend Station, Unit 1 License Renewal Application Review ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 2023-10-06
[Table view] Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2017
Mr. William F. Maguire Site Vice President River Bend Station, Unit 1 Entergy Operations, Inc.
5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
AUDIT PLAN FOR THE ONSITE AGING MANAGEMENT PROGRAM REGULATORY AUDIT FOR THE RIVER BEND STATION, UNIT 1, LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF9747)
Dear Mr. Maguire:
By letter dated May 25, 2017, (Agency Document Access and Managements (ADAMS) Accession No. ML17153A285) Entergy Operations, Inc. (Entergy) submitted an application for Renewal of Operating License No, NPF-47 for the River Bend Station, Unit 1 (RBS). The staff
of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants."
The staff plans to conduct its onsite Aging Management Program Regulatory audit at the RBS from November 6 through 9, 2017, in accordance with the enclosed regulatory audit plan. If you have any questions, please contact me by telephone at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov.
Sincerely, /RA/ Emmanuel Sayoc, Project Manager License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation
Docket No. 50-458
Enclosure:
Audit Plan
cc w/encl: Listserv
ML17298B174 OFFICE PM:MRPB:DMLR LA:MRPB:DMLR PM: MRPB:DMLR NAME ESayoc YEdmonds BRogers (AWong for) DATE 10/31/2017 10/31/2017 10/31/2017 OFFICE BC MRPB:DMLR PM: MRPB:DMLR NAME WBurton (EKeegan for) ESayoc DATE 10/31/2017 10/31/2017 Audit Plan Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1, License Renewal Application November 6-9, 2017
Division of Materials and License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Enclosure Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1, License Renewal Application
1. Background
By letter dated May 25, 2017, Entergy Operations, Inc. (Entergy), submitted to the U.S. Nuclear Regulatory Commission (NRC or the staff) its application for renewal of Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS). The staff from the Division of Materials and License Renewal will lead an onsite regulatory audit to gain a better understanding of Entergy's
aging management programs (AMPs), aging management review (AMR) items, Time-Limited Aging Analyses (TLAA), and associated bases and documentation as applicable.
- 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (10 CFR), Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants."
Guidance is provided in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants" (SRP-LR), dated December 2010, and NUREG-1801, Rev. 2, "Generic Aging Lessons Learned (GALL) Report," dated December 2010.
- 3. Regulatory Audit Scope The scope of this onsite regulatory audit is to verify, for selected systems, structures and components (SSCs), that the conditions at the plant are bounded by the conditions for which the GALL Report program was evaluated. This will be accomplished by performing plant walk downs to observe material conditions and SSC configurations. The staff will also examine Entergy's program bases documents and related references, as required to support observations made during plant walkdowns, for AMPs, AMR items, and TLAAs, and interview Entergy representatives to obtain additional clarification.
The staff will use risk insights to inform the prioritization of its review activities associated with AMPs, AMR items, and TLAAs. The staff will use risk insights to focus on the breadth and depth of its review when selecting SSCs to be subject to walkdowns for observation of material conditions and SSC configurations. However, the st aff's review is not limited to risk significant systems and components because 10 CFR Part 54 is a deterministic rule and the staff must conclude that there is reasonable assurance that activities will continue to be conducted in accordance with the current licensing basis and the effects of aging will be managed during the period of extended operation for all structures and components within the scope of Part 54. The staff has reviewed the list of risk significant systems and components (from PRA, Revision 5) provided in a presentation to the staff on May 25, 2017. The staff augmented this list with the fire protection and fire water systems because they are typically risk significant when considering external events.
- 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List.
- 5. Team Assignments Areas of Review Assigned Auditors Staff identified SSCs for which the direct observations of material conditions or plant configurations will contribute to the information required for the staff to make a safety
conclusion.
These areas may include:
A uxiliary systems (service wa ter, buried piping, standby service water, and fuel oil systems)
Electrical systems (Station blackout related systems, Environmental Qualification electrical cables, and components)
Allik, Brian - Materials Gavula, Jim
- Mechanical Ngola, Otto
- Electrical Nguyen , Duc - Electrical Sadollah, Mohammad
- Electrical Sayoc, Emmanuel
- Project Management
- 6. Logistics The audit will be conducted onsite at River Bend Station, Unit 1, on November 6-9, 2017.
Entrance and exit briefings will be held at the beginning and end of this audit, respectively.
- 7. Special Requests The staff requests Entergy to provide electronic access to applicant information, as discussed in the Audit Needs List.
The NRC staff requests a suitable facility for the audit team to caucus during the audit and to hold meetings between staff and Entergy personnel.
- 8. Deliverables An audit report should be issued to the Entergy within 90 days from the end of the audit.
Onsite Aging Management Program Regulatory Audit for the River Bend Station, Unit 1, License Renewal Application Audit Needs List
- 1. License Renewal Portal The staff requests electronic access to the applicant's license renewal portal.